CN112734359A - Science and technology project progress tracking system - Google Patents
Science and technology project progress tracking system Download PDFInfo
- Publication number
- CN112734359A CN112734359A CN202011570508.7A CN202011570508A CN112734359A CN 112734359 A CN112734359 A CN 112734359A CN 202011570508 A CN202011570508 A CN 202011570508A CN 112734359 A CN112734359 A CN 112734359A
- Authority
- CN
- China
- Prior art keywords
- project
- management module
- progress
- information
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2458—Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
- G06F16/2462—Approximate or statistical queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Probability & Statistics with Applications (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Computational Linguistics (AREA)
- Software Systems (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of science and technology project progress tracking systems, and discloses a science and technology project progress tracking system which comprises a central processing unit, wherein the central processing unit is in bidirectional signal connection with a network interconnection display unit, is in bidirectional electric connection with a database, is in bidirectional electric connection with a project basic information management module, is in bidirectional electric connection with a project task allocation management module, is in bidirectional electric connection with a project progress management module, is in bidirectional electric connection with a statistical analysis module, and is in bidirectional electric connection with a system management module. The technical project progress tracking system is used for managing the progress of a unit on a project, effectively realizes scientific, normalized and networked management on the progress information of the unit project, and improves the management level and the working efficiency of unit project managers and project implementing personnel.
Description
Technical Field
The invention relates to the technical field of science and technology project progress tracking systems, in particular to a science and technology project progress tracking system.
Background
The scientific and technological projects are projects which are independently established by taking scientific research and technical development as contents, and aim to solve the scientific and technological problems in the economic and social development, and different scientific and technological projects are classified differently according to the properties, the implementation range and the operation characteristics of the projects.
After an enterprise scientific and technological project is numerous, if intuitive and quick management is not available, the process and supervision are disordered, follow-up is not timely, the distribution of company resources is not uniform and not timely, projects are delayed, timely assessment and acceptance are not achieved, finally the projects cannot pass, project progress is timely monitored and managed for facilitating project work groups or company leaders, and therefore the scientific and technological project progress tracking system is provided to solve the problems.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a scientific and technological project progress tracking system which has the advantage of being convenient for timely monitoring and managing project progress, and solves the problems that when an enterprise has a large number of scientific and technological projects, if intuitive and quick management is not available, the processes and supervision are disordered, follow-up is not timely, the distribution of company resources is not uniform and not timely, projects are delayed, timely examination and acceptance are not realized, and finally the projects cannot pass.
(II) technical scheme
In order to realize the purpose of conveniently and timely monitoring and managing project progress, the invention provides the following technical scheme: the scientific and technological project progress tracking system comprises a central processing unit, wherein the central processing unit is in bidirectional signal connection with a network interconnection display unit, the central processing unit is in bidirectional electric connection with a database, the central processing unit is in bidirectional electric connection with a project basic information management module, the central processing unit is in bidirectional electric connection with a project task allocation management module, the central processing unit is in bidirectional electric connection with the project progress management module, the central processing unit is in bidirectional electric connection with a statistical analysis module, the central processing unit is in bidirectional electric connection with a system management module, the project basic information management module, the project task allocation management module, the project progress management module, the statistical analysis module and the system management module are all in bidirectional electric connection with the database, and the central processing unit is in bidirectional electric connection with a data input unit.
Preferably, the project basic information management module comprises a new project, a plan making and information publishing, a project administrator enters a system background to fill in project basic information, makes a project implementation plan, publishes project information, and can modify a built project at any time.
Preferably, the project task allocation management module comprises project group management and allocation tasks, and a project manager formulates a project group and allocates project tasks to the project group.
Preferably, the project schedule management module includes a report schedule and schedule details, and the project group reports the schedule of each part of the project online and can view project task information.
Preferably, the statistical analysis module includes statistics of each project schedule and implementation efficiency of each group, statistics of each project schedule, and analysis of implementation efficiency of each project group.
Preferably, the system management module includes user management, role management, department management and log management, and mainly completes management of user information, department information, role information and log information.
Preferably, the network interconnection display unit and the data input unit comprise a mobile phone and a computer, and the network interconnection display unit and the data input unit are used for displaying data and receiving data input by a user.
Preferably, the project basic information includes a number, a project name, a belonging type, a project description, a status, an urgency, an overall progress, a start time, an end time, a creation time, and a creator.
Preferably, the project task information includes a number, a task name, a belonging project, a completion degree, a weight and a completion time.
(III) advantageous effects
Compared with the prior art, the invention provides a scientific and technological project progress tracking system, which has the following beneficial effects:
the scientific and technological project progress tracking system is provided with a project basic information management module, a project manager enters a system background to fill in project basic information, formulate a project implementation plan, release project information and modify established projects at any time, then the project manager formulates project groups through a project task allocation management module and allocates project tasks for the project groups, the project groups fill in all part progresses of the projects on line through the project progress management module and view project task information, meanwhile, a statistic analysis module can count the progress conditions of the projects and analyze the implementation efficiency of the project groups, a network interconnection display unit and a data input unit enable users to directly interact and display data and receive data input by the users, the whole system is used for managing the progress of a unit on a project, and the system effectively realizes the scientization, the scientization and the oriented performance of the project progress information of the unit, The management of standardization and networking improves the management level and the working efficiency of unit project managers and project implementers.
Drawings
Fig. 1 is a system diagram of a scientific and technological project progress tracking system according to the present invention.
In the figure: the system comprises a central processing unit 1, a network interconnection display unit 2, a database 3, a project basic information management module 4, a project task allocation management module 5, a project progress management module 6, a statistical analysis module 7, a system management module 8 and a data input unit 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, a scientific and technological project progress tracking system includes a central processing unit 1, the central processing unit 1 is in bidirectional signal connection with a network interconnection display unit 2, the central processing unit 1 is in bidirectional electrical connection with a database 3, the central processing unit 1 is in bidirectional electrical connection with a project basic information management module 4, the project basic information management module 4 includes a newly-built project, a plan making and information publishing, a project manager enters a system background to fill and report project basic information, the project basic information includes a number, a project name, a type of the project, a project description, a state, an emergency degree, a total progress, a start time, an end time, a creation time and a creator, a project implementation plan is made, project information is published, a built project can be modified at any time, the central processing unit 1 is in bidirectional electrical connection with a project task allocation management module 5, the project task allocation management module 5 includes project group management and allocation, the project management system comprises a project manager, a central processor 1, a project progress management module 6, a statistical analysis module 7, a system management module 8, a task management module, a department management module and a log management module, wherein the project manager formulates project tasks and distributes project tasks for the project groups, the central processor 1 is in bidirectional electric connection with the project progress management module 6, the project progress management module 6 comprises filling progress and progress details, the project groups fill all part of progress of projects on line and can check project task information, the project task information comprises numbers, task names, belonged projects, completion degrees, weight values and completion times, the central processor 1 is in bidirectional electric connection with the statistical analysis module 7, the statistical analysis module 7 comprises project progress statistics and group implementation efficiencies, the project progress conditions are counted, the project group implementation efficiencies are analyzed, the, The management of role information and log information, the project basic information management module 4, the project task allocation management module 5, the project progress management module 6, the statistical analysis module 7 and the system management module 8 are all in bidirectional electric connection with the database 3, the central processing unit 1 is in bidirectional electric connection with the data input unit 9, the network interconnection display unit 2 and the data input unit 9 comprise a mobile phone and a computer, and the network interconnection display unit 2 and the data input unit 9 are used for displaying data and receiving data input by a user.
To sum up, the scientific and technological project progress tracking system is provided with a project basic information management module 4, a project administrator enters a system background to fill in project basic information, make a project implementation plan, release project information, modify a built project at any time, then make a project group through a project task allocation management module 5, allocate project tasks to the project group, fill in all part of the progress of the project online through a project progress management module 6, check the project task information, meanwhile, a statistical analysis module 7 can count the progress condition of each project and analyze the implementation efficiency of each project group, a network interconnection display unit 2 and a data input unit 9 enable users to interact directly and are used for displaying data and receiving the data input by the users, and the whole system is used for the progress management of units on the project, the system effectively realizes scientific, normalized and networked management of unit project progress information, improves the management level and the work efficiency of unit project managers and project implementation personnel, and solves the problems that when the quantity of scientific and technological projects of an enterprise is large, if visual and rapid management is not available, the process and supervision are disordered, follow-up is not timely, the distribution of company resources is not uniform and not timely, projects are delayed, timely examination and acceptance are not performed, and finally the projects cannot pass.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (9)
1. Science and technology project progress tracker, including central processing unit (1), its characterized in that: the system comprises a central processing unit (1), a network interconnection display unit (2), a database (3), a project task distribution management module (5), a project progress management module (6), a statistical analysis module (7), a statistical analysis module (6), a system management module (8), a project basic information management module (4), a project task distribution management module (5), a project progress management module (6), a statistical analysis module (7) and the system management module (8), wherein the central processing unit (1) is in bidirectional signal connection with the network interconnection display unit (2), the central processing unit (1) is in bidirectional electric connection with the database (3), the central processing unit (1) is in bidirectional electric connection with the project basic information management module (6), the project task distribution management module (5), the project progress management module (6), the statistical analysis module (7) and the system management module (8) are in bidirectional, the central processing unit (1) is in bidirectional electric connection with the data input unit (9).
2. The system of claim 1, wherein: the project basic information management module (4) comprises a new project, a plan making and information publishing, a project manager enters a system background to fill in project basic information, makes a project implementation plan, publishes project information, and can modify a built project at any time.
3. The system of claim 1, wherein: the project task allocation management module (5) comprises project group management and allocation tasks, and project managers formulate project groups and allocate project tasks to the project groups.
4. The system of claim 1, wherein: the project schedule management module (6) comprises a filling schedule and schedule details, project groups fill the schedule of each part of the project on line, and project task information can be checked.
5. The system of claim 1, wherein: the statistical analysis module (7) comprises project progress statistics and group implementation efficiency, statistics of project progress conditions and analysis of project group implementation efficiency.
6. The system of claim 1, wherein: the system management module (8) comprises user management, role management, department management and log management and mainly completes the management of user information, department information, role information and log information.
7. The system of claim 1, wherein: the network interconnection display unit (2) and the data input unit (9) comprise a mobile phone and a computer, and the network interconnection display unit (2) and the data input unit (9) are used for displaying data and receiving data input by a user.
8. The system of claim 2, wherein the system further comprises: the project basic information includes a number, a project name, a belonging type, a project description, a status, an urgency level, a general progress, a start time, an end time, a creation time, and a creator.
9. The system of claim 4, wherein: the project task information comprises a serial number, a task name, a belonging project, a completion degree, a weight and completion time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011570508.7A CN112734359A (en) | 2020-12-26 | 2020-12-26 | Science and technology project progress tracking system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011570508.7A CN112734359A (en) | 2020-12-26 | 2020-12-26 | Science and technology project progress tracking system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112734359A true CN112734359A (en) | 2021-04-30 |
Family
ID=75616795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011570508.7A Withdrawn CN112734359A (en) | 2020-12-26 | 2020-12-26 | Science and technology project progress tracking system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112734359A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113344512A (en) * | 2021-05-31 | 2021-09-03 | 珠海大横琴科技发展有限公司 | Project information display method and device, electronic equipment and storage medium |
-
2020
- 2020-12-26 CN CN202011570508.7A patent/CN112734359A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113344512A (en) * | 2021-05-31 | 2021-09-03 | 珠海大横琴科技发展有限公司 | Project information display method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108874640B (en) | Cluster performance evaluation method and device | |
CN111815132A (en) | Network security management information publishing method and system for power monitoring system | |
US8161326B2 (en) | Method and system for managing information technology (IT) infrastructural elements | |
CN112307003B (en) | Power grid data multidimensional auxiliary analysis method, system, terminal and readable storage medium | |
CN107040608A (en) | A kind of data processing method and system | |
CN113010576A (en) | Method, device, equipment and storage medium for capacity evaluation of cloud computing system | |
CN105096047A (en) | Overall process task control and assessment system and realization method thereof | |
CN112508486A (en) | Secondary spare part inventory management system for power system enterprise | |
CN114662953A (en) | Internet of things equipment operation and maintenance method, device, equipment and medium | |
CN102571413A (en) | Method for resource management under cluster environment | |
CN115237724A (en) | Data monitoring method, device, equipment and storage medium based on artificial intelligence | |
CN109829615B (en) | Target task multistage monitoring device and method based on proprietary cloud | |
Naldi | The availability of cloud-based services: Is it living up to its promise? | |
CN111338888A (en) | Data statistical method and device, electronic equipment and storage medium | |
CN112734359A (en) | Science and technology project progress tracking system | |
CN109858807A (en) | A kind of method and system of enterprise operation monitoring | |
CN115471215B (en) | Business process processing method and device | |
CN115660546A (en) | Electric power measurement asset warehousing management method and system | |
CN113537519B (en) | Method and device for identifying abnormal equipment | |
CN112783637B (en) | Resource regulation and control method and device | |
CN109495469B (en) | Flow analysis safety management and control system, method and device | |
Chen et al. | Responsibility management through responsibility networks | |
CN115271628A (en) | Science and technology project cloud management system | |
CN110309153B (en) | Method, system, equipment and storage medium for processing monitoring data of call center | |
CN117057527B (en) | Intelligent operation and maintenance method and system for industrial Internet of things of automobile manufacturing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210430 |
|
WW01 | Invention patent application withdrawn after publication |