CN113032996A - Water channeling channel identification method for low-permeability fractured reservoir horizontal well - Google Patents

Water channeling channel identification method for low-permeability fractured reservoir horizontal well Download PDF

Info

Publication number
CN113032996A
CN113032996A CN202110316554.2A CN202110316554A CN113032996A CN 113032996 A CN113032996 A CN 113032996A CN 202110316554 A CN202110316554 A CN 202110316554A CN 113032996 A CN113032996 A CN 113032996A
Authority
CN
China
Prior art keywords
well
injection
production well
production
pairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110316554.2A
Other languages
Chinese (zh)
Other versions
CN113032996B (en
Inventor
赵辉
盛广龙
李大健
邓学峰
周玉辉
钟珣
饶翔
孟凡坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze University
Original Assignee
Yangtze University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze University filed Critical Yangtze University
Priority to CN202110316554.2A priority Critical patent/CN113032996B/en
Publication of CN113032996A publication Critical patent/CN113032996A/en
Application granted granted Critical
Publication of CN113032996B publication Critical patent/CN113032996B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/12Timing analysis or timing optimisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a water channeling channel identification method for a hypotonic fractured reservoir horizontal well, which comprises the following steps of: s1, taking the oil well as a central well, respectively forming injection-production well pairs with the associated water wells, calculating the inter-well conductivity and the communication volume of each group of injection-production well pairs, and calculating the communication coefficient and the time constant of each group of injection-production well pairs according to the obtained inter-well conductivity and the communication volume of the injection-production well pairs; s2, calculating the accumulated seepage capacity and the accumulated storage capacity value of each group of injection-production well pairs; s3, drawing Lorentz curves of each group of injection-production well pairs, and calculating the Lorentz coefficient corresponding to each Lorentz curve; and S4, calculating the cross-flow index between wells of each group of injection-production well pairs, and determining the geological type of the cross-flow channel of the injection-production well pairs according to the calculated cross-flow index between wells. The invention provides a water channeling channel identification method for a hypotonic fractured reservoir horizontal well, which provides guidance for real-time production system optimization and strategy implementation.

Description

Water channeling channel identification method for low-permeability fractured reservoir horizontal well
Technical Field
The invention relates to the technical field of oil and gas exploration. More particularly, the invention relates to a water channeling channel identification method for a hypotonic fractured reservoir horizontal well.
Background
The reservoir stratum micro-crack of a certain oil field horizontal well development area develops, a natural seam and an artificial seam coexist, and the reservoir stratum heterogeneity is strong. After large-scale fracturing operation, along with the continuation of production time, the problems of low extraction degree, high water content, water injection and water channeling and low efficiency invalidation are exposed in part of blocks, and the production of the horizontal well is severely restricted. After a fractured horizontal well breaks through water, no effective means is available for verifying and identifying the direction, the size, the flow channeling capacity and the like of water through production dynamics, the pertinence of later-stage adjustment measures is poor, effective utilization is difficult to achieve, and the accurate identification of a horizontal well water channeling channel is the key for solving the problem.
The existing water channeling channel identification method mainly comprises an interwell tracer analysis identification method, a water absorption profile identification method, a well testing test identification method and a numerical simulation identification method. The interwell tracer analysis and identification method carries out quantitative interpretation through interwell tracer interpretation software, can judge the heterogeneous condition of an oil reservoir in the plane and the longitudinal direction, can qualitatively judge the hypertonic strip in the stratum and quantitatively obtain partial stratum parameters; the water absorption profile identification method analyzes the change of water absorption capacity of each layer according to water absorption profile data measured at different time, and judges whether a water channeling channel is formed or not by combining the change of other parameters on a logging curve; the well testing identification method can test the high-permeability channel and the direction thereof through pressure drop, pressure recovery and interference well testing, and can qualitatively predict the superior channel of the reservoir; the numerical simulation method quantitatively judges the dominant flow field and the dominant channel by virtue of the streamline tracking success field through complex geological modeling and actual production dynamic simulation operation. The methods have a certain guiding effect on the early stage of the oil reservoir and the conventional oil reservoir development, but have poor applicability and accuracy on the low-permeability fractured oil reservoir which carries out water control and oil stabilization measures such as acidizing fracturing, profile control and water shutoff and the like in the middle and later stages of the oil reservoir development, and the channeling channel cannot be identified quickly, accurately and in real time.
The oil deposit is a dynamic balance system, the communication characteristic of the oil well when the liquid production fluctuation of the oil well is caused by the injection of the water well, and a rapid inter-well communication model is established by utilizing the response relation among injection and production dynamic data, which gradually becomes an important method for identifying a water channeling channel. The connectivity model is firstly utilized in 2017 for carrying out the dynamic prediction of the polymer flooding in flying and the like, and the method is applied to an actual oil field, so that the dynamic and quantitative characterization of the formation characteristics of the polymer flooding water can be quickly and effectively calculated, and guidance suggestions are provided for the actual field development. Shenjie and the like use a connectivity method to identify the superior channeling channel of the fracture-cavity type oil reservoir in 2018, calculate the water injection split of the water injection well to the surrounding water wells on the basis of verifying the correctness of an actual model, identify the superior channel according to the water injection split, and obtain an adjustment measure. The research for identifying the channeling channel by utilizing the well connectivity is mainly used for single media, is not suitable for double media at present, can only identify through splitting numbers, has a single process, is not visual enough in the identification process, and cannot accurately judge the channeling type.
Disclosure of Invention
The invention aims to provide a water channeling channel identification method for a hypotonic fractured reservoir horizontal well, which can intuitively and accurately identify the water channeling channel of the horizontal well and predict output dynamics, thereby realizing water channeling early warning and providing guidance for optimizing a production system and strategy implementation in real time.
To achieve these objects and other advantages in accordance with the purpose of the invention, there is provided a water channeling channel identification method for a hypotonic fractured reservoir horizontal well, comprising the steps of:
s1, taking an oil well as a central well, respectively forming injection-production well pairs with the associated water wells, calculating the inter-well conductivity and the communication volume of each group of injection-production well pairs, and calculating the communication coefficient and the time constant of each group of injection-production well pairs according to the obtained inter-well conductivity and the communication volume of the injection-production well pairs;
s2, calculating the cumulative seepage capacity and the cumulative storage capacity value of each group of injection-production well pairs through the communication coefficient and the time constant of each group of injection-production well pairs calculated in S1;
s3, sequentially drawing Lorentz curves of each group of injection-production well pairs by taking the inter-accumulated seepage capacity calculated in the S2 as a vertical coordinate and the accumulated storage capacity value as a horizontal coordinate, and calculating Lorentz coefficients corresponding to each Lorentz curve;
s4, defining the product of the communication coefficient and the Lorentz coefficient of each group of injection-production well pairs as the cross-flow index between wells of the injection-production well pairs, calculating the cross-flow index between wells of each group of injection-production well pairs, and determining the geological type of the cross-flow channel of the injection-production well pairs according to the calculated cross-flow index between wells.
Preferably, in the method for identifying the water channeling channel of the horizontal well for the low-permeability fractured reservoir, when the cross flow index between wells calculated by S4 is 0-0.4, the geological type of the corresponding cross flow channel of the injection-production well pair is homogeneous; s4, when the calculated cross-flow index between wells is 0.4-0.7, the geological type of the cross-flow channel of the corresponding injection-production well pair is a hypertonic strip; and when the cross-flow index between the wells calculated by S4 is 0-0.4, the geological type of the cross-flow channel of the corresponding injection-production well pair is a crack.
Preferably, in the method for identifying the water channeling channel of the horizontal well for the low-permeability fractured reservoir, after the lorentz coefficient corresponding to each lorentz curve is calculated in S3, a threshold value of the lorentz coefficient is set, and all injection-production well pairs with the lorentz coefficients larger than the threshold value are screened out and used for calculation in S4.
Preferably, in the method for identifying a water channeling channel for a horizontal well of a hypotonic fractured reservoir, the method for calculating the communication coefficient of each injection-production well pair in S1 is as follows:
Figure BDA0002991544390000031
wherein j is a central well; i is a water well associated with the central well;
Figure BDA0002991544390000032
the communication coefficient between the i well and the j well is obtained; t isijIs the interwell conductivity between the i-well and the j-well.
Preferably, in the method for identifying a water channeling channel for a horizontal well of a hypotonic fractured reservoir, the method for calculating the time constant of each injection-production well pair in S1 is as follows:
Figure BDA0002991544390000033
wherein, tauijThe time constant represents the time lag and the attenuation between injection wells and production wells; vijIs the connected volume between the i well and the j well.
Preferably, in the method for identifying a water channeling channel for a low-permeability fractured reservoir horizontal well, the method for calculating the cumulative seepage capability of each injection-production well pair in S2 is as follows:
Figure BDA0002991544390000034
wherein, FijIs the cumulative seepage capacity between the i well and the j well.
Preferably, in the method for identifying a water channeling channel of a horizontal well for a hypotonic fractured reservoir, the method for calculating the cumulative storage capacity value of each group of injection-production well pairs in S2 is as follows:
Figure BDA0002991544390000041
wherein, CijIs the cumulative storage capacity between the i well and the j well.
The water channeling channel identification method provided by the invention establishes a data driving model based on a connectivity idea by utilizing daily dynamic data, and provides a combination mode of qualitatively judging the water channeling condition of a well group by using a Lorentz coefficient and quantitatively representing the water channeling flow by using a splitting number, so as to finely identify the water channeling channel of the horizontal well. The identification method is verified by establishing a conceptual model and is applied to an actual block, so that a foundation is laid for subsequent formulation of a corresponding injection-production system and a profile control strategy and long-term efficient and stable development.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a Lorentzian curve illustrating several exemplary geological features of the present invention;
FIG. 2 is a schematic diagram of a conceptual model permeability field in an embodiment of the invention;
FIG. 3 shows conceptual model blocks and partial single well fitting results in accordance with an embodiment of the present invention;
FIG. 4 is a graph illustrating the results of a model conductivity fit in an embodiment of the invention;
FIG. 5 is a Lorentzian plot of a portion of a horizontal well in an embodiment of the invention;
FIG. 6 is a graph of split number distribution according to an embodiment of the present invention;
FIG. 7 is a diagram illustrating the results of feature parameter inversion according to another embodiment of the present invention;
FIG. 8 is a diagram illustrating fitting results of an actual sample block and a portion of a single well according to another embodiment of the present invention;
FIG. 9 is a Lorentzian plot of a portion of a horizontal well according to another embodiment of the present invention;
FIG. 10 is a schematic illustration of the split profile of an SP10-6 well group in another embodiment of the present invention;
FIG. 11 is a schematic diagram of the actual production dynamics of an SP10-6 well group in another embodiment of the present invention.
Detailed Description
The present invention is further described in detail below with reference to the attached drawings so that those skilled in the art can implement the invention by referring to the description text.
It should be noted that in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
The embodiment of the invention provides a water channeling channel identification method for a hypotonic fractured reservoir horizontal well, which comprises the following steps of:
s1, taking an oil well as a central well, respectively forming injection-production well pairs with the associated water wells, calculating the inter-well conductivity and the communication volume of each group of injection-production well pairs, and calculating the communication coefficient and the time constant of each group of injection-production well pairs according to the obtained inter-well conductivity and the communication volume of the injection-production well pairs;
specifically, the method for calculating the communication coefficient of each group of injection-production well pairs in S1 is as follows:
Figure BDA0002991544390000051
wherein j is a central well; i is a water well associated with the central well;
Figure BDA0002991544390000052
the communication coefficient between the i well and the j well is obtained; t isijIs the interwell conductivity between the i-well and the j-well.
The method for calculating the time constant of each group of injection-production well pairs in the S1 is as follows:
Figure BDA0002991544390000053
wherein, tauijThe time constant represents the time lag and the attenuation between injection wells and production wells; vijIs the connected volume between the i well and the j well.
S2, calculating the cumulative seepage capacity and the cumulative storage capacity value of each group of injection-production well pairs through the communication coefficient and the time constant of each group of injection-production well pairs calculated in S1;
specifically, the method for calculating the cumulative seepage capability of each group of injection-production well pairs in S2 is as follows:
Figure BDA0002991544390000054
wherein, FijIs the cumulative seepage capacity between the i well and the j well.
The method for calculating the accumulated storage capacity value of each group of injection-production well pairs in the S2 is as follows:
Figure BDA0002991544390000061
wherein, CijIs the cumulative storage capacity between the i well and the j well.
S3, as shown in figure 1, sequentially drawing Lorentz curves of each group of injection and production well pairs by taking the inter-accumulated seepage capacity calculated in the S2 as a vertical coordinate and the accumulated storage capacity value as a horizontal coordinate, calculating Lorentz coefficients corresponding to each Lorentz curve, setting thresholds of the Lorentz coefficients, and screening all injection and production well pairs with Lorentz coefficients larger than the thresholds for calculation in S4;
the Lorentz coefficient refers to the ratio of the area of a closed graph formed by a curve and a diagonal line to the area formed by a coordinate axis and the diagonal line, the bigger the Lorentz coefficient is, the stronger the plane heterogeneity of the well group is, and a cross flow channel may exist, otherwise, if the Lorentz curve is approximately overlapped with the diagonal line, the well group is a homogeneous oil reservoir;
s4, defining the product of the communication coefficient and the Lorentz coefficient of each group of injection and production well pairs as the cross-flow index between wells of the injection and production well pairs, calculating the cross-flow index between wells of each group of injection and production well pairs, and determining the specific geological type of the cross-flow channel of the injection and production well pairs according to the calculated cross-flow index between wells, wherein when the cross-flow index between wells is 0-0.4, the geological type of the corresponding cross-flow channel of the injection and production well pairs is homogeneous; when the cross-flow index between wells is 0.4-0.7, the geological type of the cross-flow channel of the corresponding injection-production well pair is a hypertonic strip; and when the cross-flow index between wells is 0-0.4, the geological type of the cross-flow channel of the corresponding injection-production well pair is a crack.
In this embodiment, the calculation of the inter-well conductivity and the communication volume of each injection-production well pair may be performed by using an existing calculation method, for example, by establishing an inter-well connectivity model, in this embodiment, an inter-well connectivity model named an INSIM model may be used.
In order to determine the specific water-meeting part and the size of the incoming water of the horizontal well, the water channeling channel can be quantitatively characterized by a splitting component number method.
One important parameter for determining the connectivity between wells is the splitting coefficient, which is defined as follows: for the injection and production well group centered on the water injection well, the split number represents the amount of liquid flowing to a production well as the percentage of the total amount of injected water. Assuming that at the nth time step, the number of the injection well is i, the number of the production well connected with the injection well is j, and the splitting coefficient flowing from the i well to the j well is as follows:
Figure BDA0002991544390000071
in the formula, ncIndicating the number of production wells associated with injection well j.
Dynamic indexes such as water content and the like are obtained through a connectivity model, water injection splitting coefficients are calculated by nodes, the water injection utilization rate (the oil yield contributed by injected 1-square water) is calculated according to the splitting water quantity and the splitting oil quantity between injection and production well pairs, the water injection effect condition is determined, and the injection and production well pair with low water injection utilization rate is judged to have a water channeling channel.
In order to verify the correctness of the water channeling channel identification method, a two-dimensional heterogeneous medium containing a hypertonic strip is selectedAnd (5) demonstrating an oil reservoir model. The reservoir model is a five-injection twelve-extraction Eclipse reservoir simulator model containing horizontal wells, the permeability distribution diagram is shown in figure 2, the grid number of the model is 191 multiplied by 101 multiplied by 1, and dX=dY15 m; the initial oil saturation of the oil reservoir is 0.8, the average porosity is 0.2, the viscosity of crude oil is 2.9 mPa.s, the initial pressure of the oil reservoir is 25MPa, and the simulated production time is 900 d.
Fig. 3 is a fitting result of the accumulated oil amount and the water content of the block and a part of the production well obtained by performing historical fitting inversion by using the INSIM model, and it can be seen that the INSIM model after historical fitting and the Eclipse model have a good fitting effect, which indicates that the model can better simulate production dynamics.
The results of the model conductivity fit after the history fit are shown in fig. 4, where red indicates high conductivity and blue indicates low conductivity in fig. 4. It can be seen from fig. 4 that the position where the conductivity connecting line is red is substantially consistent with the position of the hyperosmotic strip in the figure, and the reliability of the inversion parameters of the model is verified.
And calculating and drawing Lorentz curves according to the conductivity and the communication volume between each injection-production well pair, wherein a Lorentz graph of a part of horizontal wells is shown in FIG. 5, homogeneous strata are shown near a P2 well, heterogeneous strata are shown near P5, P9 and P11 wells, and the heterogeneity near the P5 well is strongest. And calculating the cross-flow index among the well pairs on the basis, wherein the cross-flow index among the P5-I4 well pairs is 0.7093, a crack is judged to possibly exist, hypertonic strips possibly exist among the P9-I3 and the P11-I4 well pairs, and cross-flow channels possibly exist among the three well pairs.
Channeling index meter for partial horizontal well
Figure BDA0002991544390000081
In order to further clarify the size of the channeling flow and accurately identify the channeling channel, the splitting coefficient and the water injection utilization rate of the block are calculated, and the splitting number distribution diagram is shown in fig. 6. The splitting coefficient of I4 to the P5 well is 0.407, the water injection utilization rate is 33.97%, the difference between the water injection utilization rate and the average water injection utilization rate of 50.41% of the block is large, and the water channeling dominant channeling channel is judged. The conclusion is consistent with the recognition of the initial geological modeling, and the correctness of the water channeling channel identification method is proved.
And selecting a part of blocks of an oil field, wherein the permeability of the stratum at the positions of the blocks is low, the micro cracks develop, natural cracks and artificial cracks coexist, and the average porosity and the permeability are respectively 0.119 and 0.35 mD. The total number of wells in the block is 154, wherein 87 production wells (including 51 horizontal wells and 36 vertical wells), 67 water injection wells and the production starting and stopping time is from 1 month and 1 day in 2010 to 7 months and 1 day in 2019. It is worth noting that because the number of the horizontal well perforation points of the block is too many, each horizontal well perforation point is simplified into 4 in order to facilitate the analysis and judgment of the established connectivity model, and the simplification can reduce the calculation amount, improve the calculation speed and easily position the water-meeting part under the condition of not influencing the fitting precision. And (3) taking the oil production of the single well and the block as a fitting index, automatically performing history fitting on the conductivity and the communication volume of the INSIM connectivity model, and obtaining the fitting index of the block and part of single wells as shown in FIG. 8, wherein the characteristic parameter inversion result is shown in FIG. 7, and the overall fitting rate is over 80%. Therefore, the oil-water dynamic fitting result of the block and the single well is accurate.
The fitted model characteristic parameters can be used for calculating the accumulated seepage capacity and the accumulated storage capacity of each oil well, further drawing a Lorentz curve and calculating the Lorentz coefficient and the channeling index. FIG. 9 is a Lorentz plot for a portion of production wells, where the Lorentz coefficients for SP4-5, SP5-3, and SP6-4 production wells are small and the heterogeneity near them is weak, and it is determined that there is no water channeling; the production wells SP10-6, SP7-6 and SP8-11 have larger Lorentz coefficients and stronger heterogeneity nearby, and the possibility of water channeling is judged.
The production wells with the possibility of water channeling are selected for further analysis, and are only exemplified by the SP10-6 well group for the sake of space limitation, and other production wells can be identified as water channeling or not by using the same method. And judging that the water wells communicated with the SP10-6 well are S162-28, S160-26 and S164-22 through the fitting result, and obtaining a calculated channeling index table shown in the following table, wherein the channeling index between the SP10-6 well and the S164-22 well is 0.4224, and judging that a water channeling dominant channel with a type of a hypertonic channel possibly exists.
SP10-6 channeling index table
Figure BDA0002991544390000091
FIG. 10 shows the split of the group of SP10-6 wells, and it can be seen that water injection split shows that the S162-22 well injection water is mainly distributed to SP10-6, which has a large effect on the Shanping 10-6 well. Through calculation, the water injection utilization rate of the S164-22 well is 10.6%, the water injection utilization rate of the S160-26 well is 36.4%, the water injection utilization rate of the S162-28 well is 55.5%, the water injection utilization rate of the S164-22 well is far lower than that of other wells, a cross flow channel is judged to exist between the S164-22 well and the SP10-6 well, and the water breakthrough direction is the tail part of a horizontal well.
In order to verify the correctness of the identification result, production dynamics and historical measures of the well group are summarized, as shown in fig. 11, it can be seen that dynamic response exists between the S164-22 well and the SP10-6 well, water channeling occurs after the water injection splitting amount 464 of 2016.12, and the water channeling situation is improved through alternate injection and alternate production measures. The production dynamic analysis result is consistent with the water channeling channel identification result, and the correctness of the water channeling channel identification method is proved.
While embodiments of the invention have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable to various fields of endeavor for which the invention may be embodied with additional modifications as would be readily apparent to those skilled in the art, and the invention is therefore not limited to the details given herein and to the embodiments shown and described without departing from the generic concept as defined by the claims and their equivalents.

Claims (7)

1. A water channeling channel identification method for a hypotonic fractured reservoir horizontal well is characterized by comprising the following steps of:
s1, taking an oil well as a central well, respectively forming injection-production well pairs with the associated water wells, calculating the inter-well conductivity and the communication volume of each group of injection-production well pairs, and calculating the communication coefficient and the time constant of each group of injection-production well pairs according to the obtained inter-well conductivity and the communication volume of the injection-production well pairs;
s2, calculating the cumulative seepage capacity and the cumulative storage capacity value of each group of injection-production well pairs through the communication coefficient and the time constant of each group of injection-production well pairs calculated in S1;
s3, sequentially drawing Lorentz curves of each group of injection-production well pairs by taking the inter-accumulated seepage capacity calculated in the S2 as a vertical coordinate and the accumulated storage capacity value as a horizontal coordinate, and calculating Lorentz coefficients corresponding to each Lorentz curve;
s4, defining the product of the communication coefficient and the Lorentz coefficient of each group of injection-production well pairs as the cross-flow index between wells of the injection-production well pairs, calculating the cross-flow index between wells of each group of injection-production well pairs, and determining the geological type of the cross-flow channel of the injection-production well pairs according to the calculated cross-flow index between wells.
2. The method for identifying the water channeling channel for the horizontal well of the hypotonic fractured reservoir according to claim 1, wherein when the cross flow index among wells calculated by S4 is 0-0.4, the geological types of the corresponding cross flow channels of the injection and production well pair are homogeneous; s4, when the calculated cross-flow index between wells is 0.4-0.7, the geological type of the cross-flow channel of the corresponding injection-production well pair is a hypertonic strip; and when the cross-flow index between the wells calculated by S4 is 0-0.4, the geological type of the cross-flow channel of the corresponding injection-production well pair is a crack.
3. The method for identifying the water channeling channel for the horizontal well of the hypotonic fractured reservoir according to claim 2, wherein after the Lorentz coefficient corresponding to each Lorentz curve is calculated in S3, a Lorentz coefficient threshold value is set, and all injection and production well pairs with Lorentz coefficients larger than the threshold value are screened out and used for calculation in S4.
4. The method for identifying the water channeling channel of the hypotonic fractured reservoir horizontal well, according to any one of claims 1 to 3, is characterized in that the method for calculating the communication coefficient of each group of injection-production well pairs in S1 is as follows:
Figure FDA0002991544380000021
wherein j is a central well; i is a water well associated with the central well;
Figure FDA0002991544380000022
the communication coefficient between the i well and the j well is obtained; t isijIs the interwell conductivity between the i-well and the j-well.
5. The method for identifying the water channeling channel for the hypotonic fractured reservoir horizontal well according to claim 4, wherein the method for calculating the time constant of each group of injection-production well pairs in S1 is as follows:
Figure FDA0002991544380000023
wherein, tauijThe time constant represents the time lag and the attenuation between injection wells and production wells; vijIs the connected volume between the i well and the j well.
6. The method for identifying the water channeling channel for the hypotonic fractured reservoir horizontal well according to claim 5, wherein the method for calculating the cumulative seepage capability of each group of injection-production well pairs in S2 comprises the following steps:
Figure FDA0002991544380000024
wherein, FijIs the cumulative seepage capacity between the i well and the j well.
7. The method for identifying the water channeling channel for the horizontal well of the hypotonic fractured reservoir according to claim 6, wherein the method for calculating the accumulated storage capacity value of each group of injection-production well pairs in S2 is as follows:
Figure FDA0002991544380000025
wherein, CijIs the cumulative storage capacity between the i well and the j well.
CN202110316554.2A 2021-03-25 2021-03-25 Water channeling channel identification method for hypotonic fractured reservoir horizontal well Active CN113032996B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110316554.2A CN113032996B (en) 2021-03-25 2021-03-25 Water channeling channel identification method for hypotonic fractured reservoir horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110316554.2A CN113032996B (en) 2021-03-25 2021-03-25 Water channeling channel identification method for hypotonic fractured reservoir horizontal well

Publications (2)

Publication Number Publication Date
CN113032996A true CN113032996A (en) 2021-06-25
CN113032996B CN113032996B (en) 2022-06-21

Family

ID=76473482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110316554.2A Active CN113032996B (en) 2021-03-25 2021-03-25 Water channeling channel identification method for hypotonic fractured reservoir horizontal well

Country Status (1)

Country Link
CN (1) CN113032996B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100161292A1 (en) * 2008-12-15 2010-06-24 Chevron U.S.A. Inc. System and method for evaluating dynamic heterogeneity in earth models
CN109948272A (en) * 2019-03-27 2019-06-28 长江大学 Tune based on inter well connectivity blocks up dynamic prediction method and system
CN110162922A (en) * 2019-06-03 2019-08-23 西南石油大学 A kind of integrated recognition method of water-drive pool dominant flowing path
CN110273673A (en) * 2018-03-14 2019-09-24 中国石油化工股份有限公司 A kind of fracture-pore reservoir space structure flooding pattern optimum design method
CN111364970A (en) * 2020-03-30 2020-07-03 海默潘多拉数据科技(深圳)有限公司 Method for quantizing inter-well communication coefficient
CN112302594A (en) * 2020-12-01 2021-02-02 中国石油大学(北京) Method, device and equipment for determining connection structure of heterogeneous water-drive reservoir

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100161292A1 (en) * 2008-12-15 2010-06-24 Chevron U.S.A. Inc. System and method for evaluating dynamic heterogeneity in earth models
CN110273673A (en) * 2018-03-14 2019-09-24 中国石油化工股份有限公司 A kind of fracture-pore reservoir space structure flooding pattern optimum design method
CN109948272A (en) * 2019-03-27 2019-06-28 长江大学 Tune based on inter well connectivity blocks up dynamic prediction method and system
CN110162922A (en) * 2019-06-03 2019-08-23 西南石油大学 A kind of integrated recognition method of water-drive pool dominant flowing path
CN111364970A (en) * 2020-03-30 2020-07-03 海默潘多拉数据科技(深圳)有限公司 Method for quantizing inter-well communication coefficient
CN112302594A (en) * 2020-12-01 2021-02-02 中国石油大学(北京) Method, device and equipment for determining connection structure of heterogeneous water-drive reservoir

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ZHAO HUI 等: "Research on production optimal control techniques for smart oilfield", 《SCIENCE FOUNDATION IN CHINA》 *

Also Published As

Publication number Publication date
CN113032996B (en) 2022-06-21

Similar Documents

Publication Publication Date Title
CN106837297B (en) Method for identifying connectivity among wells and predicting oil-water dynamic state
CN103352693B (en) A kind of output prediction system based on oily content and method thereof
CN103742130B (en) Based on time become high infiltration strip characterizing method
CN105696986B (en) A kind of NEW TYPE OF COMPOSITE drives oil displacement experiment/test simulation method
CN106932324B (en) A kind of method of determining High water cut sandstone oil reservoir reservoir permeability changing rule
RU2661489C1 (en) Method of integrating initial data to update filtration structure of non-uniform carbonate reservoirs
CN105160414B (en) Predict the method and device of full oil reservoir producing region type
CN105952427A (en) Method for predicting and evaluating low permeability oil reservoir water-injection induced cracks
CN110162922A (en) A kind of integrated recognition method of water-drive pool dominant flowing path
AU2009293215A1 (en) Method for optimizing well production in reservoirs having flow barriers
CN104329079A (en) Method and system for recognizing gas logging oil and gas reservoir
CN107292074B (en) Method for judging connectivity between wells
CN112377178B (en) Quantitative diagnosis method for edge water invasion front edge
CN104462859A (en) Oil and gas resource recovery coefficient determining method
CN107885893B (en) Construction method for describing heterogeneity of carbon dioxide flooding reservoir
CN104060985A (en) Method and system for testing entering depth of stratified oil deposit profile control water plugging agent
CN105257285A (en) Evaluation method of oil gas filling capacity from source rock layer to karstic reservoir
CN105404972A (en) Reservoir development uncertainty research and risk control method
US6619396B1 (en) Method of producing petroleum
CN114060003A (en) Characterization method for interwell connectivity of offshore complex fault block oil reservoir
CN106481315A (en) Land sandstone oil reservoir individual well recoverable reserves quickly determines model and method for building up
CN113032996B (en) Water channeling channel identification method for hypotonic fractured reservoir horizontal well
CN111155980B (en) Water flow dominant channel identification method and device
CN105089659B (en) A kind of Conglomerate Reservoir permeable unit recognition methods
CN108843300B (en) Method and device for determining type of main flow channel in complex porous medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant