CN113137271A CN202110410644.8A CN202110410644A CN113137271A CN 113137271 A CN113137271 A CN 113137271A CN 202110410644 A CN202110410644 A CN 202110410644A CN 113137271 A CN113137271 A CN 113137271A
Authority
CN
China
Prior art keywords
filling
wire rope
kettle
steel wire
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110410644.8A
Other languages
Chinese (zh)
Inventor
王勇
郏威
吴爱祥
刘康
曹晨
王忠强
彭青松
袁锦锋
沈家华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Luohe Mine Co ltd
University of Science and Technology Beijing USTB
Original Assignee
Anhui Magang Luohe Mine Co ltd
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Luohe Mine Co ltd, University of Science and Technology Beijing USTB filed Critical Anhui Magang Luohe Mine Co ltd
Priority to CN202110410644.8A priority Critical patent/CN113137271A/en
Publication of CN113137271A publication Critical patent/CN113137271A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a flexible cutting anti-blocking and bottom anti-friction integrated device for a mine filling vertical drilling hole, and belongs to the technical field of mine filling. The device is the aboveground part including the pipeline tee bend, wire rope, the blind plate, hoist engine and filling tube, the part is including buffering the kettle in the pit, buffering kettle high pressure access hole, the access hole blind plate, the steel sheet, bolt and filling tube, arrange the hoist engine on ground, fill a pipeline tee bend of drilling connection, one section is as filling the inlet pipe, one section is as wire rope's passageway, wire rope twines in the cylinder of hoist engine, the rope body is arranged in and is filled vertical drilling, the rope end is fixed on the access hole blind plate, arrange the buffering kettle in the pit, perpendicular filling hole is connected at buffering kettle top, the high pressure access hole is arranged to the side, seal with the blind plate, buffering kettle opposite side is connected with horizontal filling pipe, the pre-buried steel sheet in tunnel bottom, will cushion the kettle through the bolt and fix at tunnel bottom plate. The device has the advantages of small construction amount, high efficiency, high safety and convenient operation.

Description

Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling
Technical Field
The invention relates to the technical field of mine filling, in particular to a flexible cutting anti-blocking and bottom anti-friction integrated device for a mine filling vertical drilling hole.
Background
With the depletion of surface resources and the increase of mining depth, the application proportion of the filling mining method in mines gradually rises in order to solve the problems of goaf, high ground pressure and large amount of tailings in the mining process. The filling method mixes the generated tailings, the cementing material, the coarse aggregate, water and the like according to a certain proportion to form the filling material with certain fluidity. The filling material is conveyed to the goaf through a pipeline system in a plug flow mode under the action of an external force or gravity, and filling operation is completed. The filling material has certain strength after being maintained, and can better control the collapse and the ground pressure of the goaf. Meanwhile, the filling mining method treats a large amount of tailings, reduces the degree of dependence on a tailing pond, and reduces land acquisition, construction cost and damage to the environment of the tailing pond.
In whole filling system, pipeline transportation system is one of comparatively weak link, produces pipe explosion, stifled pipe and wearing and tearing scheduling problem easily, and wherein stifled pipe is main, common problem, and pipeline transportation system takes place to block up and can cause great economic loss, also can influence mine safety in production simultaneously.
The reasons for pipe blockage in a filled pipe system are as follows: first, pipe leakage causes some fine slurry to leak out, causing pipe resistance to rise, resulting in pipe blockage. Secondly, the filler preparation is too thick, increasing the delivery resistance and causing pipe blockage. Thirdly, slurry concentration is low to a certain degree, which causes slurry segregation and coarse particles deposit in the pipeline to cause pipe blockage. Fourthly, foreign matters are mixed into the filling pipeline, and if the impurities cannot be screened completely or the lining of the pipeline falls off, the pipeline is blocked. At present, the problem of pipeline blockage is treated by methods such as pumping pressure water washing, pipeline disassembly and the like. Because the pipe plugging part is difficult to determine, the workload of pipeline disassembly is large, the dredging is difficult, and the mine production is seriously influenced.
Disclosure of Invention
The invention aims to solve the technical problem of providing a flexible cutting anti-blocking and bottom anti-abrasion integrated device for a mine filling vertical drilling hole, and solving the problem of conveying faults caused by foreign matters or filling materials in the drilling hole.
The device comprises an aboveground part and an underground part, wherein the aboveground part comprises a pipeline tee joint, a steel wire rope, a blind plate, a winch and a filling pipe I, the underground part comprises a buffer kettle, a buffer kettle high-pressure access hole, an access hole blind plate, a steel plate, a bolt and a filling pipe II, the winch is arranged on the ground and used for providing force for stretching the steel wire rope so as to dredge the pipeline, the filling drill hole is connected with the pipeline tee joint, one end of the pipeline tee joint is used as a filling feeding pipe and is connected with the filling pipe I, the other end of the pipeline tee joint is used as a channel of the steel wire rope, the blind plate is covered on the channel, the steel wire rope is wound in a roller of the aboveground winch, a rope body is arranged in a vertical filling drill hole, the tail end of the rope is fixed on the access hole blind plate of the buffer kettle high-pressure access hole, a buffer kettle is arranged underground, the top of the buffer kettle is connected with the vertical filling drill hole, the buffer kettle high-pressure access hole is arranged on the side surface, the buffer kettle is sealed by the access hole blind plate, when the buffering kettle needs to be overhauled, the buffering kettle can be disassembled, the other side surface of the buffering kettle is provided with a pipeline opening which is connected with a horizontal filling pipe two phase, a steel plate is embedded at the bottom of the roadway, and the buffering kettle is fixed on a bottom plate of the roadway through bolts.
A round small opening is formed in the blind plate above the pipeline tee joint and used for a steel wire rope to pass through, and the diameter of the small opening is larger than that of the steel wire rope.
Selecting a steel wire rope with the diameter of 10-30 mm according to the friction force generated by the contact of the steel wire rope and the filling material and the self weight of the steel wire rope, and adopting a steel wire rope with wear resistance and chemical corrosion resistance, wherein the wear resistance and chemical corrosion resistance of slurry are reduced by adopting a galvanized steel wire rope generally; the steel wire rope is reserved for 2-5m and placed at the bottom of the buffer kettle.
The steel wire rope type selection is carried out according to the viscous force generated by the steel wire rope and the filling material and the diameter of the filling pipeline, so that the steel wire rope type selection can be ensured to have certain strength to meet the requirement that the steel wire rope is pulled to dredge the pipeline when slurry is solidified, and meanwhile, the influence of the steel wire rope on the flow of the slurry in the pipeline is reduced.
The diameter of the inner wall of the buffering kettle is 1.5-3 times of that of the inner wall of the filling pipe, the buffering kettle is cylindrical, the bottom of the buffering kettle is provided with a through hole, and the buffering kettle is used for reducing impact force of filling materials on a joint of the vertical pipeline and the horizontal pipeline and reducing pipeline abrasion.
The steel wire rope swings in the contact process with the filling materials to prevent the filling materials from blocking the pipe, and if a pipe blocking accident happens, the winding drum is controlled by the winch to pull the steel wire rope upwards, and the pipeline is dredged under the action of the reciprocating cutting force between the steel wire rope and the filling materials.
The technical scheme of the invention has the following beneficial effects: (1) the universality is high. The whole device is attached to the existing filling drill hole, the existing filling drill hole structure is not changed, all filling mines with drill holes can be used, and the device is simple and convenient to install; (2) the cost is low. The device consists of common winches and steel wire ropes in mines, and the cost is not high no matter related facilities are newly purchased or the mine is used as waste; (3) the safety is high. The diameter of the steel wire rope is calculated scientifically based on friction force and self weight, the safety of the device is good, compared with the traditional methods of pipeline disassembly, drill dredging and the like, the method is used for dredging the drilled hole by controlling the winch, and the damage of instantaneous impact to constructors caused by insufficient dredging of the pipeline due to slurry discharge is avoided when the personnel are on the ground surface in the whole operation process.
Drawings
FIG. 1 is a front view of the flexible cutting anti-blocking and bottom anti-friction integrated device for vertical drilling of the invention;
FIG. 2 is a side view of a downhole assembly of the present invention.
Wherein: 1-pipeline tee joint, 2-steel wire rope, 3-blind plate, 4-winch, 5-buffer kettle, 6-buffer kettle high-pressure access hole, 7-access hole blind plate, 8-steel plate, 9-bolt, 10-filling pipe I and 11-filling pipe II.
Detailed Description
In order to make the technical problems, technical solutions and advantages of the present invention more apparent, the following detailed description is given with reference to the accompanying drawings and specific embodiments.
The invention provides a flexible cutting anti-blocking and bottom anti-friction integrated device for a mine filling vertical drilling hole.
As shown in figure 1, the device comprises an aboveground part and an underground part, wherein the aboveground part comprises a pipeline tee joint 1, a steel wire rope 2, a blind plate 3, a winch 4 and a filling pipe I10, the underground part comprises a buffer kettle 5, a buffer kettle high-pressure access hole 6, an access hole blind plate 7, a steel plate 8, a bolt 9 and a filling pipe II 11, the winch 4 is arranged on the ground and used for providing the force for stretching the steel wire rope, the pipeline is dredged, a filling drill hole is connected with the pipeline tee joint 1, one end of the pipeline tee joint 1 is used as a filling feeding pipe and is connected with the filling pipe I10, the other end of the pipeline tee joint is used as a channel of the steel wire rope 2, the blind plate 3 is covered on the channel, the steel wire rope 2 is wound in a roller of the aboveground winch 4, the rope body is arranged in a vertical filling drill hole, the tail end of the rope is fixed on the access hole blind plate 7 of the buffer kettle high-pressure access hole 6, the buffer kettle 5 is arranged underground, as shown in figure 2, the top of the buffer kettle 5 is connected with the vertical filling drill hole, a buffering kettle high-pressure access hole 6 is arranged on the side face of the buffering kettle 5 and is sealed by an access hole blind plate 7, a pipeline opening is formed in the other side face of the buffering kettle 5 and is connected with a horizontal filling pipe II 11, a steel plate 8 is embedded at the bottom of the roadway, and the buffering kettle 5 is fixed on a roadway bottom plate through a bolt 9.
A round small opening is formed in the blind plate 3 above the pipeline tee joint 1 and used for the steel wire rope 2 to pass through, and the diameter of the small opening is larger than that of the steel wire rope 2. The blind plate is used for sealing the three passages of the pipeline, and only one small opening is reserved for the steel wire rope to pass through.
The diameter of the steel wire rope 2 is 10mm-30mm according to the stress and the self-gravity when the steel wire rope is in contact with the filling material, and the abrasion and the chemical corrosion of slurry are reduced by adopting a galvanized steel wire rope; the steel wire rope 2 is reserved with 2-5m and placed at the bottom of the buffer pot 6. The model selection is carried out according to the viscous force generated by the steel wire rope and the filling material and the diameter of the filling pipeline, so that the steel wire rope is pulled to dredge the pipeline when the slurry is solidified and certain strength is ensured, and meanwhile, the influence of the steel wire rope on the flow of the slurry in the pipeline is reduced.
The device is provided with the buffer kettle underground, and is used for reducing the impact force of the filling materials on the joint of the vertical pipeline and the horizontal pipeline and reducing the abrasion of the pipeline. The diameter of the inner wall of the buffer pot 5 is 1.5 to 3 times of the diameter of the inner wall of the filling pipe 10, the buffer pot 5 is cylindrical, and the bottom of the buffer pot is provided with a through hole.
The using method of the device comprises the following steps:
the filling material enters the vertical filling pipeline through the pipeline tee joint 1, flows into the buffer kettle 5 and then enters the transverse pipeline for transportation. The steel wire rope 2 swings in the contact process of the filling materials, so that the possibility of pipe blockage caused by the filling materials is reduced. If a pipe blockage accident occurs, the winding drum is controlled by the winding engine 4 to pull up the steel wire rope 2, and the pipeline is dredged under the action of the reciprocating cutting force between the steel wire rope 2 and the filling material.
The following description is given with reference to specific examples.
Example 1
The Anhui iron ore adopts a filling mining method, the filling material realizes the self-flow conveying by utilizing a natural pressure head in a vertical drilling hole, and the inner diameter of the vertical drilling hole is 150 mm. The filling pipeline is easy to produce the falling of the drill hole lining and the blockage of the drill hole, and finally leads to the blockage of the filling material. The mine adopts the filling vertical drilling pipe blockage preventing device, the horizontal port of the tee joint on the mine is used for conveying filling materials, and the vertical port is used for a steel wire rope to pass through. The steel wire rope channel is closed by a blind plate, and a small opening with the diameter of 30mm is opened. A steel wire rope with the diameter of 17.5mm is selected according to theoretical calculation, an A-level zinc coating is adopted, slurry abrasion and chemical corrosion are reduced, and an idle 5t tensile winch in a mine is utilized. The steel wire rope is 2.5m in excess underground and is directly placed at the bottom of the buffer kettle. The diameter of the buffering kettle is 500mm, a high-pressure access hole and a filling pipeline hole are respectively formed in the kettle side, the access hole is sealed by a blind plate, a steel wire rope is fixed on the access hole blind plate, and the buffering kettle is fixed on a roadway bottom plate by using bolts. If pipe blockage occurs, the steel wire rope is axially pulled through the winch on the well, so that the steel wire rope and the filling material are rubbed and cut, and the purpose of dredging the pipeline is fulfilled.
While the foregoing is directed to the preferred embodiment of the present invention, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (5)

1. The utility model provides a mine fills flexible cutting of vertical drilling and prevents stifled and bottom antifriction integrated device which characterized in that: the underground filling device comprises an aboveground part and an underground part, wherein the aboveground part comprises a pipeline tee joint (1), a steel wire rope (2), a blind plate (3), a winch (4) and a filling pipe I (10), the underground part comprises a buffer kettle (5), a buffer kettle high-pressure access hole (6), an access hole blind plate (7), a steel plate (8), a bolt (9) and a filling pipe II (11), the winch (4) is arranged on the ground, the filling drilling hole is connected with the pipeline tee joint (1), one end of the pipeline tee joint (1) serves as a filling inlet pipe and is connected with the filling pipe I (10), the other end of the pipeline tee joint serves as a channel of the steel wire rope (2), the blind plate (3) covers the channel, the steel wire rope (2) is wound in a roller of the aboveground winch (4), a rope body is arranged in the vertical filling drilling hole, the tail end of the rope is fixed on the access hole blind plate (7) of the buffer kettle high-pressure access hole (6), the buffer kettle is arranged underground, the vertical filling drill hole is connected at the top of the buffering kettle (5), the buffering kettle high-pressure access hole (6) is arranged on the side face of the buffering kettle (5), the buffering kettle high-pressure access hole (6) is sealed by an access hole blind plate (7), a pipeline opening is formed in the other side face of the buffering kettle (5) and is connected with a horizontal filling pipe II (11), a steel plate (8) is embedded in the bottom of the roadway, and the buffering kettle (5) is fixed on the bottom plate of the roadway through bolts (9).
2. The mine filling vertical drilling flexible cutting anti-blocking and bottom friction reducing integrated device according to claim 1, characterized in that: a round small opening is formed in the blind plate (3) above the pipeline tee joint (1) and used for a steel wire rope (2) to pass through, and the diameter of the small opening is larger than that of the steel wire rope (2).
3. The mine filling vertical drilling flexible cutting anti-blocking and bottom friction reducing integrated device according to claim 1, characterized in that: the diameter of the steel wire rope (2) is 10mm-30mm, and the abrasion and chemical corrosion of slurry are reduced by adopting a galvanized steel wire rope; the steel wire rope (2) is reserved for 2-5m and placed at the bottom of the buffer pot (6).
4. The mine filling vertical drilling flexible cutting anti-blocking and bottom friction reducing integrated device according to claim 1, characterized in that: the diameter of the inner wall of the buffer kettle (5) is 1.5-3 times of that of the inner wall of the filling pipe I (10), the buffer kettle (5) is cylindrical, and a through hole is formed in the bottom of the buffer kettle.
5. The mine filling vertical drilling flexible cutting anti-blocking and bottom friction reducing integrated device according to claim 1, characterized in that: the steel wire rope (2) swings in the contact process with the filling materials to prevent the filling materials from blocking pipes, if a pipe blocking accident happens, the winding drum is controlled by the winding drum (4) to pull the steel wire rope (2) upwards, and the pipeline is dredged under the action of the reciprocating cutting force between the steel wire rope (2) and the filling materials.
CN202110410644.8A 2021-04-14 2021-04-14 Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling Pending CN113137271A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110410644.8A CN113137271A (en) 2021-04-14 2021-04-14 Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110410644.8A CN113137271A (en) 2021-04-14 2021-04-14 Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling

Publications (1)

Publication Number Publication Date
CN113137271A true CN113137271A (en) 2021-07-20

Family

ID=76813043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110410644.8A Pending CN113137271A (en) 2021-04-14 2021-04-14 Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling

Country Status (1)

Country Link
CN (1) CN113137271A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776886A (en) * 2022-05-17 2022-07-22 南京银茂铅锌矿业有限公司 Method for replacing filling pipe in vertical steel sleeve

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104384160A (en) * 2014-10-08 2015-03-04 中国矿业大学 Device and method for cleaning vertical feeding pipe
CN105019522A (en) * 2014-04-22 2015-11-04 吴广顺 Sewer dredger
JP2019027133A (en) * 2017-07-31 2019-02-21 サントリーホールディングス株式会社 Sanitation device and sanitation method in well pipe
CN210564652U (en) * 2019-07-08 2020-05-19 山东黄金归来庄矿业有限公司 Underground mine filling buffer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019522A (en) * 2014-04-22 2015-11-04 吴广顺 Sewer dredger
CN104384160A (en) * 2014-10-08 2015-03-04 中国矿业大学 Device and method for cleaning vertical feeding pipe
JP2019027133A (en) * 2017-07-31 2019-02-21 サントリーホールディングス株式会社 Sanitation device and sanitation method in well pipe
CN210564652U (en) * 2019-07-08 2020-05-19 山东黄金归来庄矿业有限公司 Underground mine filling buffer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776886A (en) * 2022-05-17 2022-07-22 南京银茂铅锌矿业有限公司 Method for replacing filling pipe in vertical steel sleeve
CN114776886B (en) * 2022-05-17 2023-10-03 南京银茂铅锌矿业有限公司 Method for replacing filling pipe in vertical steel sleeve

Similar Documents

Publication Publication Date Title
CN105952475B (en) A kind of residual exploiting field inbreak abandoned working grouting and reinforcing technology of coal mine and method
CN109505639B (en) Gob-side entry driving coal pillar reinforcing system and using method thereof
CN207934931U (en) A kind of energy dissipating decompressor and filling system
CN109798140A (en) Km Deep Soft Rock fracture grouting support reinforcement method
CN113137271A (en) Flexible cutting anti-blocking and bottom anti-friction integrated device for mine filling vertical drilling
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN104389634A (en) Mine vertical shaft/sieve shaft well wall structure and controllable dewatering method thereof
CN104564105B (en) A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing
CN106522218A (en) Cast-in-situ bored pile under-water concrete grouting steel conduct pipe
CN111764959B (en) Gas-liquid linkage high-concentration slurry grouting device and method for deep water-rich goaf
CN201649099U (en) Grout injector metal casting
CN104534168B (en) A kind of deep pipeline burying machine
CN103321678B (en) Gob filling device and gob filling method capable of prolonging service life of filling drilled hole
CN213682114U (en) Curtain grouting hole sealing replacement device
CN114017107B (en) Resistance-increasing pressure-relief system for filling slurry pipeline transportation and use method thereof
CN206554106U (en) Conehead muscle body posttension pile foundation
CN213116341U (en) Underground pressurized grouting water plugging soft and hard aggregate intermittent controllable filling device
CN205627308U (en) A high pressure buffering filter equipment for fill pipe network in pit
CN101250989A (en) Surface drilling down-hole sealing technique without unpackaging condition
CN208845140U (en) A kind of aggregate adding set applied to mine geological hazards
CN110725683A (en) Slurry circulation slag discharging system for shaft boring machine
CN102498771A (en) Salt drainage well with non-return function and construction method thereof
CN209099968U (en) A kind of pressure relief device that the brill of suitable underground 90 uses
CN201032052Y (en) Liquefied petroleum gas underground gas storage well
CN214660339U (en) Device for cleaning blockage of underground filling pipeline by filling and drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210720