Linkage adjustment method for intelligent production line of gypsum building materials Download PDF

Info

Publication number
CN113093668A
CN113093668A CN202110312048.6A CN202110312048A CN113093668A CN 113093668 A CN113093668 A CN 113093668A CN 202110312048 A CN202110312048 A CN 202110312048A CN 113093668 A CN113093668 A CN 113093668A
Authority
CN
China
Prior art keywords
section
speed
control
production
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110312048.6A
Other languages
Chinese (zh)
Other versions
CN113093668B (en
Inventor
杨小东
杨正波
栗运泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Building Materials Innovation and Technology Research Institute Co Ltd
Original Assignee
China National Building Materials Innovation and Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Building Materials Innovation and Technology Research Institute Co Ltd filed Critical China National Building Materials Innovation and Technology Research Institute Co Ltd
Priority to CN202110312048.6A priority Critical patent/CN113093668B/en
Publication of CN113093668A publication Critical patent/CN113093668A/en
Priority to PCT/CN2021/132950 priority patent/WO2022199093A1/en
Application granted granted Critical
Publication of CN113093668B publication Critical patent/CN113093668B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Programmable Controllers (AREA)
  • Control Of Conveyors (AREA)

Abstract

The invention discloses a linkage adjustment method for an intelligent production line of gypsum building materials, which comprises the steps of arranging a plurality of production lines, dividing each production line into a plurality of working sections according to the production flow, and establishing a linkage adjustment mode of the same type of control objects of the plurality of production lines; establishing a logic linkage system of a control object with the same property in all working sections of the active regulation production line, and leading the logic linkage system into a connection passive regulation production line; establishing a speed matching relation of all the workshop section regulating and controlling running speeds, and regulating and controlling the running speeds of all the workshop sections synchronously and equidirectionally by all the production lines according to the uniform speed matching relation; establishing a driving operation time matching relational expression of each section of all the production lines after the operation speed is adjusted to determine a new operation time point and operation interval time, and calculating a time point of finishing the next operation of each section; the invention can regulate and control the running speeds of a plurality of production lines in a linkage way, and can synchronously regulate and control the running speeds of different sections of the same production line in the same direction.

Description

Linkage adjustment method for intelligent production line of gypsum building materials
Technical Field
The invention relates to the technical field of gypsum building material production lines, in particular to a linkage adjusting method for an intelligent gypsum building material production line.
Background
The multifunctional decorative plate is an integrated multifunctional decorative plate which has the characteristics of personalized design, industrial production, assembly type construction, immediate installation and immediate installation, safety, environmental protection and the like, thoroughly changes the traditional decoration method and building material industry, perfectly replaces on-site wet operation such as putty scraping, paint brushing, paint coating, wall cloth sticking and the like, replaces various decoration materials such as wood, bricks, building blocks and the like, and thoroughly solves the pollution problem of indoor decoration from the root.
The production line of the dalle workshop consists of a plurality of working sections such as a feeding section, a panel turnover machine section, a dust collection section and a film laminating section, and the ring sections are buckled with each other and supplement each other. In the production process of the decorative plate, the gypsum board customized in a gypsum board workshop enters special film laminating equipment through a feeding machine, a panel turnover machine and a dust remover, and then is packaged into a brand-new decorative plate through film cutting.
However, the existing gypsum board production line has the following defects:
(1) the production lines are independently regulated and controlled and are not communicated with each other, the operation speed of the working section of each production line needs to be regulated and controlled manually and independently to regulate the operation speed, and the synchronous regulation and control of the production work of all the production lines in the same workshop cannot be realized;
(2) the devices of all the working sections belong to sectional control and do not have mutual communication, so that the speed difference exists among all the working sections in the production process, and the conditions of incomplete final coating, wrong adhesion and non-adhesion of edges are caused.
Disclosure of Invention
The invention aims to provide a linkage adjusting method for an intelligent production line of gypsum building materials, which aims to solve the technical problems that in the prior art, a plurality of production lines are independently regulated and controlled and are not communicated with each other, the operation speed of each production line section needs to be regulated and controlled manually and independently to adjust the operation speed, and equipment of each section belongs to sectional control and does not have mutual communication with each other.
In order to solve the technical problems, the invention specifically provides the following technical scheme:
a linkage adjusting method for an intelligent production line of gypsum building materials comprises the following steps:
100, setting a plurality of production lines, dividing each production line into a plurality of working sections according to a production flow, and creating a linkage adjustment mode of the same type of control objects of the plurality of production lines;
200, selecting one production line as an active regulation and control production line, using the rest production lines as passive regulation and control production lines, establishing a logic linkage system of a control object with the same property in all working sections of the active regulation and control production line, and introducing the logic linkage system into the passive regulation and control production line connected with a linkage adjustment mode;
300, respectively connecting all the sections in all the production lines with a PLC control system bus, selecting a production control object influencing the operation speed of the sections in each section of the active regulation production line, establishing a speed matching relational expression for regulating the operation speed of all the sections, and synchronously regulating the operation speed in the same direction by all the sections of the active regulation production line and the passive regulation production line by using a uniform speed matching relational expression;
step 400, creating a driving operation time matching relation after the operation speed of each section of all the production lines is adjusted, determining a new driving operation time point of each section after the operation speed is adjusted for the first time and an operation time interval corresponding to the current production speed, and determining a time point of next operation of each section according to the new driving operation time point and the operation time interval.
As a preferred scheme of the present invention, in step 100, the active regulation and control production line and the passive regulation and control production line form a parallel synchronous same-speed production mode in a linkage adjustment mode, and each section of the passive regulation and control production line and the active regulation and control production line is connected with a PLC control system bus;
and the same working sections of the active regulation production line and the passive regulation production line directly regulate and control production control objects by using a linkage regulation mode to synchronously modify the production control objects at the same amplitude so as to regulate and control the running speeds of all the production lines to be the same.
As a preferred scheme of the present invention, the PLC control system is configured to dynamically regulate and control the number of production lines connected to the coordinated adjustment mode for parallel production, and the PLC control system regulates and controls the production lines connected to the coordinated adjustment mode to change the operation speeds of all the work sections according to the same speed matching relationship, and performs production work after regulating and controlling the operation speeds;
and the PLC control system closes the linkage adjustment mode of any production line to independently regulate and control the production line.
As a preferred scheme of the present invention, in step 200, the production line of gypsum boards is divided into a plurality of sections from top to bottom, which are a feeding flap control section, a film coating treatment section, a film coating chasing shear control section and a discharging flap section, respectively, and multidimensional control parameters of each section are divided into an operation speed control object, a position control object and a pneumatic element control object;
the PLC control system respectively establishes logic linkage systems of operation speed control objects, position control objects and pneumatic element control objects in all the working sections.
As a preferred scheme of the invention, the film covering treatment working section and the film covering chasing and shearing control working section both comprise a segmented conveying system, and the operation speed control object comprises the feeding turning plate control working section, the film covering treatment working section, the film covering chasing and shearing control working section, the discharging turning plate working section and the production control object influencing the operation speed in the segmented conveying system;
the implementation method for adjusting the conveying speed of the segmented conveying system comprises the following steps:
establishing a mapping relation between the operating speed of the working section and the conveying speed of the corresponding segmented conveying system;
and on the premise of ensuring that the gypsum boards are conveyed and transferred according to the stable distance, the conveying speed of the sectional conveying system is adjusted according to the mapping relation.
As a preferred aspect of the present invention, in step 300, the operating speed of each station is changed into two modes, which are respectively:
regulating and controlling the operation speed of the workshop section on a human-computer interaction interface of the PLC control system, adjusting the parameters of the production control object by the PLC control system according to a function model between the production control object and the workshop section operation speed, and changing the numerical value of the production control object of the corresponding workshop section by the PLC control system;
and regulating and controlling parameters of a production control object on a human-computer interaction interface of the PLC control system, and calculating the operation speed of the workshop section by the PLC control system according to a function model between the production control object and the workshop section operation speed.
As a preferred scheme of the present invention, in step 300, a specific implementation method for establishing a speed matching relation of the operating speeds of all the sections of the production line with the linkage adjustment mode includes:
determining the speed regulation and control amplitude of a working section which is used for actively regulating and controlling the running speed;
the PLC control system changes the operation speed of the same working section on the passive regulation production line with the linkage regulation mode according to the same speed regulation amplitude;
the speed matching relational expression is used for indirectly adjusting according to the same speed adjusting and controlling amplitude so as to synchronously and equidirectionally adjust the running speeds of other working sections;
the PLC control system synchronously adjusts the running speed of all the working sections on the passive regulation production line with the linkage adjustment mode in the same direction according to the same speed matching relational expression;
and adjusting a production control object of the conveying system according to the mapping relation between the working section running speed and the conveying speed of the conveying system so as to keep the fixed distance between the head and the tail of the two gypsum boards.
As a preferred scheme of the present invention, the specific implementation steps of the driving operation time matching relation after the operation speed of each section is adjusted are as follows:
before the running speed of each section is not adjusted, determining the time interval T1 of each section at the original running speed for producing the gypsum board once per operation of the control object;
modifying the initial operation time point of the gypsum board for the primary operation of each working section when the operation speed of each working section is adjusted for the primary time, and taking the operation time point as a new operation starting point;
a new time interval T2 for each operation of gypsum board after the adjusted operating speed of each section is determined, and each section adjusts a point in time for the next operation of the production control object for each section according to the new time interval T2.
As a preferred scheme of the present invention, after the operation speed of each section is adjusted for the first time, a specific implementation manner for determining the initial operation time point is as follows:
synchronously suspending the switches of the feeding turnover plate control working sections of all the production lines, and continuing the work of the film coating treatment working section, the film coating chasing and shearing control working section and the blanking turnover plate working section until all the gypsum plates on the segmented conveying system are completely treated;
and synchronously pausing the film covering treatment working sections, the film covering chasing and shearing control working sections, the blanking plate turnover working sections and the segmented conveying system of all the production lines, writing in the adjusted parameters of the production control object, starting all the working sections, and determining the initial operation time point of each working section.
As a preferred scheme of the invention, the specific implementation method for determining the new time interval T2 of each operation of the gypsum board after the adjustment of the running speed of each section is as follows:
determining new time intervals T2 'and T2' corresponding to the film covering treatment working sections and the film covering chasing and shearing control working sections separately according to the running speeds of the film covering treatment working sections and the film covering chasing and shearing control working sections and the transportation speed adjusted by the segmented conveying system positioned above the rest working sections;
and a functional relationship exists between the new time interval T2 'and the running speed of the film covering treatment section and the corresponding transportation speed adjusted by the segmented conveying system, and a functional relationship exists between the new time interval T2' and the running speed of the film covering chasing and shearing control section and the corresponding transportation speed adjusted by the segmented conveying system.
Compared with the prior art, the invention has the following beneficial effects:
the invention not only synchronously regulates and controls the running speeds of different sections of the same production line in the same direction, but also further regulates and controls the running speeds of a plurality of production lines in a linkage manner, so that all the production lines can keep the same production speed, and even when the running speeds are regulated and controlled, all the production lines are synchronously regulated in the same direction to reduce or improve the running speeds so as to improve the production efficiency, so that the multiple production lines realize the united production of joint control, and gypsum boards produced in the same batch have the same performance and the production speeds are matched in the same production workshop.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
Fig. 1 is a schematic flow chart of the production line linkage regulation and control provided in the embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the present invention provides a linkage adjustment method for intelligent gypsum building material production lines, which not only synchronously and unidirectionally adjusts and controls the operating speeds of different sections of the same production line, but also further coordinately adjusts and controls the operating speeds of a plurality of production lines, so that all production lines can maintain the same speed for production, and even when the operating speeds are adjusted and controlled, all production lines are synchronously and unidirectionally adjusted to reduce or increase the operating speeds to improve the production efficiency, thereby enabling a plurality of production lines to realize joint control unified production.
The method specifically comprises the following steps:
100, setting a plurality of production lines, dividing each production line into a plurality of working sections according to a production flow, and creating a linkage adjustment mode of the same type of control objects of the plurality of production lines;
200, selecting one production line as an active regulation and control production line, using the rest production lines as passive regulation and control production lines, establishing a logic linkage system of a control object with the same property in all working sections of the active regulation and control production line, and introducing the logic linkage system into the passive regulation and control production line connected with a linkage adjustment mode;
300, respectively connecting all the sections in all the production lines with a PLC control system bus, selecting a production control object influencing the operation speed of the sections in each section of the active regulation production line, establishing a speed matching relational expression for regulating the operation speed of all the sections, and synchronously regulating the operation speed in the same direction by all the sections of the active regulation production line and the passive regulation production line by using a uniform speed matching relational expression;
step 400, creating a driving operation time matching relation after the operation speed of each section of all the production lines is adjusted, determining a new driving operation time point of each section after the operation speed is adjusted for the first time and an operation time interval corresponding to the current production speed, and determining a time point of next operation of each section according to the new driving operation time point and the operation time interval.
In step 100, the active regulation production line and the passive regulation production line form a parallel synchronous same-speed production mode in a linkage regulation mode, and each section of the passive regulation production line and the active regulation production line is connected with a PLC control system bus;
the same working sections of the active regulation production line and the passive regulation production line directly regulate and control production control objects by using a linkage regulation mode to synchronously modify the production control objects with the same amplitude so as to regulate and control the running speeds of all the production lines to be the same.
The PLC control system is used for dynamically regulating and controlling the number of production lines connected with the linkage adjustment mode and used for parallel production, regulating and controlling the production lines connected into the linkage adjustment mode by the PLC control system to change the running speeds of all the sections according to the same speed matching relation, and carrying out production work after regulating and controlling the running speeds;
the PLC control system closes the linkage adjustment mode of any production line to independently regulate and control the production line.
In step 200, the production line of the gypsum board is divided into a plurality of working sections from top to bottom, namely a feeding turning plate control working section, a film coating treatment working section, a film coating chasing shear control working section and a discharging turning plate working section, and the multidimensional control parameters of each working section are divided into an operation speed control object, a position control object and a pneumatic element control object;
the PLC control system respectively establishes logic linkage systems of all the working sections with respect to an operation speed control object, a position control object and a pneumatic element control object.
After any control object of any working section in each logic linkage system is adjusted, the same control objects in other working sections in the logic linkage system are synchronously and synchronously adjusted under logic control.
In order to conveniently regulate and control the running speeds of all production lines, namely the production speeds, the same working sections of all the production lines are subjected to associated regulation and control by using the linkage regulation and control mode, all the production lines use the same speed matching relational expression and the same driving running time matching relational expression, when all the production lines are subjected to associated regulation and control by using the linkage regulation and control mode, after the running speed of any working section of any one production line is selected and regulated, other production lines are synchronously regulated to the modified running speed, and other production lines regulate all the working sections to synchronously change the running speed according to the same speed matching relational expression and the same driving running time matching relational expression.
Therefore, in the embodiment, if the production speed of the production line needs to be changed, the running speed of any section of any production line is selected, and the synchronous and equidirectional uniform adjustment of all the production speeds can be realized, so that the gypsum building material production line of the embodiment adopts a top-down mode, the whole production line is decomposed into a plurality of sections according to modularization and systematization, different devices in each section are divided into control objects with different working properties, the control objects with the same working type of all the sections are independent and mutually connected, when the control object of one section is changed, the control objects with the same property in other sections are synchronously changed in the same direction, each section of other production lines keeps a uniform modification mode with the directly adjusted section, and all the control is realized by the data regulation and control of a PLC control system to regulate the running state of the control object of each section, the control mode logic is clear, the structure is simple, the operation is stable, and the efficiency is high.
In step 300, the operating speed of each station is changed in two ways, respectively:
regulating and controlling the operation speed of the workshop section on a human-computer interaction interface of a PLC control system, adjusting parameters of a production control object by the PLC control system according to a function model between the production control object and the workshop section operation speed, and changing the numerical value of the production control object of the corresponding workshop section by the PLC control system;
and regulating and controlling parameters of the production control object on a human-computer interaction interface of the PLC control system, and calculating the operation speed of the workshop section by the PLC control system according to a function model between the production control object and the workshop section operation speed.
The running speed of each working section is related to the corresponding speed control object, a stable control system of the gypsum board production line is formed, and a logic linkage system is established among the running speeds of all the working sections to ensure that the running speeds of all the working sections are synchronously and homodromously adjusted, so that the running speeds of other working sections do not need to be manually adjusted, and the whole system can still maintain a stable production flow after the running speed is adjusted.
On a human-computer interaction interface of the PLC control system, a production control object of each workshop section and the workshop section running speed of each workshop section form an independent module, a worker can adjust parameters of the production control object, determine the running speed of each workshop section according to a function model between the production control object and the workshop section running speed, or directly adjust the running speed, determine the parameters of the production control object according to the function model between the production control object and the workshop section running speed, and change the parameters of the production control object through the PLC control system.
In step 300, the specific implementation method for establishing the speed matching relation of the operating speeds of all the sections of the production line with the linkage adjustment mode is as follows:
determining the speed regulation amplitude of a working section for directly regulating the running speed on the active regulation production line, wherein the speed regulation amplitude is (V2-V1)/V1 when the working section A is changed from the original V1 to V2;
the PLC control system changes the operation speed of the same working section on the passive regulation production line with the linkage regulation mode according to the same speed regulation amplitude, and the synchronous regulation working section A is changed from the original V1 to V2, so that the speed regulation amplitude is (V2-V1)/V1;
the speed matching relation is used for indirectly adjusting according to the same speed regulation amplitude so as to synchronously and equidirectionally adjust the running speeds of other working sections, and the running speeds of the other working sections are adjusted to be V + V (V2-V1)/V1;
the PLC control system synchronously adjusts the running speed of all the working sections on the passive regulation production line with the linkage adjustment mode in the same direction according to the same speed matching relation, and the running speeds of other working sections are adjusted to V + V (V2-V1)/V1;
and adjusting a production control object of the conveying system according to the mapping relation between the working section running speed and the conveying speed of the conveying system so as to keep the fixed distance between the head and the tail of the two gypsum boards.
It is to be noted that the film covering treatment section and the film covering chasing and shearing control section both comprise a segmented conveying system, and the operation speed control objects comprise a feeding turning plate control section, a film covering treatment section, a film covering chasing and shearing control section, a discharging turning plate section and production control objects influencing the operation speed in the segmented conveying system;
the implementation method for adjusting the conveying speed of the segmented conveying system comprises the following steps:
establishing a mapping relation between the operating speed of the working section and the conveying speed of the corresponding segmented conveying system;
and on the premise of ensuring that the gypsum boards are conveyed and transferred according to the stable spacing, the conveying speed of the sectional conveying system is adjusted according to the mapping relation.
Therefore, the operation speed of each working section is linked, the mapping relation between the operation speed of the working sections and the segmented conveying speed is limited, and because the head-tail neutral position of the gypsum board cannot be too large and the adjacent boards cannot be collided during the operation of each working section, in order to ensure stable operation, the adjusted conveying speed of the segmented conveying system is determined according to the mapping relation between the operation speed of the working sections and the conveying speed of the segmented conveying system behind the working sections and the adjusted working section operation speed under the condition that the distance between different segmented conveying systems is fixed and unchanged under the general condition.
In step 400, the specific implementation steps of the driving operation time matching relation after the operation speed is adjusted in each section are as follows:
first, before the operation speed of each section is not adjusted, a time interval T1 is determined for each section to operate the gypsum board once at the original operation speed by the production control object.
When the running speed of each section is not adjusted, each section keeps the original running speed, at the moment, each section independently completes the operation on the gypsum board at a fixed time interval, for example, the feeding turning plate control section completes the feeding turning plate operation on the gypsum board at every interval t1, the film covering treatment section completes the feeding turning plate operation on the gypsum board at every interval t2, the film covering chasing and shearing control section completes the feeding turning plate operation on the gypsum board at every interval t3, and the discharging turning plate section completes the feeding turning plate operation on the gypsum board at every interval t 4.
And secondly, modifying the initial operation time point of the gypsum board for the initial operation of each section when the operation speed of each section is adjusted for the first time, and taking the operation time point as a new operation starting point.
And after the running speed of one working section is directly adjusted, the corresponding running speeds of other working sections are simultaneously and unidirectionally adjusted according to the speed matching relation, so that the whole production line of the gypsum board realizes dynamic balance at a new running speed.
After the operation speed of each section is adjusted for the first time, the specific implementation mode for determining the initial operation time point is as follows:
synchronously suspending the switches of the feeding turnover panel control working sections of all the production lines, and continuing working of the film coating treatment working section, the film coating chasing and shearing control working section and the blanking turnover panel working section until all gypsum boards on the segmented conveying system are completely treated;
and synchronously pausing the film covering treatment working sections, the film covering chasing and shearing control working sections, the blanking turnover plate working sections and the segmented conveying system of all the production lines, writing in the adjusted parameters of the production control object, starting all the working sections, and determining the initial operation time point of each working section.
And determining a new time interval T2 for each operation of the gypsum board after the operation speed of each section is adjusted, and adjusting the time point of the next operation of the production control object of each section according to the new time interval T2 for each section.
The specific implementation method for determining the new time interval T2 of each operation of the gypsum board after the adjustment of the running speed of each section is as follows:
the operation speeds of the film covering treatment working section and the film covering chasing and shearing control working section are combined, and the transportation speed adjusted by the segmented conveying system positioned above the rest working sections is combined, so that new time intervals T2 'and T2' of the corresponding working sections are independently determined;
and a functional relationship exists between the new time interval T2 'and the running speed of the film covering treatment section and the transportation speed adjusted by the corresponding segmented conveying system, and a functional relationship exists between the new time interval T2' and the running speed of the film covering chasing and shearing control section and the transportation speed adjusted by the corresponding segmented conveying system.
Therefore, after the operation speed of a certain section of a certain production line is adjusted, the operation speeds of other sections are regulated and controlled by adopting bus control, the parameter adjustment condition of the production control object of the sections is determined according to a function model between the operation speed of each section and the production control object parameter, and the operation mode of the production control object is changed by utilizing servo control.
In addition, when the running speed of a certain workshop section of a certain production line is adjusted, the PLC control system is utilized to regulate and control the same workshop section of other production lines connected into a linkage adjustment mode to synchronously adjust the running speed, and all workshop sections of other production lines adjust the synchronous and equidirectional change running speed of all the workshop sections according to the same regulation and control mode, so that unified production of joint control of a plurality of production lines is realized.
The above embodiments are only exemplary embodiments of the present application, and are not intended to limit the present application, and the protection scope of the present application is defined by the claims. Various modifications and equivalents may be made by those skilled in the art within the spirit and scope of the present application and such modifications and equivalents should also be considered to be within the scope of the present application.

Claims (10)

1. A linkage adjustment method for an intelligent production line of gypsum building materials is characterized by comprising the following steps: the method comprises the following steps:
100, setting a plurality of production lines, dividing each production line into a plurality of working sections according to a production flow, and creating a linkage adjustment mode of the same type of control objects of the plurality of production lines;
200, selecting one production line as an active regulation and control production line, using the rest production lines as passive regulation and control production lines, establishing a logic linkage system of a control object with the same property in all working sections of the active regulation and control production line, and introducing the logic linkage system into the passive regulation and control production line connected with a linkage adjustment mode;
300, respectively connecting the same sections in all the production lines with a PLC control system bus, selecting a production control object influencing the operation speed of the sections in each section of the active regulation production line, and establishing a speed matching relation of the regulation operation speeds of all the sections so as to synchronously and synchronously regulate the operation speeds of all the sections of the active regulation production line and the passive regulation production line in the same direction;
step 400, creating a driving operation time matching relation after the operation speed of each section of all the production lines is adjusted, determining a new driving operation time point of each section after the operation speed is adjusted for the first time and an operation time interval corresponding to the current production speed, and determining a time point of next operation of each section according to the new driving operation time point and the operation time interval.
2. The linkage adjusting method and system for the intelligent production line of gypsum building materials according to claim 1, wherein the linkage adjusting method comprises the following steps: in step 100, the active regulation and control production line and the passive regulation and control production line form a parallel synchronous same-speed production mode in a linkage regulation mode, and each section of the passive regulation and control production line and each section of the active regulation and control production line are connected with a PLC control system bus;
and the same working sections of the active regulation production line and the passive regulation production line directly regulate and control production control objects by using a linkage regulation mode to synchronously modify the production control objects at the same amplitude so as to regulate and control the running speeds of all the production lines to be the same.
3. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 2, which is characterized in that: the PLC control system is used for dynamically regulating and controlling the number of production lines connected with the linkage adjustment mode and used for parallel production, regulating and controlling the production lines connected with the linkage adjustment mode by the PLC control system to change the running speeds of all the sections according to the same speed matching relational expression, and carrying out production work after regulating and controlling the running speeds;
and the PLC control system closes the linkage adjustment mode of any production line to independently regulate and control the production line.
4. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 2, which is characterized in that: in step 200, the production line of the gypsum board is divided into a plurality of working sections from top to bottom, namely a feeding turning plate control working section, a film coating treatment working section, a film coating chasing shear control working section and a discharging turning plate working section, and the multidimensional control parameters of each working section are divided into an operation speed control object, a position control object and a pneumatic element control object;
the PLC control system respectively establishes logic linkage systems of operation speed control objects, position control objects and pneumatic element control objects in all the working sections.
5. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 4, which is characterized in that: the film covering treatment working section and the film covering chasing and shearing control working section comprise segmented conveying systems, and the operation speed control objects comprise the feeding turning plate control working section, the film covering treatment working section, the film covering chasing and shearing control working section, the discharging turning plate working section and the production control objects influencing the operation speed in the segmented conveying systems;
the implementation method for adjusting the conveying speed of the segmented conveying system comprises the following steps:
establishing a mapping relation between the operating speed of the working section and the conveying speed of the corresponding segmented conveying system;
and on the premise of ensuring that the gypsum boards are conveyed and transferred according to the stable distance, the conveying speed of the sectional conveying system is adjusted according to the mapping relation.
6. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 4, which is characterized in that: in step 300, the operating speed of each station is changed in two ways, respectively:
regulating and controlling the operation speed of the workshop section on a human-computer interaction interface of the PLC control system, adjusting the parameters of the production control object by the PLC control system according to a function model between the production control object and the workshop section operation speed, and changing the numerical value of the production control object of the corresponding workshop section by the PLC control system;
and regulating and controlling parameters of a production control object on a human-computer interaction interface of the PLC control system, and calculating the operation speed of the workshop section by the PLC control system according to a function model between the production control object and the workshop section operation speed.
7. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 6, which is characterized in that: in step 300, the specific implementation method for establishing the speed matching relation of the operating speeds of all the sections of the production line with the linkage adjustment mode is as follows:
determining the speed regulation and control amplitude of a working section which is used for actively regulating and controlling the running speed;
the PLC control system changes the operation speed of the same working section on the passive regulation production line with the linkage regulation mode according to the same speed regulation amplitude;
the speed matching relational expression is used for indirectly adjusting according to the same speed adjusting and controlling amplitude so as to synchronously and equidirectionally adjust the running speeds of other working sections;
the PLC control system synchronously adjusts the running speed of all the working sections on the passive regulation production line with the linkage adjustment mode in the same direction according to the same speed matching relational expression;
and adjusting a production control object of the conveying system according to the mapping relation between the working section running speed and the conveying speed of the conveying system so as to keep the fixed distance between the head and the tail of the two gypsum boards.
8. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 7, which is characterized in that: the concrete implementation steps of the driving operation time matching relational expression after the operation speed of each section is adjusted are as follows:
before the running speed of each section is not adjusted, determining the time interval T1 of each section at the original running speed for producing the gypsum board once per operation of the control object;
modifying the initial operation time point of the gypsum board for the primary operation of each working section when the operation speed of each working section is adjusted for the primary time, and taking the operation time point as a new operation starting point;
a new time interval T2 for each operation of gypsum board after the adjusted operating speed of each section is determined, and each section adjusts a point in time for the next operation of the production control object for each section according to the new time interval T2.
9. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 8, which is characterized in that: after the operation speed of each section is adjusted for the first time, the specific implementation mode for determining the initial operation time point is as follows:
synchronously suspending the switches of the feeding turnover plate control working sections of all the production lines, and continuing the work of the film coating treatment working section, the film coating chasing and shearing control working section and the blanking turnover plate working section until all the gypsum plates on the segmented conveying system are completely treated;
and synchronously pausing the film covering treatment working sections, the film covering chasing and shearing control working sections, the blanking plate turnover working sections and the segmented conveying system of all the production lines, writing in the adjusted parameters of the production control object, starting all the working sections, and determining the initial operation time point of each working section.
10. The linkage adjusting method of the intelligent production line of gypsum building materials as claimed in claim 9, which is characterized in that: the specific implementation method for determining the new time interval T2 of each operation of the gypsum board after the running speed of each section is adjusted comprises the following steps:
determining new time intervals T2 'and T2' corresponding to the film covering treatment working sections and the film covering chasing and shearing control working sections separately according to the running speeds of the film covering treatment working sections and the film covering chasing and shearing control working sections and the transportation speed adjusted by the segmented conveying system positioned above the rest working sections;
and a functional relationship exists between the new time interval T2 'and the running speed of the film covering treatment section and the corresponding transportation speed adjusted by the segmented conveying system, and a functional relationship exists between the new time interval T2' and the running speed of the film covering chasing and shearing control section and the corresponding transportation speed adjusted by the segmented conveying system.
CN202110312048.6A 2021-03-24 2021-03-24 Linkage adjustment method for intelligent production line of gypsum building materials Active CN113093668B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202110312048.6A CN113093668B (en) 2021-03-24 2021-03-24 Linkage adjustment method for intelligent production line of gypsum building materials
PCT/CN2021/132950 WO2022199093A1 (en) 2021-03-24 2021-11-25 Linkage adjustment method for intelligent production line of gypsum building material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110312048.6A CN113093668B (en) 2021-03-24 2021-03-24 Linkage adjustment method for intelligent production line of gypsum building materials

Publications (2)

Publication Number Publication Date
CN113093668A true CN113093668A (en) 2021-07-09
CN113093668B CN113093668B (en) 2022-06-03

Family

ID=76669363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110312048.6A Active CN113093668B (en) 2021-03-24 2021-03-24 Linkage adjustment method for intelligent production line of gypsum building materials

Country Status (2)

Country Link
CN (1) CN113093668B (en)
WO (1) WO2022199093A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022199093A1 (en) * 2021-03-24 2022-09-29 中建材创新科技研究院有限公司 Linkage adjustment method for intelligent production line of gypsum building material

Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1090068A (en) * 1992-11-30 1994-07-27 Pfu株式会社 Versatile production system and method for operating thereof
GB9418466D0 (en) * 1990-09-17 1994-11-02 Honda Motor Co Ltd Production control method and system therefor
US20060048686A1 (en) * 2002-06-07 2006-03-09 Hirokazu Watanabe Production lines utilizing auto guided pallet and production line design support system
CN101673421A (en) * 2009-10-12 2010-03-17 武汉钢铁(集团)公司 Automatic recording system for running time of production line device
US20100095502A1 (en) * 2008-10-16 2010-04-22 The Coca-Cola Company Method of configuring a production line to mass customize shaped vessels
CN102040103A (en) * 2009-10-09 2011-05-04 米勒·马蒂尼控股有限公司 Method and device for producing and loading of bundles of printed material
CN103217964A (en) * 2013-04-27 2013-07-24 龙岩烟草工业有限责任公司 Method and system to control multiple silk making production lines to achieve balanced feeding
CN103240800A (en) * 2012-02-03 2013-08-14 济南高新开发区七星实业有限公司 Composite insulation board production line
CN104122862A (en) * 2014-07-09 2014-10-29 江苏云道信息技术有限公司 Production line connecting system and method without master control
CN203982160U (en) * 2014-06-23 2014-12-03 天津滨海中冠胶管有限公司 A kind of rubber weather strip production line control system
CN104176924A (en) * 2014-09-05 2014-12-03 秦皇岛玻璃工业研究设计院 Multiple glass plate selecting device and method for selecting multiple glass plates at cold end of plate glass production line
CN104309100A (en) * 2014-08-22 2015-01-28 安庆市兴丰工贸有限公司 A fully-automatic bottle blowing production line
CN204374733U (en) * 2014-09-15 2015-06-03 北新集团建材股份有限公司 A kind of automatic control system of gypsum board manufacture system
US20150301521A1 (en) * 2014-04-17 2015-10-22 Masitek Instruments Inc. Systems, methods, devices and computer readable medium for real and near-real time sensor data capture and analysis
CN105425734A (en) * 2014-09-15 2016-03-23 北新集团建材股份有限公司 Automatic control system of plasterboard production system
CN205405242U (en) * 2016-03-02 2016-07-27 泰山石膏股份有限公司 A many production lines autonomous system for producing thistle board
CN105988449A (en) * 2015-03-06 2016-10-05 北新集团建材股份有限公司 Production line monitoring method, remote client, server and upper computer
CN107463152A (en) * 2017-07-14 2017-12-12 广东省生物工程研究所(广州甘蔗糖业研究所) A kind of cane sugar factory production scheduling system and its operation method
CN207481071U (en) * 2017-06-30 2018-06-12 广东方振新材料精密组件有限公司 A kind of injection and liquid condition shaping linkage production line
CN108341222A (en) * 2018-04-27 2018-07-31 张家港卡福新材料有限公司 The synchronization feeding system of a plurality of production line of Wood-plastic floor
CN108607759A (en) * 2016-12-19 2018-10-02 德阳新升机电有限责任公司 automatic spraying production line
CN109358561A (en) * 2018-12-19 2019-02-19 济南华富锻造有限公司 A kind of control system of frotton production line automation production
CN209125305U (en) * 2018-08-01 2019-07-19 福建天广消防有限公司 A kind of indoor hydrant valve body automatic production line
WO2019158650A2 (en) * 2018-02-14 2019-08-22 Langenstein & Schemann Gmbh Production system, production module, method for operating and setting up a production line, and method for producing a workpiece
CN209543125U (en) * 2019-01-16 2019-10-25 湖北三峡职业技术学院 A kind of amino acids production line automatic control device
CN110850822A (en) * 2019-11-06 2020-02-28 故城北新建材有限公司 Power-saving control system and method for gypsum board production line
CN111301982A (en) * 2019-11-12 2020-06-19 深圳中集智能科技有限公司 Synchronous beat system and control method for container production factory
CN111908086A (en) * 2020-07-22 2020-11-10 北新建材(昆明)有限公司 Automatic conveying device for base plates and adjusting and controlling method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7027883B2 (en) * 2003-10-08 2006-04-11 Taiwan Semiconductor Manufacturing Co., Ltd. Tool reserve for single fabrication and homogenous MES
CN108614538B (en) * 2018-06-21 2023-07-21 烟台东方能源科技有限公司 Control method for orderly operation of industrial equipment
CN113093668B (en) * 2021-03-24 2022-06-03 中建材创新科技研究院有限公司 Linkage adjustment method for intelligent production line of gypsum building materials

Patent Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9418466D0 (en) * 1990-09-17 1994-11-02 Honda Motor Co Ltd Production control method and system therefor
CN1090068A (en) * 1992-11-30 1994-07-27 Pfu株式会社 Versatile production system and method for operating thereof
US20060048686A1 (en) * 2002-06-07 2006-03-09 Hirokazu Watanabe Production lines utilizing auto guided pallet and production line design support system
US20100095502A1 (en) * 2008-10-16 2010-04-22 The Coca-Cola Company Method of configuring a production line to mass customize shaped vessels
CN102040103A (en) * 2009-10-09 2011-05-04 米勒·马蒂尼控股有限公司 Method and device for producing and loading of bundles of printed material
CN101673421A (en) * 2009-10-12 2010-03-17 武汉钢铁(集团)公司 Automatic recording system for running time of production line device
CN103240800A (en) * 2012-02-03 2013-08-14 济南高新开发区七星实业有限公司 Composite insulation board production line
CN103217964A (en) * 2013-04-27 2013-07-24 龙岩烟草工业有限责任公司 Method and system to control multiple silk making production lines to achieve balanced feeding
US20150301521A1 (en) * 2014-04-17 2015-10-22 Masitek Instruments Inc. Systems, methods, devices and computer readable medium for real and near-real time sensor data capture and analysis
CN203982160U (en) * 2014-06-23 2014-12-03 天津滨海中冠胶管有限公司 A kind of rubber weather strip production line control system
CN104122862A (en) * 2014-07-09 2014-10-29 江苏云道信息技术有限公司 Production line connecting system and method without master control
CN104309100A (en) * 2014-08-22 2015-01-28 安庆市兴丰工贸有限公司 A fully-automatic bottle blowing production line
CN104176924A (en) * 2014-09-05 2014-12-03 秦皇岛玻璃工业研究设计院 Multiple glass plate selecting device and method for selecting multiple glass plates at cold end of plate glass production line
CN105425734A (en) * 2014-09-15 2016-03-23 北新集团建材股份有限公司 Automatic control system of plasterboard production system
CN204374733U (en) * 2014-09-15 2015-06-03 北新集团建材股份有限公司 A kind of automatic control system of gypsum board manufacture system
CN105988449A (en) * 2015-03-06 2016-10-05 北新集团建材股份有限公司 Production line monitoring method, remote client, server and upper computer
CN205405242U (en) * 2016-03-02 2016-07-27 泰山石膏股份有限公司 A many production lines autonomous system for producing thistle board
CN108607759A (en) * 2016-12-19 2018-10-02 德阳新升机电有限责任公司 automatic spraying production line
CN207481071U (en) * 2017-06-30 2018-06-12 广东方振新材料精密组件有限公司 A kind of injection and liquid condition shaping linkage production line
CN107463152A (en) * 2017-07-14 2017-12-12 广东省生物工程研究所(广州甘蔗糖业研究所) A kind of cane sugar factory production scheduling system and its operation method
WO2019158650A2 (en) * 2018-02-14 2019-08-22 Langenstein & Schemann Gmbh Production system, production module, method for operating and setting up a production line, and method for producing a workpiece
CN108341222A (en) * 2018-04-27 2018-07-31 张家港卡福新材料有限公司 The synchronization feeding system of a plurality of production line of Wood-plastic floor
CN209125305U (en) * 2018-08-01 2019-07-19 福建天广消防有限公司 A kind of indoor hydrant valve body automatic production line
CN109358561A (en) * 2018-12-19 2019-02-19 济南华富锻造有限公司 A kind of control system of frotton production line automation production
CN209543125U (en) * 2019-01-16 2019-10-25 湖北三峡职业技术学院 A kind of amino acids production line automatic control device
CN110850822A (en) * 2019-11-06 2020-02-28 故城北新建材有限公司 Power-saving control system and method for gypsum board production line
CN111301982A (en) * 2019-11-12 2020-06-19 深圳中集智能科技有限公司 Synchronous beat system and control method for container production factory
CN111908086A (en) * 2020-07-22 2020-11-10 北新建材(昆明)有限公司 Automatic conveying device for base plates and adjusting and controlling method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘明黎: "自动化生产线中速度的同步控制原理及应用", 《制造业自动化》 *
刘明黎: "自动化生产线中速度的同步控制原理及应用", 《制造业自动化》, vol. 34, no. 20, 25 October 2012 (2012-10-25) *
杨小东: "石膏板高速接纸电控***的研发和应用", 《制造业自动化》 *
杨小东: "石膏板高速接纸电控***的研发和应用", 《制造业自动化》, vol. 37, no. 24, 25 December 2015 (2015-12-25) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022199093A1 (en) * 2021-03-24 2022-09-29 中建材创新科技研究院有限公司 Linkage adjustment method for intelligent production line of gypsum building material

Also Published As

Publication number Publication date
WO2022199093A1 (en) 2022-09-29
CN113093668B (en) 2022-06-03

Similar Documents

Publication Publication Date Title
CN113093821B (en) System and method for regulating and controlling working section speed of intelligent production line of gypsum building materials
CN113093667B (en) Intelligent monitoring system and method for intelligent production line of gypsum building materials
CN113093668B (en) Linkage adjustment method for intelligent production line of gypsum building materials
CN106894977A (en) Many frequency-changing control systems and control method
WO2022267328A1 (en) Multi-specification replacement system and method for gypsum building materials
CN107458032A (en) Wet section of control system of corrugated paper board production line
CN207310659U (en) Wet section of control system of corrugated paper board production line
CN206581340U (en) Many frequency-changing control systems
CN208180289U (en) A kind of building decoration lines self-adhesion grid cloth coating machine
CN203149352U (en) Distributed control system for production of light calcium carbonate
CN107589728A (en) A kind of intelligent vehicle clock system and method
CN204399532U (en) A kind of full-automatic double-face glue plastering machine
CN206538924U (en) Plug-in type ceiling decoration structure
CN105921362B (en) A kind of coating machine positive and negative coating alignment system
CN206153314U (en) Contour plate former
CN104313893A (en) After finishing process of novel environment-friendly home textile fabric
CN104896953B (en) The control method of cement-kiln grate-cooler and system
CN209318002U (en) A kind of paint spray booth's carton apparatus for automatic change
CN201017208Y (en) Intelligent electricity saving controller
CN113359636A (en) Position regulation and control system and method applied to gypsum board production turning plate
CN207096825U (en) One kind automatically controls nitrogen flow system
CN206460317U (en) Power set integrated automation system
CN214011782U (en) STM 32-based color steel plate processing machine controller
CN203573148U (en) Multi-machine on-line communication control system of edge-sealing machine
CN206541193U (en) A kind of tile press control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant