Prior art keywords
stress
rock
excavation
surrounding rock
thermal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110623136.8A
Other languages
Chinese (zh)
Other versions
CN113326551A (en
Inventor
鲁功达
陶剑
石安池
周家文
杨兴国
李洪涛
范刚
李海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN202110623136.8A priority Critical patent/CN113326551B/en
Publication of CN113326551A publication Critical patent/CN113326551A/en
Application granted granted Critical
Publication of CN113326551B publication Critical patent/CN113326551B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/08Thermal analysis or thermal optimisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a surrounding rock excavation damage analysis method under a thermal coupling condition and application thereof, wherein the analysis method comprises the following steps: and (3) establishing an excavation blasting-unloading-cooling whole-process model of the tunnel, and solving a process control equation comprising superposition coupling of thermal stress, dynamic stress and ground stress, so as to obtain rock thermal-force coupling response of the model under different geological conditions and excavation modes. The analysis method of the invention can determine the distribution range of the excavated damage area, can reveal the formation stage and the formation reason of the rock mass damage, has the advantages of high calculation efficiency, short required time, low manpower and material resource consumption and the like, and can provide prediction and guidance for the adaptive excavation design of the underground chambers under the conditions of high temperature and high pressure.

Description

Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof
Technical Field
The invention relates to the technical field of underground chamber excavation.
Background
With the increasing depletion of mineral resources in shallow layers of the earth surface, resource exploration and exploitation activities are continuously moving to the deep part of the earth. However, according to Lucier et al, the highest ground stress magnitude actually measured in a certain gold mine in south Africa can reach 100MPa, and according to the research of Belle and Biffi, the ground temperature gradient currently disclosed in a certain coal mine in Australia can reach 7 ℃/100 m. Therefore, the problems of high ground stress and high ground temperature caused by the increase of the resource occurrence depth form a serious technical challenge for deep geotechnical engineering practices such as deep resource exploitation, deep energy development, high-level waste geological disposal and the like.
During underground chamber excavation, the reserved rock body can form unrecoverable dynamic damage due to blasting load impact and dynamic stress redistribution. In addition, for a geothermal abnormal area or a deep high-temperature mine, after the excavation of the high-temperature chamber is finished, cold air is generally introduced into an underground tunnel by adopting modes of artificial ventilation and the like so as to reduce the temperature of a working environment, so that the cooled rock body generates temperature redistribution and causes continuous adjustment of a secondary stress field, thereby possibly generating additional thermal damage on the basis of the formed dynamic excavation damage and seriously threatening the stability and construction safety of the chamber. Therefore, a rock thermal-force coupling behavior model and an analysis method in the whole process of deep-buried high-temperature chamber excavation blasting-unloading-cooling are established, a formation mechanism, a mechanical mechanism and an influence range of surrounding rock excavation damage are further revealed, and important practical help can be provided for deep chamber excavation design under high ground stress and high ground temperature environments.
In order to solve the above problems, some feasible schemes are proposed in the prior art, such as a numerical simulation method by using memories and the like, and the distribution condition of the surrounding rock damage zone induced by explosion load and transient unloading under the condition of high ground stress is researched by using finite elements, but the method has the following defects:
(1) the numerical calculation is usually limited by the grid division mode, if the grid divided by the model is dense, the calculation efficiency is low, and the required time is long; if the model grid is thick, the accuracy of the calculation result cannot be effectively guaranteed;
(2) rock thermal-force coupling response under the coupling action of high ground stress and high ground temperature is not considered, so that a surrounding rock excavation damage evolution mechanism under the deep high-temperature and high-pressure condition cannot be described, and an accurate operation scheme under the condition cannot be obtained.
Or as the chinese patent application CN201911400238.2 proposes a method of laying sound wave monitoring points in the tunnel excavation region and calculating the rock mass damage value according to the obtained sound wave monitoring data, but the method has the following disadvantages:
(1) the arrangement of sound wave monitoring points is complex, the monitoring process needs long time, and the consumption of manpower and material resources is large.
(2) The actual monitoring method can only obtain the distribution range of the surrounding rock damage area, but cannot reflect the rock stress evolution trend in the blasting-unloading-cooling process, so that the formation mechanism and the mechanical mechanism of excavation damage are difficult to reveal, and an accurate operation scheme cannot be obtained.
Disclosure of Invention
Aiming at the defects of the prior art, the invention aims to provide a surrounding rock excavation damage analysis method under the thermal coupling condition, which can accurately judge the formation mechanism, the mechanical mechanism and the influence range of a surrounding rock damage area under different geological conditions and excavation modes based on the processes of thermal coupling analysis, stress trajectory projection and the like, so that the optimal operation schemes under different conditions and modes can be further obtained, and the limitations that the traditional numerical calculation and in-situ monitoring method is low in calculation efficiency, long in required time, large in manpower and material resource consumption, and incapable of distinguishing the formation mechanism and the mechanical mechanism of the surrounding rock damage and the like are overcome.
It is also an object of the present invention to provide some specific applications of the above method.
The invention firstly discloses the following technical scheme:
the method for analyzing the surrounding rock excavation damage under the thermal coupling condition comprises the following steps:
establishing a tunnel excavation whole-process thermodynamic coupling model containing variable parameters, wherein the thermodynamic coupling model comprises the coupling of ground stress, dynamic stress and thermal stress;
setting basic design parameters of the overall process thermodynamic coupling model, wherein the basic design parameters comprise blasting related parameters and rock thermodynamic parameters;
setting a stress model of the surrounding rock mass at the boundary of the excavated tunnel based on the overall process thermodynamic coupling model and the basic design parameters;
setting process control equations of the surrounding rock mass in different excavation processes based on the overall process thermal coupling model and the basic design parameters, wherein the process control equations comprise state equations and boundary conditions, the state equations comprise dynamic stress conduction equations and heat conduction equations, and the boundary conditions comprise stress models at the boundaries;
solving the process control equation to obtain the dynamic stress and the thermal stress of the surrounding rock mass in different processes;
obtaining a surrounding rock thermodynamic coupling model according to the dynamic stress, the thermal stress and the coupling of the dynamic stress and the thermal stress with the initial ground stress;
projecting the obtained surrounding rock thermal coupling model to a stress invariant space through stress projection to obtain a surrounding rock mass stress trajectory curve in the whole surrounding rock excavation process under different variable parameters;
and obtaining the distribution range, the formation stage and the formation reason of the surrounding rock mass excavation damage under different variable parameters according to the stress trajectory curve.
Wherein, the blasting-related parameters may further include: explosive properties, blast hole arrangement, charging mode and the like; the thermodynamic parameters of the rock mass may further include, for example: rock density ρ r Young's modulus E, rock Poisson ratio upsilon, rock yield stress under different confining pressure conditions, rock thermal expansion coefficient beta and thermal conductivity coefficient kappaAnd specific heat capacity C, etc.
The forming stage (or the forming mechanism according to the embodiment) refers to each stage of the whole tunnel excavation process, such as excavation blasting, ground stress unloading, or temperature reduction after unloading, which will be described later.
The formation cause (or the mechanical mechanism in the embodiment) refers to a thermodynamic cause for generating the loss of the surrounding rock mass, such as formation by a tensioning mechanism, formation by a shear-expansion mechanism or formation by a shear-compression mechanism.
According to some preferred embodiments of the invention, the coupling is in the form of: the coupling force is obtained by the ground stress superimposed dynamic stress superimposed heating stress.
According to some preferred embodiments of the present invention, the whole tunnel excavation process includes three stages of excavation blasting, ground stress unloading and cooling after unloading; the variable parameters comprise the excavation radius a and the unloading time t of the tunnel du Ground stress P 0 And temperature T of original rock 0
In the preferred embodiment, the stress model at the tunnel boundary may use, for example, a pressure function f (t) of uniform blasting and unloading waves, which is determined by integrating blasting design parameters, ground stress magnitude and unloading time.
According to some preferred embodiments of the present invention, the establishment of the full process thermodynamic coupling model includes the following setup conditions:
the tunnel is excavated in an infinite elastic homogeneous rock body by a full-section drilling and blasting method, the axis of the tunnel is long enough, the section of the tunnel is a circle with the radius of a, and the profile surface of the tunnel is formed by one-step excavation under the condition of plane strain;
the initial temperature of the elastic homogeneous rock mass is the original rock temperature T 0 And is subjected to far-field hydrostatic pressure, i.e. the ground stress P 0 The function of (1);
during excavation, when the pressure of the explosion wave is attenuated to be equal to the initial ground stress of the excavation boundary, transient unloading of the ground stress is generated, and the ground stress P is simulated by applying reverse traction force on the wall of the hole along a linear path 0 At unloading time t du Down excited rock mass dynamic response;
After the chamber profile, namely the profile of the circular tunnel with the section radius of a, is formed, the chamber profile is cooled by cold air, and when the chamber profile is cooled to a specified time, the whole excavation process is completed.
It will be appreciated by those skilled in the art that although the preferred embodiment involves processes that are not physically manipulated on the surface, such as an infinitely large elastically homogeneous rock mass, a tunnel with a sufficiently long axis, etc., it is operable in the model set-up of the art, such as set-up conditions based on an infinitely large elastically homogeneous rock mass, and those skilled in the art will appreciate that r → ∞ may be used as a boundary condition in the set-up or solution of the model. That is, the description of the preferred embodiment can be specifically implemented within the skill of the art.
According to some preferred embodiments of the invention, the base design parameters include: the explosive density, the detonation wave velocity, the detonation product isentropic index, the detonation product adiabatic constant, the explosive diameter, the blast hole distance, the explosive length, the rock density, the rock elastic modulus, the rock Poisson ratio, the rock thermal expansion coefficient, the rock thermal conduction coefficient, the rock specific heat capacity and the rock heat exchange coefficient.
According to some preferred embodiments of the invention, the solving is performed by a laplace transform method.
More specifically, the laplace transform method can be further applied to the solution of the dynamic stress transfer equation described later to obtain the dynamic stress evolution characteristics of the rock mass around the excavation boundary; the method can also be applied to the solution of the heat conduction equation described later to obtain the thermal stress distribution of the rock mass in the ventilation and cooling process of the tunnel.
According to some preferred embodiments of the invention, the force model at the tunnel boundary comprises:
Figure BDA0003100840230000041
wherein the content of the first and second substances,
Figure BDA0003100840230000042
t r =L/V d ,t d =2πt r /ln(2),F b0 =d b F e0 /S;
wherein t represents time, F b0 Representing the equivalent peak pressure, d, acting on the tunnel profile b Indicating the diameter of the hole, S the distance between adjacent holes, F e0 Indicating the peak pressure of the blast hole wall, delta indicating the attenuation coefficient of the explosion stress wave, t r Indicating the time at which the explosive load reaches a peak, L the length of the charge, V d Indicates detonation wave velocity, t d Representing the duration of the blast wave, t u Indicates the unloading end time (i.e., the earth stress unloading end time), t du Denotes the unloading time, P 0 Representing the ground stress.
According to some preferred embodiments of the invention, the borehole wall peak pressure is obtained by:
Figure BDA0003100840230000051
where ρ is e Denotes the explosive density, d e Representing the charge diameter, and gamma and eta represent the isentropic index and adiabatic constant, respectively, of the detonation product.
According to some preferred embodiments of the invention, the process control equation comprises:
Figure BDA0003100840230000052
wherein r represents the distance between the surrounding rock constitution point and the center of the chamber under the cylindrical coordinate system,
Figure BDA0003100840230000055
representing the displacement potential function, v, of the mass point of the surrounding rock mass in a cylindrical coordinate system p Represents the longitudinal wave velocity of the dynamic stress wave when the dynamic stress wave propagates in the surrounding rock mass medium,
Figure BDA0003100840230000053
and (3) representing a radial dynamic stress function of the surrounding rock mass under the cylindrical coordinate system.
According to some preferred embodiments of the invention, the process control equation further comprises:
Figure BDA0003100840230000054
wherein T (r, T) represents a redistribution function of rock mass temperature, rho r Representing rock density, C representing specific heat capacity of rock, k representing heat conduction coefficient of rock, H ═ H/k, wherein H represents heat exchange coefficient of rock, T (a, T) represents temperature of cavity wall unit obtained according to redistribution function T (r, T) of rock temperature, T (a, T) represents temperature of cavity wall unit obtained according to redistribution function T (r, T) of rock temperature u Indicates the unloading end time, T b Indicating the cooling gas temperature.
According to some preferred embodiments of the present invention, the surrounding rock thermodynamic coupling model comprises:
Figure BDA0003100840230000061
wherein σ r 、σ θ And σ z Respectively representing radial total coupling stress, circumferential total coupling stress and out-of-plane normal direction total coupling stress of the surrounding rock mass under a cylindrical coordinate system; tau is Represents the total coupled shear stress;
Figure BDA0003100840230000062
and
Figure BDA0003100840230000063
respectively representing the dynamic radial stress, the circumferential stress and the out-of-plane normal direction stress of the surrounding rock mass under a cylindrical coordinate system,
Figure BDA0003100840230000064
Representing dynamic shear stress, which is obtained by solving the dynamic stress conduction equation;
Figure BDA0003100840230000065
and
Figure BDA0003100840230000066
respectively representing the radial thermal stress, the circumferential thermal stress and the out-of-plane normal direction thermal stress of the surrounding rock mass under the cylindrical coordinate system,
Figure BDA0003100840230000067
Representing the shear stress resulting from a temperature change (e.g., a drop in temperature) obtained by solving the equation for heat conduction.
According to some preferred embodiments of the present invention,
Figure BDA0003100840230000068
and
Figure BDA0003100840230000069
obtained by the following process:
according to the conduction equation described in equation (3), the following dynamic stress components are obtained using the generalized hooke's law:
Figure BDA00031008402300000610
wherein, lambda and mu represent Lame constants which can be obtained by calculating the rock elastic modulus E and Poisson ratio upsilon;
wherein, the solution of the displacement potential function can be obtained by:
solving the equation (3) by a Laplace transform method and substituting the equation into each edge value condition to obtain a dynamic displacement potential function of rock mass particles under a complex domain, wherein the dynamic displacement potential function comprises the following steps:
Figure BDA00031008402300000611
wherein k is d =p/v p ,v p Represents the velocity of the longitudinal wave, p represents the laplacian,
Figure BDA00031008402300000612
representing the Laplace transform result of the force model F (t) at the tunnel boundary, K 0 And K 1 Derivatives of a second class of modified Bessel functions representing zeroth and first orders, respectively;
further solving by the numerical inverse transformation method proposed by Durbin yields:
Figure BDA0003100840230000071
wherein α represents an arbitrary real number between 0 and Re (p), Re () represents a real part, k represents the number of calculations, N represents the maximum number of calculations, i represents an imaginary unit, Im () represents an imaginary part, T i Represents a solution time interval and T is more than or equal to 0 and less than or equal to T i /2。
According to some preferred embodiments of the present invention,
Figure BDA0003100840230000072
and
Figure BDA0003100840230000073
the expression is obtained by the following procedure:
solving the equation (7) by a Laplace transform method to obtain the redistribution of the rock mass temperature in the tunnel ventilation process as follows:
Figure BDA0003100840230000074
wherein u represents an integral variable, T b Indicating the cooling gas temperature, T 0 Denotes the temperature of the original rock, J 0 、J 1 And Y 0 、Y 1 Zero and first order bezier functions representing the first and second classes, respectively.
Then, each thermal stress component can be obtained by the following formula:
Figure BDA0003100840230000075
where β represents the linear thermal expansion coefficient of the rock.
According to some preferred embodiments of the invention, the process of stress projection comprises:
a) converting the stress component under the cylindrical coordinate system into a Cartesian coordinate system as follows:
σ x =σ r cos 2 θ+σ θ sin 2 θ-2τ sinθcosθ
σ y =σ r sin 2 θ+σ θ cos 2 θ+2τ sinθcosθ
τ xy =(σ rθ )sinθcosθ+τ (cos 2 θ-sin 2 θ) (11);
b) obtaining the hydrostatic pressure I of the rock units in the model by 1 And difference of principal stress J 2
Figure BDA0003100840230000081
C) With I 1 Is shown as the abscissa of the graph,
Figure BDA0003100840230000082
and drawing stress tracks of the rock units under different variable parameters and basic design parameters in the whole process for the vertical coordinate.
According to some preferred embodiments of the invention, the method of analyzing comprises: and determining the distribution range, the formation stage and the formation reason of the surrounding rock excavation damage by analyzing the relative position relationship between the stress track of the rock mass around the excavation outline and the yield surface of the rock mass.
The invention further provides an application of any one of the analysis methods, which is used for excavating the deep-buried high-temperature chamber.
According to some preferred embodiments of the invention, the applying comprises: and selecting proper variable parameters to form an optimal excavation scheme according to the distribution range, the formation stage and the formation reason of the surrounding rock excavation damage determined under different variable parameters.
The invention has the following beneficial effects:
(1) the analysis method of the invention establishes an analysis model of the whole process of tunnel excavation blasting-unloading-cooling under the condition of deeply burying a high-temperature chamber and the like, and in some specific embodiments, solves the rock heat-force coupling response of the model under different geological conditions and excavation modes by a Laplace transform method and stress superposition, and can obtain an accurate analysis and evaluation scheme before actual excavation;
(2) the analysis method of the invention converts the complex rock mechanical behavior under different time scales into a stress invariant space through a stress projection technology, and further can visually judge the influence range of excavation damage, formation mechanisms (such as blasting, unloading and cooling) and mechanical mechanisms (such as tensioning, shearing expansion and shearing shrinkage) according to the relative position relationship between a stress track and a rock yield surface in specific implementation;
(3) compared with a numerical calculation or actual monitoring method, the analysis method disclosed by the invention can determine the distribution range of the excavation damage area, can also reveal the formation mechanism and the mechanical mechanism of rock mass damage, has the advantages of high calculation efficiency, short required time, low manpower and material resource consumption and the like, and can provide prediction and guidance for the adaptive excavation design of the underground chamber under the conditions of high temperature and high pressure.
Drawings
Fig. 1 is a schematic view of a thermal coupling model in the excavation process of a deep-buried high-temperature chamber according to the invention.
Fig. 2 is a surrounding rock stress trajectory evolution diagram under different excavation sizes obtained in example 1.
Fig. 3 shows the distribution characteristics of the surrounding rock damage areas in different excavation sizes obtained in example 1.
FIG. 4 is a surrounding rock stress trajectory evolution diagram obtained in example 1 at different unloading rates.
FIG. 5 is a distribution characteristic diagram of a surrounding rock damage zone at different unloading rates obtained in example 1.
FIG. 6 is a graph showing the evolution of stress traces of surrounding rocks under different stress conditions obtained in example 1.
FIG. 7 is a distribution characteristic diagram of the damaged area of the surrounding rock under different stress conditions obtained in example 1.
Fig. 8 is a graph showing the change of excavation damage with the temperature of the original rock under different stresses obtained in example 1.
Detailed Description
The present invention is described in detail below with reference to the following embodiments and the attached drawings, but it should be understood that the embodiments and the attached drawings are only used for the illustrative description of the present invention and do not limit the protection scope of the present invention in any way. All reasonable variations and combinations that fall within the spirit of the invention are intended to be within the scope of the invention.
According to the technical scheme of the invention, the specific surrounding rock excavation damage identification method comprises the following steps:
(1) establishing an overall process model for excavating and building the deep-buried high-temperature chamber, wherein the overall process of excavating and building comprises excavation blasting, ground stress unloading and cooling after unloading of the chamber, and the overall process model of excavation blasting, unloading and cooling of the deep-buried high-temperature chamber is obtained;
more specifically, a full process model can be built as shown in FIG. 1, which includes the following variable parameters: excavation radius a and unloading time t of underground chamber du Ground stress P 0 And temperature T of original rock 0 And the model based on the variable parameters is set as follows:
the chamber is obtained by excavating a circular tunnel with a long enough axis and a radius of a section in an infinite elastic homogeneous rock body by a full-section drilling and blasting method, and the profile surface of the tunnel is regarded as being formed by one-step excavation under the condition of plane strain;
the initial temperature of the elastic homogeneous rock mass is T 0 And is subjected to far-field hydrostatic pressure, i.e. ground stress P 0 The function of (1);
during the excavation process, when the pressure of the explosion wave is attenuated to be equal to the initial ground stress of the excavation boundary, the transient unloading of the ground stress is generated, and the ground stress P is simulated by applying reverse traction force on the wall of the hole along a linear path 0 At unloading time t du The dynamic response of the lower excited rock mass;
after the chamber profile, namely the profile of the circular tunnel with the section radius of a, is formed, the chamber profile is cooled by cold air, and when the chamber profile is cooled to a specified time, the whole excavation process is completed.
Under the above configuration, the overall process model shown in fig. 1 can be embodied as follows: the thermal-force coupling response model of the deeply buried high-temperature chamber surrounding rock in the blasting-unloading and cooling processes as shown in fig. 1(a) is obtained by superposing a dynamic mechanical response model caused by the blasting and unloading waves as shown in fig. 1(c) and a surrounding rock secondary stress adjustment model caused by the chamber ventilation and cooling as shown in fig. 1(d) on the basis of an initial ground stress model as shown in fig. 1 (b).
Under the above arrangement, the present invention further comprises:
(2) obtaining basic design parameters required by the whole process model;
more specifically, in the overall process model shown in fig. 1, the required basic design parameters include:
explosive density, detonation wave velocity, detonation product isentropic index, detonation product thermal insulation constant, charge diameter, blast hole spacing, charge length, rock density, rock elastic modulus, rock poisson ratio, rock thermal expansion coefficient, rock thermal conduction coefficient, rock specific heat capacity and rock heat transfer coefficient.
(3) Setting a boundary stress model of the whole process model;
more specifically, in the overall process model illustrated in fig. 1, the chamber excavation boundaries are determined by the following equispaced blast-unload wave pressure function f (t):
Figure BDA0003100840230000101
wherein the content of the first and second substances,
Figure BDA0003100840230000102
t r =L/V d ,t d =2πt r /ln(2),F b0 =d b F e0 /S;
wherein t represents time, F b0 Indicating action on tunnel wheelEquivalent peak pressure on the profile, d b Indicating the diameter of the hole, S the distance between adjacent holes, F e0 Indicating the peak pressure of the blast hole wall, delta indicating the attenuation coefficient of the explosion stress wave, t r Indicating the time at which the explosive load reaches a peak, L the length of the charge, V d Indicates detonation wave velocity, t d Representing the duration of the blast wave, t u Indicates the unloading end time (i.e., the earth stress unloading end time), t du Denotes the unloading time, P 0 Representing the ground stress.
Wherein the peak pressure F of the blast hole wall e0 The method can be further calculated by the following C-J detonation theoretical model:
Figure BDA0003100840230000111
wherein ρ e Denotes the density of the explosive, d e Representing the charge diameter, and gamma and eta represent the isentropic index and adiabatic constant, respectively, of the detonation product.
(4) Setting process control equations of the whole process model at different time periods, wherein the process control equations comprise: the propagation equation of dynamic stress waves in surrounding rocks in the excavation blasting-unloading process and the heat conduction equation for describing the temperature change of the surrounding rocks in the tunnel ventilation cooling process are adopted;
more specifically, the propagation model of the dynamic stress wave in the surrounding rock is shown in fig. 1(c), and the propagation equation is set as follows:
Figure BDA0003100840230000112
wherein r represents the distance between the surrounding rock constitution point and the center of the chamber under the cylindrical coordinate system,
Figure BDA0003100840230000113
representing the displacement potential function, v, of the mass points of the surrounding rock mass under the cylindrical coordinate system p Represents the longitudinal wave velocity of the dynamic stress wave when the dynamic stress wave propagates in the surrounding rock mass medium,
Figure BDA0003100840230000114
and (3) representing the radial dynamic stress function of the surrounding rock mass under the cylindrical coordinate system.
More specifically, the heat conduction model in the tunnel ventilation and cooling process is shown in fig. 1(d), and the conduction equation is set as follows:
Figure BDA0003100840230000121
wherein T (r, T) represents a redistribution function of rock mass temperature, rho r Representing rock density, C representing rock specific heat capacity, kappa representing rock heat conduction coefficient, T (a, T) representing temperature of the hole wall unit, T u Indicating the ground stress unloading end time, T b And H is H/k, wherein H represents the heat exchange coefficient of the rock.
(5) Solving the process control equation, obtaining the dynamic stress of the surrounding rock mass at different time according to the propagation equation of the dynamic stress wave in the surrounding rock, and obtaining the thermal stress of the surrounding rock mass at different time according to the heat conduction equation in the tunnel aeration cooling process;
more specifically, solving the propagation equation may include:
according to the propagation equation, the dynamic stress component of the rock mass in the excavation process is obtained by utilizing the generalized Hooke's law as follows:
Figure BDA0003100840230000122
wherein the content of the first and second substances,
Figure BDA0003100840230000123
and
Figure BDA0003100840230000124
respectively representing dynamic radial stress, hoop stress and out-of-plane normal direction stress of the surrounding rock mass under a cylindrical coordinate system; λ and μ denote Lame constants which can be sprung from rock massThe sexual modulus E and the Poisson ratio upsilon are obtained through calculation;
Figure BDA0003100840230000125
representing dynamic shear stress;
solving the control equation (3) by a Laplace transform method and substituting the solution into each edge value condition to obtain a dynamic displacement potential function of rock mass particles under a complex domain, wherein the dynamic displacement potential function comprises the following steps:
Figure BDA0003100840230000131
wherein k is d =p/v p ,v p Represents the velocity of the longitudinal wave, p represents the laplacian,
Figure BDA0003100840230000134
representing the Laplace transform result of the force model F (t), K 0 And K 1 Derivatives of a second class of modified Bessel functions representing zeroth and first orders, respectively;
further solving by the numerical inverse transformation method proposed by Durbin yields:
Figure BDA0003100840230000132
where α represents an arbitrary real number between 0 and Re (p), Re () represents a real part, k represents the number of calculations, N represents the maximum number of calculations, i represents an imaginary unit, Im () represents an imaginary part, T i Represents a solution time interval and T is more than or equal to 0 and less than or equal to T i /2。
More specifically, solving the heat transfer equation may include:
solving the heat conduction control equation (7) by adopting a Laplace transform method to obtain the following redistribution of the rock mass temperature in the tunnel ventilation process:
Figure BDA0003100840230000133
wherein u represents an integral variable, J 0 、J 1 And Y 0 、Y 1 The 0 th order and 1 st order bezier functions represent the first and second classes, respectively.
The thermal stress in the retained rock mass produced by the aeration cooling process can then be obtained by:
Figure BDA0003100840230000141
wherein beta represents the linear thermal expansion coefficient of the rock,
Figure BDA0003100840230000142
and
Figure BDA0003100840230000143
respectively representing radial thermal stress, circumferential thermal stress and out-of-plane normal direction thermal stress of the surrounding rock mass under the cylindrical coordinate system;
Figure BDA0003100840230000144
representing the shear stress resulting from cooling;
(5) obtaining a surrounding rock thermal coupling response model through the dynamic stress borne by the surrounding rock mass, the thermal stress borne by the surrounding rock mass and the initial ground stress;
more specifically, the thermodynamic coupling response model is set as follows:
Figure BDA0003100840230000145
wherein σ r 、σ θ And σ z Respectively representing radial total coupling stress, circumferential total coupling stress and out-of-plane normal direction total coupling stress of the surrounding rock mass under a cylindrical coordinate system; tau is Representing the total shear stress of the coupling.
(6) Projecting the obtained surrounding rock thermal coupling response model to a stress invariant space through stress projection, and further obtaining a rock stress track curve in the whole process of blasting, unloading and cooling, wherein the rock stress track curve contains variable parameters representing different geological conditions and excavation modes and basic design parameters;
more specifically, it may comprise
a) Converting the stress component under the cylindrical coordinate system into a Cartesian coordinate system as follows:
σ x =σ r cos 2 θ+σ θ sin 2 θ-2τ sinθcosθ
σ y =σ r sin 2 θ+σ θ cos 2 θ+2τ sinθcosθ
τ xy =(σ r —σ θ )sinθcosθ+τ (cos 2 θ-sin 2 θ) (11);
b) obtaining the hydrostatic pressure I of the rock units in the model by 1 And difference of principal stress J 2
Figure BDA0003100840230000151
C) With I 1 Is shown as the abscissa of the graph,
Figure BDA0003100840230000152
and drawing stress tracks of the rock units under different variable parameters and basic design parameters in the whole process of blasting, unloading and cooling for the ordinate.
(7) And analyzing the relative position relation between the rock stress track around the excavation outline and the yield surface of the rock stress track through the obtained rock stress track curve, obtaining the relation between the variable parameter and the distribution range, formation mechanism and mechanical mechanism of the rock excavation damage, obtaining rock thermal coupling response and the time-space evolution rule of the surrounding rock damage area under different geological conditions and excavation modes, and further determining the actual excavation scheme.
Wherein the forming mechanism comprises blasting, unloading or cooling, and the mechanical mechanism comprises tensioning, shearing expansion or shearing contraction.
When the blasting, unloading or cooling stress track intersects with the yield surface, the surrounding rock is considered to be respectively subjected to blasting, unloading and cooling damage. Meanwhile, the mechanical mechanism of the surrounding rock damage can be judged according to the intersection point position of the stress track and the yielding surface, such as:
a. when the intersection point is positioned at the tensile yield section, the surrounding rock generates tensile damage;
b. when the intersection point is positioned at the shear-expansion yield section, the surrounding rock generates shear-expansion damage;
c. when the intersection point is located the cap section, the country rock produces the damage of shearing shrinkage.
Example 1
The simulation experiment is carried out by the specific scheme of the specific embodiment under the condition that the rocks around the deep-buried high-temperature chamber are mainly indiana limestone.
Wherein, the excavation design scheme is shown in the following table 1, and the use temperature T is used in the cooling process a Air flow at 15 ℃, ventilation time 15 days:
TABLE 1 model protocol
Figure BDA0003100840230000153
Figure BDA0003100840230000161
The basic design parameters are shown in table 2 below:
TABLE 2 excavation blasting-unloading-cooling model base design parameters
Figure BDA0003100840230000162
In the process of solving the numerical inverse transformation, taking alpha to be 0.2, T i The number of iterations N is 5000 for 40 ms.
Under the above conditions, a lesion analysis chart as shown in FIGS. 2 to 8 can be obtained, in which:
fig. 2 shows stress track evolution of a tunnel boundary unit surrounding rock mass under different excavation radius parameters a in the whole process of blasting, unloading and cooling, wherein a solid circle represents an intersection point of different stress tracks and an initial yield surface, namely a point representing that a rock starts to form damage, and corresponding surrounding rock damage distribution characteristics caused by excavation blasting, unloading and cooling are shown in fig. 3.
FIG. 4 shows different unloading rates (unloading time t) du ) And (3) evolving the surrounding rock mass stress track of the boundary unit of the tunnel, wherein the solid circles represent intersection points of different stress tracks and the initial yielding surface, namely represent points where the rock starts to form damage, and the corresponding surrounding rock excavation damage distribution characteristics are shown in the attached drawing 5.
Fig. 6 shows the evolution of the stress trajectories of the surrounding rock masses of the boundary unit of the tunnel under different stresses, wherein the solid circles represent the intersection points of the different stress trajectories and the initial yielding surface, namely the points representing the initial damage formation points of the rock, and the corresponding surrounding rock excavation damage distribution characteristics are shown in fig. 7.
Fig. 8 is a statistical graph of the change rule of surrounding rock damage along with the temperature of the original rock under different stresses, namely a heat damage development rule graph, wherein the temperature values shown in the graph are different temperatures of the original rock, and the time value is the time for generating heat damage to the surrounding rock mass of the boundary unit of the tunnel.
As can be seen from the above figures:
under different chamber excavation radius parameters a:
as can be seen from fig. 2, under the action of the blasting load, the stress trace of the tunnel boundary unit with a smaller excavation radius exceeds the shear yield surface, and finally blasting shear-expansion damage is caused in the reserved rock body (fig. 3 (a)). As the excavation radius increases, the stress path created by the blast loading becomes flatter and does not intersect the rock yield plane, so the blast loading cannot cause excavation damage to the retained rock mass (fig. 3(b) and (c)). During the transient unloading of the ground stress, the unloading stress track is further extended out of the shear yield surface due to the larger excavation radius (figure 2), so that stronger unloading shear expansion damage is caused in the reserved rock mass (figure 3). During the subsequent aeration cooling process, the thermal damage range of the surrounding rock gradually expands along with the increase of the radius of the chamber (figure 3).
At different unloading rates(unloading time t) du ) The following:
as can be seen from fig. 4-5, the tendency of the stress trace to move toward the tensile yield surface is more pronounced as the unloading rate increases. When the rate of unloading is sufficiently fast, dynamic tensile stresses will be induced in the rock mass due to the rapid release of the ground stress, which may lead to the formation of unloading tensile damage. After the radial stress unloading is finished, due to the influence of inertia effect, additional annular dynamic stress is generated in the rock mass, the higher the unloading speed is, the larger the dynamic stress amplitude is, the more the stress track exceeds the shear yield surface, and finally stronger unloading shear expansion damage is caused in the reserved rock mass (fig. 5).
At different ground stress P 0 The following:
as can be seen from fig. 6 and 7, as the magnitude of the ground stress increases, the trajectory of the burst stress gradually shifts to the upper right in the stress invariant space and continuously moves away from the shear yield plane as the initial stress state changes due to the increase of the ground stress, thereby suppressing the formation of burst damage. However, in the process of releasing the ground stress, the higher the confining pressure magnitude is, the higher the circumferential additional dynamic stress is caused, and further, the stronger unloading damage is generated. In addition, since the ground stress can suppress the relaxation of rock pressure caused by temperature reduction, the thermal damage range tends to decrease monotonically as the ground stress increases.
Under different geothermal conditions (i.e. different stresses and temperature T of the source rock) 0 ) The following:
as can be seen from fig. 8, under a given geostress condition, the surrounding rock with higher temperature will generate a larger range of thermal damage under the same cooling medium, and the increase of the magnitude of the geostress will inhibit the development of the thermal damage of the surrounding rock under the same geothermal environment. In addition, under the same cooling air flow, the higher the initial temperature of the surrounding rock, the faster the heat exchange rate, so the secondary stress adjustment is more severe, and the heat damage of the surrounding rock occurs earlier (fig. 8). Meanwhile, the rise of the confining pressure offsets the relaxation of the rock mass pressure caused by the temperature reduction of the tunnel, so that the occurrence time of the thermal damage is remarkably delayed along with the increase of the magnitude of the ground stress under the same geothermal condition (figure 8).
In conclusion, the analysis method disclosed by the invention effectively reveals the formation mechanism, the mechanical mechanism and the evolution characteristics of the damage of the surrounding rock under different ground pressure and ground temperature conditions and excavation modes, and can provide important practical assistance for the excavation design of the underground chamber under the deep high-temperature and high-pressure conditions.
The above examples are merely preferred embodiments of the present invention, and the scope of the present invention is not limited to the above examples. All technical schemes belonging to the idea of the invention belong to the protection scope of the invention. It should be noted that modifications and adaptations to those skilled in the art without departing from the principles of the present invention should also be considered as within the scope of the present invention.

Claims (8)

1. The method for analyzing the surrounding rock excavation damage under the thermal coupling condition is characterized by comprising the following steps of: the method comprises the following steps:
establishing a tunnel excavation whole-process thermodynamic coupling model containing variable parameters, wherein the thermodynamic coupling model comprises the coupling of ground stress, dynamic stress and thermal stress;
setting basic design parameters of the overall process thermodynamic coupling model, wherein the basic design parameters comprise blasting related parameters and rock thermodynamic parameters;
setting a stress model of the surrounding rock mass at the tunnel boundary based on the whole-process thermodynamic coupling model and the basic design parameters;
setting process control equations of the surrounding rock mass in different excavation processes based on the overall process thermal coupling model and the basic design parameters, wherein the process control equations comprise state equations and boundary conditions, the state equations comprise dynamic stress conduction equations and heat conduction equations, and the boundary conditions comprise stress models at the boundaries;
solving the process control equation to obtain the dynamic stress and the thermal stress of the surrounding rock mass in different processes;
obtaining a surrounding rock thermodynamic coupling model according to the dynamic stress, the thermal stress and the coupling of the dynamic stress and the thermal stress with the initial ground stress;
projecting the obtained surrounding rock thermal coupling model to a stress invariant space through stress projection to obtain a surrounding rock mass stress trajectory curve in the whole surrounding rock excavation process under different variable parameters;
obtaining the distribution range, the formation stage and the formation reason of the surrounding rock mass excavation damage under different variable parameters according to the stress trajectory curve;
wherein the formation reason comprises tension formation, shear expansion formation or shear contraction formation;
the stress model at the tunnel boundary comprises:
Figure FDA0003790127350000011
wherein the content of the first and second substances,
Figure FDA0003790127350000012
t r =L/V d ,t d =2πt r /ln(2),F b0 =d b F e0 /S;
wherein t represents time, F b0 Representing the equivalent peak pressure, d, acting on the tunnel profile b Indicating the diameter of the hole, S the distance between adjacent holes, F e0 The peak pressure of the blast hole wall is represented, delta represents the attenuation coefficient of the explosion stress wave, t r The time for the explosive load to reach the peak value is shown, L is the charge length, V d Indicates detonation wave velocity, t d Representing the duration of the blast wave, t u Indicating the end time of unloading, t du Denotes the unloading time, P 0 Representing the ground stress;
the surrounding rock thermal coupling model comprises:
Figure FDA0003790127350000021
wherein σ r 、σ θ And σ z Respectively representing radial total coupling stress, circumferential total coupling stress and out-of-plane normal direction total of surrounding rock mass under cylindrical coordinate systemCoupling stress; tau is Represents the total coupled shear stress;
Figure FDA0003790127350000022
and
Figure FDA0003790127350000023
respectively representing the dynamic radial stress, the circumferential stress and the out-of-plane normal direction stress of the surrounding rock mass under a cylindrical coordinate system,
Figure FDA0003790127350000024
Representing dynamic shear stress, which is obtained by solving the dynamic stress conduction equation;
Figure FDA0003790127350000025
and
Figure FDA0003790127350000026
respectively representing the radial thermal stress, the circumferential thermal stress and the out-of-plane normal direction thermal stress of the surrounding rock mass under the cylindrical coordinate system,
Figure FDA0003790127350000027
Represents the shear stress resulting from the temperature change, which is obtained by solving the heat conduction equation.
2. The analytical method of claim 1, wherein: the whole tunnel excavation process comprises three stages of excavation blasting, ground stress unloading and cooling after unloading; the variable parameters comprise tunnel excavation radius a and unloading time t du Ground stress P 0 And temperature T of original rock 0
3. The analytical method of claim 2, wherein: the establishment of the whole-process thermodynamic coupling model comprises the following setting conditions:
the tunnel is excavated in an infinite elastic homogeneous rock body by a full-section drilling and blasting method, the axis of the tunnel is long enough, the section of the tunnel is a circle with the radius of a, and the profile surface of the tunnel is formed by one-step excavation under the condition of plane strain;
the initial temperature of the elastic homogeneous rock mass is the original rock temperature T 0 And is subjected to far-field hydrostatic pressure, i.e. the ground stress P 0 The function of (1);
during excavation, when the pressure of explosion wave is attenuated to be the same as the initial ground stress of the excavation boundary, the transient unloading of the ground stress is generated, and the ground stress P is simulated by applying reverse traction force on the wall of the hole along a linear path 0 At unloading time t du The dynamic response of the lower excited rock mass;
after the chamber profile, namely the profile of the circular tunnel with the section radius of a, is formed, the chamber profile is cooled by cold air, and when the chamber profile is cooled to a specified time, the whole excavation process is completed.
4. The analytical method of claim 1, wherein: the basic design parameters include: the explosive density, the detonation wave velocity, the detonation product isentropic index, the detonation product thermal insulation constant, the charge diameter, the blast hole spacing, the charge length, the rock density, the rock elastic modulus, the rock Poisson ratio, the rock thermal expansion coefficient, the rock thermal conduction coefficient, the rock specific heat capacity and the rock heat exchange coefficient.
5. The analytical method of claim 1, wherein: the solution is implemented by the laplace transform method.
6. The analytical method of claim 1, wherein: the process control equation includes:
Figure FDA0003790127350000031
wherein r represents the distance between the surrounding rock constitution point and the center of the chamber under the cylindrical coordinate system,
Figure FDA0003790127350000032
representing the displacement potential function, v, of the mass point of the surrounding rock mass in a cylindrical coordinate system p Represents the longitudinal wave velocity of the dynamic stress wave when the dynamic stress wave propagates in the surrounding rock mass medium,
Figure FDA0003790127350000033
representing a radial dynamic stress function of the surrounding rock mass under a cylindrical coordinate system;
and/or:
Figure FDA0003790127350000034
where T (r, T) represents the redistribution function of rock mass temperature, ρ r Representing rock density, C representing specific heat capacity of rock, k representing heat conduction coefficient of rock, H ═ H/k, wherein H represents heat exchange coefficient of rock, T (a, T) represents temperature of cavity wall unit obtained according to redistribution function T (r, T) of rock temperature, T (a, T) represents temperature of cavity wall unit obtained according to redistribution function T (r, T) of rock temperature u Indicates the unloading end time, T b Indicating the cooling gas temperature.
7. The analytical method of claim 1, wherein: the process of stress projection comprises the following steps:
a) and converting the stress component in the cylindrical coordinate system into a Cartesian coordinate system as follows:
σ x =σ r cos 2 θ+σ θ sin 2 θ-2τ sinθcosθ
σ y =σ r sin 2 θ+σ θ cos 2 θ+2τ sinθcosθ
τ xy =(σ rθ )sinθcosθ+τ (cos 2 θ-sin 2 θ) (11);
b) obtaining the hydrostatic pressure I of the rock units in the model by 1 And difference of principal stress J 2
Figure FDA0003790127350000041
C) With I 1 Is shown as the abscissa of the graph,
Figure FDA0003790127350000042
and drawing stress tracks of the rock units under different variable parameters and basic design parameters in the whole excavation process for the vertical coordinate.
8. A method of applying the analytical method of any one of claims 1 to 7 to excavated deep-buried high-temperature chambers.
CN202110623136.8A 2021-06-04 2021-06-04 Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof Active CN113326551B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110623136.8A CN113326551B (en) 2021-06-04 2021-06-04 Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110623136.8A CN113326551B (en) 2021-06-04 2021-06-04 Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof

Publications (2)

Publication Number Publication Date
CN113326551A CN113326551A (en) 2021-08-31
CN113326551B true CN113326551B (en) 2022-09-30

Family

ID=77419657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110623136.8A Active CN113326551B (en) 2021-06-04 2021-06-04 Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof

Country Status (1)

Country Link
CN (1) CN113326551B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110020393B (en) * 2017-07-28 2023-11-28 中国石油天然气股份有限公司 Method and device for calculating stress of surrounding rock of well wall
CN116858302A (en) * 2022-11-16 2023-10-10 中国矿业大学 Visualization method for data fusion of deep surrounding rock

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065039A (en) * 2015-09-14 2015-11-18 成都理工大学 Thermal insulation method for high-ground-temperature tunnel surrounding rocks through grouting
CN106383172A (en) * 2016-10-10 2017-02-08 三峡大学 Surrounding rock damage prediction method based on energy release coefficient
KR20190025583A (en) * 2019-02-19 2019-03-11 김준모 The Excavation method applied by combination of Directional Drilling with Linear Wire Cutting.
CN109856243A (en) * 2019-02-27 2019-06-07 武汉大学 A kind of evaluation method of deep rock mass three-dimensional ground stress
CN110159245A (en) * 2019-07-05 2019-08-23 山东科技大学 Distribution note exhaust passage narrow strips coal underground gasifying furnace production system and method
CN110414137A (en) * 2019-07-29 2019-11-05 三峡大学 A kind of rock convergence measure horizon prediction method based on releasable elastic strain energy
CN112832307A (en) * 2021-02-24 2021-05-25 中国电建集团华东勘测设计研究院有限公司 Dam foundation altered rock mass reinforcement treatment structure and construction method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10619469B2 (en) * 2016-06-23 2020-04-14 Saudi Arabian Oil Company Hydraulic fracturing in kerogen-rich unconventional formations
CN111159949B (en) * 2019-12-30 2024-03-12 大连海事大学 Calculation method and system for small clear distance tunnel excavation damaged area

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065039A (en) * 2015-09-14 2015-11-18 成都理工大学 Thermal insulation method for high-ground-temperature tunnel surrounding rocks through grouting
CN106383172A (en) * 2016-10-10 2017-02-08 三峡大学 Surrounding rock damage prediction method based on energy release coefficient
KR20190025583A (en) * 2019-02-19 2019-03-11 김준모 The Excavation method applied by combination of Directional Drilling with Linear Wire Cutting.
CN109856243A (en) * 2019-02-27 2019-06-07 武汉大学 A kind of evaluation method of deep rock mass three-dimensional ground stress
CN110159245A (en) * 2019-07-05 2019-08-23 山东科技大学 Distribution note exhaust passage narrow strips coal underground gasifying furnace production system and method
CN110414137A (en) * 2019-07-29 2019-11-05 三峡大学 A kind of rock convergence measure horizon prediction method based on releasable elastic strain energy
CN112832307A (en) * 2021-02-24 2021-05-25 中国电建集团华东勘测设计研究院有限公司 Dam foundation altered rock mass reinforcement treatment structure and construction method thereof

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
Numerical simulation of excavation damaged zone under coupled thermal–mechanical conditions with varying mechanical parameters;C.H. Wei 等;《International Journal of Rock Mechanics and Mining Sciences》;20150430;第75卷;第169-181页 *
Thermal-mechanical modelling of rock response and damage evolution during excavation in prestressed geothermal deposits;Jian Tao 等;《International Journal of Rock Mechanics and Mining Sciences》;20211130;第147卷;第1-14页 *
大型地下硐室群施工期围岩应力变形及稳定分析;黄康鑫 等;《水利水运工程学报》;20160414(第2期);第89-96页 *
深埋硬岩隧道卸荷热力效应及岩爆趋势分析;陈国庆等;《岩石力学与工程学报》;20130815;第32卷(第08期);第46-55页 *
考虑开挖损伤的高放废物地质处置库温度-渗流-应力耦合数值模拟方法;侯会明 等;《岩土力学》;20190829;第41卷(第3期);第1056-1064页 *
高地应力条件下***开挖诱发围岩损伤的特性研究;杨栋 等;《岩土力学》;20140415;第35卷(第4期);第1110-1116页 *

Also Published As

Publication number Publication date
CN113326551A (en) 2021-08-31

Similar Documents

Publication Publication Date Title
Han et al. Combined finite-discrete element modelling of rock fracture and fragmentation induced by contour blasting during tunnelling with high horizontal in-situ stress
Hu et al. Numerical and experimental investigation of blasting damage control of a high rock slope in a deep valley
CN113326551B (en) Surrounding rock excavation damage analysis method under thermal coupling condition and application thereof
Hu et al. Numerical simulation of the complete rock blasting response by SPH–DAM–FEM approach
Ji et al. Modeling study of cumulative damage effects and safety criterion of surrounding rock under multiple full-face blasting of a large cross-section tunnel
Yu et al. Experimental study of the mechanical behavior of sandstone affected by blasting
Hu et al. Damage-vibration couple control of rock mass blasting for high rock slopes
Aliabadian et al. Wave and fracture propagation in continuum and faulted rock masses: distinct element modeling
Shu et al. Damage characteristics and failure modes of concrete gravity dams subjected to penetration and explosion
CN114722614B (en) Blasting dynamic response simulation method based on two-dimensional-three-dimensional cooperation
Yang et al. Numerical simulation of column charge explosive in rock masses with particle flow code
Huo et al. A study on raise blasting and blast-induced vibrations in highly stressed rock masses
Vorobyov et al. Simulation of dynamic fracture of the borehole bottom taking into consideration stress concentrator
Yang et al. Effect of adjacent hole on the blast‐induced stress concentration in rock blasting
Yu et al. Study on the attenuation parameters of blasting vibration velocity in jointed rock masses
Li et al. Cutting parameter optimization for one-step shaft excavation technique based on parallel cutting method
Xie et al. Large-scale field experiments on blast-induced vibration and crater in sand medium
Fan et al. Influence of water depth on the range of crushed zones and cracked zones for underwater rock drilling and blasting
Wang et al. Experimental Study of Blast‐Induced Vibration Characteristics Based on the Delay‐Time Errors of Detonator
Zhang et al. A study of millisecond blasting on high bench at barun iron ore operation
Juneja et al. A numerical study on extent of crushed zone around blasthole in basalt rock
Zhou et al. The Analysis of Blasting Seismic Wave Passing Through Cavity Based on SPH-FEM Coupling Method.
Jin et al. Propagation mechanism of fracture zones in single-hole rock mass under high in-situ stress
Yu et al. Numerical analysis of rock joints in tunnel construction during blasting
Zhou et al. Effect of excavation blasting in underground water-sealed gas storage cavern under in-situ stress

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant