CN112698584A - One-key sequence control simulation test method, device, equipment and medium for transformer substation - Google Patents

One-key sequence control simulation test method, device, equipment and medium for transformer substation Download PDF

Info

Publication number
CN112698584A
CN112698584A CN202011596866.5A CN202011596866A CN112698584A CN 112698584 A CN112698584 A CN 112698584A CN 202011596866 A CN202011596866 A CN 202011596866A CN 112698584 A CN112698584 A CN 112698584A
Authority
CN
China
Prior art keywords
monitoring equipment
flow calculation
control instruction
monitoring
topological graph
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011596866.5A
Other languages
Chinese (zh)
Other versions
CN112698584B (en
Inventor
刘锐
袁浩
彭向松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Croxs Instruments Co ltd
Original Assignee
Changsha Croxs Instruments Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Croxs Instruments Co ltd filed Critical Changsha Croxs Instruments Co ltd
Priority to CN202011596866.5A priority Critical patent/CN112698584B/en
Publication of CN112698584A publication Critical patent/CN112698584A/en
Application granted granted Critical
Publication of CN112698584B publication Critical patent/CN112698584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The method comprises the steps of receiving a control instruction sent by monitoring equipment; determining whether the control instruction meets a preset condition; if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; determining electrical data of each topological node on the new power flow calculation topological graph; the electrical data are sent to the monitoring equipment, so that the whole simulation test environment is closer to the actual operation environment of the transformer substation through real-time load flow calculation, the test verification effect of one-key sequential control is achieved, persuasion and accuracy are greatly improved, the relation between the switch position change and load flow voltage, current and power is enabled to completely accord with the physical law of electric power operation, simulation test is more reliable, and the accuracy of debugging and verification is effectively improved.

Description

One-key sequence control simulation test method, device, equipment and medium for transformer substation
Technical Field
The application relates to the technical field of power grids, in particular to a method, a device, equipment and a medium for one-key sequence control simulation test of a transformer substation.
Background
Since the intelligent substation is built, the substation monitoring system deploys a sequential control operation function so as to improve the operation efficiency and safety of the substation equipment. The network company started in 2017 promotes the technical improvement and application of the one-key sequential control function of the intelligent transformer substation, so that the centralized monitoring operation level of the unattended transformer substation is improved. The realization of a one-key sequential control function relates to the technologies of a sequential control module of a transformer substation monitoring system, an intelligent five-prevention device, a view screen linkage system, a 'double confirmation' sensing judgment mechanism and the like. More importantly, one-key sequential control function debugging needs one-time equipment linkage, and for operating the transformer substation, power failure needs to be arranged one by one at intervals, which is difficult to solve in the current power grid operation mode. When an intelligent substation is newly built, all the total stations can carry out actual operation, sequence control ticket verification is not difficult, once interval extension is carried out, due to the fact that extension interval bus knife switches are safety measure associated knife switches, operation of a failure receiving pressing plate and an original interval protecting pressing plate in bus differential protection is carried out in extension interval secondary operation tickets, operation of extension intervals is added to the bus operation tickets, a plurality of obstacles exist in sequence control ticket verification, and the sequence control ticket verification can be carried out only by adopting a complex power failure mode. In fact, due to the fact that the power failure mode is difficult to arrange, sequential control verification cannot be conducted on part of intervals. Therefore, it is necessary to research the debugging mode of the one-key sequence control function under the condition of no power failure, and the method will play a key role in promoting the application of the one-key sequence control function.
However, at present, the communication capability of the substation is mainly simulated through simulation equipment in a one-key sequence control function debugging mode, and a simulation test only simulating the communication capability of the substation greatly differs from an actual one-key sequence control operation environment in a simulation environment, so that the accuracy of a one-key sequence control verification result is greatly influenced.
Therefore, how to solve the above problems is a problem that needs to be solved at present.
Disclosure of Invention
The application provides a method, a device, equipment and a medium for one-key sequential control simulation test of a transformer substation, and aims to solve the problems.
In a first aspect, the present application provides a method for testing simulation of one-key sequence control of a substation, where the method includes:
receiving a control instruction sent by monitoring equipment;
determining whether the control instruction meets a preset condition;
if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph;
determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data;
and sending the electrical data to the monitoring equipment.
In the implementation process, the control instruction sent by the monitoring equipment is received; determining whether the control instruction meets a preset condition; if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data; the electrical data are sent to the monitoring equipment, so that the whole simulation test environment is closer to the actual operation environment of the transformer substation through real-time load flow calculation, the test verification effect of one-key sequential control is achieved, persuasion and accuracy are greatly improved, the relation between the switch position change and load flow voltage, current and power is enabled to completely accord with the physical law of electric power operation, simulation test is more reliable, and the accuracy of debugging and verification is effectively improved.
Optionally, before the receiving the control instruction sent by the monitoring device, the method further includes:
acquiring an SCD file of a transformer substation to be subjected to simulation test;
analyzing the SCD file to obtain a model file required by MMS protocol communication communicated with monitoring equipment and a communication point table of the simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment;
and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
Optionally, the generating process of the power flow calculation topological graph includes:
acquiring a primary system structure diagram of the transformer substation to be subjected to simulation test;
and generating the power flow calculation topological graph according to the primary system graph, wherein the power flow calculation topological graph is used for being displayed on a visual interface.
Optionally, the method further comprises:
and recording all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment, and generating a message monitoring report in an excel format.
In the implementation process, all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment are recorded, and a message monitoring report in an excel format is generated, so that the whole process of one-key sequence control is accurately monitored, the monitoring equipment can check back based on a visual interface through the report form, and the test accuracy of sequence control is effectively improved.
Optionally, the determining whether the control instruction satisfies a preset condition includes:
acquiring condition information in a preset condition library, wherein the condition information is generated based on an electric power operation specification;
judging whether the control instruction is matched with a condition in the condition information;
if the matching is carried out, the preset condition is met;
if not, the preset condition is not met.
Optionally, the method further comprises:
monitoring MMS data messages of the monitoring equipment;
and analyzing the MMS data message to generate a monitoring report.
In the implementation process, the MMS data message of the monitoring equipment is monitored; the MMS data message is analyzed, and a monitoring report is generated, so that through the introduction of message monitoring and visualization, a dual means is provided for verifying the debugging and checking result, the accuracy of the simulation test is improved through the verification of the message data flow layer, and the simulation test result is more reliable and convincing.
In a second aspect, the present application provides a transformer substation key sequence control simulation testing device, the device includes:
the MMS simulation module is used for receiving a control instruction sent by the monitoring equipment;
the secondary equipment algorithm module is used for determining whether the control instruction meets a preset condition;
if so, adjusting the state of a corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; and determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data;
the secondary equipment algorithm module is further used for sending the electrical data to the monitoring equipment.
Optionally, before receiving the control instruction sent by the monitoring device, the MMS simulation module is further configured to:
acquiring an SCD file of a transformer substation to be subjected to simulation test;
analyzing the SCD file to obtain a model file required by MMS protocol communication communicated with monitoring equipment and a communication point table of the simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment;
and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
In a third aspect, the present application provides an electronic device, including:
a memory for storing executable instructions;
and the processor is used for realizing the transformer substation one-key sequence control simulation test method according to any one of the first aspect when the executable instructions stored in the memory are executed.
In a fourth aspect, the present application provides a computer-readable storage medium, on which a computer program is stored, where the computer program is executed by a processing device to perform the steps of the substation one-key sequence control simulation test method according to any one of the first aspect.
The transformer substation one-key sequence control simulation test method, device, equipment and medium provided by the application receive the control instruction sent by the monitoring equipment; determining whether the control instruction meets a preset condition; if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data; the electrical data are sent to the monitoring equipment, so that the whole simulation test environment is closer to the actual operation environment of the transformer substation through real-time load flow calculation, the test verification effect of one-key sequential control is achieved, persuasion and accuracy are greatly improved, the relation between the switch position change and load flow voltage, current and power is enabled to completely accord with the physical law of electric power operation, simulation test is more reliable, and the accuracy of debugging and verification is effectively improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained from the drawings without inventive effort.
Fig. 1 is a schematic structural diagram of an electronic device according to a first embodiment of the present application;
fig. 2 is a flowchart of a simulation test method for one-key sequence control of a substation according to a second embodiment of the present application;
fig. 3 is a schematic view of an application scenario of the transformer substation one-key sequence control simulation test method shown in fig. 2;
fig. 4 is a functional module schematic diagram of a substation one-key sequence control simulation testing apparatus according to a third embodiment of the present application.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions of the present application will be clearly and completely described below with reference to the accompanying drawings, and it is obvious that the described embodiments are some, but not all embodiments of the present application. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
First embodiment
Fig. 1 is a schematic structural diagram of an electronic device according to an embodiment of the present application, and in the present application, an example electronic device 100 for implementing a substation one-key sequence control simulation test method according to the embodiment of the present application may be described by using the schematic diagram shown in fig. 1. For example, the electronic device 100 is configured to execute the substation one-touch sequential simulation test method shown in the second embodiment to perform simulation test with the monitoring device.
As shown in FIG. 1, an electronic device 100 includes one or more processors 102, one or more memory devices 104, an input device 106, an output device 108, which are interconnected via a bus system and/or other type of connection mechanism (not shown). It should be noted that the components and structure of the electronic device 100 shown in fig. 1 are only exemplary and not limiting, and the electronic device may have some of the components shown in fig. 1 and may also have other components and structures not shown in fig. 1, as desired.
The processor 102 may be a Central Processing Unit (CPU) or other form of processing unit having data processing capabilities and/or instruction execution capabilities, and may control other components in the electronic device 100 to perform desired functions.
The storage 104 may include one or more computer program products that may include various forms of computer-readable storage media, such as volatile memory and/or non-volatile memory. The volatile memory may include, for example, Random Access Memory (RAM), cache memory (cache), and/or the like. The non-volatile memory may include, for example, Read Only Memory (ROM), hard disk, flash memory, etc. On which one or more computer program instructions may be stored that may be executed by processor 102 to implement the client functionality (implemented by the processor) of the embodiments of the application described below and/or other desired functionality. Various applications and various data, such as various data used and/or generated by the applications, may also be stored in the computer-readable storage medium.
The input device 106 may be a device used by a user to input instructions and may include one or more of a keyboard, a mouse, a microphone, a touch screen, and the like.
The output device 108 may be a device for outputting reports and may include a display screen or an output interface.
Second embodiment:
referring to a flow chart of a transformer substation one-key sequence control simulation test method shown in fig. 2, the method specifically includes the following steps:
step S201, receiving a control instruction sent by the monitoring device.
In a possible embodiment, before step S201, the method further includes: acquiring an SCD file of a transformer substation to be subjected to simulation test; analyzing the SCD file to obtain a model file required by MMS (Microsoft Media Server Protocol) Protocol communication communicated with monitoring equipment and a communication point table of simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment; and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
The SCD file is provided for the transformer substation to be subjected to the simulation test. The SCD file may be uploaded to the terminal device in advance (i.e. may be obtained from the local), or may be obtained from the network (i.e. downloaded through the network). Here, the number of the carbon atoms is not particularly limited.
It should be understood that the obtained SCD file is consistent with the SCD file in the monitoring device.
It should be noted that the monitoring device in this embodiment includes A, B network IP addresses. Before implementation, A, B network IP addresses need to be filled in a white list for monitoring the communication state of the monitoring equipment.
Further, the simulation network selection can select three simulation modes of 'A net', 'B net' and 'AB net'. Such as a communication network card (a network): selecting a network card connected with a network cable during A-network communication; communication network card (B network): and selecting the network card connected with the network cable during the B-network communication.
After the SCD file is successfully imported, the network card is bound to establish a network link with the monitoring equipment.
For example, the application scenario diagram shown in fig. 3. The testing host machine is communicated with the monitoring equipment through an MMS protocol, wherein a switch is arranged between the monitoring equipment and the testing host machine, and the switch is convenient for the testing host machine to be respectively communicated with the monitoring equipment and the telecontrol device through an MMS protocol through an independently established non-station control layer MMS network. That is, the command interaction between the test host, the monitoring device and the telecontrol equipment is transmitted through the non-station control layer MMS network independently built by the switch.
And step S202, determining whether the control instruction meets a preset condition.
As an embodiment, step S202 includes: acquiring condition information in a preset condition library, wherein the condition information is generated based on an electric power operation specification; judging whether the control instruction is matched with a condition in the condition information; if the matching is carried out, the preset condition is met; if not, the preset condition is not met.
For example, if the control command is a disconnecting link opening command, that is, when the disconnecting link opening command is received, it needs to first determine whether a breaker connected to the disconnecting link is in an opening state, and if the breaker is in the opening state, the breaker can be opened, that is, the disconnecting link opening command at this time meets the preset condition.
Optionally, the control instructions include, but are not limited to: and opening and closing instructions of a circuit breaker, a disconnecting link, a grounding switch, a pressing plate and the like.
And step S203, if yes, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph.
The generation process of the power flow calculation topological graph comprises the following steps: acquiring a primary system structure diagram of the transformer substation to be subjected to simulation test; and generating the power flow calculation topological graph according to the primary system graph, wherein the power flow calculation topological graph is used for being displayed on a visual interface.
Wherein, the primary system structure chart is provided for the transformer substation.
And step S204, determining the electrical data of each topological node on the new power flow calculation topological graph.
Wherein the electrical data includes voltage, current, and power data.
As an embodiment, step S204 includes: and calculating the electrical data of each topological node on the new power flow calculation topological graph through a power flow calculation algorithm.
The load flow calculation algorithm adopts a Newton-Raphson load flow algorithm, the calculation step length is 128 milliseconds, and the number of nodes supports 100 ten thousand.
As an embodiment, step S204 includes: generating a load flow calculation topological graph according to the primary system graph, and calculating the voltage, current and power values of each node in the load flow calculation topological graph; after the topological structure on the power flow calculation topological graph is changed, the voltage, the current and the power value of each topological node on the new power flow calculation topological graph are recalculated by the calculation step length of 100 ms.
In the implementation process, a load flow calculation topological graph is generated according to a primary system graph, and the voltage, current and power values of each node in the load flow calculation topological graph are calculated; after the topological structure on the topological graph for load flow calculation is changed, the voltage, the current and the power value of each topological node on the new topological graph for load flow calculation are recalculated by the calculation step length of 100ms, so that the whole simulation test environment can be closer to the actual operation environment of the transformer substation when the simulation test of one-key sequence control is carried out, the test verification effect of one-key sequence control, persuasion and accuracy are greatly improved, and the relation between the switch position change and the load flow voltage, current and power completely conforms to the physical law of power operation.
Step S205, sending the electrical data to the monitoring device.
As an embodiment, step S205 includes: processing the electrical data to generate an MMS message; and sending the MMS message to the monitoring equipment to complete a closed loop of a control command.
In the implementation process, the MMS message is generated by processing the electrical data; and sending the MMS message to the monitoring equipment to complete the closed loop of a control instruction, so that the simulation test effect is better.
In a possible embodiment, the method further comprises: and recording all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment, and generating a message monitoring report in an excel format.
In the implementation process, all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment are recorded, and a message monitoring report in an excel format is generated, so that the whole process of one-key sequence control is accurately monitored, the monitoring equipment can check back based on a visual interface through the report form, and the test accuracy of sequence control is effectively improved.
Optionally, the report may be output based on other formats, such as Word format or PDF format. Here, the number of the carbon atoms is not particularly limited.
In a possible embodiment, the method further comprises: monitoring MMS data messages of the monitoring equipment; and analyzing the MMS data message to generate a monitoring report.
Optionally, the listening report is output in an excel format. Of course, in actual use, the monitoring report may also be output in other formats, and is not limited herein.
In the implementation process, the MMS data message of the monitoring equipment is monitored; the MMS data message is analyzed, and a monitoring report is generated, so that through the introduction of message monitoring and visualization, a dual means is provided for verifying the debugging and checking result, the accuracy of the simulation test is improved through the verification of the message data flow layer, and the simulation test result is more reliable and convincing.
In a possible embodiment, the method further comprises: and sending the message monitoring report and the monitoring report to the monitoring equipment, so that the monitoring equipment compares the report derived by self sequence control with the message monitoring report and the monitoring report to generate a test report.
In this embodiment, according to the simulation test method for the one-key sequence control of the transformer substation, a control instruction sent by a monitoring device is received; determining whether the control instruction meets a preset condition; if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data; the electrical data are sent to the monitoring equipment, so that the whole simulation test environment is closer to the actual operation environment of the transformer substation through real-time load flow calculation, the test verification effect of one-key sequential control is achieved, persuasion and accuracy are greatly improved, the relation between the switch position change and load flow voltage, current and power is enabled to completely accord with the physical law of electric power operation, simulation test is more reliable, and the accuracy of debugging and verification is effectively improved.
The third embodiment:
referring to fig. 4, a simulation testing apparatus for a key sequence control of a substation 500 includes:
the MMS simulation module 510 is configured to receive a control instruction sent by the monitoring device;
a secondary device algorithm module 520, configured to determine whether the control instruction meets a preset condition;
the load flow calculation module 530 is used for adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction if the load flow calculation module is in the positive state, so as to obtain a new load flow calculation topological graph; and determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data;
the secondary device algorithm module 520 is further configured to send the electrical data to the monitoring device.
Optionally, before receiving the control instruction sent by the monitoring device, the MMS simulation module 510 is further configured to: acquiring an SCD file of a transformer substation to be subjected to simulation test; analyzing the SCD file to obtain a model file required by MMS protocol communication communicated with monitoring equipment and a communication point table of the simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment; and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
Optionally, the power flow calculation module 530 is further configured to: acquiring a primary system structure diagram of the transformer substation to be subjected to simulation test; and generating the power flow calculation topological graph according to the primary system graph, wherein the power flow calculation topological graph is used for being displayed on a visual interface.
Optionally, the secondary device algorithm module 520 is further configured to: acquiring condition information in a preset condition library, wherein the condition information is generated based on an electric power operation specification; judging whether the control instruction is matched with a condition in the condition information; if the matching is carried out, the preset condition is met; if not, the preset condition is not met.
In a possible embodiment, the apparatus 500 further comprises: and the message monitoring module is used for recording all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment and generating a message monitoring report in an excel format.
In a possible embodiment, the apparatus 500 further comprises: the message monitoring data visualization module is used for monitoring the MMS data message of the monitoring equipment; and analyzing the MMS data message to generate a monitoring report.
Further, this embodiment also provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processing device, the method for testing the transformer substation one-key sequence control simulation provided in the second embodiment is executed.
The computer program product of the transformer substation one-key sequence control simulation test method and device provided by the embodiment of the application comprises a computer readable storage medium storing program codes, instructions included in the program codes can be used for executing the method in the foregoing method embodiment, and specific implementation can refer to the method embodiment, and is not described herein again.
It should be noted that the above functions, if implemented in the form of software functional units and sold or used as independent products, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application. It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.

Claims (10)

1. A simulation test method for one-key sequence control of a transformer substation is characterized by comprising the following steps:
receiving a control instruction sent by monitoring equipment;
determining whether the control instruction meets a preset condition;
if so, adjusting the state of the corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph;
determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data;
and sending the electrical data to the monitoring equipment.
2. The method of claim 1, wherein prior to receiving the control instruction sent by the monitoring device, the method further comprises:
acquiring an SCD file of a transformer substation to be subjected to simulation test;
analyzing the SCD file to obtain a model file required by MMS protocol communication communicated with monitoring equipment and a communication point table of the simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment;
and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
3. The method of claim 2, wherein the generating of the power flow calculation topological graph comprises:
acquiring a primary system structure diagram of the transformer substation to be subjected to simulation test;
and generating the power flow calculation topological graph according to the primary system graph, wherein the power flow calculation topological graph is used for being displayed on a visual interface.
4. The method of claim 1, further comprising:
and recording all the control instructions sent by the monitoring equipment in the sequence control process and the electrical data returned to the monitoring equipment, and generating a message monitoring report in an excel format.
5. The method of claim 1, wherein the determining whether the control command satisfies a preset condition comprises:
acquiring condition information in a preset condition library, wherein the condition information is generated based on an electric power operation specification;
judging whether the control instruction is matched with a condition in the condition information;
if the matching is carried out, the preset condition is met;
if not, the preset condition is not met.
6. The method of claim 1, further comprising:
monitoring MMS data messages of the monitoring equipment;
and analyzing the MMS data message to generate a monitoring report.
7. The utility model provides a transformer substation's key is in good order accuse simulation testing arrangement which characterized in that, the device includes:
the MMS simulation module is used for receiving a control instruction sent by the monitoring equipment;
the secondary equipment algorithm module is used for determining whether the control instruction meets a preset condition;
if so, adjusting the state of a corresponding topological node in the load flow calculation topological graph according to the control instruction to obtain a new load flow calculation topological graph; and determining electrical data for each topological node on the new power flow calculation topological graph, wherein the electrical data comprises voltage, current and power data;
the secondary equipment algorithm module is further used for sending the electrical data to the monitoring equipment.
8. The substation one-key sequence control simulation testing device according to claim 7, wherein before the receiving of the control instruction sent by the monitoring equipment, the MMS simulation module is further configured to:
acquiring an SCD file of a transformer substation to be subjected to simulation test;
analyzing the SCD file to obtain a model file required by MMS protocol communication communicated with monitoring equipment and a communication point table of the simulated secondary equipment, wherein the communication point table comprises all state quantities uploaded to the monitoring equipment and can receive a control signal sent by the monitoring equipment;
and establishing a communication link with the monitoring equipment based on the model file and the communication point table.
9. An electronic device, comprising:
a memory for storing executable instructions;
a processor for implementing the substation one-touch sequence control simulation test method according to any one of claims 1 to 6 when executing the executable instructions stored in the memory.
10. A computer-readable storage medium, characterized in that the computer-readable storage medium has stored thereon a computer program which, when executed by a processing device, performs the steps of the substation one-touch sequence control simulation test method of any one of claims 1-6.
CN202011596866.5A 2020-12-29 2020-12-29 Substation one-key sequential control simulation test method, device, equipment and medium Active CN112698584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011596866.5A CN112698584B (en) 2020-12-29 2020-12-29 Substation one-key sequential control simulation test method, device, equipment and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011596866.5A CN112698584B (en) 2020-12-29 2020-12-29 Substation one-key sequential control simulation test method, device, equipment and medium

Publications (2)

Publication Number Publication Date
CN112698584A true CN112698584A (en) 2021-04-23
CN112698584B CN112698584B (en) 2024-03-15

Family

ID=75512000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011596866.5A Active CN112698584B (en) 2020-12-29 2020-12-29 Substation one-key sequential control simulation test method, device, equipment and medium

Country Status (1)

Country Link
CN (1) CN112698584B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113343446A (en) * 2021-05-25 2021-09-03 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101432633A (en) * 2006-04-24 2009-05-13 Abb研究有限公司 System level testing for substation automation systems
CN102566576A (en) * 2012-02-24 2012-07-11 山东鲁能智能技术有限公司 Multiple inspection robot cooperative operation method for substation sequence control system
CN105322541A (en) * 2015-11-20 2016-02-10 许继电气股份有限公司 Simulated power flow calculation method for transformer substation
CN109617241A (en) * 2018-12-29 2019-04-12 北京四方继保自动化股份有限公司 A kind of intelligent successive control system and method based on panoramic view data in substation
CN111881325A (en) * 2020-07-01 2020-11-03 国网青海省电力公司西宁供电公司 Multifunctional relay protection detection analyzer for intelligent substation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101432633A (en) * 2006-04-24 2009-05-13 Abb研究有限公司 System level testing for substation automation systems
CN102566576A (en) * 2012-02-24 2012-07-11 山东鲁能智能技术有限公司 Multiple inspection robot cooperative operation method for substation sequence control system
CN105322541A (en) * 2015-11-20 2016-02-10 许继电气股份有限公司 Simulated power flow calculation method for transformer substation
CN109617241A (en) * 2018-12-29 2019-04-12 北京四方继保自动化股份有限公司 A kind of intelligent successive control system and method based on panoramic view data in substation
CN111881325A (en) * 2020-07-01 2020-11-03 国网青海省电力公司西宁供电公司 Multifunctional relay protection detection analyzer for intelligent substation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113343446A (en) * 2021-05-25 2021-09-03 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system
CN113343446B (en) * 2021-05-25 2022-07-01 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system

Also Published As

Publication number Publication date
CN112698584B (en) 2024-03-15

Similar Documents

Publication Publication Date Title
Bialek et al. Benchmarking and validation of cascading failure analysis tools
LaRocca et al. Topological performance measures as surrogates for physical flow models for risk and vulnerability analysis for electric power systems
CN101153884A (en) Relay-protection steady-state digital moving die test system
CN112800637B (en) Intelligent substation simulation test device and method
CN112311098B (en) Substation equipment is in same direction as accuse function debug system
CN110166483B (en) Power grid fault and network attack identification method, device and equipment
CN113485214B (en) One-key sequential control operation order testing method and device for transformer substation
CN112508511A (en) Automatic generation method for stability control strategy test report
CN106681313A (en) Function testing method of dynamic stability control system and dynamic stability control system
CN106844432A (en) Data processing method and device
CN110138613B (en) Network test template construction method, power network test method and related device
CN112698584B (en) Substation one-key sequential control simulation test method, device, equipment and medium
CN112596651B (en) Acceptance method, device, equipment and storage medium for power distribution terminal debugging
Almas et al. Methodologies for power protection relay testing: From conventional to real-time hardware-in-the-loop (HIL) simulation approaches
CN110868341B (en) Method and device for testing intelligent management unit of in-situ protection
CN107681658B (en) Power grid low-frequency oscillation analysis and test method and system for dispatching master station
Dantas et al. Energy and reactive power differential protection hardware‐in‐the‐loop validation for transformer application
CN113341256B (en) Detection method, device, equipment and medium for transformer substation relay protection system
Kezunovic et al. New test methodology for evaluating protective relay security and dependability
Piesciorovsky et al. Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology
CN116775224B (en) One-key sequential control testing system and testing method
CN111026726A (en) Method and system for comparing different versions of SCD file of intelligent substation and storage medium
CN114720807B (en) Online scheduled inspection method and system for protection signals of power distribution network
Schossig et al. Methods for testing automation and control
McGuinness et al. Grid‐wide area protection settings analysis using protection settings evaluation tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant