CN113385346A - Double-oven spraying production line and process - Google Patents

Double-oven spraying production line and process Download PDF

Info

Publication number
CN113385346A
CN113385346A CN202110604461.XA CN202110604461A CN113385346A CN 113385346 A CN113385346 A CN 113385346A CN 202110604461 A CN202110604461 A CN 202110604461A CN 113385346 A CN113385346 A CN 113385346A
Authority
CN
China
Prior art keywords
double
bin
workpiece
conveyor
vertical dryer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110604461.XA
Other languages
Chinese (zh)
Inventor
林斌
杨显涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Shunde Purete Mechanical Co ltd
Original Assignee
Foshan Shunde Purete Mechanical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Shunde Purete Mechanical Co ltd filed Critical Foshan Shunde Purete Mechanical Co ltd
Priority to CN202110604461.XA priority Critical patent/CN113385346A/en
Publication of CN113385346A publication Critical patent/CN113385346A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
    • B05B16/95Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0406Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
    • B05D3/0413Heating with air

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a double-oven spraying production line and a process, which sequentially comprise a dust remover, a spraying machine, a double-bin vertical drier and a four-bin vertical drier along the production line; the inlet end of the dust remover is connected with a conveyor; a double-speed conveyor is connected between the spraying machine and the double-bin vertical dryer, and a transition conveyor is connected between the double-bin vertical dryer and the four-bin vertical dryer, so that the occupied space of production is reduced, and the operation of the whole paint spraying process is simple; and through the following steps: a. feeding; b. workpiece dust removal: c. reciprocating spraying; d. carrying for the first time; e. second conveying; g. drying in four bins: the workpiece completes the paint drying process in the four-bin vertical dryer, completes the double-oven spraying process, and improves the production efficiency.

Description

Double-oven spraying production line and process
Technical Field
The invention relates to the technical field of household decorative plate spraying, in particular to a double-oven spraying production line and a double-oven spraying process.
Background
Generally, panel furniture is required to be coated with a layer of paint or other coatings on the surface of the panel furniture to protect the product and enhance the aesthetic effect of the product, and in a traditional manual coating production line, the coated paint has long drying time, high requirement on operation skills and higher difficulty of quality control points, so the production efficiency is low.
Disclosure of Invention
The present invention is directed to solving at least one of the problems of the prior art. Therefore, the invention provides a double-oven spraying production line of an embodiment of the first aspect, which sequentially comprises a dust remover, a spraying machine, a double-bin vertical dryer and a four-bin vertical dryer along the production line; the inlet end of the dust remover is connected with a conveyor; a double-speed conveyor is connected between the spraying machine and the double-bin vertical dryer, and a transition conveyor is connected between the double-bin vertical dryer and the four-bin vertical dryer.
According to some embodiments of the invention, a first volatilization flat bin and a first hot air drying bin are arranged in the double-bin vertical dryer, and the first volatilization flat bin are independent.
According to some embodiments of the invention, a second flat evaporation bin, a second hot air drying bin, a third hot air drying bin and a cooling bin which are independent from each other are arranged in the four-bin vertical dryer.
According to a second aspect of the invention, the double-oven spraying process comprises the following steps:
a. feeding;
b. workpiece dust removal: the workpiece is sent into the dust remover, and the dust remover removes dust on the upper surface and four sides of the workpiece and removes static electricity on the surface of the workpiece;
c. reciprocating spraying: the workpiece after dust removal is sent into the spraying machine, and the spraying machine carries out reciprocating spraying operation on the upper surface and four sides of the workpiece;
d. first conveying: after the spraying of the workpiece is finished, the workpiece enters the double-speed conveyor at a constant speed, and the double-speed conveyor speeds up to send the workpiece into the double-bin vertical dryer;
e. and (3) second conveying: the transition conveyor conveys the workpieces in the double-bin vertical dryer into the four-bin vertical dryer;
f. drying in four bins: and (3) finishing the paint drying process of the workpiece in the four-bin vertical dryer, and finishing the spraying process of the double oven.
According to some embodiments of the invention, the method further comprises a step g, wherein the step g is located between the step d and the step e:
g. and conveying the workpiece into a double-bin vertical dryer, leveling the inside of the first volatilization flow leveling bin, and performing primary drying in the first volatilization flow leveling bin.
According to some embodiments of the invention, step f comprises:
f. leveling the workpiece in the first volatilization leveling bin;
f. the workpiece is respectively dried in the second hot air drying bin and the third hot air drying bin;
f. the workpiece is cooled in the cooling bin.
According to some embodiments of the present invention, after the conveyor is full of workpieces in step a, the conveyor stops rotating, and waits for the conveyor to rotate again after the subsequent equipment finishes processing, so as to receive the loading.
According to some embodiments of the invention, the workpieces enter the double-speed conveyor at a constant speed after finishing spraying in the step d, when all the workpieces are conveyed to the double-speed conveyor, the double-speed conveyor speeds up to convey the workpieces into the double-bin vertical dryer, the speed of the double-speed conveyor when the speed of the double-speed conveyor is increased is set to be four to five times of the whole linear speed, and after the conveying is finished, the double-speed conveyor slows down to be consistent with the whole linear working speed, and receives the next workpiece again.
The invention has at least the following beneficial effects:
the production line adopts the above design, reduces the occupied space of production, makes the whole paint spraying process operation simple, and improves production efficiency.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic view of a production line according to an embodiment of the present invention;
FIG. 2 is a schematic view of a dual bin dryer according to an embodiment of the present invention;
fig. 3 is a schematic view of a four-bin dryer according to an embodiment of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
Referring to fig. 1 to 3, a dual-oven coating line includes a dust remover 100, a coating machine 200, a dual-bin vertical dryer 300, and a four-bin vertical dryer 400 in sequence along the line; the inlet end of the dust remover 100 is connected with a conveyor 500; a double-speed conveyor 600 is connected between the coating machine 200 and the double-bin vertical dryer 300, and a transition conveyor 700 is connected between the double-bin vertical dryer 300 and the four-bin vertical dryer 400.
The double-bin vertical dryer 300 is internally provided with a first volatilization flow leveling bin 310 and a first hot air drying bin 320, and the first volatilization flow leveling bin 310 and the first hot air drying bin 320 are mutually independent.
The vertical four-bin dryer 400 is provided with a second flat volatilization bin 410, a second hot air drying bin 420, a third hot air drying bin 430 and a cooling bin 440 which are independent of each other.
Referring to fig. 1, in a first embodiment:
a double-oven spraying process comprises the following steps:
a. feeding;
b. workpiece dust removal: the workpiece is sent into a dust remover 100, the dust remover 100 removes dust on the upper surface and four sides of the workpiece, and simultaneously removes static electricity on the surface of the workpiece;
c. reciprocating spraying: the workpiece after the dust removal work is sent into a spraying machine 200, and the spraying machine 200 performs reciprocating spraying operation on the upper surface and four sides of the workpiece;
d. first conveying: after the spraying of the workpiece is finished, the workpiece enters a double-speed conveyor 600 at a constant speed, and the double-speed conveyor 600 speeds up to send the workpiece into a double-bin vertical dryer 300;
g. leveling: the workpiece is fed into the double-bin vertical dryer 300, leveled inside the first volatilization leveling bin 310, and subjected to preliminary drying in the first hot air drying bin 320.
e. And (3) second conveying: the transition conveyor 700 feeds the work in the double-bin vertical dryer 300 into the four-bin vertical dryer 400;
f. drying in four bins: the workpiece completes the paint drying process in the four-bin vertical dryer 400, completing the double oven spray coating process.
Referring to fig. 1, embodiment two:
a double-oven spraying process comprises the following steps:
a. feeding;
b. workpiece dust removal: the workpiece is sent into a dust remover 100, the dust remover 100 removes dust on the upper surface and four sides of the workpiece, and simultaneously removes static electricity on the surface of the workpiece;
c. reciprocating spraying: the workpiece after the dust removal work is sent into a spraying machine 200, and the spraying machine 200 performs reciprocating spraying operation on the upper surface and four sides of the workpiece;
d. first conveying: after the spraying of the workpiece is finished, the workpiece enters a double-speed conveyor 600 at a constant speed, and the double-speed conveyor 600 speeds up to send the workpiece into a double-bin vertical dryer 300;
e. and (3) second conveying: the transition conveyor 700 feeds the work in the double-bin vertical dryer 300 into the four-bin vertical dryer 400;
f. drying in four bins:
f1. the workpiece is leveled inside the first volatilization leveling bin 310;
f2. the workpiece is respectively dried in a second hot air drying bin 420 and a third hot air drying bin 430;
f2. the workpiece is cooled in a cooling chamber 440.
In the first and second embodiments, the length of the conveyor 500 is designed to be 2 meters, the circumference of the belt is 4 meters, and the length of the workpiece is 4 meters; after the conveyor 500 is full of workpieces in the step a, the conveyor 500 stops rotating, and the conveyor 500 rotates again after the subsequent equipment finishes processing to receive feeding.
In the first and second embodiments, the workpieces enter the double-speed conveyor 600 at a constant speed after being sprayed in step d, when all the workpieces are conveyed to the double-speed conveyor 600, the double-speed conveyor 600 is accelerated to convey the workpieces into the double-bin vertical dryer 300, the speed of the double-speed conveyor 600 is set to be four to five times of the whole linear speed, and after the conveying is completed, the double-speed conveyor 600 is decelerated to be consistent with the whole linear working speed, and the next workpiece is received again.
The production line adopts the above design, reduces the occupied space of production, makes the whole paint spraying process operation simple, and improves production efficiency.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.

Claims (8)

1. A double-oven spraying production line is characterized by comprising a dust remover (100), a spraying machine (200), a double-bin vertical dryer (300) and a four-bin vertical dryer (400) in sequence along the production line; the inlet end of the dust remover (100) is connected with a conveyer (500); a double-speed conveyor (600) is connected between the coating machine (200) and the double-bin vertical dryer (300), and a transition conveyor (700) is connected between the double-bin vertical dryer (300) and the four-bin vertical dryer (400).
2. The double-oven spraying production line of claim 1, wherein a first volatilization leveling bin (310) and a first hot air drying bin (320) are arranged in the double-bin vertical dryer (300), and the first volatilization leveling bin (310) are independent from each other.
3. The double-oven coating production line of claim 1, wherein a second evaporation leveling bin (410), a second hot air drying bin (420), a third hot air drying bin (430) and a cooling bin (440) which are independent of each other are arranged in the four-bin vertical dryer (400).
4. A double oven coating process, characterized in that a double oven coating line according to any one of claims 1 to 3 is used, comprising the following steps:
a. feeding;
b. workpiece dust removal: the workpiece is sent into the dust remover (100), the dust remover (100) removes dust on the upper surface and four sides of the workpiece, and static electricity on the surface of the workpiece is removed;
c. reciprocating spraying: the workpiece after dust removal is sent into the spraying machine (200), and the spraying machine (200) performs reciprocating spraying operation on the upper surface and four sides of the workpiece;
d. first conveying: after the spraying of the workpiece is finished, the workpiece enters the double-speed conveyor (600) at a constant speed, and the double-speed conveyor (600) speeds up to send the workpiece into the double-bin vertical dryer (300);
e. and (3) second conveying: the transition conveyor (700) conveys the workpieces in the double-bin vertical dryer (300) into the four-bin vertical dryer (400);
f. drying in four bins: and the workpiece completes the paint drying process in the four-bin vertical dryer (400) to complete the double-oven spraying process.
5. The dual oven spray process of claim 4, further comprising step g, wherein step g is located between step d and step e:
g. and conveying the workpiece into a double-bin vertical dryer (300), leveling the inside of the first volatilization leveling bin (310), and performing primary drying in the first volatilization leveling bin (310).
6. The dual oven spray process of claim 4, wherein step f comprises:
f1. the workpiece is leveled in the first volatilization leveling cabin (310);
f2. the workpiece is respectively dried in a second hot air drying bin (420) and a third hot air drying bin (430);
f2. the workpiece is cooled in a cooling chamber (440).
7. The dual-oven coating process of claim 4, wherein in the step a, after the conveyor (500) is full of workpieces, the rotation of the conveyor (500) is stopped, and the conveyor (500) is rotated again to receive the loading after the subsequent equipment is finished.
8. The double-oven spraying process according to claim 4, wherein in the step d, the workpieces enter the double-speed conveyor (600) at a constant speed after being sprayed, when all the workpieces are conveyed to the double-speed conveyor, the double-speed conveyor (600) accelerates to convey the workpieces into the double-bin vertical dryer (300), the speed of the double-speed conveyor (600) is set to be four to five times of the whole linear speed when the speed is increased, and after the conveying is finished, the double-speed conveyor (600) decelerates to be consistent with the whole linear working speed, and receives the next workpiece again.
CN202110604461.XA 2021-05-31 2021-05-31 Double-oven spraying production line and process Pending CN113385346A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110604461.XA CN113385346A (en) 2021-05-31 2021-05-31 Double-oven spraying production line and process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110604461.XA CN113385346A (en) 2021-05-31 2021-05-31 Double-oven spraying production line and process

Publications (1)

Publication Number Publication Date
CN113385346A true CN113385346A (en) 2021-09-14

Family

ID=77619707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110604461.XA Pending CN113385346A (en) 2021-05-31 2021-05-31 Double-oven spraying production line and process

Country Status (1)

Country Link
CN (1) CN113385346A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114950818A (en) * 2022-05-11 2022-08-30 湖北豪尔特智能装备有限公司 UV spraying drying production line and process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105032661A (en) * 2015-08-21 2015-11-11 蚌埠液力机械有限公司 Automatic spraying production line of hidden film coating agents and coating method for hydraulic torque converter
CN108080165A (en) * 2017-12-13 2018-05-29 东莞市辉煌龙腾机械有限公司 A kind of automatic Spray-Painting and its lacquer spraying technique
CN209476555U (en) * 2018-12-11 2019-10-11 中联西北工程设计研究院有限公司 A kind of double-speed chain conveying paint line
CN110715581A (en) * 2019-10-24 2020-01-21 湖南军成科技有限公司 Big bullet production line
CN110841855A (en) * 2019-12-11 2020-02-28 东莞华力机械有限公司 Environment-friendly paint spraying production line
CN210135735U (en) * 2019-04-12 2020-03-10 苏州诺尔沃智能设备有限公司 Three-dimensional drying cabinet wind path system
CN211099806U (en) * 2019-09-12 2020-07-28 吉祥新材料股份有限公司 Two roast production lines of coating of panel
CN112354760A (en) * 2020-10-30 2021-02-12 广东创智智能装备有限公司 Intelligent spraying production line and spraying process for automobile wheel rim cover

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105032661A (en) * 2015-08-21 2015-11-11 蚌埠液力机械有限公司 Automatic spraying production line of hidden film coating agents and coating method for hydraulic torque converter
CN108080165A (en) * 2017-12-13 2018-05-29 东莞市辉煌龙腾机械有限公司 A kind of automatic Spray-Painting and its lacquer spraying technique
CN209476555U (en) * 2018-12-11 2019-10-11 中联西北工程设计研究院有限公司 A kind of double-speed chain conveying paint line
CN210135735U (en) * 2019-04-12 2020-03-10 苏州诺尔沃智能设备有限公司 Three-dimensional drying cabinet wind path system
CN211099806U (en) * 2019-09-12 2020-07-28 吉祥新材料股份有限公司 Two roast production lines of coating of panel
CN110715581A (en) * 2019-10-24 2020-01-21 湖南军成科技有限公司 Big bullet production line
CN110841855A (en) * 2019-12-11 2020-02-28 东莞华力机械有限公司 Environment-friendly paint spraying production line
CN112354760A (en) * 2020-10-30 2021-02-12 广东创智智能装备有限公司 Intelligent spraying production line and spraying process for automobile wheel rim cover

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王恺主编: "《木材工业实用大全 涂饰卷》", 30 September 1998, 中国林业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114950818A (en) * 2022-05-11 2022-08-30 湖北豪尔特智能装备有限公司 UV spraying drying production line and process

Similar Documents

Publication Publication Date Title
CN102847630A (en) Spraying production line
KR100719763B1 (en) In-line spray system
CN105983503A (en) Full-automatic plastic vacuum film-coating painting line and film coating method
CN113385346A (en) Double-oven spraying production line and process
CN106155028A (en) The control system of flexible paint line and control method
CN203200516U (en) Leather coating machine capable of achieving drying
CN110721887B (en) Vacuum spraying method for UV primer of wooden product and UV primer-painted wooden product
CN105057150A (en) Special integrated production device for furniture parts
CN202983998U (en) Pretreatment line for steel plates and section bars
CN206464141U (en) Low-cost and high-performance automatic spraying line
US2316959A (en) Apparatus for coating articles
CN109107809A (en) A kind of compressor piston surface Teflon spray-painting production line
CN207358886U (en) Inside and outside wall peening system
CN207901839U (en) A kind of water transfer production line
CN111356567A (en) Installation for producing coated plastic components and method therefor
CN111842081A (en) Vacuum spraying method for UV finish paint of wooden products and UV finish paint vacuum painted wooden products
CN212791591U (en) Aluminum plate double-side spraying machine
CN105289880A (en) Automatic batch spraying method for small-size parts
CN107744903A (en) Dacroment application, drying integrated device
CN107775995A (en) A kind of carton flanging glue spreading apparatus and its process
CN214262492U (en) Multi-station spraying system
CN106179857B (en) It is a kind of suitable for small batch, the automatic coating system and method for multi items components
CN114950818A (en) UV spraying drying production line and process
CN110465439B (en) Full-automatic environment-friendly scraping oil mixing production line
CN211412454U (en) Bilateral spraying and drying spraying line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 528308 2nd floor, No.5, Industrial Avenue, intensive industrial zone, Xiyong village committee, Lunjiao street, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Hanqiu Intelligent Equipment Co.,Ltd.

Address before: 528308 2nd floor, No.5, Industrial Avenue, intensive industrial zone, Xiyong village committee, Lunjiao street, Shunde District, Foshan City, Guangdong Province

Applicant before: FOSHAN SHUNDE PURETE MECHANICAL CO.,LTD.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20210914

RJ01 Rejection of invention patent application after publication