CN112593664B - Bag Liang Baozhu wave-shaped net and installation method thereof - Google Patents

Bag Liang Baozhu wave-shaped net and installation method thereof Download PDF

Info

Publication number
CN112593664B
CN112593664B CN202011400253.XA CN202011400253A CN112593664B CN 112593664 B CN112593664 B CN 112593664B CN 202011400253 A CN202011400253 A CN 202011400253A CN 112593664 B CN112593664 B CN 112593664B
Authority
CN
China
Prior art keywords
baozhu
liang
bag
buckle
corrugated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011400253.XA
Other languages
Chinese (zh)
Other versions
CN112593664A (en
Inventor
刘德政
缪德开
刘云龙
吴云辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Haoru Environmental Protection Technology Co ltd
Original Assignee
Yunnan Haoru Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Haoru Environmental Protection Technology Co ltd filed Critical Yunnan Haoru Environmental Protection Technology Co ltd
Priority to CN202011400253.XA priority Critical patent/CN112593664B/en
Publication of CN112593664A publication Critical patent/CN112593664A/en
Application granted granted Critical
Publication of CN112593664B publication Critical patent/CN112593664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/045Means for fastening plaster-bases to a supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/047Plaster carrying meshes
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00034Physico-chemical characteristics of the mixtures
    • C04B2111/00146Sprayable or pumpable mixtures
    • C04B2111/00155Sprayable, i.e. concrete-like, materials able to be shaped by spraying instead of by casting, e.g. gunite

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a bag Liang Baozhu corrugated net and an installation method thereof, and relates to the field of building protection. After the corrugated net is used for packing Liang Baozhu, the steel beam and the steel column are subjected to guniting treatment, so that the steel beam and the steel column are not easy to rust, maintenance is not needed, and time and labor are saved; the surface cement mortar is pollution-free and environment-friendly; in addition, the whole building has better integration, better aesthetic degree and more convenient decoration.

Description

Bag Liang Baozhu wave-shaped net and installation method thereof
Technical Field
The invention relates to the field of building protection, in particular to a bag Liang Baozhu waveform net and an installation method thereof.
Background
The building refers to an asset formed by artificial building, belongs to the category of fixed assets, and comprises two major categories of houses and constructions. Houses refer to engineering structures for people to live, work, learn, produce, manage, entertain, store items and perform other social activities. A building is distinguished from a building, which refers to an engineering building outside a house, such as a fence, a road, a dam, a well, a tunnel, a water tower, a bridge, a chimney, and the like.
The steel beam and steel column is an indispensable supporting component in a building, the existing steel beam and steel column is usually exposed, the surface is painted for corrosion prevention treatment, but the treatment mode has the following defects: (1) The steel beam and the steel column are exposed, so that rust is easy to occur, meanwhile, the surface paint bulges fall off, and periodic maintenance is needed, so that labor and manpower are wasted; (2) The paint is painted on the surfaces of the steel beams and the steel columns, so that the pH value of the air is too high, and the environment is not good.
Disclosure of Invention
The present invention is directed to a corrugated mesh for a bag Liang Baozhu and a method for installing the same, which solve the above-mentioned problems.
In order to achieve the above purpose, the present invention provides the following technical solutions:
the utility model provides a package Liang Baozhu wave form net, includes the wave form net, the arch package side of wave form net passes the iron wire along the mesh of wave form net, and the length of iron wire is greater than the wave form net, the mounting is installed in the welding of iron wire, the iron wire on the wave form net wears one every 30-40 cm.
As a further scheme of the invention: the wave-shaped net is formed by pressing a net-shaped wire net into a wave-shaped structure through a forming machine.
As a further scheme of the invention: the fastener comprises a buckle and a clamping seat, wherein the side face of the buckle is provided with a groove, clamping blocks which are symmetrically arranged are integrally formed on the outer wall of the buckle, a clamping groove matched with the shape of the buckle is formed in the clamping seat, a clamping groove is formed in the clamping groove corresponding to the position of the clamping block, a horizontal sleeve is fixed on the inner wall of the clamping seat, a cushion block is slidably arranged in the sleeve, the shape of the cushion block is identical to that of the groove, one end of the cushion block in the sleeve is fixedly connected with one end of the spring, the other end of the spring is fixedly connected with the inner wall of the clamping seat, one end of the cushion block in the sleeve is fixedly provided with a handle, and the handle penetrates through the sleeve to extend out of the clamping seat and is slidably connected with the clamping seat.
As a further scheme of the invention: the fixing piece is an angle iron welded and fixed at two ends of the iron wire.
A method for installing a corrugated net of a bag Liang Baozhu, when protecting independent steel beams and steel columns, other wooden beams and columns,
the same construction method, also protected, comprises the following steps:
step one: firstly, wrapping a steel beam and a steel column through a wave-shaped net, and then mutually buckling a buckle at two ends of an iron wire and a clamping seat to form surrounding protection for the steel beam and the steel column;
step two: preparing composite mortar;
step three: spraying slurry;
step four: leveling.
As a further scheme of the invention: the composite mortar comprises 30-50 parts of concrete, 8-12 parts of fireproof agent and 2-4 parts of water reducer, and retarder, fireproof agent and water reducer are put into the concrete for full stirring for 10min.
As a further scheme of the invention: when spraying, a protective cover is adopted, so that the interference of wind in the external environment to the spraying work is avoided.
As a further scheme of the invention: when the mortar is leveled, a drying lamp is used for setting the temperature to 40 ℃ for drying, the drying time is set to be half an hour, and the drying speed of the mortar is improved.
As a further scheme of the invention: when the three-face column or the two-face column is protected, the three-face column or the two-face column is wrapped by a wave-shaped net which is provided with iron wires, and the extra part is paved on the wall surfaces on two sides, and then the three-face column or the two-face column is welded or bound.
As a further scheme of the invention: when protecting trilateral roof beam or two-sided roof beam, with wear the wave form net of iron wire with trilateral or two-sided bread, many partly spread respectively on the wall and the top on one side, the wall is connected and is adopted spot welding or ligature, and the top is connected and is adopted to penetrate the nail fixed, and the iron wire ligature is penetrated on the nail.
Compared with the prior art, the invention has the beneficial effects that:
1) After the bag Liang Baozhu is wrapped, the steel beam and the steel column are not easy to rust, have high fireproof performance and do not need maintenance;
2) After the bag Liang Baozhu, the environment is protected, and the surface cement mortar is not polluted;
3) After being packed Liang Baozhu, the service life of the building design is prolonged;
4) After Liang Baozhu is packed, the whole building has better integrity, better aesthetic degree and more convenient decoration;
5) The adhesive force is higher after mortar spraying.
Drawings
Fig. 1 is a schematic diagram of a waveform net of a packet Liang Baozhu.
Fig. 2 is a schematic view of the cartridge and snap-fit arrangement in a corrugated mesh of a bag Liang Baozhu.
Fig. 3 is a schematic view of the structure of angle iron in a corrugated mesh of a bag Liang Baozhu.
As shown in the figure: the wave form net 1, the iron wire 2, the buckle 3, the cassette 4, the fixture block 5, the groove 6, the buckle groove 7, the cushion block 8, the sleeve 9, the spring 10, the clamping groove 11 and the angle iron 12.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
Referring to fig. 1-2, in the embodiment of the invention, a bag Liang Baozhu corrugated net comprises a corrugated net 1, wherein the corrugated net 1 is a structure that a net-shaped wire net is pressed into a wave shape by a forming machine, the arch bag side surface of the corrugated net 1 passes through an iron wire 2 along the mesh of the corrugated net 1, the length of the iron wire 2 is greater than that of the corrugated net 1, so that the iron wire 2 on the corrugated net 1 is conveniently bound, one iron wire 2 passes every 30-40cm, one end of the iron wire 2 is fixedly welded with a buckle 3, and the other end of the iron wire 2 is fixedly welded with a clamping seat 4 mutually buckled with the buckle 3.
The side of buckle 3 has offered recess 6, and integrated into one piece is fixed with fixture block 5 that the symmetry set up on the outer wall of buckle 3, through the design of recess 6, makes the part that buckle 3 connects fixture block 5 shrink under the effect of user's pinching force to make things convenient for buckle 3 to enter into in the cassette 4.
The inside of cassette 4 has been seted up with the buckle 7 of buckle 3 shape matching, clamping groove 11 has been seted up to the position of corresponding fixture block 5 in the clamping groove 7, make when fixture block 5 slides and moves clamping groove 11 department, send fixture block 5 to clamping groove 11 under the elasticity effect of buckle 3 self, thereby make buckle 3 lock to in the cassette 4, be fixed with horizontal sleeve 9 on the inner wall of cassette 4, sleeve 9's inside slidable mounting has cushion 8, the shape of cushion 8 is the same with the shape of recess 6, and cushion 8 orientation one end in the sleeve 9 and the one end fixed connection of spring 10, the other end of spring 10 and the inner wall fixed connection of cassette 4, and cushion 8 is located the one end in sleeve 9 and is fixed with the handle, the handle passes sleeve 9 and stretches out outside the cassette 4 and with cassette 4 sliding connection, be convenient for slide along sleeve 9 through the handle, after buckle 3 inserts in the cassette 4, cushion 8 is in the effect of spring 10 is by jack into recess 6, thereby effectively avoided outside fixture block 5 clamping groove 11, the effect of card 3 has been improved.
The method for installing the Liang Baozhu corrugated net of the bag comprises the following steps when protecting independent steel beams and steel columns:
step one: firstly, wrapping a steel beam and a steel column through a wave-shaped net, and then mutually buckling a buckle at two ends of an iron wire and a clamping seat to form surrounding protection for the steel beam and the steel column;
step two: preparing composite mortar; the composite mortar comprises 30-50 parts of concrete, 8-12 parts of fireproof agent and 2-4 parts of water reducer, and retarder, fireproof agent and water reducer are put into the concrete for full stirring, and the stirring time is controlled at 10min;
step three: spraying slurry; when spraying, a protective cover is adopted, so that the interference of wind in the external environment on the spraying work is avoided;
step four: leveling, setting 40 ℃ for drying by using a drying lamp, setting the drying time to be half an hour, and improving the drying speed of mortar.
Example 2
The fixing piece is an angle iron 12 welded and fixed at two ends of the iron wire 2.
Example 3
The method for installing the Liang Baozhu corrugated net of the bag comprises the following steps when three-sided columns or two-sided columns are protected:
step one: firstly, wrapping steel beams and steel columns through a wave-shaped net, wrapping three-sided columns or two-sided columns with a wave-shaped net which is penetrated with iron wires, and paving the rest parts on the wall surfaces on two sides, and performing spot welding or binding;
step two: preparing composite mortar; the composite mortar comprises 30-50 parts of concrete, 8-12 parts of fireproof agent and 2-4 parts of water reducer, and retarder, fireproof agent and water reducer are put into the concrete for full stirring, and the stirring time is controlled at 10min;
step three: spraying slurry; when spraying, a protective cover is adopted, so that the interference of wind in the external environment on the spraying work is avoided;
step four: leveling; when the mortar is leveled, a drying lamp is used for setting the temperature to 40 ℃ for drying, the drying time is set to be half an hour, and the drying speed of the mortar is improved.
Example 4
The method for installing the bag Liang Baozhu corrugated net comprises the following steps when protecting a three-sided beam or a two-sided beam:
step one: firstly, wrapping steel beams and steel columns through a wave-shaped net, wrapping three sides or two sides of the steel columns through the wave-shaped net with iron wires, respectively paving one more part of the steel columns and the two more parts of the steel columns on one side of the wall surface and the top of the steel columns, connecting the wall surface by adopting spot welding or binding, connecting the top of the steel columns by adopting a nail-shooting fixture, and binding the iron wires on the nail-shooting fixture;
step two: preparing composite mortar; the composite mortar comprises 30-50 parts of concrete, 8-12 parts of fireproof agent and 2-4 parts of water reducer, and retarder, fireproof agent and water reducer are put into the concrete for full stirring, and the stirring time is controlled at 10min;
step three: spraying slurry; when spraying, a protective cover is adopted, so that the interference of wind in the external environment on the spraying work is avoided;
step four: leveling, setting 40 ℃ for drying by using a drying lamp, setting the drying time to be half an hour, and improving the drying speed of mortar.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that the foregoing embodiments may be modified or equivalents may be substituted for elements thereof, and that any modifications, equivalents, improvements or changes that fall within the spirit and principles of the present invention are intended to be within the scope of the present invention, and that those not specifically described in the present specification are within the skill of the art.

Claims (8)

1. The utility model provides a bag Liang Baozhu wave network, includes wave network (1), its characterized in that, the arch package side of wave network (1) passes iron wire (2) along the mesh of wave network (1), and the length of iron wire (2) is greater than wave network (1), the one end welded fastening of iron wire (2) has buckle (3), and the other end welded fastening of iron wire (2) has cassette (4) with buckle (3) mutual lock, and recess (6) have been seted up to the side of buckle (3), integrated into one piece is fixed with fixture block (5) of symmetry setting on the outer wall of buckle (3), and buckle groove (7) with buckle (3) shape matching have been seted up to the inside of cassette (4), and clamping groove (11) have been seted up to the position of corresponding fixture block (5) in buckle groove (7), be fixed with horizontal sleeve (9) on the inner wall of cassette (4), the inside slidable mounting of sleeve (9) has cushion (8) the shape the same with recess (6), and cushion (8) towards one end in sleeve (9) and spring (10)'s one end fixed connection's the inner wall (10) and the other end of spring (10) and fixed connection of cushion (8) are located in the fixed sleeve (9), the handle passes through the sleeve (9) to extend out of the clamping seat (4) and is in sliding connection with the clamping seat (4), and the iron wires (2) on the wave net (1) are threaded every 30 cm to 40 cm.
2. A corrugated wire of a bag Liang Baozhu according to claim 1, wherein the corrugated wire (1) is a wire mesh shaped net which is pressed into a wave-like shape by a forming machine.
3. A method of installing a bag Liang Baozhu corrugated mesh according to any one of claims 1-2, comprising the steps of:
step one: firstly, wrapping a steel beam and a steel column through a wave-shaped net, and then mutually buckling a buckle at two ends of an iron wire and a clamping seat to form surrounding protection for the steel beam and the steel column;
step two: preparing composite mortar;
step three: spraying slurry;
step four: leveling.
4. The method for installing the wave network of the package Liang Baozhu as set forth in claim 3, wherein the composite mortar comprises 30-50 parts of concrete, 2-4 parts of retarder, 8-12 parts of fire retardant and 2-4 parts of water reducer, the retarder, the fire retardant and the water reducer are put into the concrete to be fully stirred, the mixture is uniform, and the stirring time is controlled to be 10 minutes.
5. A method of installing a corrugated screen for a bag Liang Baozhu as claimed in claim 3, wherein a protective cover is used to prevent the wind of the external environment from interfering with the spraying operation while spraying.
6. A method of installing a corrugated screen for a bag Liang Baozhu as claimed in claim 3, wherein the drying is performed at 40 ℃ using a drying lamp set at the time of leveling, and the drying time is set to half an hour, thereby improving the drying speed of the mortar.
7. A method of installing a corrugated mesh for a bag Liang Baozhu as claimed in claim 3, wherein when protecting three or two posts, the three or two posts are covered with the corrugated mesh with iron wires, and the extra part is spread on the wall surfaces on both sides, and spot-welded or bound.
8. A method of installing a corrugated mesh for a bag Liang Baozhu as claimed in claim 3, wherein when protecting a three-sided beam or a two-sided beam, the three-sided or two-sided beam is covered with a corrugated mesh with iron wires, and the three-sided or two-sided beam is covered with a part of the corrugated mesh with iron wires, and the two-sided or two-sided corrugated mesh is spread on the wall surface and the top of one side respectively, the wall surface is connected by spot welding or binding, the top is connected by nail shooting and the iron wires are bound on the nails.
CN202011400253.XA 2020-12-02 2020-12-02 Bag Liang Baozhu wave-shaped net and installation method thereof Active CN112593664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011400253.XA CN112593664B (en) 2020-12-02 2020-12-02 Bag Liang Baozhu wave-shaped net and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011400253.XA CN112593664B (en) 2020-12-02 2020-12-02 Bag Liang Baozhu wave-shaped net and installation method thereof

Publications (2)

Publication Number Publication Date
CN112593664A CN112593664A (en) 2021-04-02
CN112593664B true CN112593664B (en) 2023-06-20

Family

ID=75188453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011400253.XA Active CN112593664B (en) 2020-12-02 2020-12-02 Bag Liang Baozhu wave-shaped net and installation method thereof

Country Status (1)

Country Link
CN (1) CN112593664B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB514267A (en) * 1938-04-28 1939-11-03 Victor Lefebure Improvements in or relating to fire-resisting casings for beams and columns in structures
CN102587527A (en) * 2012-03-14 2012-07-18 宝钢建筑***集成有限公司 Steel column-coated fire-protection construction method
CN203834842U (en) * 2014-03-28 2014-09-17 河南杭萧钢构有限公司 Decoration node for steel column, after sprayed with fire retardant coating, of steel-structure building
TWM514491U (en) * 2015-10-15 2015-12-21 Taitope Internat Co Ltd Beam and column wrapping device of sliding type shockproof structure
CN205348462U (en) * 2015-11-22 2016-06-29 云南德政建筑新材料科技有限公司 Shock attenuation is taken precautions against earthquakes and is fallen integrative wall of steel structure beam and column of making an uproar
CN110158888A (en) * 2019-06-11 2019-08-23 贵州建工集团第十一建筑工程有限责任公司 A kind of construction method of steel structure surface brick paving
CN211058193U (en) * 2019-08-20 2020-07-21 冀宝鹏 Steel beam protection device of steel structure fabricated house

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB514267A (en) * 1938-04-28 1939-11-03 Victor Lefebure Improvements in or relating to fire-resisting casings for beams and columns in structures
CN102587527A (en) * 2012-03-14 2012-07-18 宝钢建筑***集成有限公司 Steel column-coated fire-protection construction method
CN203834842U (en) * 2014-03-28 2014-09-17 河南杭萧钢构有限公司 Decoration node for steel column, after sprayed with fire retardant coating, of steel-structure building
TWM514491U (en) * 2015-10-15 2015-12-21 Taitope Internat Co Ltd Beam and column wrapping device of sliding type shockproof structure
CN205348462U (en) * 2015-11-22 2016-06-29 云南德政建筑新材料科技有限公司 Shock attenuation is taken precautions against earthquakes and is fallen integrative wall of steel structure beam and column of making an uproar
CN110158888A (en) * 2019-06-11 2019-08-23 贵州建工集团第十一建筑工程有限责任公司 A kind of construction method of steel structure surface brick paving
CN211058193U (en) * 2019-08-20 2020-07-21 冀宝鹏 Steel beam protection device of steel structure fabricated house

Also Published As

Publication number Publication date
CN112593664A (en) 2021-04-02

Similar Documents

Publication Publication Date Title
KR102023419B1 (en) The foundation structure of the house possible for moving
CN103590511A (en) Bearing-reclining-type mounted assembly-type wall
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN108612203A (en) A kind of hole fireproof blocking method
CN102677794A (en) Exterior wall external insulation composite wall provided with support
CN108049635A (en) Stone curtain wall exterior decoration construction method
MX9706241A (en) Process for inorganic granulates production and their use.
CN112593664B (en) Bag Liang Baozhu wave-shaped net and installation method thereof
CN206784632U (en) A kind of anti-corrosion fireproof construction of steel construction
CN102155088A (en) Process for constructing and positioning wall surface of outer wall boss-type tri-proof decoration integrated plate
CN103266676A (en) Preparation method of film-coated rock wool board heat insulation system for building curtain wall
CN108775097A (en) A kind of flameproof protection decoration integrated construction on steel member
CN104878934B (en) Building method of light and energy-saving walls
CN115182489A (en) Deformation joint curtain wall node structure is striden to tower undaria height
CN213742524U (en) Archaizing building
CN203284898U (en) Film-coated rock wool board heat insulation system used for building curtain wall
CN208251335U (en) A kind of external wall water-proofing anticracking insulation construction
CN209179263U (en) A kind of building curtain wall with anti-seismic structure
CN208009830U (en) One kind hiding spool crack resistence and mends slot structure
US9963638B2 (en) Universal fireproofing patch
CN102587526A (en) Cement wood-wool plate and wall connecting structure and construction method
CN202181624U (en) External heat insulation compound wall with supporting function for external wall
CN110872898A (en) House fire prevention acoustic celotex board mounting structure
CN208586765U (en) A kind of node waterproof connection structure of two buildings
CN209025491U (en) Box type house transformed from waste containers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20210423

Address after: No. 5, building C, Jintai building materials market, Changhong West Road, Guandu District, Kunming City, Yunnan Province 650000

Applicant after: Yunnan Haoru Environmental Protection Technology Co.,Ltd.

Address before: 618300 Building 1, No.4 and No.6, Section 2, Yuxi Road, Guanghan City, Deyang City, Sichuan Province

Applicant before: Guanghan Dekai building materials Co.,Ltd.

TA01 Transfer of patent application right
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant