CN112942115A - Thin-wall platform and construction method thereof - Google Patents
Thin-wall platform and construction method thereof Download PDFInfo
- Publication number
- CN112942115A CN112942115A CN202110121126.4A CN202110121126A CN112942115A CN 112942115 A CN112942115 A CN 112942115A CN 202110121126 A CN202110121126 A CN 202110121126A CN 112942115 A CN112942115 A CN 112942115A
- Authority
- CN
- China
- Prior art keywords
- thin
- steel bars
- outer side
- side template
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a thin-wall platform and a construction method thereof, comprising the following steps: A. an inner side template and an outer side template are respectively and fixedly installed on the foundation, and the inner side template is positioned on the inner side of the outer side template; a plurality of prefabricated holes which are in one-to-one correspondence are arranged on the inner side template and the outer side template; B. inserting steel bars into the prefabricated holes according to design requirements, and filling and plugging unused prefabricated holes; C. binding and reinforcing the steel bars; D. and pouring concrete into the inner side formwork and the outer side formwork, and removing the inner side formwork and the outer side formwork after the concrete is cured. The invention can improve the defects of the prior art, improve the installation accuracy of the reinforcing steel bars in the thin-wall table and improve the firmness of template installation.
Description
Technical Field
The invention relates to the technical field of road and bridge construction, in particular to a thin-wall platform and a construction method thereof.
Background
Abutments are building components used to support the superstructure of bridges and to engage embankments, of which thin-walled abutments are a common type. The existing thin-wall abutment is easy to cause the problems that the position of a steel bar is inaccurate, the appearance is influenced by the deformation of a template, and even the structure size is inaccurate in the pouring process.
Disclosure of Invention
The invention aims to provide a thin-wall platform and a construction method thereof, which can overcome the defects of the prior art, improve the installation accuracy of reinforcing steel bars in the thin-wall platform and improve the installation firmness of a template.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows.
A construction method of a thin-wall platform comprises the following steps:
A. an inner side template and an outer side template are respectively and fixedly installed on the foundation, and the inner side template is positioned on the inner side of the outer side template; a plurality of prefabricated holes which are in one-to-one correspondence are arranged on the inner side template and the outer side template;
B. inserting steel bars into the prefabricated holes according to design requirements, and filling and plugging unused prefabricated holes;
C. binding and reinforcing the steel bars;
D. and pouring concrete into the inner side formwork and the outer side formwork, and removing the inner side formwork and the outer side formwork after the concrete is cured.
Preferably, the top and the bottom of the lateral side of the outer formwork are respectively provided with a rib plate.
Preferably, in the step C, when the reinforcing steel bars are bound and reinforced, the target reinforcing steel bars are wound by using steel wires to stress the target reinforcing steel bars, then the support rings are inserted into the corresponding prefabricated holes in which the target reinforcing steel bars are inserted, and finally the target reinforcing steel bars are bound and reinforced by using the steel wires.
Preferably, the support ring includes the ring body, and the ring body outside is provided with the rubber layer with prefabricated downthehole wall interference fit, and the inboard activity of ring body is pegged graft and is had the spacing post of a plurality of, and threaded connection has the adjusting bolt with spacing post one-to-one on the ring body, and the medial extremity of spacing post is provided with the inclined plane portion, adjusting bolt and inclined plane portion crimping, and the outside end of spacing post is provided with recessed arc portion, arc portion and reinforcing bar crimping.
A thin-wall platform is manufactured by the construction method of the thin-wall platform.
Adopt the beneficial effect that above-mentioned technical scheme brought to lie in: according to the invention, the accuracy of positioning the reinforcing steel bars can be effectively improved by improving the structure of the thin-wall platform formwork and optimizing the pouring process of the thin-wall platform, and the formwork can be fixed more firmly by using the specially designed support ring, so that the deformation of the formwork is further avoided.
Drawings
FIG. 1 is a block diagram of a thin-walled stage in accordance with an embodiment of the present invention.
FIG. 2 is an axial cross-sectional view of a support ring in one embodiment of the present invention.
In the figure: 1. a foundation; 2. an inner side template; 3. an outer side template; 4. prefabricating holes; 5. an arc-shaped portion; 6. reinforcing steel bars; 7. a rib plate; 8. a support ring; 9. a steel wire; 10. a ring body; 11. a rubber layer; 12. a limiting column; 13. adjusting the bolt; 14. a bevel portion.
Detailed Description
The standard parts used in the invention can be purchased from the market, the special-shaped parts can be customized according to the description and the description of the attached drawings, and the specific connection mode of each part adopts the conventional means of mature bolts, rivets, welding, sticking and the like in the prior art, and the detailed description is not repeated.
Referring to fig. 1-2, one embodiment of the present invention includes the steps of:
A. an inner side template 2 and an outer side template 3 are respectively and fixedly installed on the foundation 1, and the inner side template 2 is positioned on the inner side of the outer side template 3; a plurality of prefabricated holes 4 which are in one-to-one correspondence are arranged on the inner side template 2 and the outer side template 3;
B. inserting reinforcing steel bars 6 into the prefabricated holes 4 according to design requirements, and filling and plugging unused prefabricated holes 4;
C. binding and reinforcing the steel bars 6;
D. and pouring concrete into the inner side formwork 2 and the outer side formwork 3, and removing the inner side formwork 2 and the outer side formwork 3 after the concrete is cured.
And rib plates 7 are respectively arranged at the top and the bottom of the side surface of the outer side template 3.
In the step C, when the steel bars 6 are bound and reinforced, firstly, the target steel bars 6 are wound by using the steel wires 9 to enable the target steel bars 6 to be stressed, then the support rings 8 are inserted into the corresponding prefabricated holes 4 inserted in the target steel bars 6, and finally, the steel wires 9 are used for binding and reinforcing the target steel bars 6.
The support ring 8 includes ring body 10, and the ring body 10 outside is provided with rubber layer 11 with 4 inner wall interference fit in prefabricated hole, and the activity of ring body 10 inboard is pegged graft there is the spacing post 12 of a plurality of, and threaded connection has adjusting bolt 13 with spacing post 12 one-to-one on the ring body 10, and the medial extremity of spacing post 12 is provided with inclined plane portion 14, adjusting bolt 13 and the 14 crimping of inclined plane portion, and the outside end of spacing post 12 is provided with recessed arc portion 5, and arc portion 5 and 6 crimping of reinforcing bar.
A thin-wall platform is manufactured by the construction method of the thin-wall platform.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. A construction method of a thin-wall platform is characterized by comprising the following steps:
A. an inner side template (2) and an outer side template (3) are respectively and fixedly installed on the foundation (1), and the inner side template (2) is positioned on the inner side of the outer side template (3); a plurality of prefabricated holes (4) which are in one-to-one correspondence are arranged on the inner side template (2) and the outer side template (3);
B. inserting steel bars (6) into the prefabricated holes (4) according to design requirements, and filling and plugging unused prefabricated holes (4);
C. binding and reinforcing the steel bars (6);
D. and (3) pouring concrete into the inner side formwork (2) and the outer side formwork (3), and removing the inner side formwork (2) and the outer side formwork (3) after the concrete is cured.
2. The method of constructing a thin-walled platform of claim 1, wherein: and rib plates (7) are respectively arranged at the top and the bottom of the side surface of the outer side template (3).
3. The method of constructing a thin-walled platform of claim 1, wherein: in the step C, when the steel bars (6) are bound and reinforced, firstly, the target steel bars (6) are wound by using the steel wires (9) to enable the target steel bars (6) to be stressed, then the support rings (8) are inserted into the corresponding prefabricated holes (4) spliced by the target steel bars (6), and finally, the steel wires (9) are used for binding and reinforcing the target steel bars (6).
4. The method of constructing a thin-walled platform of claim 3, wherein: support ring (8) are including ring body (10), ring body (10) outside is provided with rubber layer (11) with prefabricated hole (4) inner wall interference fit, ring body (10) inboard activity is pegged graft and is had spacing post (12) of a plurality of, threaded connection has adjusting bolt (13) with spacing post (12) one-to-one on ring body (10), the medial extremity of spacing post (12) is provided with inclined plane portion (14), adjusting bolt (13) and inclined plane portion (14) crimping, the outside end of spacing post (12) is provided with recessed arc portion (5), arc portion (5) and reinforcing bar (6) crimping.
5. A thin-walled table, characterized in that: the thin-walled platform of any of claims 1 to 4, when constructed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110121126.4A CN112942115A (en) | 2021-01-28 | 2021-01-28 | Thin-wall platform and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110121126.4A CN112942115A (en) | 2021-01-28 | 2021-01-28 | Thin-wall platform and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112942115A true CN112942115A (en) | 2021-06-11 |
Family
ID=76239007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110121126.4A Pending CN112942115A (en) | 2021-01-28 | 2021-01-28 | Thin-wall platform and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112942115A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131697A (en) * | 2014-07-28 | 2014-11-05 | 江苏南通三建集团有限公司 | Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system |
CN104343086A (en) * | 2014-10-27 | 2015-02-11 | 中铁港航局集团有限公司 | Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon |
CN108915244A (en) * | 2018-07-26 | 2018-11-30 | 重庆新久融科技有限公司 | A kind of combination aluminum alloy mould plate |
CN209053004U (en) * | 2018-07-16 | 2019-07-02 | 中铁二十五局集团第二工程有限公司 | A kind of hollow Pier Formwork structure |
CN209307842U (en) * | 2018-12-13 | 2019-08-27 | 四川交投建设工程股份有限公司 | Hollow High Pier template system |
CN211131902U (en) * | 2019-11-25 | 2020-07-31 | 临邑县人民医院 | Medicine tray for general surgery department nursing |
-
2021
- 2021-01-28 CN CN202110121126.4A patent/CN112942115A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131697A (en) * | 2014-07-28 | 2014-11-05 | 江苏南通三建集团有限公司 | Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system |
CN104343086A (en) * | 2014-10-27 | 2015-02-11 | 中铁港航局集团有限公司 | Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon |
CN209053004U (en) * | 2018-07-16 | 2019-07-02 | 中铁二十五局集团第二工程有限公司 | A kind of hollow Pier Formwork structure |
CN108915244A (en) * | 2018-07-26 | 2018-11-30 | 重庆新久融科技有限公司 | A kind of combination aluminum alloy mould plate |
CN209307842U (en) * | 2018-12-13 | 2019-08-27 | 四川交投建设工程股份有限公司 | Hollow High Pier template system |
CN211131902U (en) * | 2019-11-25 | 2020-07-31 | 临邑县人民医院 | Medicine tray for general surgery department nursing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210975503U (en) | Large-span prefabricated assembled bent cap and pier stand connection structure | |
CN109208823B (en) | Quick-assembly built-in steel box type concrete filled steel tube column and production process thereof | |
CN204781679U (en) | Spiral stair | |
CN112942115A (en) | Thin-wall platform and construction method thereof | |
CN112627034A (en) | Synchronous construction method for turning over mold of high pier of bridge | |
CN209703708U (en) | It is a kind of for the pre-buried positioning device for hanging nail of prefabricated components | |
CN2841802Y (en) | Internal mould for cast-in-situ reinforced concrete | |
CN109339223B (en) | Connecting node of upright post and steel cap beam and construction method thereof | |
CN201292663Y (en) | Stereotype stairway steel formwork | |
CN108166398B (en) | Structure and process for preventing bridge hollow slab core mould from floating upwards by utilizing existing exhaust pipe drain pipe | |
CN109235925B (en) | Method and device for reinforcing damaged reinforced concrete column by sleeve-mounted prefabricated part | |
CN214644692U (en) | Post-tensioning precast concrete supporting member and inner supporting system | |
CN210551995U (en) | Prefabricated post production mould | |
CN212742044U (en) | Prefabricated base in shield tunnel | |
CN204551245U (en) | Prefabricated assembled pier column | |
CN211080767U (en) | Superposed beam, superposed beam and cast-in-place column connecting node | |
CN113957792A (en) | Method for synchronously constructing pier body and tie beam in high-pier turnover formwork construction | |
CN110805141B (en) | Connecting device and method for steel pipe column and shock insulation support after jacking of building | |
CN209971052U (en) | Two T roof beam nomadic formula apparatus for producing of prestressing force | |
CN207920076U (en) | The stair tread formwork that both sides are provided with shear wall installs device | |
CN112502160A (en) | Post-tensioning precast concrete supporting member, inner supporting system and construction method | |
CN206299039U (en) | The square concrete hollow column of centrifugal forming prestressing force | |
CN215053865U (en) | Prefabricated assembled concrete member convenient to installation | |
CN216379633U (en) | Pipe gallery template module containing bracket embedded part | |
CN216838941U (en) | Concrete bridge pier and heightened concrete bridge with same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |