CN113027477A - Construction method for quickly dredging blocked mine - Google Patents

Construction method for quickly dredging blocked mine Download PDF

Info

Publication number
CN113027477A
CN113027477A CN202110357988.7A CN202110357988A CN113027477A CN 113027477 A CN113027477 A CN 113027477A CN 202110357988 A CN202110357988 A CN 202110357988A CN 113027477 A CN113027477 A CN 113027477A
Authority
CN
China
Prior art keywords
ballast
mine
drilling machine
construction method
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110357988.7A
Other languages
Chinese (zh)
Other versions
CN113027477B (en
Inventor
谈捷
周瑜
李步华
王冰
彭益军
李庭慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Engineering Technology Co Ltd
Original Assignee
Pangang Group Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Engineering Technology Co Ltd filed Critical Pangang Group Engineering Technology Co Ltd
Priority to CN202110357988.7A priority Critical patent/CN113027477B/en
Publication of CN113027477A publication Critical patent/CN113027477A/en
Application granted granted Critical
Publication of CN113027477B publication Critical patent/CN113027477B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to the field of mine construction, and particularly discloses a construction method for quickly dredging a blocked mine, aiming at safely and efficiently removing blocked mine ballast to quickly dredge the mine. The construction method comprises the steps of firstly building a drilling machine operation platform, then installing a drilling machine on the built drilling machine operation platform, destroying a stress structure of the well plugging ballast in a shaft in a following pipe drilling mode, crushing the well plugging ballast, and blasting to collapse the well plugging ballast if the well plugging ballast is not crushed; the whole construction process is simple and easy to implement, safe and reliable, the requirements on the construction technical level and the technical difficulty are not high, the construction is easy to master, and the dredging of the well plugging mine can be quickly completed.

Description

Construction method for quickly dredging blocked mine
Technical Field
The invention belongs to the field of mine construction, and particularly relates to a construction method for rapidly dredging a blocked mine.
Background
At present, underground mining is mostly adopted in mining, but a mine ventilation system often has a plurality of problems, and well plugging is one of the more serious problems. For example: the stope with the stope completed is directly used as a ventilation shaft, and through long-time geological action, the gob is easy to be blocked by caving and falling, so that the normal operation of the underground ventilation system is directly influenced. Another example is: in the project of converting open pit to underground mining in the Hill stope, a main 3# air inlet shaft of a design change follow-up project of 1200-plus-1280 m air inlet system project is positioned in the middle of a connecting channel of a first-stage trackless slope channel of 1280m, the 3# air inlet shaft is a square well with the total height of the section from 1200m to 1300m and the excavation section of 2.5 multiplied by 3.0m, the sections of the elevations of 1200m, 1220m, 1240m, 1260m, 1280m and 1300m are all connected by connecting channels, then water is supplied upwards from the 1200m section, a water supply pipeline is connected to 1280m through the well, the well is a man-going well, and the man-going ladder installation is carried out after the excavation to meet the requirements of air supply, water supply pipeline installation and personnel passing. However, although a small well with the diameter of 1.2m is drilled in the early period of the well by using a raise boring machine, the excavation of 1280-1300m is finished according to the section of 2.5 multiplied by 3.0m, but the well shaft is blocked in the process of driving downwards from 1280 m. Therefore, how to safely and quickly dredge blocked mines is a problem to be solved urgently by technical personnel in the field of mine construction.
Disclosure of Invention
The invention provides a construction method for quickly dredging a blocked mine, aiming at safely and efficiently removing blocked slag stones to quickly dredge the mine.
The technical scheme adopted by the invention for solving the technical problems is as follows: the construction method for quickly dredging the blocked mine comprises the following steps:
firstly, erecting a drilling machine operation platform at a mine well plugging position, clearing loose ballast stones in an erection range before erection, and leveling uneven positions in the erection range by adopting concrete;
after the rig operation platform is erected, hoisting the rig to the rig operation platform and installing the rig in place;
step three, a drilling tool is installed on the drilling machine which is installed in place;
step four, starting the drilling machine to drill holes and core, and drilling holes along with the casing pipe in a mode that the casing pipe follows the protective wall, so as to destroy the stress structure of the well plugging slag stones in the shaft; if the hole forming of the follow pipe penetrates the slag stones of the blocked well, but the slag stones of the blocked well are not broken, performing the operation of the fifth step;
and fifthly, removing the drilling tool and the drilling machine, not removing the casing pipe, and then blasting the penetrated well plugging ballast.
Further, the drilling rig is a geological core drilling rig, and the drilling tool comprises a drill rod.
Furthermore, in the fourth step, when drilling the casing, the casing shoe connected to the casing is hammered by the down-the-hole hammer, so that the casing can be synchronously followed.
Further, in the fifth step, the blasting process is as follows:
A. selecting a plate with the width smaller than the diameter of the sleeve and the length larger than the diameter of the sleeve as a support plate, facilitating the connection of a rope with the support plate, lowering the support plate along the pipe wall of the sleeve until the support plate penetrates out of the bottom end of the sleeve, then lifting the rope upwards to enable the two ends of the support plate to be tightly attached to the bottom end of the sleeve, and finally tying the rope and enabling the rope to be in a tensioned state to fix the support plate;
B. processing a blasting cartridge on a drilling machine operation platform and connecting a detonating cord, then lowering the blasting cartridge onto a supporting plate and warning, and carrying out blasting operation after safety is determined;
C. and if the blocked well ballast is not collapsed by one-time blasting, repeating the steps A and B until the blocked well ballast is collapsed.
The invention has the beneficial effects that: the construction method comprises the steps of firstly building a drilling machine operation platform, then installing a drilling machine on the built drilling machine operation platform, destroying a stress structure of the well plugging ballast in a shaft in a following pipe drilling mode, crushing the well plugging ballast, and blasting to collapse the well plugging ballast if the well plugging ballast is not crushed; the whole construction process is simple and easy to implement, safe and reliable, the requirements on the construction technical level and the technical difficulty are not high, the construction is easy to master, and the dredging of the well plugging mine can be quickly completed.
Drawings
FIG. 1 is a schematic view of the operation of blasting the well plugging ballast;
labeled as: the device comprises a mine 1, a drilling machine operating platform 2, a casing 3, well plugging ballast 4, a supporting plate 5, a rope 6 and a blasting cartridge 7.
Detailed Description
The invention will be further described with reference to the accompanying drawings.
The construction method for quickly dredging the blocked mine comprises the following steps:
firstly, erecting a drilling machine operation platform 2 at a well plugging position of a mine 1, clearing loose ballast stones in an erecting range before erecting, and leveling uneven positions in the erecting range by adopting concrete; the erected drilling machine operation platform 2 is required to be smooth and can bear vibration impact load in the drilling process so as to meet the requirement of safe operation;
after the rig operation platform 2 is erected, hoisting the rig to the rig operation platform 2 and installing the rig in place; the drilling machine can be various, and is preferably a geological coring drilling machine; the drilling machine can be hoisted by a winch which is arranged on a construction site and is more than 3T;
step three, a drilling tool is installed on the drilling machine which is installed in place; drilling tools typically include drill rods and the like; when the drilling tool is installed, the drilling machine, the drilling tool and the casing 3 need to be checked repeatedly, and the drill rod and the casing with cracks and thread sliding can not be used uniformly;
step four, starting the drilling machine to drill holes and core, drilling holes along with the casing pipe in a mode that the casing pipe 3 follows the protective wall, and damaging the stress structure of the well plugging slag stones 4 in the shaft; if the hole forming of the follow pipe penetrates the well plugging slag stones 4, but the well plugging slag stones 4 are not broken, performing the operation of the fifth step;
and fifthly, removing the drilling tool and the drilling machine, not removing the casing 3, and then blasting the penetrated well plugging ballast 4.
The construction method is simple and easy to implement, the construction process is safe and reliable, the requirements on the construction technical level and the technical difficulty are not high, the construction method is easy to master, and the dredging of the blocked mine can be safely and efficiently completed.
Preferably, in the fourth step, when drilling the casing, the casing shoe connected to the casing 3 is hammered by a down-the-hole hammer, so that the casing 3 is synchronously followed; the sleeve 3 is a shaped product and can be repeatedly used for many times; the casing 3 can play a role of wall protection to prevent the rock mass from being disturbed and falling during the hole forming process; in addition, the inner diameter of the sleeve 3 is larger than the outer diameter of the drill rod, and the rigidity of the sleeve 3 is better, so that the drill rod can be prevented from bending, and the pore-forming quality is improved.
Referring to fig. 1, in step five, the blasting process is as follows:
A. selecting a plate with the width smaller than the diameter of the sleeve and the length larger than the diameter of the sleeve as a support plate 5, facilitating the connection of a rope 6 with the support plate 5, lowering the support plate 5 along the pipe wall of the sleeve 3 until the support plate 5 penetrates out of the bottom end of the sleeve 3, then pulling the rope 6 upwards to enable the two ends of the support plate 5 to be tightly attached to the bottom end of the sleeve 3, and finally tying the rope 6 and enabling the rope 6 to be in a tensioned state to fix the support plate 5; the rope 6 is generally tied;
B. processing a blasting cartridge 7 on the drilling machine operation platform 2 and connecting the blasting cartridge with a detonating cord, then lowering the blasting cartridge 7 onto the supporting plate 5 and making warning, and blasting operation is carried out after safety is determined;
C. and if the plugging ballast 4 is not cracked by one explosion, repeating the steps A and B until the plugging ballast 4 is cracked. If the mine is blocked in multiple sections or the single section is blocked longer, the method can be adopted for charging and blasting in sections until no well ballast 4 blocks in the shaft.
According to the blasting treatment mode, the blasting explosive cartridge 7 is positioned near the bottom of the well plugging ballast stone 4, so that the stress structure of the well plugging ballast stone 4 in a shaft is favorably damaged, the well plugging ballast stone 4 is effectively collapsed, the well plugging ballast stone 4 is far away from the drilling machine operation platform 2, and the construction safety is high.

Claims (4)

1. The construction method for rapidly dredging the blocked mine is characterized by comprising the following steps:
firstly, erecting a drilling machine operation platform (2) at a well plugging position of a mine (1), clearing loose ballast stones in an erection range before erection, and leveling uneven positions in the erection range by adopting concrete;
secondly, after the rig operation platform (2) is erected, hoisting the rig to the rig operation platform (2) and installing the rig in place;
step three, a drilling tool is installed on the drilling machine which is installed in place;
fourthly, starting the drilling machine to drill holes and core, drilling holes along with the casing pipe in a mode that the casing pipe (3) follows the protective wall, and damaging the stress structure of the well plugging ballast stones (4) in the shaft; if the hole forming of the follow pipe penetrates the well plugging slag stones (4) but the well plugging slag stones (4) are not broken, performing the operation of the fifth step;
and fifthly, removing the drilling tool and the drilling machine, not removing the casing (3), and then blasting the penetrated well plugging ballast stone (4).
2. The construction method for rapidly dredging the blocked mine well according to claim 1, wherein the construction method comprises the following steps: the drilling machine is a geological core drilling machine, and the drilling tool comprises a drilling rod.
3. The construction method for rapidly dredging the blocked mine well according to claim 1, wherein the construction method comprises the following steps: in the fourth step, when drilling with the casing, the casing shoe connected to the casing (3) is hammered by a down-the-hole hammer, so that the casing (3) can be synchronously followed.
4. The construction method for rapidly dredging the blocked mine well according to any one of claims 1 to 3, wherein: in the fifth step, the blasting process is as follows:
A. selecting a plate with the width smaller than the diameter of the sleeve and the length larger than the diameter of the sleeve as a support plate (5), facilitating the connection of a rope (6) with the support plate (5) and the downward placement of the support plate (5) along the pipe wall of the sleeve (3) until the support plate (5) penetrates out of the bottom end of the sleeve (3), pulling the rope (6) upwards to enable the two ends of the support plate (5) to be tightly attached to the bottom end of the sleeve (3), and finally tying the rope (6) and enabling the rope (6) to be in a tensioning state to fix the support plate (5;
B. processing a blasting cartridge (7) on a drilling machine operation platform (2) and connecting an initiating line, then lowering the blasting cartridge (7) onto a support plate (5) and warning, and carrying out blasting operation after safety is determined;
C. and if the plugging ballast (4) is not collapsed by one explosion, repeating the steps A and B until the plugging ballast (4) is collapsed.
CN202110357988.7A 2021-04-01 2021-04-01 Construction method for quickly dredging blocked mine Active CN113027477B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110357988.7A CN113027477B (en) 2021-04-01 2021-04-01 Construction method for quickly dredging blocked mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110357988.7A CN113027477B (en) 2021-04-01 2021-04-01 Construction method for quickly dredging blocked mine

Publications (2)

Publication Number Publication Date
CN113027477A true CN113027477A (en) 2021-06-25
CN113027477B CN113027477B (en) 2022-07-29

Family

ID=76454046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110357988.7A Active CN113027477B (en) 2021-04-01 2021-04-01 Construction method for quickly dredging blocked mine

Country Status (1)

Country Link
CN (1) CN113027477B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115014140A (en) * 2022-06-25 2022-09-06 天津矿山工程有限公司 Method for blasting and drifting section by section in hole by drilling casing method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06257377A (en) * 1993-03-05 1994-09-13 Fujita Corp Tunnel construction method and device therefor
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
RU2451791C1 (en) * 2010-12-10 2012-05-27 Государственное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Tunnelling exploding-loading complex
CN102807001A (en) * 2012-07-10 2012-12-05 陕西红旗民爆集团股份有限公司 Small-cartridge explosive lateral box feeding system without middle package
CN102877808A (en) * 2012-10-24 2013-01-16 中国水利水电第三工程局有限公司 Method for treating well blockage through camera positioning and sectioning blasting
CN108426496A (en) * 2018-05-31 2018-08-21 中国矿业大学(北京) A kind of dynamite charge device and packing method for bursting work
CN208780032U (en) * 2018-08-15 2019-04-23 中国水利水电第十六工程局有限公司 Deep hole blasting operation explosive conveyer
CN110887420A (en) * 2019-11-11 2020-03-17 刘梦 Supplementary stifled explosive device that fills up of porthole
CN111521082A (en) * 2020-04-08 2020-08-11 西部矿业股份有限公司 One-time well completion method by matching high-pass shaft and medium-length hole sectional blasting in raise-boring construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06257377A (en) * 1993-03-05 1994-09-13 Fujita Corp Tunnel construction method and device therefor
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
RU2451791C1 (en) * 2010-12-10 2012-05-27 Государственное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Tunnelling exploding-loading complex
CN102807001A (en) * 2012-07-10 2012-12-05 陕西红旗民爆集团股份有限公司 Small-cartridge explosive lateral box feeding system without middle package
CN102877808A (en) * 2012-10-24 2013-01-16 中国水利水电第三工程局有限公司 Method for treating well blockage through camera positioning and sectioning blasting
CN108426496A (en) * 2018-05-31 2018-08-21 中国矿业大学(北京) A kind of dynamite charge device and packing method for bursting work
CN208780032U (en) * 2018-08-15 2019-04-23 中国水利水电第十六工程局有限公司 Deep hole blasting operation explosive conveyer
CN110887420A (en) * 2019-11-11 2020-03-17 刘梦 Supplementary stifled explosive device that fills up of porthole
CN111521082A (en) * 2020-04-08 2020-08-11 西部矿业股份有限公司 One-time well completion method by matching high-pass shaft and medium-length hole sectional blasting in raise-boring construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘玉国等: "牛斜山石灰石矿溜井堵井原因及预防、处理措施", 《中国水泥》, no. 01, 1 January 2017 (2017-01-01) *
梁开水等: "***疏通下水管道的研究与实践", 《***》, no. 04, 25 December 2000 (2000-12-25) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115014140A (en) * 2022-06-25 2022-09-06 天津矿山工程有限公司 Method for blasting and drifting section by section in hole by drilling casing method

Also Published As

Publication number Publication date
CN113027477B (en) 2022-07-29

Similar Documents

Publication Publication Date Title
CN101831906B (en) Dry type pneumatic rock drilling pile-driving machine and working method thereof
RU2378479C2 (en) Method and device for implementation of processes in underground borehole by means of usage of flexible well casing
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN103850684A (en) Sinking technology for expanding pilot well drilled by raise-boring machine, by using vertical well heading machine
CN110118084B (en) Ultra-deep shaft construction method
CN104989272A (en) Upward inverse well drilling process
CN113027477B (en) Construction method for quickly dredging blocked mine
JP7292772B2 (en) External expansion pipe construction method for drilling in the mining zone
JP6971170B2 (en) How to build an underground structure
CN104989409B (en) A kind of full face tunneling method after vertical shaft light section pore-forming
CN113266283B (en) Well-guiding type shaft heading machine starting process
CN214576923U (en) Coal bed gas horizontal well system
CN114575746A (en) Construction method for natural gas pipeline reverse well drilling crossing
CN110374664B (en) Reverse drilling construction method for high gas and outburst coal seam fresh air well
CN216841792U (en) Coal chute structure for underground coal mine
DK181436B1 (en) Method and system for pulling tubulars out of a subterranean well
CN216518145U (en) Reverse-pulling reaming construction drill jamming treatment rescue system for inclined shaft in unfavorable geological section
RU2806905C1 (en) Well construction method
RU2816141C1 (en) Well construction method
CN114320204B (en) Drill jamming treatment method for reverse-pulling hole expanding construction of inclined shaft in unfavorable geological section
CN112302659B (en) Multifunctional anti-blocking dredging device for blasting excavation of tunnel ventilation shaft
RU2039277C1 (en) Method for formation of protective pillar
RU2158829C1 (en) Method of minerals hydraulic borehole mining and device for its embodiment
RU2059812C1 (en) Unit for mining of underground formation
Feng et al. Application of BMC counter shaft drilling rig in the return wind vertical shaft in Hengsheng coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant