CN113319008A CN202110641843.XA CN202110641843A CN113319008A CN 113319008 A CN113319008 A CN 113319008A CN 202110641843 A CN202110641843 A CN 202110641843A CN 113319008 A CN113319008 A CN 113319008A
Authority
CN
China
Prior art keywords
water testing
water
testing mechanism
automatic
shower head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110641843.XA
Other languages
Chinese (zh)
Inventor
陈景龙
金磊
顾凯
郑贵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Langkun Automatic Equipment Co Ltd
Original Assignee
Suzhou Langkun Automatic Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Langkun Automatic Equipment Co Ltd filed Critical Suzhou Langkun Automatic Equipment Co Ltd
Priority to CN202110641843.XA priority Critical patent/CN113319008A/en
Publication of CN113319008A publication Critical patent/CN113319008A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/34Sorting according to other particular properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/02Measures preceding sorting, e.g. arranging articles in a stream orientating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention discloses an automatic sprinkler water testing machine which comprises a rack, an operation platform, a material taking mechanism, a first water testing mechanism, a second water testing mechanism, a carrying mechanism, a water source pump box and a compressed air source, wherein the operation platform is arranged on the rack, a pair of material taking mechanisms are arranged on the operation platform in parallel, the material taking mechanisms are respectively connected with the first water testing mechanism and the second water testing mechanism, the carrying mechanism is arranged between the first water testing mechanism and the second water testing mechanism in a crossing mode, and the first water testing mechanism is circularly connected with the water source pump box. Through the mode, the automatic water testing machine for the shower head is provided, batch feeding and discharging are achieved through the carrying mechanism, the first water testing mechanism is connected to the water source pump box, automatic water testing operation can be efficiently achieved, the automatic water testing machine has the function of automatically switching water testing of shower head gears, the whole machine can seamlessly conduct water testing operation of different gears without manual pause, and the working efficiency of water testing of the shower head is remarkably improved.

Description

Automatic water testing machine for shower head
Technical Field
The invention relates to the field of automation equipment, in particular to an automatic watering machine for a shower head.
Background
After the shower production is finished, water testing is carried out on each shower product in a manual testing mode, and unqualified defective products with the water leakage problem are removed from a product production line. The labor intensity of water testing work is high, workers need to repeatedly switch water supply and air supply and shower gear, the water testing work efficiency is low, and the production requirements cannot be met.
Disclosure of Invention
The automatic water testing machine for the shower head is mainly used for achieving batch feeding and discharging through the carrying mechanism, the first water testing mechanism is connected to the water source pump box, automatic water testing operation can be achieved efficiently, the automatic water testing machine has the function of automatically switching water testing of shower head gears, the whole machine can conduct water testing operation of different gears in a seamless mode without manual pause, and the working efficiency of water testing of the shower head is improved remarkably.
In order to solve the technical problems, the invention adopts a technical scheme that: the automatic sprinkler testing machine comprises a rack, an operation platform, a material taking mechanism, a first water testing mechanism, a second water testing mechanism, a carrying mechanism, a water source pump box and a compressed air source, wherein the operation platform is arranged on the rack, the operation platform is provided with a pair of material taking mechanisms in parallel, the material taking mechanisms are respectively connected with the first water testing mechanism and the second water testing mechanism, the carrying mechanism stretches between the first water testing mechanism and the second water testing mechanism, the first water testing mechanism is connected with the water source pump box in a circulating mode, and the second water testing mechanism is connected with the compressed air source.
In a preferred embodiment of the present invention, the first water testing mechanism and the second water testing mechanism have the same structure, and are composed of a back plate, a shaft seat, air claws, a pneumatic water testing valve, an air cylinder, a cam, a main swing arm, and a transfer arm, wherein the back plate is vertically suspended on the rack, the shaft seat is arranged on the front surface of the back plate, two pairs of air claws are movably connected to the shaft seat, the pneumatic water testing valve is arranged between each pair of air claws, the pneumatic water testing valve is integrally embedded in the head of the air claws, the air cylinder is arranged on the back surface of the back plate, the air cylinder drives the main swing arm through the cam, the transfer arm is arranged on the tail of the air claw in an extending manner, and the main swing arm synchronously links with the transfer arm on each pair of air claws through a rotating shaft connecting rod.
In a preferred embodiment of the invention, a lifting platform guided by a wire rail and driven by a servo is arranged below the back plate, a translation sliding table is arranged on the bottom surface of the lifting platform, a secondary plate is vertically arranged on the translation sliding table, the front surface of the secondary plate is matched with a gear shifting servo connected by a movable shaft for each pair of air claws, the head of the gear shifting servo is connected with a gear driving plate, a shower gear shifting piece is arranged on the gear driving plate, a secondary cylinder is vertically arranged on the back surface of the secondary plate, and the secondary cylinder is connected with the gear shifting servo through a rotating shaft rocker.
In a preferred embodiment of the invention, the pneumatic water test valve is provided with a test interface which can be connected with a compressed air source and a water source pump box.
The invention has the beneficial effects that: according to the automatic water testing machine for the shower head, batch feeding and discharging are achieved through the carrying mechanism, the first water testing mechanism is connected to the water source pump box, automatic water testing operation can be achieved efficiently, the automatic water testing machine has the function of automatic water testing switching of shower head gears, the whole machine can carry out water testing operation of different gears in a seamless mode without manual pause, and the working efficiency of water testing of the shower head is improved remarkably.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without inventive efforts, wherein:
FIG. 1 is a diagram of the structure of an automatic sprinkler water tester according to a preferred embodiment of the present invention;
FIG. 2 is a top view of a preferred embodiment of an automatic water test machine for a shower head according to the present invention;
FIG. 3 is a side view of a first water testing mechanism of a preferred embodiment of the automatic water testing machine for a shower head according to the present invention;
FIG. 4 is a back structure view of a first water testing mechanism of a preferred embodiment of the automatic water testing machine for shower head of the present invention;
FIG. 5 is a block diagram of a material taking mechanism of a preferred embodiment of the automatic watering machine for shower heads according to the present invention;
fig. 6 is a structural diagram of a carrying mechanism of an automatic sprinkler water testing machine according to a preferred embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-6, embodiments of the present invention include:
the utility model provides an automatic water testing machine of gondola water faucet, includes frame 1, operation platform 2, extracting mechanism 3, first water testing mechanism 4, second water testing mechanism 5, handling mechanism 6, water source pump case 7, compressed air source 8, be provided with operation platform 2 in the frame 1, the last parallel a pair of extracting mechanism 3 that is provided with of operation platform 2, extracting mechanism 3 plugs into first water testing mechanism 4 and second water testing mechanism 5 respectively, it is provided with handling mechanism 6 to span between first water testing mechanism 4 and the second water testing mechanism 5, first water testing mechanism 4 cyclic connection water source pump case 7, second water testing mechanism 5 inserts compressed air source 8.
The first water testing mechanism 4 and the second water testing mechanism 5 are identical in structure and composed of a back plate 21, a shaft seat 22, air claws 23, a pneumatic water testing valve 24, an air cylinder 25, a cam 26, a main swing arm 27 and a transfer arm 28, the back plate 21 is vertically suspended on the rack 1, the shaft seat 22 is arranged on the front surface of the back plate 21, two pairs of air claws 23 are movably connected to the shaft seat 22, the pneumatic water testing valve 24 is arranged between each pair of air claws 23, the pneumatic water testing valve 24 is integrally embedded into the head of the air claws 23, the air cylinder 25 is arranged on the back surface of the back plate 21, the air cylinder 25 drives the main swing arm 27 through the cam 26, the transfer arm 28 is arranged at the tail of the air claws 23 in an extending mode, and the main swing arm 27 is synchronously linked with the transfer arm 28 on each pair of air claws 23 through a rotating shaft connecting rod 30.
Further, backplate 21 below is provided with by the line rail direction, by servo driven platform 31, platform 31 bottom surface is provided with translation slip table 32, the vertical subplate 33 that is provided with on translation slip table 32, subplate 33 openly matches a servo 34 of shifting by the swing joint for every gas claw 23, a gear dial 35 is connected to servo 34's head of shifting, be provided with gondola water faucet gear plectrum 36 on the gear dial 35, the vertical slave cylinder 252 that is provided with in subplate 33 back, slave cylinder 252 is through pivot rocker connection shift servo 34.
Further, the pneumatic water test valve 24 is provided with a test interface 29 which can be connected with the compressed air source 8 and the water source pump box 7.
As shown in fig. 5, the material taking mechanism 3 of the present invention is configured such that, when the production is performed, a feeding manipulator is cooperatively disposed outside the device, and the feeding manipulator grabs a group of four shower products and feeds the shower products into the device. The material taking mechanism 3 is guided by a linear rail on the operation platform 2, and is driven by a linear module 101 parallel to the linear rail in a translation manner, wherein a sliding table is arranged on the linear rail, a rotary table 102 is horizontally arranged on the sliding table, and the rotary table 102 is driven by a servo at the bottom of the sliding table through a gear set to rotate by 360 degrees. The rotary table 102 is provided with a synchronous guide post on which a feeding lifting table 103 is arranged, the feeding lifting table 103 is provided with a pair of supports 104 for realizing interval adjustment by servo, each support 104 is provided with a shaft seat, the shaft seats are horizontally provided with two long rods 105, the long rods 105 synchronously expand tightly through a belt by one servo to realize constant speed rotation, the tail ends of the long rods are provided with clamping jaws 106, and a material taking mechanism 3 is provided with four clamping jaws and can take four shower products to be tested from an external feeding manipulator.
After the material taking mechanism 3 adjusts the self-rotation position, the shower head is delivered to the air claw 23 shown in fig. 3, and before the air claw 23 is delivered, the air cylinder 25 drives the main swing arm 27 driven by the cam 26 to operate according to the prefabricated control logic of the PLC, so that the air claw 23 can perfectly deliver and clamp the shower head product.
After the handover is completed, the auxiliary cylinder 252 drives the shift servo 34 to adjust to a proper angle, so that the shower gear shifting piece 36 can be matched with a shift plate of a shower product.
After the preparation work is completed, the pneumatic water test valve 24 is communicated with water, the water enters the shower head under the action of pressure and is sprayed out, a tester observes each shower head, sends an NG instruction to the PLC after NG is found, and the NG products are screened at the station of blanking.
After the first water testing operation is completed, the shower head is handed over to the second water testing mechanism 5 by the carrying mechanism 6 as shown in fig. 6, the structure of the second water testing mechanism 5 is the same as that of the first water testing mechanism 4, but the testing interface 29 is connected with compressed air, and residual moisture in the shower head is blown out and dried under the action of the compressed air.
And finally, taking down all shower products from the second water testing mechanism 5 by the material taking mechanism 3, and finishing the whole operation cycle.
In conclusion, the automatic water testing machine for the shower head is provided, batch feeding and discharging are achieved through the carrying mechanism 6, the first water testing mechanism 4 is connected to the water source pump box 7, automatic water testing operation can be achieved efficiently, the automatic water testing machine has the function of automatic water testing switching of shower head gears, the whole machine can carry out water testing operation of different gears in a seamless mode without manual pause, and the working efficiency of water testing of the shower head is improved remarkably.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by the present specification, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (4)

1. The automatic sprinkler testing machine is characterized by comprising a rack, an operation platform, material taking mechanisms, a first water testing mechanism, a second water testing mechanism, a carrying mechanism, a water source pump box and a compressed air source, wherein the operation platform is arranged on the rack, a pair of material taking mechanisms are arranged on the operation platform in parallel, the material taking mechanisms are respectively connected with the first water testing mechanism and the second water testing mechanism, the carrying mechanism stretches between the first water testing mechanism and the second water testing mechanism, the first water testing mechanism is circularly connected with the water source pump box, and the second water testing mechanism is connected with the compressed air source.
2. The automatic water testing machine of claim 1, wherein the first water testing mechanism and the second water testing mechanism have the same structure and are composed of a back plate, a shaft seat, air claws, pneumatic water testing valves, a cylinder, a cam, a main swing arm and a switching arm, the back plate is vertically suspended on the rack, the front surface of the back plate is provided with the shaft seat, two pairs of air claws are movably connected to the shaft seat, a pneumatic water testing valve is arranged between each pair of air claws, the pneumatic water testing valves are integrally embedded in the head parts of the air claws, the back plate is provided with the cylinder, the cylinder drives the main swing arm through the cam, the tail parts of the air claws extend to be provided with the switching arm, and the main swing arm synchronously links the switching arm on each pair of air claws through a rotating shaft connecting rod.
3. The automatic water testing machine of claim 2, wherein a hanging platform guided by a line rail and driven by a servo is arranged below the back plate, a translation sliding table is arranged on the bottom surface of the hanging platform, a secondary plate is vertically arranged on the translation sliding table, the secondary plate is used for matching a shifting servo connected with a movable shaft for each pair of air claws, the head of the shifting servo is connected with a gear driving plate, a shower gear shifting piece is arranged on the gear driving plate, a secondary cylinder is vertically arranged on the back surface of the secondary plate, and the secondary cylinder is connected with the shifting servo through a rotating shaft rocker.
4. The automatic water test machine of claim 2, wherein the pneumatic water test valve is provided with a test interface which can be connected with a compressed air source and a water source pump box.
CN202110641843.XA 2021-06-09 2021-06-09 Automatic water testing machine for shower head Pending CN113319008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110641843.XA CN113319008A (en) 2021-06-09 2021-06-09 Automatic water testing machine for shower head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110641843.XA CN113319008A (en) 2021-06-09 2021-06-09 Automatic water testing machine for shower head

Publications (1)

Publication Number Publication Date
CN113319008A true CN113319008A (en) 2021-08-31

Family

ID=77420101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110641843.XA Pending CN113319008A (en) 2021-06-09 2021-06-09 Automatic water testing machine for shower head

Country Status (1)

Country Link
CN (1) CN113319008A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114486214A (en) * 2021-12-31 2022-05-13 屈初成 Shower head production line set for bathroom

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001021323A1 (en) * 1999-09-23 2001-03-29 Newteam Ltd Shower head
CN202024879U (en) * 2011-01-10 2011-11-02 福建闽机机械科技有限公司 Multifunctional test device for shower switching and ball joint head swinging lifetimes
CN109959506A (en) * 2019-04-28 2019-07-02 厦门力巨自动化科技有限公司 A kind of shower spray test machine
CN209582050U (en) * 2019-01-07 2019-11-05 深圳市玉沣科技有限公司 A kind of horizontal bagging machine structure
CN111089687A (en) * 2020-01-16 2020-05-01 厦门建霖健康家居股份有限公司 Sprinkler air tightness testing device and testing method thereof
CN111528491A (en) * 2020-04-20 2020-08-14 李丙华 Peanut sheller
CN212807580U (en) * 2020-07-31 2021-03-26 厦门中馨毅自动化设备股份有限公司 Shower head life testing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001021323A1 (en) * 1999-09-23 2001-03-29 Newteam Ltd Shower head
CN202024879U (en) * 2011-01-10 2011-11-02 福建闽机机械科技有限公司 Multifunctional test device for shower switching and ball joint head swinging lifetimes
CN209582050U (en) * 2019-01-07 2019-11-05 深圳市玉沣科技有限公司 A kind of horizontal bagging machine structure
CN109959506A (en) * 2019-04-28 2019-07-02 厦门力巨自动化科技有限公司 A kind of shower spray test machine
CN111089687A (en) * 2020-01-16 2020-05-01 厦门建霖健康家居股份有限公司 Sprinkler air tightness testing device and testing method thereof
CN111528491A (en) * 2020-04-20 2020-08-14 李丙华 Peanut sheller
CN212807580U (en) * 2020-07-31 2021-03-26 厦门中馨毅自动化设备股份有限公司 Shower head life testing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114486214A (en) * 2021-12-31 2022-05-13 屈初成 Shower head production line set for bathroom

Similar Documents

Publication Publication Date Title
CN100584566C (en) On-line automatic ingot stripper for glue gloves
CN102183739B (en) Device for moving electric energy meter between meter case and multi-epitope tooling board
CN107598240B (en) A kind of sheet frame class part specialized working machine tool of machine and processing method
CN107248686B (en) A kind of panel jack automatic assembling machine
CN105629517B (en) Intelligent plastic spectacles production line
CN103569637A (en) Automatic pallet filler of commutator
CN109435438A (en) A kind of complete complex-curved screen process press of servo drive control monochrome double-station
CN202066955U (en) Device for moving electric energy meter between meter box and multiple meter position tooling plate
CN113319008A (en) Automatic water testing machine for shower head
CN110104246A (en) Gauge apron strip automatic bundling machine, gauge apron production line and production method
CN112171221A (en) Automatic production line for oil cylinder
CN108747594A (en) A kind of cylinder end piece robot automation production line
CN208802508U (en) Automatic ball valve assembles circular route
CN107570855A (en) A kind of automatic convex welding device of nut
CN105947780B (en) A kind of primacord synchronizes the automatic control technology of rewinding
CN211136253U (en) Automatic processing equipment for surface holes of door and window materials
CN203992132U (en) A kind of vertical pipe expander structure and a kind of Full-automatic tube expander
CN109047011A (en) A kind of full-automatic production procedure of transformer shaping detection
CN202974076U (en) Automatic production line of industrial detonator bayonet
CN201613546U (en) Multi-row grabbing machine
CN205798947U (en) A kind of Pneumatic Cylinder Production Line
CN107601270A (en) A kind of stock rail steel rail lifting appliance
CN211034327U (en) Automatic tensile test equipment of container twistlock
CN209598652U (en) Suit equipment for O-ring and valve body socket
CN209506203U (en) A kind of bilateral material grasping manipulator mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination