CN112660327A - Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device - Google Patents
Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device Download PDFInfo
- Publication number
- CN112660327A CN112660327A CN202011426761.5A CN202011426761A CN112660327A CN 112660327 A CN112660327 A CN 112660327A CN 202011426761 A CN202011426761 A CN 202011426761A CN 112660327 A CN112660327 A CN 112660327A
- Authority
- CN
- China
- Prior art keywords
- storage
- floating production
- cross beam
- transporting
- ballast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a transportation tool support in a ballast pipe cabin modified by a floating type production, storage and unloading device, which comprises a cross beam, an upright post, an inclined pull pipe, a lifting lug and a base toggle plate, wherein the lifting lug is arranged at one end of the cross beam, the other end of the cross beam is fixed on the upright post, and the base toggle plate is arranged at the lower end of the upright post. The floating production, storage and discharge device of the invention refits the transportation tool support in the ballast pipe cabin, has wide application and coverage range, can be repeatedly used, has low cost, is safe and reliable, has simple operation and improves the work efficiency.
Description
Technical Field
The invention relates to a tooling support for transporting a ballast pipe cabin modified by a floating production, storage and unloading device.
Background
In the refitting process of the floating production oil storage ship, the ballast is required to be reformed, the ballast pipes are required to be rearranged, as the refitting project is adopted, the hull structure of the ballast tank is in a finished state, the piping installation can not be carried out in a segmented manufacturing stage as in the new manufacturing project, a large number of piping can not be directly hoisted in place, the pipe installation difficulty is high, the construction difficulty of workers is limited, the project construction period and the cost control are restricted, and the tooling support for transporting the ballast pipes in the refitting device is designed aiming at the problems to solve the problem.
Disclosure of Invention
The invention aims to provide a tooling support for transferring in a ballast pipe cabin refitted by a floating production, storage and discharge device, which has the advantages of wide use and coverage range, reusability and low cost.
The technical scheme adopted by the invention for realizing the purpose is as follows: the utility model provides a floating production storage discharge devices repacking ballast pipe in-cabin transportation frock support, includes crossbeam, stand, inclined pull pipe, lug, base bracket, the lug is installed in the one end of crossbeam, and the other end of crossbeam is fixed on the stand, and the base bracket is installed at the stand lower extreme.
And a supporting pipe for supporting and reinforcing is arranged between the cross beam and the upright post.
And the stand column is provided with an inclined pull pipe for preventing the support from toppling.
The tooling support for transporting in the ballast pipe cabin refitted by the floating production, storage and unloading device has the advantages of wide application and coverage range, reusability, low cost, safety, reliability, simple operation and improvement on work efficiency.
Drawings
Fig. 1 is a front view of a tooling support for the conversion of a floating production, storage and offloading unit into a ballast tank of the present invention.
Fig. 2 is a schematic view showing a first usage state of the tooling support for transporting in the modified ballast pipe chamber of the floating production, storage and offloading device of the invention.
Fig. 3 is a schematic view showing a second usage state of the tooling support for transporting in the modified ballast pipe chamber of the floating production, storage and offloading device of the invention.
In the figure: 1. a cross beam; 2. supporting a tube; 3. a column; 4. obliquely pulling the pipe; 5. lifting lugs; 6. a base toggle plate; 7. a chain block; 9. Shackle dismounting; 8. a wire rope; 10. a ballast pipe; 11. an inner bottom plate.
Detailed Description
As shown in fig. 1 to 3, the floating production, storage and offloading device is modified to a ballast pipe cabin transportation tooling support, which comprises a cross beam 1, a support pipe 2, a vertical column 3, a diagonal draw pipe 4, a 5 ton lifting lug 5, a base toggle plate 6, and a 5 ton lifting lug 5, wherein the cross beam 1 is installed at one end, the other end of the cross beam 1 is welded on the vertical column 3 and is supported and reinforced by the support pipe 2, the base toggle plate 6 is added at the lower end of the vertical column 3 and is integrally welded on an inner bottom plate 11 of the floating production, storage and offloading device, the diagonal draw pipe 4 is added at the middle part of the vertical column 3 to prevent the support from toppling over in the operation process, during the actual operation process, two groups of supports are matched to carry out operation, the tooling support is welded on the inner bottom plate 11 of the floating production, a chain block 7 is connected below the 5 ton lifting lug and is connected with a steel wire rope, meanwhile, a worker can carry out the forward and backward transportation operation of the ballast pipe through manpower or other auxiliary tools on site, if the transportation distance is far, a support can be added in the front to assist the transportation operation, the position of the ballast pipe can be adjusted by using a chain block to reach the actual installation position after the ballast pipe is in place, and the modified ballast pipe in-cabin transportation tool is simple and convenient to install, wide in use coverage range, safe and reliable in operation, and capable of achieving the purposes of reducing cost and improving work efficiency.
Claims (3)
1. The utility model provides a floating production is stored discharge devices and is repacked ballast pipe under-deck transportation frock support which characterized in that: the lifting lug is arranged at one end of the cross beam, the other end of the cross beam is fixed on the stand column, and the base toggle plate is arranged at the lower end of the stand column.
2. The vessel frame for transporting in the ballast tank of a floating production, storage and offloading device of claim 1, wherein: and a supporting pipe for supporting and reinforcing is arranged between the cross beam and the upright post.
3. The vessel frame for transporting in the ballast tank of a floating production, storage and offloading device of claim 1, wherein: and the stand column is provided with an inclined pull pipe for preventing the support from toppling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011426761.5A CN112660327A (en) | 2020-12-09 | 2020-12-09 | Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011426761.5A CN112660327A (en) | 2020-12-09 | 2020-12-09 | Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112660327A true CN112660327A (en) | 2021-04-16 |
Family
ID=75401583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011426761.5A Pending CN112660327A (en) | 2020-12-09 | 2020-12-09 | Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112660327A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1927570A1 (en) * | 2006-11-28 | 2008-06-04 | Manitowoc Crane Group France | Crane tower with counterweight |
CN204265319U (en) * | 2015-01-14 | 2015-04-15 | 烟台明炬气体有限公司 | A kind of gas cylinder hoisting tooling |
CN205590192U (en) * | 2016-04-12 | 2016-09-21 | 新蒲建设集团有限公司 | Rotation type prefabricated plate lifting device |
CN206786135U (en) * | 2017-04-01 | 2017-12-22 | 中国十七冶集团有限公司 | A kind of pipeline waterborne and π type compensator hoisting bracket |
CN206955494U (en) * | 2017-06-18 | 2018-02-02 | 中铁十八局集团第五工程有限公司 | A kind of hoisting frame for being used for nose girder supporting leg under 900 tons of nose-girder bridging machines |
CN209276106U (en) * | 2018-10-25 | 2019-08-20 | 宁夏大北农科技实业有限公司 | A kind of dedicated fork of stevedore ton packet cargo |
-
2020
- 2020-12-09 CN CN202011426761.5A patent/CN112660327A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1927570A1 (en) * | 2006-11-28 | 2008-06-04 | Manitowoc Crane Group France | Crane tower with counterweight |
CN204265319U (en) * | 2015-01-14 | 2015-04-15 | 烟台明炬气体有限公司 | A kind of gas cylinder hoisting tooling |
CN205590192U (en) * | 2016-04-12 | 2016-09-21 | 新蒲建设集团有限公司 | Rotation type prefabricated plate lifting device |
CN206786135U (en) * | 2017-04-01 | 2017-12-22 | 中国十七冶集团有限公司 | A kind of pipeline waterborne and π type compensator hoisting bracket |
CN206955494U (en) * | 2017-06-18 | 2018-02-02 | 中铁十八局集团第五工程有限公司 | A kind of hoisting frame for being used for nose girder supporting leg under 900 tons of nose-girder bridging machines |
CN209276106U (en) * | 2018-10-25 | 2019-08-20 | 宁夏大北农科技实业有限公司 | A kind of dedicated fork of stevedore ton packet cargo |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204081623U (en) | The servicing unit of a kind of reducing desulfurizing tower upside-down mounting | |
CN102168858B (en) | Manufacturing process for shipping chimney unit module | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN213351278U (en) | Lifting device for flip-chip welding of tank wall of vertical storage tank | |
CN102494536B (en) | Construction method for dust-fall pipe of sintering chamber | |
CN200985250Y (en) | Pile leg single slice assembling trolley device | |
CN112660327A (en) | Tooling support for transporting in refitted ballast pipe cabin of floating production, storage and unloading device | |
CN210457193U (en) | Telescopic hanging beam of precast concrete tower barrel | |
CN215250979U (en) | Device for replacing vertical maintenance nozzle of converter oxygen lance | |
CN213111200U (en) | Steel pipe transportation and installation trolley with centering, leveling and adjusting functions | |
CN202643086U (en) | Hoisting tool of hydroxylation reactor | |
CN113371581B (en) | Hoisting and overhauling method for 500kV welded GIL vertical section pipeline | |
CN213449540U (en) | Drawer type platform construction equipment of unloading | |
CN110510504B (en) | Hoisting method of deck pipe system unit module | |
CN202073877U (en) | Cable-rope-free clamp with independent masts special for hoisting rigid steel column | |
CN112192503A (en) | Installation method for installing tower in cold box | |
CN211496586U (en) | Special four-hook pipe type hanging beam for offshore booster station | |
CN219906751U (en) | Offshore pile turning device | |
CN215925673U (en) | Back anchor formula is hoisting apparatus in advance | |
CN104405957A (en) | Mounting vehicle for mine overhead pipeline | |
CN103359308A (en) | Pipe sleeve reinforcing device and method | |
CN218780855U (en) | Movable pipeline jacking consignment device | |
CN213294502U (en) | A hoisting support for installation of mine pipeline | |
CN220452389U (en) | Frock is dismantled to LNG unloading arm front and back drive hydraulic cylinder | |
CN212707406U (en) | Discharging device of concrete loading vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210416 |
|
RJ01 | Rejection of invention patent application after publication |