Prior art keywords
rack
frame
switch board
guide rail
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110731125.1A
Other languages
Chinese (zh)
Other versions
CN113346388A (en
Inventor
郝文杰
于金
李毅
李岩
马波
段东林
马功雷
王娇
刘福林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202110731125.1A priority Critical patent/CN113346388B/en
Publication of CN113346388A publication Critical patent/CN113346388A/en
Application granted granted Critical
Publication of CN113346388B publication Critical patent/CN113346388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/52Mobile units, e.g. for work sites
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Patch Boards (AREA)

Abstract

The invention discloses a power distribution cabinet translation device which comprises a rack, a hydraulic cylinder and a suspension rod, wherein the rack is a three-dimensional frame mechanism, moving wheels are arranged at the bottom of the rack, the suspension rod is connected in the rack in a sliding manner, the hydraulic cylinder is positioned at the upper end of the rack, a piston rod of the hydraulic cylinder is connected with the suspension rod through a pull rope, and a positioning frame and an anti-shaking mechanism are connected to the side wall of the rack. According to the invention, the power distribution cabinet is hoisted by the hoisting rod, the periphery of the power distribution cabinet is fixed with the anti-shaking mechanism by the positioning frame, the stability of the power distribution cabinet in the moving process can be ensured, the hoisting of the power distribution cabinet is realized by the device, the moving convenience is increased, the working efficiency is improved, the moving is safe and convenient, the labor force is greatly saved, the damage in the moving process is avoided, and the use is safe and reliable.

Description

Switch board translation device
Technical Field
The invention relates to the technical field of power distribution cabinet movement, in particular to a power distribution cabinet translation device.
Background
The switch board has characteristics bulky, that weight is big, and part electric original paper requires higher to transportation, installation in the switch board, can not bump, prevents to damage. The installation of the distribution panel cabinet is an important work in the construction of electric power engineering.
At present, a rolling bar is generally adopted for the on-site translation of the installation of a disc cabinet, when a power distribution cabinet is installed, the rolling bar is used as a roller way and matched with a crowbar, the power distribution cabinet is easy to slip off in the replacement process of the rolling bar, and the risk of crushing injury is high; and adopt the crowbar to remove the switch board, not only cause the switch board casing to warp easily, inefficiency moreover. Therefore, the problem that the moving of the current power distribution cabinet is low in efficiency, high in risk and high in labor intensity.
Disclosure of Invention
The invention aims at the defects in the prior art, and provides a power distribution cabinet translation device, which is characterized in that a power distribution cabinet is hoisted through a hoisting rod, the periphery of the power distribution cabinet is fixed with an anti-shaking mechanism through a positioning frame, the stability of the power distribution cabinet in the moving process can be ensured, the power distribution cabinet is hoisted through the device, the moving convenience is increased, the working efficiency is improved, the movement is safe and convenient, the labor force is greatly saved, the damage in the moving process is avoided, and the use is safe and reliable.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a switch board translation device, includes frame, pneumatic cylinder and jib, the frame is three-dimensional frame mechanism, and the bottom of frame is equipped with removes the wheel, and it has the jib to slide in the frame, and the pneumatic cylinder is located the upper end of frame, and the piston rod of pneumatic cylinder passes through the stay cord with the jib to be connected, even there are locating rack and anti-shake mechanism on the lateral wall of frame.
Preferably, the upper end of jib is equipped with the rings of being connected with the stay cord, and the lower extreme of jib is equipped with the arm-tie, be equipped with the trompil on the arm-tie, the vertical first guide bar that is equipped with on the lateral wall of frame, the both ends of jib are equipped with the slide opening with first guide bar complex.
Preferably, the upper end of the rack is provided with a cross beam, one side of the cross beam is connected with a first guide rail, the first guide rail is matched with a first sliding block, the two ends of the first guide rail are respectively provided with a first fixed pulley and a second fixed pulley, one end of the pull rope is connected with the hanging rod, the other end of the pull rope is connected with the first sliding block by bypassing the first fixed pulley, the first sliding block is connected with a steering rope, and the steering rope is connected with the hydraulic cylinder by bypassing the second fixed pulley.
Preferably, a second guide rail is arranged on one side of the first guide rail in parallel, a second sliding block is arranged on the second guide rail, and the second sliding block is respectively connected with the steering rope and a piston rod of the hydraulic cylinder.
Preferably, a handle is connected to the side wall of the frame.
Preferably, the locating rack includes baffle and slide bar, the both ends of baffle even have the slide bar, be equipped with the sliding sleeve on the lateral wall of slide bar, be equipped with on the lateral wall of frame with sliding sleeve sliding fit's second guide bar, be equipped with the locking bolt on the lateral wall of sliding sleeve.
Preferably, the number of the positioning frames is two, and the two positioning frames are positioned on two sides of the hanging rod.
Preferably, a U-shaped frame is arranged on the side wall of the sliding rod, the end part of the baffle is matched with the U-shaped frame, the baffle abuts against one side of the sliding rod, and a positioning bolt for fixing the baffle is arranged on the U-shaped frame.
Preferably, the anti-shaking mechanism comprises a lead screw, a fixed seat is arranged on the side wall of the rack, the lead screw is in threaded fit with the fixed seat, a handle is arranged at one end of the lead screw, and a top plate is arranged at the other end of the lead screw.
Preferably, the frame includes connection frame and supporting leg, the edge of connection frame all is equipped with the supporting leg, be equipped with the stiffener between supporting leg and the connection frame, remove the lower extreme that the wheel is located the supporting leg, remove the wheel and adopt the universal wheel.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the power distribution cabinet is hoisted by the hoisting rod, the periphery of the power distribution cabinet is fixed with the anti-shaking mechanism by the positioning frame, the stability of the power distribution cabinet in the moving process can be ensured, the hoisting of the power distribution cabinet is realized by the device, the moving convenience is increased, the working efficiency is improved, the moving is safe and convenient, the labor force is greatly saved, the damage in the moving process is avoided, and the use is safe and reliable.
2. Two ends of the suspension rod are matched with the first guide rod, so that the suspension rod is prevented from shaking when moving up and down, and the stability is improved.
3. The invention reduces the whole length through the steering of the fixed pulley, increases the stroke under the condition of a certain length of the frame, improves the moving range of the suspender, has more compact structure, and increases the stability in the pulling process through the matching of the first guide rail and the first slide block.
4. The second guide rail and the second sliding block are arranged, so that the linearity of pulling of the hydraulic cylinder is guaranteed, the tilting tension between the steering rope and the hydraulic cylinder is avoided, the hydraulic cylinder is prevented from being damaged by the tilting tension, the service life of the hydraulic cylinder is prolonged, and the structural stability is further improved.
5. The positioning frame and the anti-shaking mechanism can be adjusted, power distribution cabinets with different sizes can be fixed, and the universality is improved.
6. The stop lever and the slide bar are detachably connected, so that the matching convenience of the rack and the power distribution cabinet can be improved, the rack can be conveniently moved above the power distribution cabinet, and the positioning frame is convenient to disassemble and assemble and convenient to use.
7. The integral structure of the invention adopts a frame type, has simple structure, is convenient to manufacture, reduces the gravity, is beneficial to moving and improves the use convenience.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a top view of the present invention;
FIG. 3 is a front view of the present invention;
FIG. 4 is a left side view of the present invention;
FIG. 5 is a schematic view of a boom construction;
FIG. 6 is a schematic structural view of the positioning frame;
FIG. 7 is a front view of the spacer;
FIG. 8 is a schematic structural view of a U-shaped frame;
fig. 9 is a schematic structural view of the anti-rattle mechanism.
In the figure: 1-a frame; 101-a handle; 102-a moving wheel; 103-a cross beam; 104-a first fixed pulley; 105-a first slider; 106 — a first guide rail; 107-a second fixed pulley; 108-a second guide rail; 109-a second slider; 110-a first guide bar; 111-a second guide bar; 112-a fixed seat; 113-a connecting frame; 114-a reinforcing rod; 115-support legs; 2-a hydraulic cylinder; 3, hanging a rod; 301-a lifting ring; 302-pulling a plate; 303-broaching holes; 304-a slide hole; 4-a positioning frame; 401-a baffle; 402-a slide bar; 403-a sliding sleeve; 404-a locking bolt; 405-a positioning bolt; 406-U-shaped frame; 5-anti-shaking mechanism; 501-top plate; 502-lead screw; 503-a handle; 6-pulling a rope; 601-steering rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in figure 1, a power distribution cabinet translation device comprises a frame 1, a hydraulic cylinder 2 and a suspender 3, wherein the frame 1 is a three-dimensional frame mechanism, the frame 1 comprises a connecting frame 113 and supporting legs 115, the four corners of the connecting frame 113 are respectively provided with the supporting legs 115, the length of each supporting leg 115 is larger than the height of a power distribution cabinet, a reinforcing rod 114 is arranged between each supporting leg 115 and the connecting frame 113, the lower ends of the supporting legs 115 are provided with moving wheels 102, the moving wheels 102 adopt universal wheels, the suspender 3 is connected in the frame 1 in a sliding manner, the hydraulic cylinder 2 is positioned at the upper end of the frame 1, a piston rod of the hydraulic cylinder 2 is connected with the suspender 3 through a stay cord 6, the hydraulic cylinder 2 can drive the suspender 3 to move up and down, thereby realize even having locating rack 4 and preventing shaking mechanism 5 on the lateral wall of frame 1 to the handling of switch board, can fix a position fixedly around the switch board, prevent to rock at removal in-process switch board. The height that plays of switch board can be controlled through the stroke of pneumatic cylinder 2, can hoist the switch board of co-altitude not, then can realize the removal to the switch board through removing frame 1, even have handle 503101 on the lateral wall of frame 1, increase the convenience of removal.
As shown in fig. 5, be equipped with rings 301 of being connected with stay cord 6 in the upper end of jib 3, it is convenient to connect fixedly, the lower extreme of jib 3 is equipped with arm-tie 302, be equipped with a plurality of trompils 303 on the arm-tie 302, be connected between the upper end of switch board and the arm-tie 302 through the rope, it can conveniently fix not unidimensional switch board to set up a plurality of trompils 303, vertically on the lateral wall of frame 1 be equipped with first guide bar 110, the both ends of jib 3 are equipped with and first guide bar 110 complex slide opening 304, thereby the stability that jib 3 reciprocated has been guaranteed, avoid rocking.
As shown in fig. 2-4, in order to increase the stroke of the boom 3, a cross beam 103 is arranged at the upper end of the frame 1, one side of the cross beam 103 is connected with a first guide rail 106, a first slider 105 is matched on the first guide rail 106, a first fixed pulley 104 and a second fixed pulley 107 are respectively arranged at two ends of the first guide rail 106, one end of a pull rope 6 is connected with the boom 3, the other end of the pull rope 6 is connected with the first slider 105 by bypassing the first fixed pulley 104, a steering rope 601 is connected on the first slider 105, the steering rope 601 is connected with the hydraulic cylinder 2 by bypassing the second fixed pulley 107, the overall length is reduced by the steering of the fixed pulleys, the stroke is increased under the condition that the length of the frame 1 is fixed, the moving range of the boom 3 is increased, the structure is more compact, and in addition, the stability in the pulling process is increased by the matching of the first guide rail 106 and the first slider 105.
In order to further improve the stability, a second guide rail 108 is arranged in parallel on one side of the first guide rail 106, a second slider 109 is arranged on the second guide rail 108, the second slider 109 is respectively connected with the steering rope 601 and the piston rod of the hydraulic cylinder 2, the linearity of the operation of the hydraulic cylinder 2 is further improved by arranging the second guide rail 108 and the second slider 109, and the stability during pulling is improved.
As shown in fig. 6, the switch board is preceding, the back both sides are fixed through locating rack 4, two locating racks 4 are located the both sides of jib 3, prevent to remove in-process switch board swing back and forth, locating rack 4 includes baffle 401 and slide bar 402, there is slide bar 402 at the both ends of baffle 401, be equipped with sliding sleeve 403 on the lateral wall of slide bar 402, be equipped with on the lateral wall of frame 1 with sliding sleeve 403 sliding fit's second guide bar 111, be equipped with locking bolt 404 on the lateral wall of sliding sleeve 403, sliding locating rack 4, baffle 401 contacts with the lateral wall of switch board, spacing to the switch board, then rotate locking bolt 404 and fix locating rack 4 locking.
As shown in fig. 7-8, in order to facilitate the access of the power distribution cabinet, a U-shaped frame 406 is disposed on a side wall of the sliding rod 402, a tip of the baffle 401 is matched with the U-shaped frame 406, the baffle 401 abuts against one side of the sliding rod 402, a positioning bolt 405 for fixing the baffle 401 is disposed on the U-shaped frame 406, the baffle 401 is taken down, the power distribution cabinet can be abducted, the rack 1 is convenient to be matched with the power distribution cabinet, two ends of the baffle 401 are limited by the sliding rod 402, two sides of the baffle 401 are fixed by the U-shaped frame 406 and the positioning bolt 405 respectively, the baffle 401 cannot fall off in use, and the power distribution cabinet is convenient to disassemble and assemble.
The left and right both sides of switch board are fixed through preventing shaking mechanism 5, as shown in fig. 9, prevent shaking mechanism 5 and include lead screw 502, are equipped with fixing base 112 on the lateral wall of frame 1, lead screw 502 and fixing base 112 screw-thread fit, and the one end of lead screw 502 is equipped with handle 503101, and the other end of lead screw 502 is equipped with roof 501, pushes up on the lateral wall of switch board through roof 501, fixes the switch board, prevents to control and shakes.
The specific using method comprises the following steps:
opening a positioning bolt 405, taking down a baffle 401, moving a rack 1, moving the rack 1 to the position above a power distribution cabinet needing translation, enabling a suspender 3 to be positioned right above the power distribution cabinet, connecting a lifting lug at the upper end of the power distribution cabinet with a pulling plate 302 through a rope, then starting a hydraulic cylinder 2, pulling a second slider 109 through the hydraulic cylinder 2, pulling a first slider 105 through a steering rope 601 by the first slider 105, pulling the suspender 3 through a pulling rope 6 by the first slider 105, enabling the suspender 3 to slide upwards along a first guide rod 110, lifting the power distribution cabinet upwards to lift the power distribution cabinet off the ground, matching the baffle 401 with a U-shaped frame 406, fixing the baffle 401 through the positioning bolt 405, sliding positioning frames 4 at two sides of the power distribution cabinet to enable the baffle 401 of the positioning frame 4 to be in contact with the power distribution cabinet, then rotating a locking bolt 404 to fix the positioning frame 4 to realize the fixing of the front side and the rear side of the power distribution cabinet, rotating a lead screw 502 to enable a top plate 501 to support the side wall of the power distribution cabinet, fix the left and right sides of switch board, draw frame 1 through handle 503101 and remove, frame 1 is hanging the switch board and is removed the assigned position after, loosens lead screw 502 and locking bolt 404, starts hydraulic cylinder 2, puts down the switch board slowly, then loosens between switch board and the jib 3, opens baffle 401, with frame 1 push away from the top of switch board can.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (5)

1. The utility model provides a switch board translation device which characterized in that: the hydraulic steering device comprises a rack, a hydraulic cylinder and a suspension rod, wherein the rack is a three-dimensional frame mechanism, moving wheels are arranged at the bottom of the rack, the suspension rod is connected in the rack in a sliding mode, the hydraulic cylinder is located at the upper end of the rack, a piston rod of the hydraulic cylinder is connected with the suspension rod through a pull rope, a positioning frame and an anti-shaking mechanism are connected to the side wall of the rack, a cross beam is arranged at the upper end of the rack, a first guide rail is connected to one side of the cross beam, a first sliding block is matched with the first guide rail, a first fixed pulley and a second fixed pulley are arranged at two ends of the first guide rail respectively, one end of the pull rope is connected with the suspension rod, the other end of the pull rope bypasses the first fixed pulley and is connected with the first sliding block, a steering rope is connected with the first sliding block and bypasses the second fixed pulley and is connected with the hydraulic cylinder, a second guide rail is arranged on one side of the first guide rail in parallel, a second sliding block is arranged on the second guide rail and is respectively connected with the steering rope, The piston rod of pneumatic cylinder is connected, the locating rack includes baffle and slide bar, even there is the slide bar at the both ends of baffle, be equipped with the sliding sleeve on the lateral wall of slide bar, be equipped with on the lateral wall of frame with sliding sleeve sliding fit's second guide bar, be equipped with locking bolt on the lateral wall of sliding sleeve, the quantity of locating rack is two, and two locating racks are located the both sides of jib, be equipped with U type frame on the lateral wall of slide bar, the tip and the cooperation of U type frame of baffle, the baffle top is equipped with fixed stop's positioning bolt on one side of slide bar on the U type frame.
2. The switch board translation device according to claim 1, characterized in that: the upper end of jib is equipped with the rings of being connected with the stay cord, and the lower extreme of jib is equipped with the arm-tie, be equipped with the trompil on the arm-tie, vertically on the lateral wall of frame be equipped with first guide bar, the both ends of jib are equipped with the sliding hole with first guide bar complex.
3. The switch board translation device according to claim 1, characterized in that: the side wall of the frame is connected with a handle.
4. The switch board translation device according to claim 1, characterized in that: the anti-shaking mechanism comprises a lead screw, a fixed seat is arranged on the side wall of the rack, the lead screw is in threaded fit with the fixed seat, a handle is arranged at one end of the lead screw, and a top plate is arranged at the other end of the lead screw.
5. The switch board translation device according to claim 1, characterized in that: the frame includes splice box and supporting leg, the edge of splice box all is equipped with the supporting leg, be equipped with the stiffener between supporting leg and the splice box, remove the lower extreme that the wheel is located the supporting leg, remove the wheel and adopt the universal wheel.
CN202110731125.1A 2021-06-29 2021-06-29 Switch board translation device Active CN113346388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110731125.1A CN113346388B (en) 2021-06-29 2021-06-29 Switch board translation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110731125.1A CN113346388B (en) 2021-06-29 2021-06-29 Switch board translation device

Publications (2)

Publication Number Publication Date
CN113346388A CN113346388A (en) 2021-09-03
CN113346388B true CN113346388B (en) 2022-07-08

Family

ID=77481606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110731125.1A Active CN113346388B (en) 2021-06-29 2021-06-29 Switch board translation device

Country Status (1)

Country Link
CN (1) CN113346388B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108173143A (en) * 2018-03-08 2018-06-15 江苏森鑫木业有限公司 A kind of architectural electric cabinet with shock-absorbing function
CN207910276U (en) * 2018-03-16 2018-09-25 江苏森鑫木业有限公司 A kind of building block processing power distribution cabinet
CN208200186U (en) * 2018-04-19 2018-12-07 镇江普森电气有限公司 Large-scale power distribution cabinet transfer device
CN209565654U (en) * 2018-10-30 2019-11-01 江苏沙里金金属有限公司 It is a kind of to be convenient for mobile automatic arc welding
CN110092312B (en) * 2019-05-28 2024-06-18 国家电网有限公司 Movable lifting frame for installation of power distribution cabinet
CN213224911U (en) * 2020-08-26 2021-05-18 湖北欧本钢结构有限公司 Butt welding auxiliary device for large-scale steel structure

Also Published As

Publication number Publication date
CN113346388A (en) 2021-09-03

Similar Documents

Publication Publication Date Title
CN210163041U (en) Lifting device of gate type plate shearing machine
CN113346388B (en) Switch board translation device
CN209853572U (en) Boiler installation overhead hoist
CN217264258U (en) Bagged concrete lifting frame device
CN213889977U (en) Tool rack for workpieces to be taken at equal height
CN210340124U (en) Scroll handling equipment of convenient centre gripping
CN210973656U (en) Big data machine case equipment conveyer
CN211565701U (en) Circuit breaker floor truck
CN212292565U (en) Balance crane with electric lifting mechanism
CN211393590U (en) Lifting equipment for maintaining mechanical equipment
CN212695475U (en) Fast assembly's switch board
CN214879601U (en) Chain block jacking device
CN213894993U (en) Lifting appliance vehicle device for replacing injection rod of high-pressure casting machine
CN221001905U (en) Anti-overturning lifting hanging basket for building construction
CN211594917U (en) Small-size hoisting and transporting equipment for production workshop
CN217627163U (en) Vertical rolling mill main shaft lifting clamping device
CN221027189U (en) Lifting hook device for lifting equipment
CN213651627U (en) Handling device is used in die carrier production
CN217972414U (en) Material conveyor for electric power construction
CN217672136U (en) Universal engine bracket easy to mount
CN216190886U (en) A mobile device for converter
CN220972320U (en) General type stand of high accuracy equipment
CN211644431U (en) Crawler crane
CN114152828B (en) Flexible direct-current transmission converter valve submodule power overhaul test device and test method
CN221191379U (en) Electric hoist crane with protective structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant