CN1129688C - Bridge support maintaining method and apparatus - Google Patents

Bridge support maintaining method and apparatus Download PDF

Info

Publication number
CN1129688C
CN1129688C CN 00108445 CN00108445A CN1129688C CN 1129688 C CN1129688 C CN 1129688C CN 00108445 CN00108445 CN 00108445 CN 00108445 A CN00108445 A CN 00108445A CN 1129688 C CN1129688 C CN 1129688C
Authority
CN
China
Prior art keywords
bridge
jack
fixed
carriage
fixed mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00108445
Other languages
Chinese (zh)
Other versions
CN1271043A (en
Inventor
徐斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00108445 priority Critical patent/CN1129688C/en
Publication of CN1271043A publication Critical patent/CN1271043A/en
Application granted granted Critical
Publication of CN1129688C publication Critical patent/CN1129688C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a bridge support seat maintaining method and an apparatus. Particularly, the present invention exchanges a support seat which is arranged between a bridge board and a cover beam in a highway, city high erection and a sea cross bridge. The apparatus of the present invention is formed in a mode that a fixed frame which is connected into integration by an upper and a lower embracing brakes by a supporting rod, is connected with a supporting beam and a connecting board into a whole by a connecting rod through a jack to be fixed on a fixed plate so as to form a universal adjustable frame, and the universal adjustable frame and an embrace supporter are connected into an integral supporting frame. The method uses a pier column as a stress supporting column which is used for finishing large tonnage operation, a bridge can be constructed when vehicles are run, and thus, traffic can not be affected. The present invention can protect a paving layer of the bridge face against damage, is suitable for the use and maintenance of the bridges with different structures, and other maintenance operation of the bridges, and a use range is wide.

Description

The method for maintaining of bridge pad and device
The present invention relates to a kind of method for maintaining of bridge critical piece and the device that must use, particularly in freeway bridge, urban viaduct, sea-crossing bridge, to method for maintaining and the device that is installed in the bridge pad between bridge board and the bent cap.
Along with the development of communication, each city and intercity for transport solution crowds and blocked state has been built one after another and has much been striden river, sea-crossing bridge and road bridge, viaduct, freeway bridge.As time goes on, in bridge, play anti-collision, reduce vibration and telescopic action, and the bridge pad of being made by elastomeric material is easily aging, more fragile than other parts, thereby lose its function and effect, will directly cause the bridge breakdown so for a long time, influence the driving safety of vehicle.But can not be, and stop the use of whole highway or bridge because of the damage of bearing.How to keep in repair, change for this reason bridge pad, especially stride the replacing of river, Oversea bridge bearing, very big technical barrier really.
The patent No. 89204056.4 " bridge pad is changed frame " is changed the device of bearing though a kind of bridge that is used to keep in repair also is provided, and it adopts and place jack on crossbeam, with jack Liang Tiding is got on, thereby changes bearing.But the two ends of crossbeam are to be placed on the hanging basket, and hanging basket is again the two ends that are suspended on crossbeam, is some suspended structures entirely, do not have the fixing strong point, in case the operation unbalance stress, hanging basket will take place by the carrying out of bias effect construction.On this crossbeam, construct simultaneously, have many unsafe factors.This device can't guarantee that also the stressed energy of both sides hanging basket institute is identical in concrete operations on the other hand, therefore can not finish the large-tonnage operation and protect bridge deck pavement not impaired.And the position that the bent cap two ends of most bridge construction all do not hang hanging basket.
The object of the present invention is to provide a kind of method for maintaining and device of bridge pad, can carry out the replacing of bearing safely, effectively, and can protect bridge deck pavement to avoid destroying with this method; Can construct on one side, Yi Bian be open to traffic; Can be fit to use, the maintenance of various different bridges, and safe and reliable.
The present invention is achieved in that the device of bridge pad maintenance is for connecting into whole fixed mount by upper and lower brake holding by strut, through jack with by holder fine strain of millet, junction plate by straight, tiltedly connecting rod connects into integral body, is fixed on and constitutes omnipotent adjustable shelf on the base plate, and be close to by omnipotent adjustable shelf lower end base plate and embrace on the straight line portion of holder two ends, pass a through hole of embracing in the holder with bolt and be fixedly connected into whole carriage with nut and form.
The method for maintaining step:
A. the pier stud of selecting construction bridges is a bearing post,
B. fixed mount is fixed on the pier stud,
C. installation bracket on fixed mount,
D. on fixed mount, lay hydraulic jack,
E. on jack, place carriage,, operation is changed in the bridge board picking-up by carriage simultaneously firmly with each jack stand.
Fig. 1. structural representation of the present invention;
Fig. 2. the right view of Fig. 1;
Fig. 3. the A-A view of Fig. 1;
Fig. 4. the B-B view of Fig. 2;
Fig. 5. the C-C view of Fig. 2.
Below in conjunction with accompanying drawing embodiments of the invention are further described.
Brake holding sheet 15,18 by the cross section is The steel plate of shape is made, and inner surface is close to rubber pad 16 respectively, and sticks with glue agent through vulcanizing treatment with strengthening last brake holding 4 and the following brake holding 2 that screw 17 connects into itself and brake holding sheet 15, brake holding sheet 18 integral body.
Two brake holding sheets, 15 usefulness bolts, nut connect into whole embracing and hold in the palm 6, and two ends is a straight line portion 19.
Junction plate 8 is made by the rectangular plate of last regular through hole, and its thickness matches with joist 9 thickness.
Fixed mount 23 is by 4 struts 3 and bolt, nut, with brake holding on two 4, whole composition that twice brake holding 2 connects into.
Omnipotent adjustable shelf 20 is close to by the two sides of junction plate 8, joist 9 and is fixed two direct-connected extension bar 11, two oblique connecting rods 12 with bolt, nut, and junction plate 8 is weldingly fixed on the base plate 7 of ∏ shape with two clamping plate 22, connects into whole the composition.
Carriage 21 is close to respectively on the external surface of embracing holder 6 two ends straight line portioies 19 by two clamping plate 22 on omnipotent adjustable shelf 20 its lower end base plates 7, passes the through hole of embracing in the holder 6 with bolt, is fixedly connected into whole the composition with nut.Promptly an omnipotent adjustable shelf 20 and an armful holder 6 are connected into integral body by carriage 21.
The method for maintaining step
A. select that corresponding bridge pier post 1 is generally 4 forward and backward and horizontal pier studs as stressed bearing post in the construction bridges, if bridge floor broad, long available 6 pier studs or a plurality of pier stud.
B. 4 fixed mounts 23 are utilized brake holding 4 and twice brake holdings 2 on two on it respectively, hug on the design attitude of 4 pier studs 1 that are buckled in the bridge both sides, and be connected, be fixed into integral body with bolt, nut and pier stud 1.
C. 4 carriages 21 are utilized embracing on it to hold in the palm 6 respectively, embrace on the pier stud 1 of fixed mount 23 top positions with bolt, nut pine.
D. two or more jack 5 can be placed on each fixed mount 23 as required, and hold up each carriage 21 on the pier stud 1 respectively.
E. at last on fixed mount 23, assume unified command of operation, utilize the jack 5 on it, upwards hold up 4 carriages 21 simultaneously, hold up the mat formation bridge board 13 of layer 14 of bridges two sidebands by carriage 21 again, at this moment immediately aging bearing to be changed on bridge board 13 times, the bent cap 10 is taken out, new bearing put into install, finish Deng maintenance, put down jack 5 and carriage 21 then, make bridge board 13 return to the origin-location.
The present invention is compared with prior art: reason bridge pier post is as stressed bearing post, and thereon fixedly fixed mount carry out operation, therefore safety, reliable can be used for finishing the large-tonnage operation.Because of with the direct jack-up carriage of jack, by carriage the bridge board jack-up of integral body is changed then again, so the stressed bridge deck pavement of evenly can protecting is not impaired.Again can be according to the difference of the suffered gravity of bridge, select the jack of different numbers to operate, and fixed mount, carrier structure are simple, easily make, easy to use, and the direct-connected extension bar of the omnipotent adjustable shelf on the carriage, tiltedly connecting rod can make the position do suitable adjustment according to the requirement of job site, satisfies the requirement of construction.So the method can be widely used in the maintenance of different types of rridges and change bearing, the scope of application is wide.
When the method is changed bearing or made other maintenance activity at carriage jack-up bridge board,, do not influence driving while all can construct, be open to traffic.

Claims (7)

1. the maintenance unit of a bridge pad, it is characterized in that connecting into whole fixed mount (23) by strut (3) by upper and lower brake holding (4), (2), connect into integral body through jack (5) and by joist (9), junction plate (8) by straight, oblique connecting rod (11), (12), be fixed on base plate (7) and go up formation omnipotent adjustable shelf (20), reach base plate (7) by omnipotent adjustable shelf (20) lower end, be close to and embrace on holder (6) two ends straight line portioies (19), pass the through hole of embracing in the holder (6) with bolt, be fixedly connected into whole carriage (21) with nut and form.
2. device according to claim 1, it is characterized in that brake holding (4), descend brake holding (2) to make brake holding sheet (15), (18) by steel plate, inner surface is close to rubber pad (16) respectively, and sticks with glue agent and through vulcanizing treatment with strengthening screw (17) itself and brake holding sheet (15), brake holding sheet (18) are connected into whole formation.
3. device according to claim 1, the two brake holding sheets (15) that it is characterized in that embracing holder (6) and by two ends be straight line portion (19) connect into whole formation with bolt, nut.
4. device according to claim 1 is characterized in that the integral body that fixed mount (23) is connected into brake holding (4) on two, twice brake holdings (2) by 4 bracing bars (3) and bolt, nut.
5. device according to claim 1, it is characterized in that junction plate (8) made by the rectangular plate of last regular through hole, thickness matches with joist (9) thickness, two sides of itself and holder fine strain of millet (9) are close to and are used bolt, nut is fixed two direct-connected extension bars (11), two oblique connecting rods (12), and junction plate (8) is weldingly fixed on the base plate (7) with two clamping plate (22), connect into omnipotent adjustable shelf (20), two clamping plate (22) on its lower end base plate (7) of omnipotent adjustable shelf (20), be close to respectively on the external surface of embracing holder (6) two ends straight line portioies (19), pass the through hole of embracing in the holder (6) with bolt, be fixedly connected into whole carriage (21) with nut.
6. the method for maintaining of a bridge pad is characterized in that:
A. the pier stud of selecting construction bridges is a bearing post;
B. fixed mount is fixed on the pier stud;
C. installation bracket on fixed mount;
D. on fixed mount, lay hydraulic jack;
E. on jack, place carriage,, operation is changed in the bridge picking-up by carriage simultaneously firmly with each jack stand.
7. method according to claim 6 is characterized in that:
A. select in the construction bridges corresponding 4 bridge pier posts (1) as stressed bearing post;
B. 4 fixed mounts (23) are utilized brake holding on two on it (4) and twice brake holdings (2) respectively, hug on the design attitude of 4 pier studs (1) that are buckled in the bridge both sides, and be connected, be fixed into integral body with bolt, nut and pier stud (1);
C. 4 carriages (21) are utilized embracing on it to hold in the palm (6) respectively, embrace on the pier stud (1) of fixed mount (23) top position with bolt, nut pine;
D. with two or more jack (5), be placed on each fixed mount (23), and hold up each carriage (21) on the pier stud (1) respectively;
E. utilize the jack (5) on the fixed mount (23), upwards hold up 4 carriages (21) simultaneously, hold up the mat formation bridge board (13) of layer (14) of bridge two sidebands by carriage (21) again, at this moment immediately with under the bridge board (13), bearing aging on lid fine strain of millet (10) changes, put down jack (5) and carriage (21) then, make bridge board (13) return to the origin-location.
CN 00108445 2000-05-25 2000-05-25 Bridge support maintaining method and apparatus Expired - Fee Related CN1129688C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00108445 CN1129688C (en) 2000-05-25 2000-05-25 Bridge support maintaining method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00108445 CN1129688C (en) 2000-05-25 2000-05-25 Bridge support maintaining method and apparatus

Publications (2)

Publication Number Publication Date
CN1271043A CN1271043A (en) 2000-10-25
CN1129688C true CN1129688C (en) 2003-12-03

Family

ID=4579194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00108445 Expired - Fee Related CN1129688C (en) 2000-05-25 2000-05-25 Bridge support maintaining method and apparatus

Country Status (1)

Country Link
CN (1) CN1129688C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858055A (en) * 2010-06-04 2010-10-13 中交第一航务工程局有限公司 Setting steel pipe bracket support system of cover beam and construction method thereof
CN102251490B (en) * 2011-04-26 2013-08-14 北京市市政工程设计研究总院 Spring-propped bridge reinforcing structure
CN102392417B (en) * 2011-11-26 2013-08-21 科达集团股份有限公司 Dual-cantilever bearing support structure for large steel pipe and installation method
CN104846750B (en) * 2015-04-20 2016-09-07 上海同罡建筑工程有限公司 A kind of prestressing force friction-type thick pillar beam support and change method with seam
CN113622322A (en) * 2021-08-13 2021-11-09 中铁十五局集团有限公司 Device and method for replacing and maintaining bridge support

Also Published As

Publication number Publication date
CN1271043A (en) 2000-10-25

Similar Documents

Publication Publication Date Title
JP3340681B2 (en) Construction method of overhanging girder bridge using corrugated steel web
KR101164451B1 (en) Girder with fixing apparatus for vertical tendon and structure construction method using the same
CN103243654A (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN206815974U (en) A kind of multipurpose construction protection column for being easy to peace to tear open
CN103243651A (en) Method for fixedly installing and leveling base of metal upright column of bridge guardrail
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
KR101390169B1 (en) Arch type footpath girder bridge and construction method thereof
CN1129688C (en) Bridge support maintaining method and apparatus
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN2424230Y (en) Maintenance appts. for bridge abutment
CN100497834C (en) Construction equipment for integral roof-holding highway bridge top structure
KR100401251B1 (en) mobile and fixative bridge maintaining system
CN210594979U (en) Business line sound barrier concrete screen body quick installation device
KR200397402Y1 (en) A pillar For Bridge Inspection
CN207646620U (en) The movable construction platform of prefabricated wide cut beam slab
JPS59327Y2 (en) Suspended scaffolding for bridge piers
CN218813219U (en) Triangular bracket for bridge deck of steel-concrete composite beam
CN111576188A (en) Steel construction bridge antidumping structure
CN219342890U (en) Bridge high pier column prestress tensioning construction platform
CN221441327U (en) Corrugated steel plate arch bridge structure for reinforcing dangerously old bridge culvert
CN211665584U (en) Staple bolt installation construction hanging flower basket on column pier
CN221193011U (en) Road bridge construction support frame
CN217414413U (en) Prefabricated box girder box indoor prestressing force stretch-draw tool mobile device
CN209891038U (en) Adjustable temporary bridge
CN212426789U (en) Light-duty basket counter-force pre-compaction device that hangs

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
AR01 Abandonment of patent right to avoid double patenting

According to article 9 of the patent law and article 13 of the detailed rules for the implementation of the patent law: 108445.3 of the invention patents in this issue as a notice of authorization, and at the same time corresponding to the 235236.2 utility model patent to be given up, and in the 19 volume of the 49 issue of the new type of communique on the patent right to abandon the announcement.

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: CCCC ROAD AND BRIDGE CONSULTANTS CO., LTD.

Assignor: Xu Bin

Contract record no.: 2010110000221

Denomination of invention: Bridge support maintaining method and apparatus

Granted publication date: 20031203

License type: Exclusive License

Open date: 20001025

Record date: 20101227

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20031203

Termination date: 20150525

EXPY Termination of patent right or utility model