CN112942959B - Mounting method capable of improving perpendicularity of lamp post for municipal road - Google Patents

Mounting method capable of improving perpendicularity of lamp post for municipal road Download PDF

Info

Publication number
CN112942959B
CN112942959B CN202110454698.4A CN202110454698A CN112942959B CN 112942959 B CN112942959 B CN 112942959B CN 202110454698 A CN202110454698 A CN 202110454698A CN 112942959 B CN112942959 B CN 112942959B
Authority
CN
China
Prior art keywords
frame
lamp post
area
lamp
detection ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110454698.4A
Other languages
Chinese (zh)
Other versions
CN112942959A (en
Inventor
冯建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tongji Municipal Highway Engineering Consulting Co ltd Hefei Branch
Original Assignee
Shanghai Tongji Municipal Highway Engineering Consulting Co ltd Hefei Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tongji Municipal Highway Engineering Consulting Co ltd Hefei Branch filed Critical Shanghai Tongji Municipal Highway Engineering Consulting Co ltd Hefei Branch
Priority to CN202110454698.4A priority Critical patent/CN112942959B/en
Publication of CN112942959A publication Critical patent/CN112942959A/en
Application granted granted Critical
Publication of CN112942959B publication Critical patent/CN112942959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/12Instruments for setting out fixed angles, e.g. right angles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses an installation method capable of improving the verticality of a lamp post for a municipal road, which is used for defining the upper end surface of an embedded frame as a reference surface and adjusting the levelness of the reference surface when the municipal road lamp post is installed, and further installing the lamp post by taking the reference surface as an installation plane to improve the verticality of the lamp post, and comprises the following steps: building straightness detection subassembly that hangs down, building angle adjusting part, establishing coordinate system, mounting plate, detection ball are in position in the coordinate system, adjusting the straightness that hangs down of pre-buried frame and horizontal plane, fixed pre-buried frame through set up bottom plate and pre-buried frame in the road foundation ditch, when carrying out the lamp pole installation, fix the bottom plate in the foundation ditch earlier, when treating to adjust pre-buried frame and horizontal plane mutually perpendicular, it is fixed with the foundation ditch with pre-buried frame lateral wall, guaranteed the levelness of pre-buried frame up end to pre-buried frame is the level reference, with lamp pole one end vertical fixation in pre-buried frame, improved the security of installation accuracy and later stage.

Description

Mounting method capable of improving perpendicularity of lamp post for municipal road
Technical Field
The invention relates to the field of municipal roads, in particular to an installation method for a municipal road, which can improve the verticality of a lamp post.
Background
Road street lamps, road indicator lamps, signal lamps and the like are the most basic equipment of roads and are generally symmetrically arranged along two sides of a municipal road, and the installation of lamp posts is an important link in the installation and construction process of the road street lamps.
At present, the installation of lamp pole is the manual work usually and digs the foundation ditch, buries the lamp pole bottom behind the foundation ditch and fills up the foundation ditch, and wherein the straightness that hangs down of lamp pole is very important, and it is more to accomplish a municipal administration light pole's quantity usually, therefore the personnel use installation ground as the horizontal plane when the installation operation usually, and artifical range estimation light pole's straightness that hangs down deuterogamies manual righting, and it is difficult to guarantee to observe installation road surface levelness through the naked eye, probably has the risk of collapsing after the installation to cause the potential safety hazard.
Therefore, the mounting method capable of improving the perpendicularity of the lamp post for the municipal road is provided, and the method can be mounted quickly, has accurate horizontal reference and can ensure the perpendicularity.
Disclosure of Invention
The invention aims to provide an installation method capable of improving the perpendicularity of a lamp post for a municipal road, which can be installed quickly, has accurate horizontal reference and can ensure the perpendicularity.
The invention is realized by adopting the following technical scheme: the utility model provides a town road is with can improving lamp pole straightness's installation method that hangs down, it is used for when town road light pole installation, defines pre-buried frame up end as the reference surface, adjusts the levelness of reference surface, and then regards reference surface as the installation plane installation lamp pole, improves the lamp pole straightness that hangs down, the installation method includes the following step:
s1, building a verticality detection assembly
The method comprises the following steps that a position sensor is arranged in the center of the inner wall of the bottom of a pre-buried frame, two vertical rods are symmetrically installed on the inner wall of the bottom of the pre-buried frame by taking the position sensor as a central point, a cross rod perpendicular to the two vertical rods is fixed at the top ends of the two vertical rods, a connecting rope is arranged at the position, right above the position sensor, of the cross rod, and the other end of the connecting rope is connected with a detection ball;
s2, building an angle adjusting assembly
Determining four square connecting points on the outer wall of the bottom of the embedded frame around the central point by taking the position sensor as the central point, arranging regulators at least at two adjacent connecting points, arranging supporting rods at the rest connecting points, and installing the regulators and the supporting rods on a bottom plate;
s3, establishing a coordinate system
Establishing a coordinate system by taking a straight line formed by two opposite connecting points as a coordinate axis by taking the position sensor as an origin, wherein the coordinate system comprises a first area, a second area, a third area and a fourth area;
s4, mounting the bottom plate
Placing the bottom plate and the pre-buried pit into a pre-dug foundation pit, and fixing the bottom plate;
s5, detecting the position of the detection ball in the coordinate system
After the bottom plate is fixed, the detection ball is always kept in a vertical state under the influence of gravity, the projection position of the detection ball projected on a coordinate system can be located in one of the original point, the coordinate axis, the first area, the second area, the third area and the fourth area, and the specific position is detected through a position sensor;
s6, adjusting the verticality of the embedded frame and the horizontal plane
If the projection position of the detection ball on the coordinate system is located at the original point, the embedded frame is vertical to the horizontal plane;
if the projection position of the detection ball on the coordinate system is located at the coordinate axis, the regulators located on the adjacent coordinate axes work until the detection ball returns to the original point, and the embedded frame is vertical to the horizontal plane;
if the projection position of the detection ball on the coordinate system is located in any one of the first area, the second area, the third area and the fourth area, one of the regulators works until the detection ball returns to one of the coordinate axes; the other regulator works until the detection ball returns to the original point, and the embedded frame is vertical to the horizontal plane;
s7, fixing the pre-embedded frame
And fixing the embedded frame in the foundation pit, and vertically fixing one end of the lamp post in the embedded frame.
As a further improvement of the above scheme, in step S1, the position sensor is disposed in a preset groove in the bottom inner wall of the pre-buried frame, the upper surface of the position sensor and the bottom inner wall of the pre-buried frame are at the same level, and the total length of the connecting rope and the detecting ball is the same as the length of the vertical rod.
Preferably, in step S2, the adjuster is an electric telescopic rod.
As a further improvement of the above scheme, in step S4, the bottom plate is riveted and fixed in the foundation pit.
As a further improvement of the above scheme, in step S1, a lamp post fixing assembly is provided in the embedded frame, and the lamp post fixing assembly includes:
the lamp post comprises at least two clamping plates, a lamp post and a lamp post, wherein each two clamping plates are positioned on two opposite sides of the lamp post and used for clamping the lamp post;
a carrier plate for supporting a light pole;
at least one group of compression bars symmetrically arranged at two ends of the bearing plate;
the piston channels are in one-to-one correspondence with the pressure rods, the piston channels are installed in the embedded frame, piston sliding blocks are arranged at two ends of each piston channel, and one end of each pressure rod, which is far away from the bearing plate, movably penetrates through one end of each piston channel and is fixedly connected with one of the piston sliding blocks; and
the push rods correspond to the clamping plates one to one, one end of each push rod movably penetrates through the other end of the piston channel and is fixedly connected with the other piston slide block, and the other end of each push rod is fixedly connected with one side, away from the lamp post, of the clamping plate.
As a further improvement of the above scheme, in step S7, the side wall of the embedded frame and the inner wall of the foundation pit are fixed by pouring, and one end of the lamp post is vertically fixed in the embedded frame.
As a further improvement of the above scheme, in step S1, be provided with the fixed plate parallel with pre-buried frame up end in the pre-buried frame, set up concentric and the same first through-hole of size and second through-hole on pre-buried frame upper end and the fixed plate respectively, all be provided with locating component in first through-hole and the second through-hole, locating component includes that a plurality of rings are seted up the recess of first through-hole pore wall, it is provided with the conflict piece to slide in the recess, conflict piece one end is located first through-hole and rotates and is provided with the ball, the other end with be provided with coupling spring between the recess.
The present invention also provides a pole mounting arrangement for a town road, the pole mounting arrangement comprising:
the perpendicularity detection assembly module is used for detecting the perpendicularity of the embedded frame;
the angle adjusting component module is used for adjusting the angle between the embedded frame and the horizontal plane;
a coordinate system module for establishing a position coordinate system of the detection ball;
a bottom plate fixing module for fixing the bottom plate;
the detection ball position module is used for detecting the specific position of the detection ball in the coordinate system;
the adjusting module is used for adjusting the verticality of the embedded frame and the horizontal plane; and
and the embedded frame fixing module is used for fixing the embedded frame.
The invention also provides a method for installing the road signal lamp, which comprises the following steps:
mounting a signal lamp at one end of a lamp post;
and the other end of the lamp post is fixedly installed on the lamp post according to the installation method capable of improving the verticality of the lamp post for any municipal road.
The invention also provides an installation method of the road illumination street lamp, which comprises the following steps:
installing the lighting street lamp at one end of a lamp post;
and the other end of the lamp post is fixedly installed on the lamp post according to the installation method capable of improving the verticality of the lamp post for any municipal road.
Compared with the prior art, through setting up bottom plate and pre-buried frame in the road foundation ditch, when carrying out the lamp pole installation, fix the bottom plate in the foundation ditch earlier, when waiting to adjust pre-buried frame and horizontal plane mutually perpendicular, it is fixed with the foundation ditch with pre-buried frame lateral wall, guaranteed the levelness of pre-buried frame up end to pre-buried frame is the level reference, with lamp pole one end vertical fixation in pre-buried frame, has improved the security of installation accuracy and later stage.
Drawings
Fig. 1 is a schematic view showing a concrete implementation manner of the municipal road lamp pole device of the invention.
Fig. 2 is a schematic view of a specific implementation manner of the lamp post mounting structure for the town road of the invention.
Fig. 3 is a schematic view of a positioning assembly in the municipal road pole apparatus shown in fig. 1.
FIG. 4 is a disassembly schematic view of the bearing plate, the limiting block and the lamp post in the lamp post mounting structure for the town road shown in FIG. 2.
FIG. 5 is a schematic view of the transmission member shown in FIG. 2.
Fig. 6 is a schematic diagram showing a position state of the verticality detecting assembly and the angle adjusting assembly in fig. 1.
Fig. 7 is a schematic view showing another embodiment of the town road lamp apparatus of the present invention.
Fig. 8 is a flow chart of the town road lamp pole installation method of the present invention.
FIG. 9 is a flow chart of the installation method for the town road of the present invention, which can improve the verticality of the lamp post.
In the figure: 1. pre-embedding a frame; 2. a first through hole; 3. a fixing plate; 4. a lamp post; 5. a first telescopic rod; 6. a first rack; 7. a first gear; 8. a clamping plate; 9. a second gear; 10. a drive shaft; 11. a lifting rod; 12. a second rack; 13. a carrier plate; 14. a second telescopic rod; 15. erecting a rod; 16. a limiting block; 17. a groove is embedded; 18. a second through hole; 19. a groove; 20. a contact block; 21. a connecting spring; 22. a ball bearing; 23. a push rod; 24. a piston slide block; 25. a piston channel; 26. a pressure lever; 27. a regulator; 28. a base plate; 29. a cross bar; 30. connecting ropes; 31. detecting the ball; 32. a sensor; 33. a support rod.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
The embodiment discloses a lamp pole equipment for municipal administration road, please refer to fig. 1, and the lamp pole equipment includes lamp pole 4, improves the lamp pole mounting structure of 4 stability of lamp pole, improves the lamp pole installation device that 4 straightness that hang down of lamp pole.
Referring to fig. 2, the lamp post mounting structure for the town road includes an embedded frame 1 and a lamp post fixing assembly.
The pre-buried frame 1 is provided with a first through hole 2 for the lamp pole 4 to run through. The lamp pole 4 inserts in first through-hole 2, and pre-buried frame 1 is fixed lamp pole 4 through first through-hole 2. Referring to fig. 3, a positioning assembly is disposed in the first through hole 2, and the positioning assembly includes a plurality of grooves 19 circumferentially formed on the hole wall of the first through hole 2. A contact block 20 is arranged in the groove 19 in a sliding manner, one end of the contact block 20 is positioned in the first through hole 2 and is provided with a ball 22 in a rotating manner, and a connecting spring 21 is arranged between the other end of the contact block and the groove 19. When the lamp post 4 passes through the first through hole 2, the abutting block 20 enables the end provided with the ball 22 to be positioned on the lamp post 4 under the action of the connecting spring 21.
Fixed mounting has fixed plate 3 in the pre-buried frame 1, the second through-hole 18 that is concentric and the same size with first through-hole 2 is seted up at fixed plate 3 middle part, be provided with in the second through-hole 18 locating component through two sets of locating components, further improves the stability of lamp pole.
The lamp pole fixing assembly comprises a bottom bearing plate 13, a transmission part and at least two clamping plates 8 for clamping the lamp pole 4.
Referring to fig. 4, a bottom locking structure is disposed in the carrier plate 13, and the bottom locking structure includes a stopper 16. The limiting block 16 is fixedly installed at the bottom end of the lamp post 4, in this embodiment, the limiting block 16 penetrates through the lamp post 4, and two ends of the limiting block are exposed outside the lamp post 4. In other embodiments, the stopper 16 may be two pieces fixed to opposite sides of the light pole 4. Of course, the number of stoppers 16 may be larger.
The bearing plate 13 is internally provided with a cavity, and the surface of the bearing plate is provided with an embedded groove 17 communicated with the cavity. The embedded groove 17 is used for the lamp pole 4 to carry the limiting block 16 to pass through, so that the limiting block 16 is accommodated in the cavity. The lamp pole 4 drives the limiting block 16, the limiting block 16 is locked in the cavity after rotating in the cavity, and the lamp pole 4 is positioned on the bearing plate 13. In this embodiment, after the end of the lamp post 4 mounted with the limiting block 16 passes through the first through hole 2, the end is inserted into the insertion groove 17 and rotates a certain angle in the cavity, so that the bottom end of the lamp post 4 can be locked.
Every two clamping plates 8 are used as a group for clamping the lamp post 4. Two clamping plates 8 are located on opposite sides of the light pole 4. The driving medium passes through lamp pole 4 and descends the drive in pre-buried frame 1 the grip block 8 is right 4 lateral walls of lamp pole carry out the centre gripping fixedly, and when lamp pole 4 was installed and is constantly descended in getting into pre-buried frame 1 promptly, 8 centre gripping fixed lamp poles of driving medium drive grip block.
In this embodiment, the grip block 8 is pressed close to 4 one ends of lamp pole can be provided with anti-skidding line, improve grip block 8's centre gripping effect.
In this embodiment, a pressure sensor can be arranged on the clamping plate 8, a second telescopic rod 14 is arranged between the embedded frame 1 and the bearing plate 13, a locking structure is arranged in the second telescopic rod 14, and when the pressure sensor reaches a set clamping pressure, the second telescopic rod 14 is locked and stops stretching to support the bearing plate 13.
Referring to fig. 5, the transmission member includes at least one set of lifting rods 11 symmetrically disposed at two ends of the carrier plate 13, a transmission shaft 10 rotatably disposed in the pre-buried frame 1, and a first telescopic rod 5.
A second rack 12 is laid on the lifting rod 11. The transmission shaft 10 is fixedly provided with a first gear 7 and a second gear 9, and the second gear 9 is meshed with the second rack 12. One end of the first telescopic rod 5 is fixed on the inner wall of the embedded frame 1, the other end of the first telescopic rod is fixedly connected with one side, away from the lamp post 4, of the clamping plate 8, and a first rack 6 meshed with the first gear 7 is laid on the side wall of the first telescopic rod 5. Under the action of gravity and external force, the loading plate 13 and the lamp post 4 descend to drive the lifting rod 11 to descend, the transmission shaft 10 is driven to rotate through the matching of the second rack 12 and the second gear 9, and then the first gear 7 rotates along with the transmission shaft 10. Under the effect of first rack 6, the extension of first telescopic link 5 drives grip block 8 and carries out the centre gripping to lamp pole 4 lateral wall fixedly, and when taking out lamp pole 4, external force drives lamp pole 4 and loading board 13 and rises, and 5 reverse motion of first telescopic link, lamp pole 4 is kept away from promptly to grip block 8.
The embedded frame is arranged in the road, when the lamp post is installed, one end of the lamp post welded with the limiting block penetrates through the first through hole and the embedded groove and rotates for a certain angle in the cavity, the bottom of the lamp post can be locked, and meanwhile, the clamping plates on the two sides are driven to clamp and fix the side wall of the lamp post under the action of the dead weight of the lamp post and external force, so that the lamp post is clamped and positioned while being stable, the lamp post is prevented from inclining, and the installation efficiency and safety are improved;
when the lamp post is taken out, the whole lamp post is pulled out upwards by external force, and then the lamp post is rotated by a certain angle, so that the bottom end of the lamp post is separated from the cavity through the embedded groove, and the lamp post is convenient and quick;
can install fixedly to the lamp pole of different width, the commonality is good.
Referring to fig. 6, the lamp post mounting device includes a verticality detecting module, an angle adjusting module, a coordinate system module, a bottom plate fixing module, a detection ball position module, an adjusting module, and a pre-buried frame fixing module.
The perpendicularity detection assembly module is used for detecting the perpendicularity of the embedded frame 1.
The angle adjusting component module is used for adjusting the angle between the embedded frame 1 and the horizontal plane.
The coordinate system module is used for establishing a position coordinate system of the detection ball on the inner wall of the frame bottom of the embedded frame 1.
The floor mounting module is used to mount the floor 28 within the foundation pit.
The detection ball position module is used for detecting the specific position of the detection ball in the coordinate system.
The adjusting module is used for adjusting the verticality of the embedded frame and the horizontal plane.
The pre-buried frame fixing module is used for fixing the pre-buried frame in the foundation pit.
Through setting up bottom plate and pre-buried frame in the road, when carrying out the lamp pole installation, fix the bottom plate in the foundation ditch earlier, when treating to adjust pre-buried frame and horizontal plane mutually perpendicular, it is fixed with the foundation ditch with pre-buried frame lateral wall, guaranteed the levelness of pre-buried frame up end to pre-buried frame is the level reference, with lamp pole one end vertical fixation in pre-buried frame, has improved the security of installation accuracy and later stage.
Example 2
This embodiment is substantially the same as embodiment 1 except for the structure of the transmission member.
Referring to fig. 7, the transmission member includes at least one set of pressing rods 26, piston channels 25 corresponding to the pressing rods 26, and push rods 23 corresponding to the clamping plates 8.
The compression rods 26 are symmetrically arranged at two ends of the bearing plate 13, the piston channel 25 is arranged in the embedded frame 1, piston sliding blocks 24 are arranged at two ends of the piston channel, and one end of each compression rod 26, far away from the bearing plate 13, movably penetrates through one end of the piston channel 25 and is fixedly connected with one of the piston sliding blocks 24. One end of the push rod 23 movably penetrates through the piston channel 25, the other end of the push rod is fixedly connected with the other piston slide block 24, and the other end of the push rod is fixedly connected with one side, far away from the lamp post 4, of the clamping plate 8. Under the action of gravity and external force, the bearing plate 13 and the lamp post 4 descend to drive the lifting rod 11 to descend, the piston slide block 24 at one end is driven by the pressure rod 26 to move in the piston channel 25, and then the piston slide block 24 at the other end synchronously moves to drive the push rod 23 and the clamping plate 8 to clamp and fix the side wall of the lamp post 4. When the lamp pole 4 is taken out, the external force drives the lamp pole 4 and the bearing plate 13 to ascend, the push rod 23 moves reversely, and the clamping plate 8 is away from the lamp pole 4.
Example 3
Please refer to fig. 8, which is a flow chart of a method for installing a lamp pole for a town road.
The embodiment discloses a method for installing a lamp post for a municipal road, wherein the lamp post 4 is installed through the lamp post equipment in the embodiment 1.
The lamp post mounting method comprises the following steps:
s1: and fixing the embedded frame 1 in a foundation pit dug in advance.
S2: one end of the lamp pole 4 welded with the limiting block 16 penetrates through the first through hole 2 and the embedded groove 17, and enters the cavity of the bearing plate 13, and the lamp pole 4 is rotated, so that the lamp pole 4 and the limiting block 16 are integrally locked in the bearing plate 13.
S3: downward external force is applied to the lamp pole 4, so that the lamp pole 4 and the bearing plate 13 descend, and the clamping plate 8 is driven by the transmission part to clamp and fix the side wall of the lamp pole 4.
The method of installing a town road lamp pole of the present embodiment has the same advantageous effects as the structure of installing a town road lamp pole of embodiment 1.
Example 4
Please refer to fig. 9, which is a flowchart of an installation method for increasing the verticality of the lamp post 4.
The embodiment discloses an installation method for a municipal road capable of improving lamp pole verticality, which is used for defining the upper end surface of a pre-buried frame 1 as a reference surface and adjusting the levelness of the reference surface when a municipal road lamp pole is installed, and then installing the lamp pole by taking the reference surface as an installation plane, so that the lamp pole verticality is improved. The light pole is installed by the light pole device in embodiment 1.
The installation method comprises the following steps:
s1, building a verticality detection assembly;
a position sensor 32 is arranged at the center of the inner wall of the frame bottom of the embedded frame 1, two vertical upright posts 15 are symmetrically arranged on the inner wall of the frame bottom of the embedded frame 1 by taking the position sensor 32 as a central point, and a cross rod 29 which is perpendicular to the two upright posts 15 is fixed at the top ends of the two upright posts 15. A connecting rope 30 is provided at a position of the crossbar 29 directly above the position sensor 32, and a detection ball 31 is connected to the other end of the connecting rope 30. In order to further improve the precision, position sensor 32 sets up the predetermined inslot at pre-buried frame 1 frame end inner wall, and the upper surface is located same level with pre-buried frame 1 frame end inner wall, the total length of connecting rope 30 and detection ball 31 with pole setting 15 length is the same, when adjusting to perpendicular, detection ball 31 just contacts with position sensor 32.
S2, building an angle adjusting assembly;
the position sensor 32 is used as a central point, four square connecting points are determined around the central point on the outer wall of the frame bottom of the embedded frame 1, the regulator 27 is arranged at two adjacent connecting points, the supporting rod 33 is arranged at the rest connecting points, and the regulator 27 and the supporting rod 33 are both arranged on the bottom plate 28. The whole embedded frame 1 is driven to be adjusted through the lifting of at least two adjusters 27. Of course, three or four may be provided depending on the actual situation.
S3, establishing a coordinate system;
a coordinate system is established by taking the position sensor 32 as an origin and taking a straight line formed by two opposite connecting points as a coordinate axis, and the coordinate system comprises a first area, a second area, a third area and a fourth area.
S4, mounting the bottom plate 28;
placing the bottom plate 28 and the pre-buried pit 1 into a pre-dug foundation pit, and fixing the bottom plate 28; the fixing method of the bottom plate 28 is not limited, and the bottom plate may be fixed by casting or may be fixed by riveting.
S5, detecting the position of the detection ball 31 in the coordinate system;
after the bottom plate 28 is fixed, the detection ball 31 is always kept in a vertical state under the influence of gravity, and the projection position of the projection of the detection ball 31 on the coordinate system is located in one of the origin, the coordinate axis, the first area, the second area, the third area and the fourth area, and the specific position is detected by the position sensor 31.
S6, adjusting the verticality of the embedded frame 1 and the horizontal plane;
if the projection position of the detection ball 31 on the coordinate system is located at the original point, the embedded frame 1 is vertical to the horizontal plane and does not need to be adjusted.
If the projection position of the detection ball 31 on the coordinate system is located on the coordinate axis, the regulator 27 located on the adjacent coordinate axis works until the detection ball 31 returns to the original point, and the pre-buried frame 1 is perpendicular to the horizontal plane.
If the projection position of the detection ball 31 on the coordinate system is located in any one of the first area, the second area, the third area and the fourth area, one of the adjusters 27 operates until the detection ball 31 returns to one of the coordinate axes; the other regulator 27 works until the detection ball 31 returns to the original point, the embedded frame 1 is vertical to the horizontal plane, and the two regulators 27 can work sequentially or simultaneously.
S7, fixing the embedded frame 1;
and fixing the embedded frame 1 in the foundation pit, and vertically fixing one end of the lamp post in the embedded frame 1. The fixing mode of the embedded frame 1 is not limited, and in the embodiment, preferably, the side wall of the embedded frame 1 is fixed with the inner wall of the foundation pit in a pouring mode.
Specifically, a fixing plate 3 parallel to the upper end face of the embedded frame 1 is arranged in the embedded frame 1. The upper end of the embedded frame 1 and the fixing plate 3 are respectively provided with a first through hole 2 and a second through hole 18 which are concentric and have the same size. All be provided with locating component in first through-hole 2 and the second through-hole 18, locating component includes that a plurality of annulars are seted up the recess 19 of 2 pore walls of first through-hole, it is provided with touch block 20 to slide in the recess 19, touch block 20 one end is located first through-hole 2 and rotates and is provided with ball 22, the other end with be provided with coupling spring 21 between the recess 19, through setting up first through-hole 2, second through-hole 18 and locating component, when first through-hole 2, second through-hole 18 are run through to the lamp pole lower extreme, further improve the straightness that hangs down.
Through set up bottom plate and pre-buried frame in the road, when carrying out the lamp pole installation, fix the bottom plate in the foundation ditch earlier, when treating to adjust pre-buried frame and horizontal plane mutually perpendicular, it is fixed with the foundation ditch with pre-buried frame lateral wall, guaranteed the levelness of pre-buried frame up end to pre-buried frame is the level reference, with lamp pole one end vertical fixation in pre-buried frame, has improved the security of installation accuracy and later stage.
Example 5
The embodiment discloses a road signal lamp, which is installed on a road through a lamp post device in the embodiment 1. The method for installing the road signal lamp comprises the following steps:
the municipal road is adjusted according to the installation method capable of improving the verticality of the lamp post in embodiment 4.
The signal lamp is arranged at one end of the lamp post.
And the other end of the lamp post is installed according to the method for installing the lamp post for the municipal road in the embodiment 3.
Example 6
The present embodiment discloses a street lighting lamp for road, which is installed on both sides of a road through the lamp post device of embodiment 1. The method for installing the street lighting lamp for the road comprises the following steps:
the embedded frame is adjusted by the installation method capable of improving the perpendicularity of the lamp post according to the municipal road described in embodiment 4.
The lighting street lamp is arranged at one end of the lamp post.
And the other end of the lamp post is installed according to the method for installing the lamp post for the municipal road in the embodiment 3.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. An installation method for improving the verticality of a lamp post for a municipal road comprises the steps of fixing an embedded frame (1) in a foundation pit and vertically fixing one end of the lamp post in the embedded frame (1); the method is characterized in that: this step is preceded by:
the method comprises the steps that a position sensor (32) is arranged in the center of the inner wall of the frame bottom of a pre-buried frame (1), two vertical rods (15) are symmetrically installed on the inner wall of the frame bottom of the pre-buried frame (1) by taking the position sensor (32) as a central point, a cross rod (29) perpendicular to the two vertical rods (15) is fixed to the top ends of the two vertical rods (15), a connecting rope (30) is arranged at a position, right above the position sensor (32), of the cross rod (29), and the other end of the connecting rope (30) is connected with a detection ball (31); the position sensor (32) is used as a central point, four square connecting points are determined on the outer wall of the frame bottom of the embedded frame (1) around the central point, at least two adjacent connecting points are provided with regulators (27), the rest connecting points are provided with supporting rods (33), and the regulators (27) and the supporting rods (33) are both arranged on a bottom plate (28);
then still need adjust the lamp pole squareness:
a control position sensor (32) detects the verticality of the embedded frame (1);
establishing a position coordinate system of the detection ball (31); establishing a coordinate system by taking a straight line formed by two opposite connecting points as a coordinate axis by taking the position sensor (32) as an origin, wherein the coordinate system comprises a first area, a second area, a third area and a fourth area;
placing a bottom plate (28) and the embedded frame (1) into a foundation pit dug in advance, and fixing the bottom plate (28);
detecting the specific position of the detection ball (31) in the coordinate system; after the bottom plate (28) is fixed, the detection ball (31) is always kept in a vertical state under the influence of gravity, the projection position of the projection of the detection ball on a coordinate system can be located in one of the original point, the coordinate axis, the first area, the second area, the third area and the fourth area, and the specific position is detected through a position sensor (32);
adjusting the verticality of the embedded frame (1) and the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located at the original point, the embedded frame (1) is vertical to the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located at the coordinate axis, the regulator (27) located on the adjacent coordinate axis works until the detection ball (31) returns to the original point, and the embedded frame (1) is vertical to the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located in any one of the first area, the second area, the third area and the fourth area, one of the regulators (27) works until the detection ball (31) returns to one of the coordinate axes; and the other regulator (27) works until the detection ball (31) returns to the original point, and the embedded frame (1) is vertical to the horizontal plane.
2. The mounting method for improving the verticality of the lamp post for the municipal road according to claim 1, is characterized in that: position sensor (32) set up at the pre-established inslot of pre-buried frame (1) frame end inner wall, and the upper surface is located same level with pre-buried frame (1) frame end inner wall, the total length of connecting rope (30) and detection ball (31) with pole setting (15) length is the same.
3. The installation method for improving the verticality of the lamp post for the municipal road according to claim 1, characterized in that: the regulator (27) is an electric telescopic rod.
4. The mounting method for improving the verticality of the lamp post for the municipal road according to claim 1, is characterized in that: and the bottom plate (28) is riveted and fixed in the foundation pit.
5. The mounting method for improving the verticality of the lamp post for the municipal road according to claim 1, is characterized in that: the side wall of the embedded frame (1) is fixedly poured with the inner wall of the foundation pit, and one end of the lamp post (4) is vertically fixed in the embedded frame (1).
6. The installation method for improving the verticality of the lamp post for the municipal road according to claim 1, characterized in that: be provided with in pre-buried frame (1) with fixed plate (3) that parallel with pre-buried frame (1) up end, set up concentric and the same first through-hole (2) of size and second through-hole (18) on pre-buried frame (1) upper end and fixed plate (3) respectively, all be provided with locating component in first through-hole (2) and second through-hole (18), locating component includes that a plurality of rings are seted up recess (19) of first through-hole (2) pore wall, it is provided with to touch multitouch (20) to slide in recess (19), touch multitouch (20) one end is located first through-hole (2) and rotates and is provided with ball (22), the other end with be provided with between recess (19) connecting spring (21).
7. The mounting method for improving the verticality of the lamp post for the municipal road according to claim 1, is characterized in that: be provided with the fixed subassembly of lamp pole in pre-buried frame (1), the fixed subassembly of lamp pole includes:
the lamp post comprises at least two clamping plates (8), wherein each two clamping plates (8) are positioned on two opposite sides of the lamp post (4) and used for clamping the lamp post (4);
a carrier plate (13) for supporting a light pole (4);
at least one group of compression bars (26) which are symmetrically arranged at two ends of the bearing plate (13);
the piston channels (25) are in one-to-one correspondence with the pressure rods (26), the piston channels are installed in the embedded frame (1), piston sliding blocks (24) are arranged at two ends of each piston channel, one end, far away from the bearing plate (13), of each pressure rod (26) movably penetrates through one end of each piston channel (25) and is fixedly connected with one piston sliding block (24); and
the push rods (23) correspond to the clamping plates (8) one to one, one end of each push rod (23) movably penetrates through the other end of the piston channel (25) and the other end of the piston slide block (24) to be fixedly connected, and the other end of each push rod is fixedly connected with one side, far away from the lamp pole (4), of each clamping plate (8).
8. A lamp post mounting device for improving the verticality of a lamp post is used for fixing an embedded frame (1) in a foundation pit and vertically fixing one end of the lamp post in the embedded frame (1); before this, it is necessary to:
the method comprises the steps that a position sensor (32) is arranged in the center of the inner wall of the frame bottom of a pre-buried frame (1), two vertical rods (15) are symmetrically installed on the inner wall of the frame bottom of the pre-buried frame (1) by taking the position sensor (32) as a central point, a cross rod (29) perpendicular to the two vertical rods (15) is fixed to the top ends of the two vertical rods (15), a connecting rope (30) is arranged at a position, right above the position sensor (32), of the cross rod (29), and the other end of the connecting rope (30) is connected with a detection ball (31); the position sensor (32) is used as a central point, four square connecting points are determined on the outer wall of the frame bottom of the embedded frame (1) around the central point, at least two adjacent connecting points are provided with regulators (27), the rest connecting points are provided with supporting rods (33), and the regulators (27) and the supporting rods (33) are both arranged on a bottom plate (28); placing a bottom plate (28) and the embedded frame (1) into a foundation pit dug in advance, and fixing the bottom plate (28);
the method is characterized in that: then still need the lamp pole installation device to adjust the lamp pole straightness that hangs down, the lamp pole installation device includes:
the perpendicularity detection assembly module is used for controlling the position sensor (32) to detect the perpendicularity of the embedded frame (1);
the angle adjusting component module is used for adjusting the angle between the embedded frame (1) and the horizontal plane;
a coordinate system module for establishing a position coordinate system of the detection ball (31); establishing a coordinate system by taking a straight line formed by two opposite connecting points as a coordinate axis by taking the position sensor (32) as an origin, wherein the coordinate system comprises a first area, a second area, a third area and a fourth area;
a base plate fixing module for fixing a base plate (28);
a detection ball position module for detecting the specific position of the detection ball (31) in the coordinate system; after the bottom plate (28) is fixed, the detection ball (31) is always kept in a vertical state under the influence of gravity, the projection position of the projection of the detection ball (31) on a coordinate system can be located in one of the original point, the coordinate axis, the first area, the second area, the third area and the fourth area, and the specific position is detected through a position sensor (32);
the adjusting module is used for adjusting the verticality of the embedded frame (1) and the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located at the original point, the embedded frame (1) is vertical to the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located on the coordinate axis, the regulator (27) located on the adjacent coordinate axis works until the detection ball (31) returns to the original point, and the embedded frame (1) is vertical to the horizontal plane; if the projection position of the detection ball (31) on the coordinate system is located in any one of the first area, the second area, the third area and the fourth area, one of the regulators (27) works until the detection ball (31) returns to one of the coordinate axes; the other regulator (27) works until the detection ball (31) returns to the original point, and the embedded frame (1) is vertical to the horizontal plane;
and the embedded frame fixing module is used for fixing the embedded frame (1).
9. A method for mounting a road signal lamp is characterized by comprising the following steps:
mounting a signal lamp at one end of a lamp post;
the other end of the lamp post is fixedly installed on the lamp post according to the method for installing the municipal road post, which can improve the verticality of the lamp post, of any one of claims 1 to 7.
10. A method for installing an illuminating street lamp for a road is characterized by comprising the following steps:
installing the illuminating street lamp at one end of a lamp post;
the other end of the lamp post is fixedly installed on the lamp post according to the method for installing the municipal road post, which can improve the verticality of the lamp post, of any one of claims 1 to 7.
CN202110454698.4A 2021-04-26 2021-04-26 Mounting method capable of improving perpendicularity of lamp post for municipal road Active CN112942959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110454698.4A CN112942959B (en) 2021-04-26 2021-04-26 Mounting method capable of improving perpendicularity of lamp post for municipal road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110454698.4A CN112942959B (en) 2021-04-26 2021-04-26 Mounting method capable of improving perpendicularity of lamp post for municipal road

Publications (2)

Publication Number Publication Date
CN112942959A CN112942959A (en) 2021-06-11
CN112942959B true CN112942959B (en) 2022-11-08

Family

ID=76233484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110454698.4A Active CN112942959B (en) 2021-04-26 2021-04-26 Mounting method capable of improving perpendicularity of lamp post for municipal road

Country Status (1)

Country Link
CN (1) CN112942959B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113124364B (en) * 2021-04-26 2024-03-01 上海同济市政公路工程咨询有限公司合肥分公司 Lamp post mounting structure for municipal road and mounting method thereof
CN114863705A (en) * 2022-07-07 2022-08-05 北京赛目科技有限公司 Method and device for determining position of traffic light, electronic equipment and storage medium

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010066165A (en) * 2008-09-11 2010-03-25 Audio Technica Corp Inclination sensor for laser leveler
KR20130059665A (en) * 2011-11-29 2013-06-07 주식회사 시스매니아 Structure of the folded type pole
US9309686B2 (en) * 2014-04-10 2016-04-12 Us Tower Corporation Multi-axial mast positioning system
RU163123U1 (en) * 2015-12-10 2016-07-10 Федеральное государственное казенное военное образовательное учреждение высшего профессионального образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" DEVICE FOR INSTALLING SUPPORTS OF AIR LINES AND CONTACT NETWORK
CN107062146B (en) * 2017-05-19 2018-04-24 河南睿光新能源科技有限公司 A kind of energy saving and environment friendly street lamp based on SMART WIRE bar
CN208187414U (en) * 2018-06-02 2018-12-04 浙江交科工程检测有限公司 A kind of skyscraper verticality measurement device
CN208653469U (en) * 2018-07-13 2019-03-26 宁波永耀惠程电力科技有限公司 A kind of shaft tower device for monitoring inclination suitable for high voltage transmission line
CN210485510U (en) * 2019-11-21 2020-05-08 周浩 Oil field digital street lamp
CN110985961A (en) * 2019-11-25 2020-04-10 廖建波 LED street lamp structure
CN211475733U (en) * 2020-03-11 2020-09-11 广安智慧照明科技有限公司 Auxiliary clamping device for street lamp installation
CN212763365U (en) * 2020-06-03 2021-03-23 德清世锦智能科技有限公司 Teaching aid is panel fixing device for manufacturing
CN111705647A (en) * 2020-06-30 2020-09-25 浙江路鑫交通设施工程有限公司 Safe impact-resistant guardrail and installation method thereof

Also Published As

Publication number Publication date
CN112942959A (en) 2021-06-11

Similar Documents

Publication Publication Date Title
CN112942959B (en) Mounting method capable of improving perpendicularity of lamp post for municipal road
WO2020133972A1 (en) High-precision automatic positioning and verticality adjustment system for ultra-long steel column by reverse construction method and construction method
CN113562629B (en) Lattice column positioning and verticality adjusting system
CN113124364B (en) Lamp post mounting structure for municipal road and mounting method thereof
CN114135043B (en) Pre-buried sliding chute type suspended ceiling mounting structure and construction method
CN215254576U (en) Concrete form strutting arrangement for building engineering
CN112985287B (en) Bridge construction deformation monitoring devices
CN111323000B (en) Laser positioning system
CN109896450B (en) Special pulley construction device and method for cable trench
CN116858190B (en) Intelligent vertical detection equipment for building engineering construction
CN220100718U (en) Prefabricated shear wall adjusting equipment
CN219243217U (en) Body temperature automatic detection equipment
CN111766157A (en) Pull-anchor type railing horizontal thrust detection device and implementation method
CN111746811A (en) Unmanned aerial vehicle photogrammetry mounting platform
CN110702024A (en) Device for detecting deflection of building structural member
CN219605273U (en) Pile hole diameter detection device
CN215482507U (en) Highway traffic sign tablet auxiliary device
CN215598418U (en) Building construction straightness detection device that hangs down
CN219471228U (en) Concrete column foundation pre-buried locator
CN217155665U (en) Height-adjustable sensor vertical rod jacking device with horizontal measurement function
CN219994821U (en) Adjustable camera fixed establishment that water gauge detected shooting
CN213813202U (en) High-precision falling ball impact testing machine
CN117967073B (en) Large-scale steel construction support and extrusion detection equipment for venue construction
CN218296220U (en) Installation device of central air conditioner indoor unit
CN221219568U (en) Scaffold for construction industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant