CN112963009A - Concrete pouring and plugging method for holes of waffle slab - Google Patents

Concrete pouring and plugging method for holes of waffle slab Download PDF

Info

Publication number
CN112963009A
CN112963009A CN202110298650.9A CN202110298650A CN112963009A CN 112963009 A CN112963009 A CN 112963009A CN 202110298650 A CN202110298650 A CN 202110298650A CN 112963009 A CN112963009 A CN 112963009A
Authority
CN
China
Prior art keywords
barrel
waffle
concrete
hole
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110298650.9A
Other languages
Chinese (zh)
Inventor
龚锦
王龙
方四宝
白守更
徐愿生
汪永
于永浩
刘泽芳
陈翰林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202110298650.9A priority Critical patent/CN112963009A/en
Publication of CN112963009A publication Critical patent/CN112963009A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention relates to a method for pouring and plugging concrete in holes of a waffle slab; the method comprises the following steps: according to design change, cutting off the inner wall of the wafer barrel in the hole of the wafer plate and chiseling the concrete on the side wall; planting ribs obliquely along the side wall of the hole of the waffle slab; pasting double-sided adhesive tape around the hole wall at the bottom of the waffle barrel cavity; four steel wires are fixedly led out by opening holes on the periphery of a barrel cover of the waffle barrel; four steel wires led out from the barrel cover of the waffle barrel are tied and fixed with four implanted steel bars to ensure that the barrel cover is tightly covered with the originally poured concrete on the periphery of the waffle barrel; pouring concrete and maintaining to enable the concrete to reach the design strength; and carrying out surface layer epoxy treatment on the surface of the pouring position. According to the invention, the steel bar is implanted into the side wall of the hole of the waffle slab to form the steel bar framework, the steel wire waffle slab barrel cover is hung on the steel bar framework to serve as the bottom die, so that the barrel cover is tightly connected with the waffle barrel, glue is applied to the edges of the barrel cover and the barrel wall to prevent slurry leakage, and then concrete is poured to seal the hole of the waffle slab, so that the waffle slab has the characteristics of convenience in operation and good sealing effect.

Description

Concrete pouring and plugging method for holes of waffle slab
Technical Field
The invention relates to the field of construction of electronic plants, in particular to a method for pouring and plugging concrete in holes of waffle slabs.
Background
At present, the core area of a large-scale electronic factory building is gradually developed into a waffle slab structure, the thickness of the waffle slab in the core area is large, and in the construction process, partial holes of the waffle slab are often blocked due to design change. At present, no good plugging method can be used for effectively plugging the holes of the wafer plate, and the good plugging rear surface is provided.
Disclosure of Invention
The invention aims to overcome the defects and provides a method for pouring and plugging concrete in holes of a waffle slab, which has the characteristics of high strength and good surface effect.
In order to achieve the above object, the present invention is realized by:
a method for pouring and plugging concrete in holes of waffle slab comprises the following steps:
step 1, cutting off the inner wall of a wafer barrel in a wafer plate hole and chiseling concrete on the side wall according to the wafer plate hole needing to be blocked according to a design change mark;
step 2, obliquely planting bars along the side wall of the waffle slab with an angle of 60 degrees with the vertical direction, wherein the bar planting depth is more than or equal to 10 d;
step 3, binding and firmly fixing the obliquely implanted steel bars by using steel wires;
step 4, fixedly leading out four steel wires by opening holes on the periphery of a barrel cover of the waffle barrel;
step 5, sticking double-sided adhesive tapes around the wall of the hole of the concrete originally poured on the periphery of the waffle drum;
step 6, four steel wires led out from the barrel cover of the waffle barrel and four implanted steel bars are tied and fixed to ensure that the barrel cover and the originally poured concrete on the periphery of the waffle barrel are covered tightly;
step 7, pouring concrete and maintaining to enable the concrete to reach the design strength;
and 8, performing surface layer epoxy treatment on the surface of the pouring position.
The method for pouring and plugging the concrete in the holes of the waffle slab comprises the following step 2
Step 2.1, paying off and positioning on site according to requirements, wherein a detector is used for detecting and avoiding the position of the existing steel bar, marking the position of a drilling hole and drilling the hole;
step 2.2, cleaning up dust around the holes, and cleaning the holes by using an air pump and a steel wire brush; after the cleaning, soaking the cotton threads in acetone, and cleaning the inner wall of the hole to finally clean and dry the hole;
step 2.3, after cleaning the holes, tightly plugging the cleaned holes by using clean cotton threads to prevent dust and foreign matters from falling into the holes;
step 2.4, inserting the processed steel bars into the holes, filling bar planting glue for anchoring into a glue injection cylinder, and installing a glue injection nozzle; injecting the bar planting glue into the hole through the glue injection pipe until the air outlet pipe at the other end overflows the glue;
and 2.5, after the cleaning of the bar planting holes is finished, carrying out hidden acceptance check and making an acceptance check record.
According to the invention, the steel bar is implanted into the side wall of the hole of the waffle slab to form a steel bar framework, the steel wire waffle slab barrel cover is hung on the steel bar framework to serve as a bottom die, so that the barrel cover is tightly connected with the waffle barrel, glue is applied to the edges of the barrel cover and the barrel wall to prevent slurry leakage, and then concrete is poured to seal the hole of the waffle slab. Therefore, the invention has the characteristics of convenient operation and good sealing effect.
Drawings
Fig. 1 is a construction schematic diagram of the plugging method.
Fig. 2 is a schematic view of a bar planting process in the plugging method.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1, a method for pouring and blocking concrete in a hole of a waffle slab comprises the following steps:
step 1, cutting off the inner wall of a wafer barrel in a wafer plate hole 1 and chiseling side wall concrete according to the wafer plate hole 1 which needs to be plugged according to a design change mark;
step 2, obliquely implanting a steel bar 2 along the side wall of the waffle slab at an angle of 60 degrees with the vertical direction, wherein the depth of the implanted steel bar 2 is more than or equal to 10 d;
step 3, binding and firmly fixing the obliquely implanted steel bars by using steel wires;
step 4, fixedly leading out four steel wires 4 by opening holes on the periphery of a barrel cover 3 of the waffle barrel;
step 5, sticking double-sided adhesive tapes around the wall of the hole of the concrete originally poured on the periphery of the waffle drum;
step 6, four steel wires 4 led out from a barrel cover 3 of the waffle barrel are tied and fixed with four implanted steel bars 2 to ensure that the barrel cover 3 is tightly covered with the originally poured concrete on the periphery of the waffle barrel;
step 7, pouring concrete and maintaining to enable the concrete to reach the design strength;
and 8, performing surface layer epoxy treatment on the surface of the pouring position.
As shown in fig. 2, in step 2, the bar-planting process includes
Step 2.1, paying off and positioning on site according to requirements, wherein a detector is used for detecting and avoiding the position of the existing steel bar, marking the position of a drilling hole and drilling the hole;
step 2.2, cleaning up dust around the holes, and cleaning the holes by using an air pump and a steel wire brush; after the cleaning, soaking the cotton threads in acetone, and cleaning the inner wall of the hole to finally clean and dry the hole;
step 2.3, after cleaning the holes, tightly plugging the cleaned holes by using clean cotton threads to prevent dust and foreign matters from falling into the holes;
step 2.4, inserting the processed steel bars into the holes, filling bar planting glue for anchoring into a glue injection cylinder, and installing a glue injection nozzle; injecting the bar planting glue into the hole through the glue injection pipe until the air outlet pipe at the other end overflows the glue;
and 2.5, after the cleaning of the bar planting holes is finished, carrying out hidden acceptance check and making an acceptance check record.
According to the invention, the steel bar is implanted into the side wall of the hole of the waffle slab to form a steel bar framework, the steel wire waffle slab barrel cover is hung on the steel bar framework to serve as a bottom die, so that the barrel cover is tightly connected with the waffle barrel, glue is applied to the edges of the barrel cover and the barrel wall to prevent slurry leakage, and then concrete is poured to seal the hole of the waffle slab. Therefore, the invention has the characteristics of convenient operation and good sealing effect.

Claims (2)

1. A method for pouring and plugging concrete in holes of waffle slab is characterized by comprising the following steps: the method comprises the following steps:
step 1, cutting off the inner wall of a wafer barrel in a wafer plate hole and chiseling concrete on the side wall according to the wafer plate hole needing to be blocked according to a design change mark;
step 2, obliquely planting bars along the side wall of the waffle slab with an angle of 60 degrees with the vertical direction, wherein the bar planting depth is more than or equal to 10 d;
step 3, binding and firmly fixing the obliquely implanted steel bars by using steel wires;
step 4, fixedly leading out four steel wires by opening holes on the periphery of a barrel cover of the waffle barrel;
step 5, sticking double-sided adhesive tapes around the wall of the hole of the concrete originally poured on the periphery of the waffle drum;
step 6, four steel wires led out from the barrel cover of the waffle barrel and four implanted steel bars are tied and fixed to ensure that the barrel cover and the originally poured concrete on the periphery of the waffle barrel are covered tightly;
step 7, pouring concrete and maintaining to enable the concrete to reach the design strength;
and 8, performing surface layer epoxy treatment on the surface of the pouring position.
2. The waffle slab hole concrete pouring and plugging method according to claim 1, wherein: in step 2, the process of bar planting comprises
Step 2.1, paying off and positioning on site according to requirements, wherein a detector is used for detecting and avoiding the position of the existing steel bar, marking the position of a drilling hole and drilling the hole;
step 2.2, cleaning up dust around the holes, and cleaning the holes by using an air pump and a steel wire brush; after the cleaning, soaking the cotton threads in acetone, and cleaning the inner wall of the hole to finally clean and dry the hole;
step 2.3, after cleaning the holes, tightly plugging the cleaned holes by using clean cotton threads to prevent dust and foreign matters from falling into the holes;
step 2.4, inserting the processed steel bars into the holes, filling bar planting glue for anchoring into a glue injection cylinder, and installing a glue injection nozzle; injecting the bar planting glue into the hole through the glue injection pipe until the air outlet pipe at the other end overflows the glue;
and 2.5, after the cleaning of the bar planting holes is finished, carrying out hidden acceptance check and making an acceptance check record.
CN202110298650.9A 2021-03-20 2021-03-20 Concrete pouring and plugging method for holes of waffle slab Pending CN112963009A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110298650.9A CN112963009A (en) 2021-03-20 2021-03-20 Concrete pouring and plugging method for holes of waffle slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110298650.9A CN112963009A (en) 2021-03-20 2021-03-20 Concrete pouring and plugging method for holes of waffle slab

Publications (1)

Publication Number Publication Date
CN112963009A true CN112963009A (en) 2021-06-15

Family

ID=76277831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110298650.9A Pending CN112963009A (en) 2021-03-20 2021-03-20 Concrete pouring and plugging method for holes of waffle slab

Country Status (1)

Country Link
CN (1) CN112963009A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033211A (en) * 2021-11-22 2022-02-11 河南省安装集团有限责任公司 Method for plugging reserved holes in floor measurement and positioning without hanging holes

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201474296U (en) * 2009-09-11 2010-05-19 中冶京唐建设有限公司 Floor slab back casting hole moulding board support structure
JP2011094335A (en) * 2009-10-28 2011-05-12 Takenaka Komuten Co Ltd Method for constructing floor slab
CN106049866A (en) * 2016-06-08 2016-10-26 韦刚 Method for blocking holes of hollow cement bricks and product
CN108756035A (en) * 2018-05-31 2018-11-06 上海宝冶集团有限公司 A kind of waffle board construction method that whole cylinder is removable
CN109322505A (en) * 2018-11-23 2019-02-12 上海宝冶集团南京建筑有限公司 A kind of roofing reserved opening concrete plugging device and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201474296U (en) * 2009-09-11 2010-05-19 中冶京唐建设有限公司 Floor slab back casting hole moulding board support structure
JP2011094335A (en) * 2009-10-28 2011-05-12 Takenaka Komuten Co Ltd Method for constructing floor slab
CN106049866A (en) * 2016-06-08 2016-10-26 韦刚 Method for blocking holes of hollow cement bricks and product
CN108756035A (en) * 2018-05-31 2018-11-06 上海宝冶集团有限公司 A kind of waffle board construction method that whole cylinder is removable
CN109322505A (en) * 2018-11-23 2019-02-12 上海宝冶集团南京建筑有限公司 A kind of roofing reserved opening concrete plugging device and preparation method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张勇;: "华夫板施工工艺", 科技创新导报, no. 07, pages 67 *
王清冬;: "浅谈房屋建筑吊洞施工工艺及要点", 居舍, no. 24, pages 172 - 173 *
黄培松;: "奇氏筒模具华夫板精度控制施工技术", 陕西建筑, no. 08, pages 66 - 68 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033211A (en) * 2021-11-22 2022-02-11 河南省安装集团有限责任公司 Method for plugging reserved holes in floor measurement and positioning without hanging holes

Similar Documents

Publication Publication Date Title
CN106088364A (en) A kind of Novel underground room antiseep attachment structure and construction method thereof
CN101705697A (en) Diaphragm wall joint flexible water stop installing device and method
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN112963009A (en) Concrete pouring and plugging method for holes of waffle slab
CN203947772U (en) A kind of kitchen and toilet draining main riser service sleeve
CN109707057A (en) The plugging structure and its construction method of Basement Main Wall Crack infiltration
CN110616877B (en) Method for plugging special-shaped hole of pipe well without formwork hanging construction
CN104846785B (en) Large-section sealing device mounting method
CN206667305U (en) Basement seepage point gradually leak stopping structure
CN204644969U (en) Heavy in section sealing device
CN209509195U (en) A kind of plugging device suitable for small area floor hole
CN107059944A (en) Basement seepage point gradually leak stopping structure and construction method
CN214784846U (en) Device is clogged to outer wall cantilever frame hole
CN107842199B (en) A kind of preforming combination tool of mattess partitioning slot and its built-in process
CN102797264B (en) Construction method for joints of underground continuous walls
CN219059753U (en) Railway bridge deck drain pipe hole plugging device
CN111779895A (en) Novel pre-buried multifunctional PVC pipe water-stop joint and installation method thereof
CN112695875B (en) Method for installing secondary drainage device in toilet
CN205189421U (en) Huge steel core concrete column is irritated core and is watered and smash device
CN109577498A (en) A kind of plugging device suitable for small area floor hole
CN215166653U (en) Leakage-proof structure for root of pipeline
CN215673987U (en) Water stopping pipeline structure between floors
CN216446572U (en) Fast easy plugging device of reservation entrance to a cave
CN218597749U (en) Wall preformed hole plugging device
CN217105905U (en) Soft porcelain brick hanging plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination