CN112650808B - Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification - Google Patents

Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification Download PDF

Info

Publication number
CN112650808B
CN112650808B CN202011308319.2A CN202011308319A CN112650808B CN 112650808 B CN112650808 B CN 112650808B CN 202011308319 A CN202011308319 A CN 202011308319A CN 112650808 B CN112650808 B CN 112650808B
Authority
CN
China
Prior art keywords
logic
rule
real
equipment
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011308319.2A
Other languages
Chinese (zh)
Other versions
CN112650808A (en
Inventor
邹哲学
梁旭东
张协
潘洪湘
周斌
梁锋
何东青
马顾铭
丁潇凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NARI Group Corp, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical NARI Group Corp
Priority to CN202011308319.2A priority Critical patent/CN112650808B/en
Publication of CN112650808A publication Critical patent/CN112650808A/en
Priority to PCT/CN2021/123415 priority patent/WO2022105483A1/en
Application granted granted Critical
Publication of CN112650808B publication Critical patent/CN112650808B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Power Engineering (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Strategic Management (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Human Computer Interaction (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a transformer substation anti-error logic visualization method capable of real-time verification and simulation verification, which comprises the following steps of: configuring an anti-misoperation lockout logic rule in a text form to generate a rule base shared by all stations; storing data required by the anti-misoperation lockout logic rule verification in a memory buffer area of a real-time database; displaying a transformer substation primary wiring diagram in a graphic browser; performing real-time verification of the anti-misoperation lockout logic rule on each device in the wiring diagram, and visually displaying the real-time verification process and the result; and performing anti-error logic rule simulation verification on the total station primary equipment, and visually displaying a simulation verification process and a result. The invention greatly simplifies the anti-misoperation lockout logic rule, visually displays the logic relation in a graphical mode, and improves the auditing efficiency of substation workers on lockout logic.

Description

Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification
Technical Field
The invention belongs to the technical field of power automation, and particularly relates to a transformer substation anti-misoperation logic visualization method capable of real-time verification and simulation verification.
Background
The basic requirement of substation operation control is to prevent electrical misoperation, called misoperation for short. The five-prevention function is a core function of preventing misoperation, namely preventing a circuit breaker from being mistakenly switched off and on, preventing an isolating switch or a handcart contact from being switched off and on under load, preventing a grounding wire (grounding switch) from being electrified, preventing a grounding switch (grounding wire) from being electrified and preventing the circuit breaker from being mistakenly switched into an electrified interval.
The five-prevention interlocking logic description file stored in the engineering configuration adopts a private description method for each manufacturer, and the description method is not standard. The description file formats are not consistent, common description files have file formats such as Word, Excel or AutoCAD, and some description files have logic equation expression modes; the anti-misoperation lockout logic in the station control layer system and the bay level measurement and control device is generally described in a text mode, and comprises complex semantics, so that the non-professional person cannot understand the anti-misoperation lockout logic, and the anti-misoperation lockout logic is not beneficial to reading, checking and debugging test.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, provides a substation anti-misoperation logic visualization method capable of realizing real-time verification and simulation verification, and solves the problems that the anti-misoperation logic display in the prior art is unclear, intuitive, incapable of real-time verification and incapable of simulation verification
In order to solve the technical problems, the invention provides a substation anti-error logic visualization method capable of real-time verification and analog verification, which comprises the following steps of:
configuring an anti-misoperation lockout logic rule in a text form to generate a rule base shared by all stations;
storing data required by the anti-misoperation lockout logic rule verification in a memory buffer area of a real-time database;
displaying a transformer substation primary wiring diagram in a graphic browser;
performing real-time verification of the anti-misoperation lockout logic rule on each device in the wiring diagram, and visually displaying the real-time verification process and the result;
and performing anti-error logic rule simulation verification on the total station primary equipment, and visually displaying a simulation verification process and a result.
Furthermore, when the anti-misoperation lockout logic rule is verified, the section of the real-time database at the current moment is intercepted, and a part of the real-time database is copied to the temporarily opened memory space, and the temporarily opened memory space is the simulation database.
Further, the performing real-time verification on the anti-misoperation lockout logic rule of each device in the wiring diagram includes:
clicking primary equipment on a primary equipment wiring diagram of a transformer substation, and acquiring a current equipment state and an equipment name from a database;
periodically reading the error locking prevention logic rule of the current equipment, the current remote signaling value of the measuring point equipment and the corresponding dividing or combining operation condition of the measuring point through the equipment name and the equipment state;
if the remote signaling value in the current database of the measuring point is different from the on-off operation condition corresponding to the measuring point in the error prevention logic rule, the rule is not satisfied; if the two are the same, the rule is satisfied.
Further, the visually displaying the real-time verification process and the result includes:
displaying operation types, condition numbers, measuring point names and branch and join operation conditions corresponding to all rules of the current equipment on an interface, wherein the conditions are represented by using an AND gate rectangular symbol &, or the conditions are represented by using an OR gate rectangular symbol ≧ 1, and the left side of the AND gate rectangular symbol is the measuring point name and the branch and join operation conditions;
and the right side of the rectangular sign of the AND gate outputs a connecting line with different colors according to the left side and the condition calculation result, and the right side of the rectangular sign of the OR gate is the operation mode description of the locking logic of the equipment.
Further, the visually displaying the simulation verification process and the result includes:
the total station primary equipment anti-misoperation lockout logic visualization display interface comprises a tree list area, a visualization logic diagram area and a state simulation area;
the tree-shaped list area sequentially displays the name of the transformer substation, the voltage grade, the interval name, the name of the primary equipment and the name of the operation rule of the primary equipment according to the tree-shaped layer level relation;
the visual logic map area is a map for visually displaying the real-time verification process and the structure of the anti-misoperation lockout logic rule;
the state simulation area is the simulation setting function of the primary equipment related to the current error prevention rule, the list is divided into three columns of equipment name, real-time state and simulation state, the equipment name column displays the name of the primary equipment related to the current error prevention rule, the real-time state column displays the real-time position state of the primary equipment, the simulation state column displays the real-time position state of the primary equipment by default,
after a certain equipment operation anti-error rule is selected in the tree list, the right visual logic area displays the corresponding anti-error rule and calculates the anti-error logic check result of the current position state of the equipment related in the anti-error rule, the state simulation area is used for simulating the on-off operation of the equipment corresponding to the measuring point in the rule, the simulation operation does not change the actual value of the measuring point, and is used for simulating the condition that the on-off operation or the on-off operation corresponding to the current equipment meets or does not meet, and refreshing and displaying the anti-error logic check result.
Furthermore, the visual display window is a modeless dialog box and keeps a set-top state in the whole process.
Compared with the prior art, the invention has the following beneficial effects:
1) the anti-misoperation lockout logic rule is greatly simplified, complex logic relation semantics are shielded and description is met, the logic relation is visually displayed in a graphical mode, and the lockout logic auditing efficiency of substation workers is improved.
2) And the anti-misoperation logic simulation check function is added, so that an operator can conveniently and quickly simulate the anti-misoperation logic rule of the operating equipment on a graphical interface.
Drawings
FIG. 1 is a real-time verification interface;
FIG. 2 is a total station simulation verification interface;
FIG. 3 is a flow chart of the method of the present invention;
FIG. 4 is an example of an anti-mislockout logic rule.
Detailed Description
The invention is further described below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
The technical conception of the invention is as follows: and the visual display and verification functions of the anti-misoperation logic are realized by periodically reading the anti-misoperation logic rules in the real-time database and the remote signaling values of the operation objects in the logic operation part.
The method comprises the following steps: (1) the method comprises the steps of generating a rule base (2) shared by a total station monitoring background and a measurement and control device, providing a set of real-time database management system to provide rapid real-time data access (3), displaying five-prevention lockout logic on a visual graphical interface (4), verifying whether a certain equipment anti-misoperation lockout logic rule meets or does not meet in real time (5), simulating the condition that the equipment split-combination verification total station five-prevention logic rule meets or does not meet, and not changing the real-time database. The invention provides a method for checking five-prevention lockout logic in real time and in total station simulation, which improves the efficiency of checking and checking the anti-misoperation lockout logic rule, saves the debugging time of operators and ensures the correctness of the anti-misoperation lockout logic.
Example 1
Referring to fig. 2, the substation anti-error logic visualization method capable of real-time verification and simulation verification of the invention includes:
step one, unifying a rule base.
And configuring error locking prevention logic rules in a text form in a monitoring background, wherein the branch or combined operation of each device corresponds to one rule, the operation type 1 corresponds to the combined operation rule of the current device, and the operation type 0 corresponds to the current branch operation rule.
And generating a rule base shared by a monitoring background and a measurement and control device (device for acquiring the state of the equipment) of the total station, wherein all equipment (circuit breakers and disconnecting links) participating in error prevention in the transformer substation acquire corresponding error-prevention locking logic rules from the rule base, so that the consistent effectiveness of the error-prevention rules of the total station is ensured. The rule base adopts files with uniform format, and the monitoring background and the measurement and control device use the rule files to perform anti-error logic judgment.
Rule contents and formats as shown in fig. 4, taking rule 1 and rule 2 as examples, the device name "the 61850 model signal and control switch 1 of NS 3670" represents the operation rule configured for the device, the interval name represents the location of the device, the operation type 1 represents the combined operation of the device, 0 represents the divided operation of the device, the condition number is the number of the following conditions, (1) (2) is the condition, the measurement point is the description of other devices, such as (1) represents, the 61850 model with the name NS3670 is disconnected 2, the measurement point name can be repeated, ns3670.CTRL/QGCSWI2.pos. stval represents that the interval name is NS3670, CTRL represents that the device can be remotely controlled, QGCSWI2 is the identification of the device, and is unique and unrepeatable within the interval of NS3670. "equal to point" means that the equipment state described by the measuring point (1) is equal to point, and the condition (1) can be met. Rule 1 concludes that if the 61850 model signal of the device NS3670 is to be combined with the control switch 1, the device states described in conditions (1) and (2) must first be satisfied; rule 2 is similar.
One device can have a plurality of combined (separated) operation rules, wherein both the rule 1 and the rule 2 are combined operation rules of the 61850 model signal of the device NS3670 and the control knife switch 1, and the two rules are in an OR relationship, and before the device is combined, the device can be verified to pass by meeting at least one of the rule 1 and the rule 2.
And step two, a real-time database.
Real-time data in the transformer substation comprise steady-state data, transient-state data, dynamic data, equipment states, images and the like, wherein the panoramic data comprehensively reflect the equipment states and the operation conditions of the transformer substation, and a set of real-time database management system is provided for providing quick real-time data access, so that various system resources can be shared conveniently, and a database can faithfully reflect the operation conditions of field equipment. In order to achieve the purpose of fast data access, basic data and real-time data of the system are stored in a memory buffer area of a real-time database. The basic data is data which is basically unchanged or slowly changed in the operation of the power system, such as: power generation, transformation, transmission and their control and measurement configure equipment and parameters, also commonly referred to as grid model data. Real-time data is data that is automatically measured, including telemetry, and electrical quantities.
And step three, simulating a database.
When the anti-misoperation lockout logic rule is verified, the section of the real-time database at the current moment is intercepted, and a part of the real-time database is copied to the temporarily opened memory space, and the temporarily opened memory space is the simulation database. And by utilizing the simulation database, the real-time database cannot be modified when the condition that the error locking prevention logic rule of one device is met or not met is verified.
And step four, a graphic browser.
The graphic browser is used for displaying a primary wiring diagram of the transformer substation, the topological relation among all devices in the transformer substation is described in the primary wiring diagram, operating personnel can conveniently know the operation condition of the transformer substation, different devices are represented by different primitives, the states of the primitives are associated with the database, and the states of the primitives can change along with the change of data in the database. The wiring diagram is displayed, the current state of the equipment capable of being operated is displayed, the misoperation-preventive locking logic rule of the current equipment can be directly checked by clicking each piece of equipment, the state of the equipment changes, the state on the wiring diagram changes, the state of the same equipment is different, and the misoperation-preventive locking logic rule is also different. The anti-misoperation lockout logic rule visualization is displayed based on a graphic browser, and the rule which does not meet the anti-misoperation lockout logic is marked out by using a special color.
And fifthly, visualization and real-time verification of anti-misoperation lockout logic.
Clicking primary equipment on a primary equipment wiring diagram of a transformer substation, acquiring a current equipment state and an equipment name from a database, and if the current state is a score, indicating that the equipment can only be subjected to combined operation, and checking a combined operation rule; if the current state is "yes", it indicates that the device can only perform branch operation, and the branch operation rule needs to be checked.
The method comprises the steps of periodically reading an anti-misoperation lockout logic rule of the current equipment, a current remote signaling value of a point measuring equipment and branch or joint operation conditions corresponding to measuring points through equipment names and equipment states, extracting operation types, condition numbers, measuring point names and branch and joint operation conditions corresponding to the measuring points of the current equipment, displaying the operation types, the condition numbers, the measuring point names and the branch and joint operation conditions on a human-computer interface, representing the conditions by using an AND gate rectangular symbol "&", or representing the conditions by using an OR gate rectangular symbol "≧ 1", and representing the measuring point names, the branch and joint operation conditions on the left side of the AND gate rectangular symbol.
If the remote signaling value in the current database of the measuring point is different from the on-off operation condition corresponding to the measuring point in the error prevention logic rule, the rule is not satisfied; if the two are the same, the rule is met, on the human-computer interface, the right side of the rectangular sign of the AND gate outputs connecting lines with different colors according to the left side and the condition calculation result, and the right side of the rectangular sign of the OR gate is the operation mode description of the locking logic of the equipment, so that the visual display and real-time verification functions of the anti-misoperation locking logic are realized, as shown in FIG. 1.
And step six, performing logic simulation verification on the total station anti-misoperation lockout.
The all-station primary equipment anti-error logic visual display interface is characterized in that as shown in fig. 2, a uniform calling inlet is arranged in a monitoring background, user authority verification is performed when the all-station primary equipment anti-error logic visual display interface is entered, a user with authority is allowed to enter the all-station primary equipment anti-error logic visual display interface, a visual display window is a non-modal dialog box, operation of a monitoring picture is not affected, and the whole process is kept in a set-top state.
The total station primary equipment anti-misoperation lockout logic visualization display interface comprises a tree list area, a visualization logic diagram area and a state simulation area, and is shown in fig. 2. The tree-shaped list area sequentially displays the name of the transformer substation, the voltage grade, the interval name, the name of primary equipment and the name of the operating rule of the primary equipment according to the tree-shaped layer level relation; the visual logic map area is the diagram of the anti-misoperation lockout logic visualization displayed in the step five; the state simulation area has a simulation setting function of the primary equipment related to the current error prevention rule, the list is divided into three columns, namely an equipment name column, a real-time state column and a simulation state column, the equipment name column displays the name of the primary equipment related to the current error prevention rule, the real-time state column displays the real-time position state of the primary equipment, the simulation state column displays the real-time position state of the primary equipment in a default mode, the equipment name column and the real-time state column are forbidden to be modified, the equipment state of the simulation state column can be subjected to simulation setting, and simulation is displayed after the simulation setting.
After a certain equipment operation anti-error rule is selected in the tree list, the right visual logic area displays the corresponding anti-error rule and calculates an anti-error logic check result of the current position state of the equipment related in the anti-error rule according to the method in the step five, the state simulation area is used for simulating the on-off operation of the equipment corresponding to the measuring point in the rule, the simulation operation does not change the actual value of the measuring point, and is used for simulating the condition that the on-off operation or the on-off operation corresponding to the current equipment meets or does not meet, and refreshing and displaying the anti-error logic check result.
Example 2
The system realized according to the method in the invention is specifically shown as follows:
the method comprises the steps that a right-click is made on a primary equipment wiring diagram of a substation monitoring host to select an anti-misoperation logic visual menu item, the menu item is clicked to pop up a visual locking logic display window of current equipment operation, display contents comprise the operation mode of anti-misoperation locking logic of the current primary equipment and locking logic rule conditions of the anti-misoperation locking logic, and the name of the primary equipment is consistent with the name of equipment in an operation interface. And displaying the target state anti-misoperation lockout logic of the current equipment by default (if the current equipment 2111 disconnecting link is in an open position and can only be operated in a closed position, displaying the visual lockout logic rule of the target state 2111 closed position by default).
And displaying the real-time locking logic rule calculation result by adopting different colors for the condition on the left side of the rectangular symbol of the AND gate and the operation description on the right side of the rectangular symbol of the OR gate of the visual locking logic display window. The monitoring background checks the state of the real-time equipment participating in logic calculation in real time, when the current single logic condition is met, the logic condition on the left side of the rectangular sign of the AND gate and the connecting line on the right side of the rectangular sign of the AND gate are displayed in green, and when the current single logic condition is not met, the logic condition and the connecting line are displayed in red; and displaying the operation description corresponding to the right side of the rectangular symbol of the OR gate according to an actual logic check result, and performing logic check according to the method of the step five, wherein the logic check is performed by using green display for the operation description and the logic connecting line, simultaneously using green bold font to mark 'satisfied' above the operation description, and the logic check is not performed by using red display for the operation description and the logic connecting line, and using red bold font to mark 'unsatisfied' above the operation description.
And (4) performing logic simulation verification on total-station anti-misoperation locking. The all-station primary equipment anti-misoperation logic visual display interface is provided with a uniform calling inlet at a monitoring background, user permission verification is carried out when the all-station anti-misoperation logic visual display interface is accessed, a user with permission is allowed to access the all-station logic visual display and simulation verification interface, a visual display window is a non-modal dialog box, the operation of a monitoring picture is not influenced, and the whole process is kept in a set-top state. The total-station primary equipment anti-misoperation lockout logic visualization display interface is divided into a tree list area, a visualization logic diagram area and a state simulation area.
And the tree list area sequentially shows the name of the transformer substation, the voltage grade, the interval name, the name of the primary equipment and the name of the primary equipment operation rule according to the tree layer level relation, after a certain equipment operation error prevention rule in the tree list is selected, the corresponding error prevention rule is shown on the right side, and an error prevention logic check result of the current position state of the equipment related in the error prevention rule is calculated.
And the real-time display mode of the primary equipment of the visual logic map area is the same as the anti-error logic visualization function of the five-primary equipment.
The state simulation area has a simulation setting function of primary equipment related to the current error prevention rule, the list is divided into three columns, namely an equipment name column, a real-time state and a simulation state, the equipment name column displays the name of the primary equipment related to the current error prevention rule, the real-time state column displays the real-time position state of the primary equipment, the simulation state column displays the real-time position state of the primary equipment in a default mode, the equipment name column and the real-time state column are forbidden to be modified, the equipment state of the simulation state column is allowed to be modified to carry out simulation setting, and simulation is displayed after the simulation setting.
The simulation of the position state of the equipment supports two modes of manual simulation and graphic simulation. The manual simulation is realized by manually setting the position state of the equipment in the simulation state column, the simulation state cells are displayed by using red ground color when the simulation state is inconsistent with the real-time state, the simulation state cells are restored to normal white ground color display when the simulation state is consistent with the real-time state, the monitoring picture displays the position state of the equipment after the simulation setting in real time after the simulation setting, and the manual simulation setting adopts a pull-down menu option mode to select the position separation and the position combination of the equipment; and the graphic simulation carries out equipment simulation setting by clicking a primary equipment primitive on the monitoring graphic picture, and the state simulation area refreshes the simulated equipment position state in real time after the simulation setting. And when the simulation state of the equipment is changed, the visual logic map area displays the color whether the logic condition is met in real time, the simulated latching logic check result is refreshed in real time, and all simulation setting states are cleared when the anti-error rule of the tree list is switched.
The invention has the technical effects of improving the automation level in the transformer substation and enhancing the safety and stability of the operation of the transformer substation. The main technical advantages are as follows:
1) the anti-misoperation lockout logic rule is greatly simplified, complex logic relation semantics are shielded and description is met, the logic relation is visually displayed in a graphical mode, and the lockout logic auditing efficiency of substation workers is improved.
2) And the anti-misoperation logic simulation check function is added, so that an operator can conveniently and quickly simulate the anti-misoperation logic rule of the operating equipment on a graphical interface.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, it is possible to make various improvements and modifications without departing from the technical principle of the present invention, and those improvements and modifications should be also considered as the protection scope of the present invention.

Claims (5)

1. A transformer substation anti-error logic visualization method capable of real-time verification and analog verification is characterized by comprising the following steps:
configuring an anti-misoperation lockout logic rule in a text form to generate a rule base shared by all stations;
storing data required by the anti-misoperation lockout logic rule verification in a memory buffer area of a real-time database;
displaying a transformer substation primary wiring diagram in a graphic browser;
performing real-time verification of the anti-misoperation lockout logic rule on each device in the wiring diagram, and visually displaying the real-time verification process and result;
performing anti-error logic rule simulation verification on the total station primary equipment, and visually displaying a simulation verification process and a result;
the visual display of the simulation verification process and the result comprises the following steps:
the total station primary equipment anti-misoperation lockout logic visualization display interface comprises a tree list area, a visualization logic diagram area and a state simulation area;
the tree-shaped list area sequentially displays the name of the transformer substation, the voltage grade, the interval name, the name of the primary equipment and the name of the operation rule of the primary equipment according to the tree-shaped layer level relation;
the visual logic map area is a map for visually displaying the real-time verification process and the structure of the anti-misoperation lockout logic rule;
the state simulation area is the simulation setting function of the primary equipment related to the current error prevention rule, the list is divided into three columns of equipment name, real-time state and simulation state, the equipment name column displays the name of the primary equipment related to the current error prevention rule, the real-time state column displays the real-time position state of the primary equipment, the simulation state column displays the real-time position state of the primary equipment by default,
after a certain equipment operation anti-error rule is selected in the tree list, the visual logic diagram area on the right side displays the corresponding anti-error rule and calculates an anti-error logic check result of the current position state of equipment related in the anti-error rule, the state simulation area is used for simulating the on-off operation of equipment corresponding to the measuring points in the rule, the simulation operation does not change the actual values of the measuring points and is used for simulating the conditions that the on-off operation or the on-off operation corresponding to the current equipment meets or does not meet, and the anti-error logic check result is refreshed and displayed.
2. The substation anti-misoperation logic visualization method capable of real-time verification and simulation verification according to claim 1, wherein when the anti-misoperation lockout logic rule is verified, a section of the real-time database at the current moment is intercepted and a real-time database is copied to a temporarily opened memory space, and the temporarily opened memory space is a simulation database.
3. The substation anti-misoperation logic visualization method capable of real-time verification and analog verification according to claim 1, wherein the real-time verification of the anti-misoperation lockout logic rules of each device in the wiring diagram comprises:
clicking primary equipment on a transformer substation primary equipment wiring diagram, and acquiring the current equipment state and the equipment name from a database;
periodically reading the error locking prevention logic rule of the current equipment, the current remote signaling value of the measuring point equipment and the corresponding dividing or combining operation condition of the measuring point through the equipment name and the equipment state;
if the remote signaling value in the current database of the measuring point is different from the on-off operation condition corresponding to the measuring point in the error prevention logic rule, the rule is not satisfied; if the two are the same, the rule is satisfied.
4. The substation anti-misoperation logic visualization method capable of being verified in real time and verified in an analog manner according to claim 1, wherein the step of visually displaying the real-time verification process and the result comprises the following steps:
displaying operation types, condition numbers, measuring point names and branch and join operation conditions corresponding to all rules of the current equipment on an interface, wherein the conditions are represented by using an AND gate rectangular symbol &, or the conditions are represented by using an OR gate rectangular symbol ≧ 1, and the left side of the AND gate rectangular symbol is the measuring point name and the branch and join operation conditions;
and the right side of the rectangular sign of the AND gate outputs a connecting line with different colors according to the left side and the condition calculation result, and the right side of the rectangular sign of the OR gate is the operation mode description of the locking logic of the equipment.
5. The substation anti-misoperation logic visualization method capable of real-time verification and analog verification according to claim 1, wherein the all-station primary equipment anti-misoperation lockout logic visualization display interface is a modeless dialog box and is kept in a set-top state all the time.
CN202011308319.2A 2020-11-20 2020-11-20 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification Active CN112650808B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202011308319.2A CN112650808B (en) 2020-11-20 2020-11-20 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification
PCT/CN2021/123415 WO2022105483A1 (en) 2020-11-20 2021-10-13 Transformer substation misoperation-prevention logic visualization method capable of realizing real-time checking and simulation checking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011308319.2A CN112650808B (en) 2020-11-20 2020-11-20 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification

Publications (2)

Publication Number Publication Date
CN112650808A CN112650808A (en) 2021-04-13
CN112650808B true CN112650808B (en) 2022-08-26

Family

ID=75349540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011308319.2A Active CN112650808B (en) 2020-11-20 2020-11-20 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification

Country Status (2)

Country Link
CN (1) CN112650808B (en)
WO (1) WO2022105483A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112650808B (en) * 2020-11-20 2022-08-26 国电南瑞科技股份有限公司 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification
CN113641122A (en) * 2021-08-06 2021-11-12 广西电网有限责任公司电力科学研究院 Interlocking logic visualization method and device for intelligent high-voltage switch
CN114091151B (en) * 2021-11-15 2023-03-31 国网江苏省电力有限公司扬州供电分公司 BIM model-based substation auxiliary equipment linkage logic verification method
CN115395644B (en) * 2022-07-27 2023-07-28 国网宁夏电力有限公司超高压公司 Misoperation prevention method, device and system based on cooperation of secondary equipment and secondary equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821662A (en) * 2015-05-19 2015-08-05 国家电网公司 Multidimensional intelligent anti-misoperation system and method
CN107482772A (en) * 2017-08-02 2017-12-15 许继集团有限公司 A kind of measure and control device and its anti-misoperation locking logic methods of exhibiting

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968096A (en) * 2012-10-29 2013-03-13 广东电网公司电力科学研究院 Safe error proof verifying method for master station type comprehensive intelligent error proof system
US10809753B2 (en) * 2017-03-13 2020-10-20 University Of Tennessee Research Foundation Real-time simulator and controller of power system using distributed data streaming server
CN112650808B (en) * 2020-11-20 2022-08-26 国电南瑞科技股份有限公司 Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821662A (en) * 2015-05-19 2015-08-05 国家电网公司 Multidimensional intelligent anti-misoperation system and method
CN107482772A (en) * 2017-08-02 2017-12-15 许继集团有限公司 A kind of measure and control device and its anti-misoperation locking logic methods of exhibiting

Also Published As

Publication number Publication date
CN112650808A (en) 2021-04-13
WO2022105483A1 (en) 2022-05-27

Similar Documents

Publication Publication Date Title
CN112650808B (en) Transformer substation anti-error logic visualization method capable of realizing real-time verification and simulation verification
CN107317394B (en) Anti-misoperation method, device and system for scheduling operation ticket
CN104734364B (en) The method and system of relay protection device of intelligent substation SV, GOOSE input test
CN105914892B (en) A kind of secondary maintenance peace arranges bill system and its implementation
CN103794109A (en) Electric power control system with simulation training function, and simulation training method thereof
US8249851B2 (en) Monitoring system using real-time simulator
CN112670944A (en) Online monitoring real-time analysis and early warning method for power grid relay protection fixed value
CN112072786A (en) Visual display method for misoperation-preventive locking logic of transformer substation
CN110910703A (en) Virtual simulation intelligent electrician wiring teaching training system
CN113553486A (en) Power transmission line running state visualization method, device, equipment and storage medium
CN112216167A (en) Booster station simulation operation automatic scoring system, method and equipment
CN105823940A (en) Relay protection testing system and method
CN109754662A (en) A kind of intelligent substation O&M method based on simulation training system
CN116580610A (en) Virtual transformer station operation and maintenance VR training and real training system
CN108802512B (en) Power distribution system test method and device
CN116029105A (en) Simulation training method for comprehensive energy practical training
CN111723481B (en) Relay protection equipment simulation verification method and device and readable storage medium
CN115758762A (en) Scene visualization method and device for power business
CN115765167A (en) Intelligent monitoring method and system for health codes of power distribution network based on data value mining
CN114037095A (en) Method, system, equipment and storage medium applied to electric power anti-misoperation maintenance isolation
CN205210636U (en) Distribution substation switching operation monitored control system
CN109754681A (en) A kind of intelligent substation simulation training system
CN113708501A (en) Method and system for improving scheduling operation ticket standard rate
CN112991859A (en) 10kV switch cabinet oriented relay protection operation and maintenance training method
US20230306154A1 (en) Systems and methods for model driven real-time solutions for power systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant