CN113232984A - Settlement material management device for construction cost - Google Patents

Settlement material management device for construction cost Download PDF

Info

Publication number
CN113232984A
CN113232984A CN202110558367.5A CN202110558367A CN113232984A CN 113232984 A CN113232984 A CN 113232984A CN 202110558367 A CN202110558367 A CN 202110558367A CN 113232984 A CN113232984 A CN 113232984A
Authority
CN
China
Prior art keywords
sliding
material management
plate
fixedly arranged
settlement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110558367.5A
Other languages
Chinese (zh)
Inventor
冯鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110558367.5A priority Critical patent/CN113232984A/en
Publication of CN113232984A publication Critical patent/CN113232984A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D25/00Details of other kinds or types of rigid or semi-rigid containers
    • B65D25/02Internal fittings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D25/00Details of other kinds or types of rigid or semi-rigid containers
    • B65D25/02Internal fittings
    • B65D25/04Partitions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D25/00Details of other kinds or types of rigid or semi-rigid containers
    • B65D25/20External fittings
    • B65D25/24External fittings for spacing bases of containers from supporting surfaces, e.g. legs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D81/00Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents
    • B65D81/18Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents providing specific environment for contents, e.g. temperature above or below ambient
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D81/00Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents
    • B65D81/24Adaptations for preventing deterioration or decay of contents; Applications to the container or packaging material of food preservatives, fungicides, pesticides or animal repellants
    • B65D81/26Adaptations for preventing deterioration or decay of contents; Applications to the container or packaging material of food preservatives, fungicides, pesticides or animal repellants with provision for draining away, or absorbing, or removing by ventilation, fluids, e.g. exuded by contents; Applications of corrosion inhibitors or desiccators
    • B65D81/266Adaptations for preventing deterioration or decay of contents; Applications to the container or packaging material of food preservatives, fungicides, pesticides or animal repellants with provision for draining away, or absorbing, or removing by ventilation, fluids, e.g. exuded by contents; Applications of corrosion inhibitors or desiccators for absorbing gases, e.g. oxygen absorbers or desiccants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D11/00Self-contained movable devices, e.g. domestic refrigerators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/04Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection
    • F25D17/042Air treating means within refrigerated spaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/04Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection
    • F25D17/06Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection by forced circulation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D25/00Charging, supporting, and discharging the articles to be cooled
    • F25D25/02Charging, supporting, and discharging the articles to be cooled by shelves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2317/00Details or arrangements for circulating cooling fluids; Details or arrangements for circulating gas, e.g. air, within refrigerated spaces, not provided for in other groups of this subclass
    • F25D2317/04Treating air flowing to refrigeration compartments
    • F25D2317/041Treating air flowing to refrigeration compartments by purification
    • F25D2317/0411Treating air flowing to refrigeration compartments by purification by dehumidification

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The invention provides a settlement material management device for construction cost, which relates to the technical field of construction cost settlement material management and aims to solve the problems that the conventional construction cost settlement material management device cannot well classify and store settlement materials, cannot simply and quickly pick and place the settlement materials and cannot prevent the settlement materials from curling; a refrigerating device is fixedly arranged on the rear side of the material management mechanism, and an adjusting mechanism is fixedly arranged on the top of the inner side of the material management mechanism; the material management mechanism is internally and fixedly provided with a containing device, and the bottom of the inner side of the material management mechanism is provided with a sliding device in a sliding manner; the front side of the top of the material management mechanism is rotatably provided with a cover plate device; the bottom of the outer side of the adjusting mechanism is provided with a protective device in a sliding manner; and a drying device is fixedly arranged in the sliding device.

Description

Settlement material management device for construction cost
Technical Field
The invention belongs to the technical field of engineering cost settlement material management, and particularly relates to a settlement material management device for engineering cost.
Background
In the building engineering management process, paper data such as a large amount of drawings and reports need to be stored for a long time, the long-term storage of the paper data faces the problems of moisture prevention, fire prevention and the like, the humidity is too large, the ventilation condition is not good, the stored paper is easy to mildew, and small moldy spots in grayish green or brown appear around the edge part or corner of the paper, if the storage is improper, and the paper can be curled when the temperature is too high, so that the paper data are damaged, and the engineering management is inconvenient.
For example, application No.: CN107237576A relates to a confidential device for engineering cost data, which comprises a box body, a locking mechanism and a self-destruction mechanism, wherein the box body comprises a lower box body and an upper box cover, a containing cavity is arranged in the lower box body, and the upper box cover is hinged on the lower box body by a hinge; the locking mechanism is arranged on the side edge of the box body far away from the hinge and comprises a fixed piece and a movable piece, the fixed piece is arranged on the upper box cover, and the movable piece is arranged on the lower box body; the self-destruction mechanism comprises a flexible rope and a flat water bag made of an acid-resistant film material, the water bag is arranged in the containing cavity, concentrated sulfuric acid is filled in the water bag, one end of the flexible rope is connected with a fixing piece on the upper box cover, the other end of the flexible rope is connected with one end of the water bag after bypassing the hinge, and one end, far away from the flexible rope, of the water bag is fixed on the side wall of the container. The invention aims to provide a construction cost data security device to prevent the leakage of construction cost data information.
Based on the prior art discovery, current engineering cost settlement material management device can not be fine carry out categorised the save to the settlement material, and can not get simple swift getting the settlement material, also can not prevent that the settlement material from appearing phenomenons such as turn-up, and current management device is unfavorable for carrying out effectual saving to engineering cost management device, has reduced engineering cost settlement material management device's practicality.
Disclosure of Invention
In order to solve the technical problems, the invention provides a settlement material management device for construction cost, which aims to solve the problems that the existing construction cost settlement material management device cannot classify and store settlement materials well, cannot take and place the settlement materials simply and quickly, cannot prevent the settlement materials from curling and the like, is not beneficial to effectively storing the construction cost management device and reduces the practicability of the construction cost settlement material management device.
The invention relates to a settlement material management device for construction cost, which is achieved by the following specific technical means:
a settlement material management device for construction cost includes a support mechanism;
the supporting mechanism main body is of a square structure, and a material management mechanism is fixedly arranged at the top of the supporting mechanism; the bottom of the supporting mechanism is fixedly provided with a universal wheel device;
the refrigeration device is fixedly arranged on the rear side of the material management mechanism, and the adjusting mechanism is fixedly arranged at the top of the inner side of the material management mechanism; the material management mechanism is internally and fixedly provided with a containing device, and the bottom of the inner side of the material management mechanism is provided with a sliding device in a sliding manner; the front side of the top of the material management mechanism is rotatably provided with a cover plate device;
the bottom of the outer side of the adjusting mechanism is provided with a protective device in a sliding manner;
the drying device is fixedly arranged in the sliding device, and the number of the drying devices is four.
Further, the support mechanism includes:
the screws A are rotatably arranged inside two sides of the supporting mechanism through threaded connection, and the number of the screws A is four;
the bearing is fixedly arranged inside the supporting plate in an interference fit manner, and the inside of the bearing is fixedly arranged outside the bottom of the screw A in an interference fit manner; the number of the supporting plates is two groups;
the disc is fixedly arranged at the top of the screw A;
the connecting rod is fixedly arranged on the outer side of the top of the disc;
the connecting plate, the inside fixed bearing that is provided with through interference fit of connecting plate, and the bearing is inside to be fixed to be set up in the connecting rod outside through interference fit.
Further, the material management mechanism comprises:
the rotating plates are rotatably arranged at the bottom of the front side of the material management mechanism, and the number of the rotating plates is two;
the ventilation hole is opened inside the rear side of the material management mechanism and is of a symmetrical structure.
Further, the refrigeration apparatus includes:
the refrigeration plate is fixedly arranged in the refrigeration device, and a water-cooling tube device is fixedly arranged in the refrigeration plate; a through groove is formed in the refrigerating plate;
the fan devices are fixedly arranged inside the rear side of the refrigerating device, and the number of the fan devices is two.
Further, the adjustment mechanism includes:
the fixing plate A is fixedly arranged in the material management mechanism, and a trapezoidal sliding groove is formed in the fixing plate A;
the sliding plates are arranged on the inner sides of the trapezoidal sliding chutes in the fixing plate A in a sliding manner, and the number of the sliding plates is two;
the outer side of the top end of the screw B is fixedly provided with a bearing in an interference fit manner, and the bearing is fixedly arranged inside the fixing plate A in the interference fit manner; the screw B is rotatably arranged on the inner side of the bottom of the sliding plate through threaded connection, and the screw B completely penetrates through the material management mechanism.
Further, the storage device includes:
the fixing plate B is fixedly arranged in the material management mechanism and is positioned below the fixing plate A;
the storage box is arranged at the top of the fixed plate B in a sliding mode, and the top of the storage box is attached to the top of the fixed plate A; the number of the storage boxes is two;
the vertical rods are fixedly arranged inside two sides of the storage box, and the number of the vertical rods is four;
the two sides of the pressing plate A are arranged on the outer side of the vertical rod in a sliding mode, and a spring device is arranged between the top of the pressing plate A and the top end of the vertical rod;
the pressing plates B are arranged inside the pressing plates A in a sliding mode, and the number of the pressing plates B is two.
Further, the sliding device includes:
the sliding frame is fixedly provided with a sliding rail device at the bottom of the sliding frame, and the sliding rail device at the bottom of the sliding frame is arranged on the inner side of the bottom of the material management mechanism in a sliding manner;
the partition plate A is fixedly arranged inside the sliding frame, and four groups of through holes are formed in the partition plate A;
the partition plate B is fixedly arranged inside the sliding frame, and the partition plate B and the partition plate A form a cross structure;
the transverse plates are fixedly arranged on the outer sides of the partition plates A and the partition plates B, and the number of the transverse plates is four.
Further, the cover device includes:
the top of the baffle is rotatably arranged on the front side of the top of the material management mechanism, and the bottom of the baffle is attached to the top of the fixing plate A;
the connecting blocks are fixedly arranged on two sides of the baffle, and the number of the connecting blocks is two;
the sliding rod is arranged in the connecting block in a sliding manner, and the front end of the sliding rod is arranged in the material management mechanism in a sliding manner; a spring device is arranged between the bottom end of the sliding rod and the outer side of the connecting block.
Further, the guard device includes:
the protection plate A is fixedly provided with trapezoidal slide rails at the top and the bottom, and the trapezoidal slide rails at the top and the bottom of the protection plate A are respectively arranged in the fixing plate A and the fixing plate B in a sliding manner;
the protection plate B is the same as the protection plate A in structure and is arranged between the fixing plate A and the fixing plate B in a sliding mode;
the self-locking block is fixedly arranged on the rear side of the protection plate B, and the rear end of the self-locking block is of a spherical structure; the rear end of the self-locking block is of an open structure, and the self-locking block is arranged inside the protection plate A in a sliding mode.
Further, the drying device includes:
the fixed blocks are fixedly arranged on the inner side of the sliding frame, and the number of the fixed blocks is four;
the drying box is arranged outside the fixed block in a sliding manner;
the sliding block is arranged in the fixed block in a sliding mode, and a spring device is arranged between the bottom of the sliding block and the inside of the fixed block; the top of the sliding block is arranged inside the drying box in a sliding mode.
Compared with the prior art, the invention has the following beneficial effects:
1. in the device, the vertical rod, the pressing plate A and the spring device are arranged, so that the effect of extruding the settlement material to prevent the settlement material from curling is realized; utilize clamp plate B cooperation clamp plate A to realize carrying out the extruded effect according to the size of settlement material, played the effect that simple swift prevented that settlement material from appearing the turn-up phenomenon, compare current engineering cost settlement material management device can more effectual realization prevent the effect of turn-up operation according to settlement material size, be favorable to preserving the settlement material.
2. In this device, set up baffle A and baffle B and diaphragm, realized dividing into the carriage separation into the effect that the multiunit was accomodate the space, utilized the carriage to realize light convenient effect of getting the settlement material and put, utilized screw rod B cooperation slide, realized carrying out the effect of adjusting to accomodating the space according to the settlement material, the realization that compares current settlement material management device can be more simple and convenient is accomodate the settlement material classification and is preserved and the effect of easily getting and put, has strengthened management device's practicality.
3. In this device, through having set up connecting rod and connecting plate, realized making two sets of discs drive screw rod A pivoted effect simultaneously, made screw rod A drive the backup pad and move down and prop up management device, played and carried out effective fixed effect to management device after removing through the universal wheel device, compare current engineering cost settlement material management device can be more simple and convenient realization and carry out effective fixed effect to settlement material management device, strengthened management device's stability.
4. In the device, the slide rod is arranged, so that the effect of easily and conveniently fixing the baffle is realized, the spherical structure and the opening-shaped structure at the front end of the self-locking block are utilized to realize the effect of simply and quickly fixing the protection plate A and the protection plate B, and the slide block is matched with the spring device to realize the effect of simply and quickly replacing the drying box; utilize fan unit cooperation refrigeration board and ventilation hole, realized effectively carrying out temperature control's effect to material management mechanism inside, played the effect that prevents settlement material and cause certain damage because of the high temperature, be favorable to settlement material management device to use.
Drawings
Fig. 1 is a schematic front view of the present invention.
FIG. 2 is a schematic view of the internal structure of the material management facility of the present invention.
Fig. 3 is a front view schematically illustrating the structure of the vent hole according to the present invention.
Fig. 4 is a schematic view of the internal structure of the sliding apparatus of the present invention.
Fig. 5 is an exploded view of the drying apparatus of the present invention.
Fig. 6 is a schematic top view of the adjusting structure of the present invention.
Fig. 7 is a schematic top view of the supporting mechanism of the present invention.
Fig. 8 is a schematic view of the internal structure of the refrigerating apparatus of the present invention.
Fig. 9 is a schematic view of the internal structure of the storage case of the present invention.
Fig. 10 is an enlarged view of part a of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
1. a support mechanism; 101. a screw A; 102. a support plate; 103. a disc; 104. a connecting rod; 105. a connecting plate;
2. a material management authority; 201. rotating the plate; 202. a vent hole;
3. a refrigeration device; 301. a refrigeration plate; 302. a fan device;
4. an adjustment mechanism; 401. fixing a plate A; 402. a slide plate; 403. a screw B;
5. a storage device; 501. a fixing plate B; 502. a storage box; 503. a vertical rod; 504. pressing a plate A; 505. pressing a plate B;
6. a sliding device; 601. a carriage; 602. a separator A; 603. a partition board B; 604. a transverse plate;
7. a cover plate device; 701. a baffle plate; 702. connecting blocks; 703. a slide bar;
8. a guard; 801. a protection plate A; 802. a protection plate B; 803. a self-locking block;
9. a drying device; 901. a fixed block; 902. drying the box; 903. a slide block.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
as shown in figures 1 to 10:
the invention provides a settlement material management device for construction cost, which comprises a supporting mechanism 1, wherein the main body of the supporting mechanism 1 is of a square structure, and a material management mechanism 2 is fixedly arranged at the top of the supporting mechanism 1; the bottom of the supporting mechanism 1 is fixedly provided with a universal wheel device; a material management organization 2, the material management organization 2 comprising: the rotating plates 201 are rotatably arranged at the bottom of the front side of the material management mechanism 2, and the number of the rotating plates 201 is two; the vent holes 202 are formed in the rear inner portion of the material management mechanism 2, and the vent holes 202 are of a symmetrical structure; a refrigerating device 3 is fixedly arranged at the rear side of the material management mechanism 2, and an adjusting mechanism 4 is fixedly arranged at the top of the inner side of the material management mechanism 2; the refrigeration apparatus 3 includes: the refrigeration plate 301, the refrigeration plate 301 is fixedly arranged in the refrigeration device 3, and the water-cooling tube device is fixedly arranged in the refrigeration plate 301; a through groove is formed in the refrigeration plate 301; the fan devices 302 are fixedly arranged in the rear inner part of the refrigerating device 3, and the number of the fan devices 302 is two; the material management mechanism 2 is internally and fixedly provided with a containing device 5, and the bottom of the inner side of the material management mechanism 2 is provided with a sliding device 6 in a sliding way; the front side of the top of the material management mechanism 2 is rotatably provided with a cover plate device 7; the cover device 7 includes: the top of the baffle 701 is rotatably arranged on the front side of the top of the material management mechanism 2, and the bottom of the baffle 701 is attached to the top of the fixing plate A401; the connecting blocks 702 are fixedly arranged on two sides of the baffle 701, and the number of the connecting blocks 702 is two; the sliding rod 703 is arranged in the connecting block 702 in a sliding manner, and the front end of the sliding rod 703 is arranged in the material management mechanism 2 in a sliding manner; a spring device is arranged between the bottom end of the sliding rod 703 and the outer side of the connecting block 702; the bottom of the outer side of the adjusting mechanism 4 is provided with a protective device 8 in a sliding manner; the guard device 8 includes: the top and the bottom of the protection plate A801 are fixedly provided with trapezoidal sliding rails, and the top and the bottom of the protection plate A801 are respectively arranged in the fixing plate A401 and the fixing plate B501 in a sliding manner; the protection plate B802 is of the same structure as the protection plate A801, and the protection plate B802 is arranged between the fixing plate A401 and the fixing plate B501 in a sliding mode; the self-locking block 803 is fixedly arranged at the rear side of the protection plate B802, and the rear end of the self-locking block 803 is of a spherical structure; the rear end of the self-locking block 803 is in an open structure, and the self-locking block 803 is slidably arranged in the protection plate A801; the drying device comprises a sliding device 6, wherein drying devices 9 are fixedly arranged in the sliding device 6, and the number of the drying devices 9 is four; the drying device 9 includes: the fixed blocks 901 are fixedly arranged on the inner side of the sliding frame 601, and the number of the fixed blocks 901 is four; the drying box 902 is arranged outside the fixing block 901 in a sliding mode; the sliding block 903 is arranged in the fixed block 901 in a sliding mode, and a spring device is arranged between the bottom of the sliding block 903 and the inside of the fixed block 901; slider 903 is slidably disposed on top inside drying box 902.
Wherein, supporting mechanism 1 includes: the screws A101 are rotatably arranged inside two sides of the supporting mechanism 1 through threaded connection, and the number of the screws A101 is four; the support plate 102 is internally and fixedly provided with a bearing in an interference fit manner, and the inside of the bearing is fixedly arranged on the outer side of the bottom of the screw A101 in the interference fit manner; the number of the support plates 102 is set to two groups; the disc 103, the disc 103 is fixedly arranged at the top of the screw A101; the connecting rod 104 is fixedly arranged on the outer side of the top of the disc 103; a bearing is fixedly arranged inside the connecting plate 105 through interference fit, and the inside of the bearing is fixedly arranged outside the connecting rod 104 through interference fit; through having set up connecting rod 104 and connecting plate 105, realized making two sets of discs 103 drive screw A101 pivoted effect simultaneously, made screw A101 drive backup pad 102 and move down and prop up management device, played the effect of carrying out effective fixed to management device after removing through the universal wheel device.
Wherein, adjustment mechanism 4 includes: the fixing plate A401 is fixedly arranged inside the material management mechanism 2, and a trapezoidal sliding groove is formed inside the fixing plate A401; the sliding plates 402 are arranged inside the trapezoidal sliding chutes in the fixing plate A401 in a sliding manner, and the number of the sliding plates 402 is two; the outer side of the top end of the screw B403 is fixedly provided with a bearing in an interference fit manner, and the bearing is fixedly arranged inside the fixing plate A401 in the interference fit manner; the screw B403 is rotatably arranged on the inner side of the bottom of the sliding plate 402 through threaded connection, and the screw B403 completely penetrates through the material management mechanism 2; the screw B403 is used in cooperation with the slide plate 402, whereby the accommodation space can be adjusted according to the settlement material.
Wherein, storage device 5 includes: a fixing plate B501, wherein the fixing plate B501 is fixedly arranged inside the material management mechanism 2, and the fixing plate B501 is positioned below the fixing plate a 401; the storage box 502 is arranged at the top of the fixing plate B501 in a sliding mode, and the top of the storage box 502 is attached to the top of the fixing plate A401; the storage boxes 502 are arranged in two groups; the vertical rods 503 are fixedly arranged inside two sides of the storage box 502, and the number of the vertical rods 503 is four; the two sides of the pressing plate A504 are arranged on the outer sides of the vertical rods 503 in a sliding mode, and a spring device is arranged between the top of the pressing plate A504 and the top ends of the vertical rods 503; the pressing plates B505 are arranged inside the pressing plate A504 in a sliding mode, and the number of the pressing plates B505 is two; through the arrangement of the vertical rod 503, the pressing plate A504 and the spring device, the effect of extruding the settlement material to prevent the settlement material from curling is achieved; the pressing plate B505 is matched with the pressing plate A504 to realize the effect of extruding according to the size of the settlement material, and the effect of simply and quickly preventing the settlement material from curling is achieved.
Wherein, the sliding device 6 includes: the sliding frame 601, the bottom of the sliding frame 601 is fixedly provided with a sliding rail device, and the sliding rail device at the bottom of the sliding frame 601 is arranged at the inner side of the bottom of the material management mechanism 2 in a sliding manner; the partition plate A602 is fixedly arranged inside the sliding frame 601, and four groups of through holes are formed inside the partition plate A602; the partition plate B603 and the partition plate B603 are fixedly arranged in the sliding frame 601, and the partition plate B603 and the partition plate A602 form a cross structure; the transverse plates 604 are fixedly arranged on the outer sides of the partition plates A602 and the partition plates B603, and the number of the transverse plates 604 is four; through having set up baffle A602 and baffle B603 and diaphragm 604, realized dividing into the effect of multiunit accommodation space with carriage 601, utilized carriage 601 to realize light convenient effect of getting to settle accounts material and put.
In another embodiment, a pulley device is fixedly arranged at the bottom of the sliding frame 601; pulley devices are fixedly arranged at the top and the bottom of the protection plate A801 and the protection plate B802, and the sliding frame 601, the protection plate A801 and the protection plate B802 can slide smoothly under the action of the pulley devices; an elastic rubber device is arranged between the top of the pressing plate A504 and the top of the vertical rod 503, and the pressing plate A504 and the pressing plate B505 extrude the settlement materials under the action of the elastic rubber device to prevent the settlement materials from curling.
When in use: the settlement material management device is moved to a designated position through a universal wheel device at the bottom of the supporting mechanism 1, a connecting plate 105 is rotated, a connecting rod 104 is matched with a disc 103 to drive a screw A101 to rotate, the screw A101 drives a supporting plate 102 to move downwards to support the settlement material management device, the management device is effectively fixed after being moved through the universal wheel device, a sliding frame 601 is pulled, settlement materials are placed in the sliding frame 601, the effect of dividing the sliding frame 601 into a plurality of groups of containing spaces is realized through arrangement of a partition plate A602, a partition plate B603 and a transverse plate 604, the effect of easily and conveniently taking and placing the settlement materials is realized through the sliding frame 601, a containing box 502 is pulled, the settlement materials are placed at the bottoms of a pressing plate A504 and a pressing plate B505, the pressing plate A504 and the pressing plate B505 move downwards through a spring device to extrude the settlement materials, and through arrangement of a vertical rod 503, the pressing plate A504 and the spring device, the effect of preventing the settlement material from curling by extruding the settlement material is realized; the effect of extruding according to the size of the settlement material is achieved by the aid of the pressing plate B505 matched with the pressing plate A504, the effect of simply and quickly preventing the settlement material from curling is achieved, the protective plate A801 and the protective plate B802 are simply and quickly fixed by the aid of the spherical structure and the opening-shaped structure at the front end of the self-locking block 803, the sliding plate 402 is driven to slide in the fixed plate A401 by rotating the screw B403, the accommodating space is adjusted according to the settlement material by the aid of the screw B403 matched with the sliding plate 402, the effect of easily and conveniently fixing the baffle 701 is achieved by the aid of the sliding rod 703, and the effect of simply and quickly replacing the drying box 902 is achieved by the aid of the sliding block 903 matched with the spring device; utilize fan unit 302 cooperation system cold drawing 301 and ventilation hole 202, realized effectively carrying out temperature control's effect to material management mechanism 2 inside, compare current engineering cost settlement material management device and can more effectively realize carrying out the effect of preserving according to the settlement material size, be favorable to preserving the settlement material, strengthened the practicality.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (10)

1. A settlement material management device for construction costs, characterized in that: comprises a supporting mechanism (1);
the main body of the supporting mechanism (1) is of a square structure, and the top of the supporting mechanism (1) is fixedly provided with a material management mechanism (2); the bottom of the supporting mechanism (1) is fixedly provided with a universal wheel device;
the refrigeration device comprises a material management mechanism (2), wherein a refrigeration device (3) is fixedly arranged at the rear side of the material management mechanism (2), and an adjusting mechanism (4) is fixedly arranged at the top of the inner side of the material management mechanism (2); a storage device (5) is fixedly arranged in the material management mechanism (2), and a sliding device (6) is arranged at the bottom of the inner side of the material management mechanism (2) in a sliding manner; a cover plate device (7) is rotatably arranged on the front side of the top of the material management mechanism (2);
the bottom of the outer side of the adjusting mechanism (4) is provided with a protective device (8) in a sliding manner;
the drying device comprises a sliding device (6), wherein drying devices (9) are fixedly arranged in the sliding device (6), and the number of the drying devices (9) is four.
2. The settlement material management device for construction costs according to claim 1, wherein: the support mechanism (1) comprises:
the screws A (101) are rotatably arranged inside two sides of the supporting mechanism (1) through threaded connection, and the number of the screws A (101) is four;
the support plate (102), the inside of the support plate (102) is fixedly provided with a bearing through interference fit, and the inside of the bearing is fixedly arranged on the outer side of the bottom of the screw A (101) through interference fit; the number of the supporting plates (102) is two;
the disc (103), the disc (103) is fixedly arranged on the top of the screw A (101);
the connecting rod (104), the connecting rod (104) is fixedly arranged on the outer side of the top of the disc (103);
the connecting plate (105), the inside fixed bearing that is provided with through interference fit of connecting plate (105), and the inside fixed setting in connecting rod (104) outside through interference fit of bearing.
3. The settlement material management device for construction costs according to claim 1, wherein: the material management mechanism (2) comprises:
the rotating plates (201), the rotating plates (201) are rotatably arranged at the bottom of the front side of the material management mechanism (2), and the number of the rotating plates (201) is two;
the ventilation hole (202), ventilation hole (202) are seted up in material management mechanism (2) rear side inside, and ventilation hole (202) are symmetrical structure.
4. The settlement material management device for construction costs according to claim 1, wherein: the refrigeration device (3) comprises:
the refrigeration plate (301), the refrigeration plate (301) is fixedly arranged in the refrigeration device (3), and a water-cooling tube device is fixedly arranged in the refrigeration plate (301); a through groove is formed in the refrigerating plate (301);
the fan devices (302) are fixedly arranged inside the rear side of the refrigerating device (3), and the number of the fan devices (302) is two.
5. The settlement material management device for construction costs according to claim 1, wherein: the adjusting mechanism (4) comprises:
the fixing plate A (401) is fixedly arranged inside the material management mechanism (2), and a trapezoidal sliding groove is formed inside the fixing plate A (401);
the sliding plates (402) are arranged on the inner sides of the trapezoidal sliding chutes in the fixing plate A (401) in a sliding manner, and the number of the sliding plates (402) is two;
the outer side of the top end of the screw B (403) is fixedly provided with a bearing in an interference fit manner, and the bearing is fixedly arranged inside the fixing plate A (401) in the interference fit manner; the screw B (403) is rotatably arranged on the inner side of the bottom of the sliding plate (402) through threaded connection, and the screw B (403) completely penetrates through the material management mechanism (2).
6. The settlement material management device for construction costs according to claim 1, wherein: the housing device (5) comprises:
the fixing plate B (501), the fixing plate B (501) is fixedly arranged in the material management mechanism (2), and the fixing plate B (501) is positioned below the fixing plate A (401);
the storage box (502) is arranged at the top of the fixing plate B (501) in a sliding mode, and the top of the storage box (502) is attached to the top of the fixing plate A (401); the number of the storage boxes (502) is two;
the vertical rods (503) are fixedly arranged inside two sides of the storage box (502), and the number of the vertical rods (503) is four;
the two sides of the pressing plate A (504) are arranged on the outer side of the vertical rod (503) in a sliding mode, and a spring device is arranged between the top of the pressing plate A (504) and the top end of the vertical rod (503);
and the pressing plates B (505), the pressing plates B (505) are arranged inside the pressing plate A (504) in a sliding way, and the number of the pressing plates B (505) is two.
7. The settlement material management device for construction costs according to claim 1, wherein: the sliding device (6) comprises:
the sliding frame (601), the bottom of the sliding frame (601) is fixedly provided with a sliding rail device, and the sliding rail device at the bottom of the sliding frame (601) is arranged at the inner side of the bottom of the material management mechanism (2) in a sliding manner;
the baffle A (602), the baffle A (602) is fixedly arranged inside the sliding frame (601), and four groups of through holes are formed inside the baffle A (602);
the partition plate B (603), the partition plate B (603) is fixedly arranged in the sliding frame (601), and the partition plate B (603) and the partition plate A (602) form a cross structure;
the transverse plates (604) are fixedly arranged on the outer sides of the partition plates A (602) and the partition plates B (603), and the number of the transverse plates (604) is four.
8. The settlement material management device for construction costs according to claim 1, wherein: the cover device (7) comprises:
the top of the baffle (701) is rotatably arranged on the front side of the top of the material management mechanism (2), and the bottom of the baffle (701) is attached to the top of the fixing plate A (401);
the connecting blocks (702), the connecting blocks (702) are fixedly arranged on two sides of the baffle (701), and the number of the connecting blocks (702) is two;
the sliding rod (703) is arranged in the connecting block (702) in a sliding manner, and the front end of the sliding rod (703) is arranged in the material management mechanism (2) in a sliding manner; a spring device is arranged between the bottom end of the sliding rod (703) and the outer side of the connecting block (702).
9. The settlement material management device for construction costs according to claim 1, wherein: the guard device (8) comprises:
the protection plate A (801), trapezoidal slide rails are fixedly arranged at the top and the bottom of the protection plate A (801), and the trapezoidal slide rails at the top and the bottom of the protection plate A (801) are respectively arranged in the fixing plate A (401) and the fixing plate B (501) in a sliding manner;
the protection plate B (802), the protection plate B (802) and the protection plate A (801) are the same in structure, and the protection plate B (802) is arranged between the fixing plate A (401) and the fixing plate B (501) in a sliding mode;
the self-locking block (803) is fixedly arranged on the rear side of the protection plate B (802), and the rear end of the self-locking block (803) is of a spherical structure; the rear end of the self-locking block (803) is of an open structure, and the self-locking block (803) is arranged inside the protection plate A (801) in a sliding mode.
10. The settlement material management device for construction costs according to claim 1, wherein: the drying device (9) comprises:
the fixed blocks (901), the fixed blocks (901) are fixedly arranged at the inner side of the sliding frame (601), and the number of the fixed blocks (901) is four;
the drying box (902), the drying box (902) is arranged outside the fixed block (901) in a sliding manner;
the sliding block (903), the sliding block (903) is arranged inside the fixed block (901) in a sliding mode, and a spring device is arranged between the bottom of the sliding block (903) and the inside of the fixed block (901); the top of the sliding block (903) is arranged inside the drying box (902) in a sliding mode.
CN202110558367.5A 2021-05-21 2021-05-21 Settlement material management device for construction cost Pending CN113232984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110558367.5A CN113232984A (en) 2021-05-21 2021-05-21 Settlement material management device for construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110558367.5A CN113232984A (en) 2021-05-21 2021-05-21 Settlement material management device for construction cost

Publications (1)

Publication Number Publication Date
CN113232984A true CN113232984A (en) 2021-08-10

Family

ID=77138098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110558367.5A Pending CN113232984A (en) 2021-05-21 2021-05-21 Settlement material management device for construction cost

Country Status (1)

Country Link
CN (1) CN113232984A (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007055673A (en) * 2005-08-26 2007-03-08 Ricoh Co Ltd Packing device
CN107237576A (en) * 2017-08-03 2017-10-10 重庆工程职业技术学院 Cost Data privacy device
CN109051244A (en) * 2018-06-21 2018-12-21 郑州郑先医药科技有限公司 A kind of Chinese medicine storage box with sterilizing function
CN209184063U (en) * 2019-01-16 2019-07-30 梁丽萍 A kind of electric automatization overhaul of the equipments protective device
CN209644336U (en) * 2019-01-22 2019-11-19 贵州师范大学 A kind of law files management cabinet
CN210169548U (en) * 2019-06-04 2020-03-24 九江学院 Model rack for product design
CN210203958U (en) * 2019-06-06 2020-03-31 江西应用技术职业学院 Filing cabinet for management science and engineering
CN210392169U (en) * 2019-09-10 2020-04-24 青岛高企通互联网有限公司 Movable computer storage box based on block chain technology
CN111284829A (en) * 2020-03-06 2020-06-16 陈美奇 Block chain label placer
CN211083499U (en) * 2019-11-26 2020-07-24 巢湖水利电力建设有限公司 Novel water conservancy construction equipment supports device
CN211309493U (en) * 2019-10-14 2020-08-21 唐山烁丰纸制品有限公司 Packing box with protective inner container
CN211443207U (en) * 2019-12-30 2020-09-08 山东锦诚即测技术检验检测有限公司 Protective device for reinforcing bar detector
CN211565832U (en) * 2019-12-20 2020-09-25 张学明 Toolbox is used in building engineering cost budget
CN211944379U (en) * 2020-01-15 2020-11-17 天津宗泰金属制品有限公司 High-carbon barbed wire charging basket convenient and rapid to assemble and disassemble
CN211984452U (en) * 2020-01-07 2020-11-24 无锡职业技术学院 Drawer type shoe cabinet
CN211996796U (en) * 2020-04-21 2020-11-24 张玉立 Storage device for file administration
CN213128620U (en) * 2020-08-10 2021-05-07 辽宁巨隆达建设工程管理咨询有限公司 Hydraulic engineering building site is with dampproofing filing cabinet

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007055673A (en) * 2005-08-26 2007-03-08 Ricoh Co Ltd Packing device
CN107237576A (en) * 2017-08-03 2017-10-10 重庆工程职业技术学院 Cost Data privacy device
CN109051244A (en) * 2018-06-21 2018-12-21 郑州郑先医药科技有限公司 A kind of Chinese medicine storage box with sterilizing function
CN209184063U (en) * 2019-01-16 2019-07-30 梁丽萍 A kind of electric automatization overhaul of the equipments protective device
CN209644336U (en) * 2019-01-22 2019-11-19 贵州师范大学 A kind of law files management cabinet
CN210169548U (en) * 2019-06-04 2020-03-24 九江学院 Model rack for product design
CN210203958U (en) * 2019-06-06 2020-03-31 江西应用技术职业学院 Filing cabinet for management science and engineering
CN210392169U (en) * 2019-09-10 2020-04-24 青岛高企通互联网有限公司 Movable computer storage box based on block chain technology
CN211309493U (en) * 2019-10-14 2020-08-21 唐山烁丰纸制品有限公司 Packing box with protective inner container
CN211083499U (en) * 2019-11-26 2020-07-24 巢湖水利电力建设有限公司 Novel water conservancy construction equipment supports device
CN211565832U (en) * 2019-12-20 2020-09-25 张学明 Toolbox is used in building engineering cost budget
CN211443207U (en) * 2019-12-30 2020-09-08 山东锦诚即测技术检验检测有限公司 Protective device for reinforcing bar detector
CN211984452U (en) * 2020-01-07 2020-11-24 无锡职业技术学院 Drawer type shoe cabinet
CN211944379U (en) * 2020-01-15 2020-11-17 天津宗泰金属制品有限公司 High-carbon barbed wire charging basket convenient and rapid to assemble and disassemble
CN111284829A (en) * 2020-03-06 2020-06-16 陈美奇 Block chain label placer
CN211996796U (en) * 2020-04-21 2020-11-24 张玉立 Storage device for file administration
CN213128620U (en) * 2020-08-10 2021-05-07 辽宁巨隆达建设工程管理咨询有限公司 Hydraulic engineering building site is with dampproofing filing cabinet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金喜子: "运输管理机构档案管理的思考", 《才智》 *

Similar Documents

Publication Publication Date Title
CN113232984A (en) Settlement material management device for construction cost
CN215225826U (en) File administration's multi-functional filing cabinet
CN212325837U (en) File management device
CN211480660U (en) Moisture-proof electrical cabinet
CN216374687U (en) Lithium battery transportation device with fixing function
CN207383894U (en) A kind of medical archive manages cabinet
CN211408142U (en) Student's management book archives strorage device
CN210446201U (en) Data security archives save equipment
CN215417899U (en) Integrated film capacitor
CN113096697B (en) Storage device for artificial intelligence data
CN118058584A (en) File storage device with classification management function
CN220512473U (en) File storage cabinet
CN215190148U (en) Intensive archives cabinet with dampproofing ventilation function
CN113558389A (en) Information management device for financial accounting
CN215456378U (en) Intelligent file cabinet convenient to arrange files
CN216723720U (en) Intelligent archive shelf management control device
CN221242086U (en) File strorage device
CN112205773A (en) File cabinet moving alarm device based on file management safety protection
CN213074973U (en) Folder for information security
CN219108985U (en) File cabinet
CN221356263U (en) Medical archive management cabinet
CN221285032U (en) Report form collating unit
CN216602092U (en) Intelligent anti-theft file cabinet based on face recognition control
CN213720707U (en) Homeland resource data management equipment
CN215225735U (en) Archives storage device is used in inspection of period

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210810

RJ01 Rejection of invention patent application after publication