CN112726701A - Bulldozing device for building construction - Google Patents

Bulldozing device for building construction Download PDF

Info

Publication number
CN112726701A
CN112726701A CN202011612039.0A CN202011612039A CN112726701A CN 112726701 A CN112726701 A CN 112726701A CN 202011612039 A CN202011612039 A CN 202011612039A CN 112726701 A CN112726701 A CN 112726701A
Authority
CN
China
Prior art keywords
buffer
block
guide
rod
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011612039.0A
Other languages
Chinese (zh)
Other versions
CN112726701B (en
Inventor
顾春荣
黄达智
沈昂儿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Youxin Construction Co ltd
Original Assignee
Wanjian Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanjian Construction Co ltd filed Critical Wanjian Construction Co ltd
Priority to CN202011612039.0A priority Critical patent/CN112726701B/en
Publication of CN112726701A publication Critical patent/CN112726701A/en
Application granted granted Critical
Publication of CN112726701B publication Critical patent/CN112726701B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/76Graders, bulldozers, or the like with scraper plates or ploughshare-like elements; Levelling scarifying devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D55/00Endless track vehicles
    • B62D55/06Endless track vehicles with tracks without ground wheels
    • B62D55/065Multi-track vehicles, i.e. more than two tracks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D55/00Endless track vehicles
    • B62D55/08Endless track units; Parts thereof
    • B62D55/30Track-tensioning means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/76Graders, bulldozers, or the like with scraper plates or ploughshare-like elements; Levelling scarifying devices
    • E02F3/80Component parts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/02Travelling-gear, e.g. associated with slewing gears
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/02Travelling-gear, e.g. associated with slewing gears
    • E02F9/04Walking gears moving the dredger forward step-by-step

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

The invention discloses a bulldozing device for building construction, which comprises a vehicle body, a bulldozing plate arranged on the vehicle body, supporting blocks symmetrically arranged on the vehicle body, a crawler arranged on the supporting blocks, a first driving wheel arranged on the supporting blocks, a first buffer block arranged on the supporting blocks, a second driving wheel arranged on the first buffer block and a plurality of limiting parts arranged on the supporting blocks, wherein the first driving wheel is arranged on the supporting blocks; the first buffer block is connected with the supporting block through a buffer part; the track is composed of a plurality of connecting pieces and a plurality of anti-skidding blocks. According to the invention, through buffering the driving wheels, the shaking sense of an operator is reduced when the bulldozer moves; the guide part prevents the track from loosening and separating from the driving wheel.

Description

Bulldozing device for building construction
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a bulldozing device for building construction.
Background
When operating personnel bulldozes through the bull-dozer, the bull-dozer can round trip movement to push away soil from a position to another position, when the bull-dozer need go up the downhill path or go up and down the ladder at the in-process that removes, the bull-dozer can let operating personnel produce easily and rock up or down when moving, the problem of dizziness appears easily, and the bull-dozer also lets the track not hard up easily in work moreover always, thereby the condition of falling the chain appears.
Disclosure of Invention
The invention provides a bulldozing device for building construction, which is used for overcoming the defects of the prior art and slowing down the shaking and preventing the track from loosening.
In order to achieve the purpose, the invention adopts the following technical scheme: a bulldozing device for building construction comprises a vehicle body, a bulldozing plate arranged on the vehicle body, supporting blocks symmetrically arranged on the vehicle body, tracks arranged on the supporting blocks, a first driving wheel arranged on the supporting blocks, a first buffer block arranged on the supporting blocks, a second driving wheel arranged on the first buffer block and a plurality of limiting components arranged on the supporting blocks; the first buffer block is connected with the supporting block through a buffer part;
first drive wheel is the action wheel, can let step or the upper and lower slope about the second drive wheel adaptation through first buffer block, let the second drive slightly rotate, in order to offset the vibrations of automobile body, thereby reduce rocking of operating personnel when the operation, improve work efficiency, the extension is long in service time, spacing part can let the track can keep normal motion under the environment of complicacy or the adverse circumstances of handing over, buffering part can reduce can also guarantee under the prerequisite that the automobile body rocked that the track does not deviate from the drive wheel, can let the bull-dozer long time work.
The connecting piece also comprises a first lug arranged on the connecting piece, a first connecting hole arranged on the first lug, a second lug symmetrically arranged on the connecting piece and a second connecting hole arranged on the second lug; the connecting pieces are connected by a first connecting rod; the first lug and the second lug can be matched with each other; the connection rod may enter the first connection hole and the second connection hole.
Thereby get up connecting piece interconnect through the head rod and constitute the basis of track, drive wheel and connecting piece intermeshing, make first drive wheel let the second drive wheel also take place to rotate when rotating, because first drive wheel is the initiative, so can settle the back at the cockpit of motor and the like, be close to the place of first drive wheel, and the cockpit is preceding to be the bull-dozer board, both gravity offsets, like this, can prevent that the bull-dozer from taking place the upset, can make the bull-dozer can conveniently carry at higher slope or higher ladder, increase the removal power, thereby improve the operation region, mutually support between first lug and the second lug, can let the connecting piece more steady in the transmission, reduce rocking of bull-dozer when removing.
The anti-skid block also comprises third connecting holes symmetrically arranged on the connecting piece, anti-skid strips arranged on the anti-skid block, fourth connecting holes arranged on the anti-skid strips and respectively matched with the third connecting holes, third convex blocks arranged on the anti-skid block and fourth convex blocks arranged on the anti-skid block; the antiskid blocks are connected with the connecting pieces through second connecting rods; the aperture of the fourth connecting hole is larger than that of the third connecting hole; the second connecting rod can enter the third connecting hole and the fourth connecting hole; the third and fourth bumps may be fitted to each other.
The anti-skid strips can improve the friction force, so that the bulldozer can run on soft soil without the problem of call-making, the anti-skid blocks and the connecting pieces are connected together by the second connecting rods, and the second connecting piece enters the third connecting hole of the connecting piece from the fourth connecting hole of the anti-skid strip when being installed, and the upper end of the second connecting piece is large, the lower end is small, the large end can be clamped on the fourth connecting hole, on one hand, the second connecting rod is prevented from entering the third connecting hole in a transition way, on the other hand, because the anti-skid strip is triangular, the two sides are inclined, therefore, when the bulldozer moves in the ground, soil and the anti-slip strips enter the fourth connecting holes from two sides, so that the soil has a thrust force on the second connecting rods in the fourth connecting holes, and the second connecting rods are prevented from loosening, so that the fastening between the anti-slip blocks and the connecting pieces is improved; third lug and fourth lug are mutually supported, like this for the track can keep the contact of maximum area with ground in the motion, thereby prevent that the bull-dozer is too heavy compaction soil, for subsequent loosening the soil with bulldoze and facilitate, can prevent that the bull-dozer from being absorbed in soil if the surface area increases moreover, two lugs mutually support, can prevent again that soil from entering into the connecting piece through the non slipping spur on, thereby improve the life of connecting piece.
The limiting part comprises a supporting plate arranged on the supporting block, a supporting rod arranged on the supporting plate, a limiting wheel rotatably arranged on the supporting rod, a limiting groove arranged on the connecting piece and matched with the limiting wheel, and limiting rings symmetrically arranged on the supporting rod; the limiting ring can limit the first connecting rod; the limit ring can limit the second connecting rod.
The limiting wheels are always positioned on the limiting grooves, so that in the moving process of the crawler belt, on one hand, the borne force can be partially transmitted to the supporting blocks through the limiting wheels instead of being stressed through the two driving wheels, the crawler belt can uniformly receive load, the crawler belt cannot be deformed too much when contacting with the ground, the limiting rings can share the supporting force received by the crawler belt on the one hand, on the other hand, the crawler belt can always keep limiting on the first connecting rod and the second connecting rod when moving, the first connecting rod is prevented from coming out of the second connecting hole, the second connecting rod is prevented from coming out of the third connecting hole, the first connecting rod always keeps connecting the connecting pieces, the second connecting rod always keeps connecting the connecting pieces with each other, the second connecting rod always keeps connecting the connecting pieces with the anti-skid blocks, the phenomenon that the crawler belt is loosened due to the connecting rods is avoided, and the service life of the crawler belt is finally prolonged, the bulldozer can keep working.
The buffer component comprises a buffer rod for enabling the first buffer block to rotate, a buffer cavity arranged on the supporting block, a second buffer block slidably arranged on the buffer cavity, left and right buffer springs arranged on the buffer cavity and used for enabling the second buffer block to reset, a connecting plate used for connecting the buffer block and the buffer rod, upper and lower buffer springs used for enabling the first buffer block to reset, and a guide component arranged on the first buffer block; the guide assembly comprises a guide groove arranged on the first buffer block, a guide block which can be vertically moved on the guide groove, a pushing part which is arranged on the supporting block and used for pushing the guide block to move, a guide rod arranged on the guide block, a first guide wheel which is rotatably arranged on the guide rod, and a second guide wheel which is symmetrically arranged on the guide rod; the first guide wheel is matched with the limiting groove; the first guide wheel can limit the second connecting rod; the second guide rod is in contact with the connecting piece.
When the bulldozer ascends a slope, the track on one side of the second driving wheel firstly collides with the slope, the force of the collision is firstly transmitted back to the second driving wheel and then transmitted to the second buffer block through the buffer rod, and then the impact force received by the second buffer block is counteracted by the left buffer spring and the right buffer spring, so that the left buffer and the right buffer are realized; if the track receives the vertical force, the first buffer block rotates around the buffer rod, and then the vertical force is counteracted under the action of the upper buffer spring and the lower buffer spring; however, no matter the second driving gear moves up and down or moves left and right, the track is deformed and loosened, so that the pushing part pushes the guide block to enable the first guide wheel to be always contacted with the limiting groove through the pushing part no matter the second driving gear moves up and down or moves left and right, on one hand, the track can be tensioned again, on the other hand, the track can be prevented from being separated from the chain, and the stability of the track is improved; the second leading wheel blocks the both sides of connecting piece, has about the direction for the track appears warping, and first leading wheel still can be on the spacing groove in the time of not hard up phenomenon, further prevents that the track from taking off the chain, thereby improves the stability of track, finally improves the operating time and the life of bull-dozer.
In summary, the invention has the following advantages: the shaking sense of an operator is reduced when the bulldozer moves by buffering the driving wheels; the guide part prevents the track from loosening and separating from the driving wheel.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Figure 2 is a schematic view of a track of the present invention.
Fig. 3 is a top view of fig. 2.
Fig. 4 is a cross-sectional perspective view of fig. 3 taken along a-a.
Fig. 5 is a partial schematic view of a spacing member of the present invention.
Fig. 6 is an exploded view of the connecting member and cleat of the present invention.
FIG. 7 is a partial schematic view of a cushioning member according to the present invention.
Fig. 8 is an enlarged view of a portion a in fig. 4.
Fig. 9 is a partial schematic view of a guide assembly of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
As shown in fig. 1 to 9, a dozing device for building construction includes a vehicle body 1, a dozing plate 11, a supporting block 12, a track 13, a first driving wheel 14, a first buffer block 15, a second driving wheel 16, a plurality of limit parts 4, a buffer part 5, a plurality of connecting members 2, and a plurality of anti-skid blocks 3; the bulldozer comprises a bulldozer board 11, supporting blocks 12, tracks 13, a first driving wheel 14, a first buffer block 15, a second driving wheel 16 and a plurality of limiting components 4, wherein the bulldozer board 11 is arranged on the bulldozer body 1, the supporting blocks 12 are symmetrically arranged on the bulldozer body 1, the tracks 13 are arranged on the supporting blocks 12, the first driving wheel 14 is arranged on the supporting blocks 12, the first buffer block 15 is arranged on the supporting blocks 12, the second driving wheel 16 is arranged on the first buffer block 15; the first buffer block 15 is connected with the supporting block 12 through a buffer part 5; the crawler belt 13 is composed of a plurality of connecting pieces 2 and a plurality of anti-skid blocks 3.
As shown in fig. 5 and 6, the connecting member 2 further includes a first protrusion 21, a first connecting hole 22, a second protrusion 23, a second connecting hole 24, and a first connecting rod 25; the first lug 21 is arranged on the connecting piece 2, the first connecting holes 22 are arranged on the first lug 21, the second lugs 23 are symmetrically arranged on the connecting piece 2, and the second connecting holes 24 are arranged on the second lugs 23; a first connecting rod 25 is connected with the connecting piece 2; the first projection 21 and the second projection 23 can be fitted to each other; the connecting rods can enter the first connecting hole 22 and the second connecting hole 24.
As shown in fig. 5 and 6, the anti-skid block 3 further includes a third connecting hole 31, an anti-skid strip 32, a fourth connecting hole 33, a third projection 34, a fourth projection 35 and a second connecting rod 36; the third connecting holes 31 are symmetrically arranged on the connecting piece 2, the antislip strips 32 are arranged on the antislip blocks 3, the fourth connecting holes 33 are arranged on the antislip strips 32 and are respectively matched with the third connecting holes 31, the third convex blocks 34 are arranged on the antislip blocks 3, and the fourth convex blocks 35 are arranged on the antislip blocks 3; the second connecting rod 36 connects the antiskid block 3 and the connecting piece 2; the aperture of the fourth connecting hole 33 is larger than that of the third connecting hole 31; the second connecting rod 36 can enter the third connecting hole 31 and the fourth connecting hole 33; the third projection 34 and the fourth projection 35 may cooperate with each other.
As shown in fig. 5, the limiting component 4 includes a supporting plate 41, a supporting rod 42, a limiting wheel 43, a limiting groove 44 and a limiting ring 45; the supporting plate 41 is arranged on the supporting block 12, the supporting rod 42 is arranged on the supporting plate 41, the limiting wheel 43 is rotatably arranged on the supporting rod 42, the limiting groove 44 is arranged on the connecting piece 2 and is matched with the limiting wheel 43, and the limiting rings 45 are symmetrically arranged on the supporting rod 42; the limiting ring 45 can limit the first connecting rod 25; the limit ring 45 can limit the second connecting rod 36.
As shown in fig. 4 and 7, the buffer member 5 includes a buffer rod 51, a buffer cavity 52, a second buffer block 53, left and right buffer springs 54, a connecting plate 55, upper and lower buffer springs 56, and a guide assembly 6; buffer rod 51 is used for letting first buffer block 15 rotate, and cushion chamber 52 locates on supporting shoe 12, and second buffer block 53 locates slidable on cushion chamber 52, and left and right buffer spring 54 locates on cushion chamber 52 and be used for letting second buffer block 53 resets, and connecting plate 55 is used for connecting the buffer block with buffer rod 51, upper and lower buffer spring 56 is used for letting first buffer block 15 resets, and guide assembly 6 locates on first buffer block 15.
As shown in fig. 8 and 9, the guide assembly 6 includes a guide groove 61, a guide block 62, a pushing part 63, a guide rod 64, a first guide wheel 65, and a second guide wheel 66; the guide groove 61 is arranged on the first buffer block 15, the guide block 62 is arranged on the guide groove 61 in a manner of moving up and down, the pushing part 63 is arranged on the support block 12 and is used for pushing the guide block 62 to move, the guide rod 64 is arranged on the guide block 62, the first guide wheel 65 is rotatably arranged on the guide rod 64, and the second guide wheel 66 is symmetrically arranged on the guide rod 64; the first guide wheel 65 is matched with the limiting groove 44; the first guide wheel 65 can limit the second connecting rod 36; the second guide bar 64 is in contact with the link 2.
The specific working process is as follows:
when the bulldozer goes up and down the steps, first driving wheel 14 can go up one step earlier, because second driving wheel 16 does not go up the steps yet, under the reaction of steps, the buffer block can be pushed away and the rotation is made, first driving wheel 14 takes place to rotate, the rocking that produces this moment will be absorbed by buffer spring, when first driving wheel 14 rotated, track 13 can become flexible, when first driving wheel 14 rotated simultaneously, push away portion 63 and can push away guide block 62 and move up, thereby keep track 13's tensioning, thereby prevent the breaking away from of track 13.
While there have been shown and described what are at present considered the fundamental principles and essential features of the invention and its advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. A bulldozing device for building construction comprises a vehicle body (1), a bulldozing plate (11) arranged on the vehicle body (1), supporting blocks (12) symmetrically arranged on the vehicle body (1), tracks (13) arranged on the supporting blocks (12), first driving wheels (14) arranged on the supporting blocks (12), first buffer blocks (15) arranged on the supporting blocks (12), second driving wheels (16) arranged on the first buffer blocks (15), and a plurality of limiting parts (4) arranged on the supporting blocks (12); the first buffer block (15) is connected with the supporting block (12) through a buffer part (5); the method is characterized in that: the crawler belt (13) is composed of a plurality of connecting pieces (2) and a plurality of anti-skid blocks (3).
2. A dozing device for building construction as claimed in claim 1 wherein: the connecting piece (2) further comprises a first lug (21) arranged on the connecting piece (2), a first connecting hole (22) arranged on the first lug (21), second lugs (23) symmetrically arranged on the connecting piece (2), and a second connecting hole (24) arranged on the second lug (23); the connecting pieces (2) are connected by a first connecting rod (25); the first projection (21) and the second projection (23) are mutually engageable; the connecting rod can be brought into the first connecting bore (22) and the second connecting bore (24).
3. A dozing device for building construction as claimed in claim 1 wherein: the anti-skid block (3) further comprises third connecting holes (31) symmetrically formed in the connecting piece (2), anti-skid strips (32) formed in the anti-skid block (3), fourth connecting holes (33) formed in the anti-skid strips (32) and matched with the third connecting holes (31) respectively, third convex blocks (34) formed in the anti-skid block (3) and fourth convex blocks (35) formed in the anti-skid block (3); the antiskid blocks (3) are connected with the connecting pieces (2) through second connecting rods (36); the aperture of the fourth connecting hole (33) is larger than that of the third connecting hole (31); the second connecting rod (36) can enter the third connecting hole (31) and the fourth connecting hole (33); the third projection (34) and the fourth projection (35) are mutually engageable.
4. A dozing device for building construction as claimed in claim 1 wherein: the limiting component (4) comprises a supporting plate (41) arranged on the supporting block (12), a supporting rod (42) arranged on the supporting plate (41), a limiting wheel (43) rotatably arranged on the supporting rod (42), a limiting groove (44) arranged on the connecting piece (2) and matched with the limiting wheel (43), and limiting rings (45) symmetrically arranged on the supporting rod (42); the limiting ring (45) can limit the first connecting rod (25); the limiting ring (45) can limit the second connecting rod (36).
5. A dozing device for building construction as claimed in claim 1 wherein: the buffer component (5) comprises a buffer rod (51) used for enabling the first buffer block (15) to rotate, a buffer cavity (52) arranged on the supporting block (12), a second buffer block (53) arranged on the buffer cavity (52) in a sliding mode, left and right buffer springs (54) arranged on the buffer cavity (52) and used for enabling the second buffer block (53) to reset, a connecting plate (55) used for connecting the buffer block and the buffer rod (51), upper and lower buffer springs (56) used for enabling the first buffer block (15) to reset, and a guide assembly (6) arranged on the first buffer block (15).
6. A dozing device for building construction as claimed in claim 5 wherein: the guide assembly (6) comprises a guide groove (61) arranged on the first buffer block (15), a guide block (62) arranged on the guide groove (61) in a vertically movable manner, a pushing part (63) arranged on the supporting block (12) and used for pushing the guide block (62) to move, a guide rod (64) arranged on the guide block (62), a first guide wheel (65) rotatably arranged on the guide rod (64), and second guide wheels (66) symmetrically arranged on the guide rod (64); the first guide wheel (65) is matched with the limiting groove (44); the first guide wheel (65) can limit the second connecting rod (36); the second guide rod (64) is in contact with the connecting piece (2).
CN202011612039.0A 2020-12-30 2020-12-30 Bulldozing device for building construction Active CN112726701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011612039.0A CN112726701B (en) 2020-12-30 2020-12-30 Bulldozing device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011612039.0A CN112726701B (en) 2020-12-30 2020-12-30 Bulldozing device for building construction

Publications (2)

Publication Number Publication Date
CN112726701A true CN112726701A (en) 2021-04-30
CN112726701B CN112726701B (en) 2022-12-20

Family

ID=75610234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011612039.0A Active CN112726701B (en) 2020-12-30 2020-12-30 Bulldozing device for building construction

Country Status (1)

Country Link
CN (1) CN112726701B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113281064A (en) * 2021-06-29 2021-08-20 山推工程机械股份有限公司 Complete machine empty load test platform of crawler dozer and use method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101844588A (en) * 2010-05-20 2010-09-29 北京市三一重机有限公司 Crawler tension device and crawler-type engineering machinery
CN202175126U (en) * 2011-07-21 2012-03-28 泉州奇星机械有限公司 Tensioning buffer device for caterpillars
CN102398639A (en) * 2010-09-14 2012-04-04 约瑟夫福格勒公司 Tracklaying gear
CN204161506U (en) * 2014-11-06 2015-02-18 山东卡特重工机械有限公司 Caterpillar track tensioning mechanism of excavator
KR20170135699A (en) * 2016-05-30 2017-12-08 고려대학교 산학협력단 Tension adjusting device for track and track system for moving apparatus having the same
CN109398516A (en) * 2018-12-14 2019-03-01 宁波史河机器人科技有限公司 A kind of crawler attachment
CN210734331U (en) * 2019-07-12 2020-06-12 广东嘉腾机器人自动化有限公司 Crawler-type moving platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101844588A (en) * 2010-05-20 2010-09-29 北京市三一重机有限公司 Crawler tension device and crawler-type engineering machinery
CN102398639A (en) * 2010-09-14 2012-04-04 约瑟夫福格勒公司 Tracklaying gear
CN202175126U (en) * 2011-07-21 2012-03-28 泉州奇星机械有限公司 Tensioning buffer device for caterpillars
CN204161506U (en) * 2014-11-06 2015-02-18 山东卡特重工机械有限公司 Caterpillar track tensioning mechanism of excavator
KR20170135699A (en) * 2016-05-30 2017-12-08 고려대학교 산학협력단 Tension adjusting device for track and track system for moving apparatus having the same
CN109398516A (en) * 2018-12-14 2019-03-01 宁波史河机器人科技有限公司 A kind of crawler attachment
CN210734331U (en) * 2019-07-12 2020-06-12 广东嘉腾机器人自动化有限公司 Crawler-type moving platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113281064A (en) * 2021-06-29 2021-08-20 山推工程机械股份有限公司 Complete machine empty load test platform of crawler dozer and use method
CN113281064B (en) * 2021-06-29 2022-05-06 山推工程机械股份有限公司 Complete machine empty load test platform of crawler dozer and use method

Also Published As

Publication number Publication date
CN112726701B (en) 2022-12-20

Similar Documents

Publication Publication Date Title
CN101563268A (en) Suspension system for track vehicle
CN112726701B (en) Bulldozing device for building construction
GB2404901A (en) Suspension structure for a wheelchair
CN1505570A (en) Vehicle with retractable wheel
CN1874924A (en) Standing board
US4369989A (en) Stabilizing jack for skid steer vehicle
CN116513330B (en) Intelligent stair climbing robot
CN110901778A (en) All-terrain chassis capable of freely switching tracks and Mecanum wheels
JP2545543B2 (en) Wheel trampling device
KR100856424B1 (en) Rail transporter movable with left and right
EP1809492B1 (en) Preventing device of sliding for vehicle
WO2012069786A1 (en) Tracked or wheeled vehicle with skid
JP2008260344A (en) Crawler type traveling device
CN2730712Y (en) Driving mechanism for brake rod of baby carrier
JP5234935B2 (en) snowblower
CN111977564A (en) Simple jacking structure and device of automobile
CN114368361B (en) Self-help cleaning method for large hard objects in tire gap of wheeled transport vehicle
CN219410701U (en) Road maintenance auxiliary device
CN213836514U (en) Hydraulic vibration snow shovel
CN220348412U (en) Robot base
CN117208101A (en) Mounting seat, crawler belt running device and working machine
CN215398615U (en) Front frame mechanism of movable crushing trolley
CN221545780U (en) Chassis for bulldozer
US1885485A (en) Convertible noiseless tracklayer tractor
CN218055468U (en) Height-adjustable frame structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221115

Address after: 315032 Building 3, No. 538, Kangzhuang South Road, Jiangbei District, Ningbo, Zhejiang

Applicant after: Ningbo Youxin Construction Co.,Ltd.

Address before: 322100 No.62, Li village, Huaxi Village, Nanma Town, Dongyang City, Jinhua City, Zhejiang Province

Applicant before: Wanjian Construction Co.,Ltd.

GR01 Patent grant
GR01 Patent grant