CN112580977A - Network distribution service gridding supervision method and device, computer equipment and storage medium - Google Patents

Network distribution service gridding supervision method and device, computer equipment and storage medium Download PDF

Info

Publication number
CN112580977A
CN112580977A CN202011493737.3A CN202011493737A CN112580977A CN 112580977 A CN112580977 A CN 112580977A CN 202011493737 A CN202011493737 A CN 202011493737A CN 112580977 A CN112580977 A CN 112580977A
Authority
CN
China
Prior art keywords
power supply
distribution network
grid
power distribution
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011493737.3A
Other languages
Chinese (zh)
Inventor
傅奇思
熊彪
刘颖利
林相华
潘杰
詹少昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Co ltd
Original Assignee
Shenzhen Power Supply Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Co ltd filed Critical Shenzhen Power Supply Co ltd
Priority to CN202011493737.3A priority Critical patent/CN112580977A/en
Publication of CN112580977A publication Critical patent/CN112580977A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The application relates to a method and a device for monitoring distribution network service gridding, computer equipment and a storage medium. The method comprises the following steps: acquiring power distribution network service data of a power distribution network power supply area, dividing the power distribution network power supply area according to a preset strategy to obtain power supply grids, analyzing the power distribution network service data and the power supply grids to obtain analysis data of the power supply grids, and determining monitoring information according to the analysis data so as to manage the power supply grids through the monitoring information; according to the method, the power supply area can be meshed, then the power distribution network services in the power supply grid are analyzed, monitoring information is further acquired, the whole service process is managed according to the monitoring information, and all the power distribution network services are uniformly monitored and managed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, the supervision efficiency of the power distribution network services is improved, and meanwhile the overall operation analysis and coordination management and control capability of different power distribution network services is improved.

Description

Network distribution service gridding supervision method and device, computer equipment and storage medium
Technical Field
The application relates to the technical field of network distribution service gridding supervision, in particular to a network distribution service gridding supervision method, a network distribution service gridding supervision device, computer equipment and a storage medium.
Background
The power distribution network is composed of overhead lines, cables, towers, distribution transformers, isolating switches, reactive power compensators, a plurality of accessory facilities and the like, and plays a role in distributing electric energy in the power network.
In the traditional technology, the power distribution network is divided into different power distribution network services according to different specialties, and the different power distribution network services are supervised and managed. However, the traditional power distribution network management mode can reduce the supervision efficiency of the power distribution network service.
Disclosure of Invention
Therefore, it is necessary to provide a method, an apparatus, a computer device, and a storage medium for monitoring and managing a distribution network service in a grid manner, which can improve the management effect of the distribution network service.
A network distribution service gridding supervision method comprises the following steps:
acquiring power distribution network service data of a power distribution network power supply area;
dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
In one embodiment, the dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid includes:
dividing the power supply area of the power distribution network by combining electronic map data according to the preset strategy to obtain the power supply grid; the power distribution network service data comprises: safety production data, marketing service data, electronic map data, fault emergency repair data and voltage monitoring data of a power distribution network power supply area.
In one embodiment, the dividing the power supply area of the power distribution network by combining the electronic map data according to the preset strategy to obtain the power supply grid includes:
and dividing the power supply area of the power distribution network by combining the electronic map data according to an independent power supply area, a physical street and a standard power supply connection wire to obtain the power supply grid.
In one embodiment, the analyzing the distribution network service data and the power supply grid to obtain the analysis data of the power supply grid includes:
associating the power distribution network service data with the power supply grid to obtain grid service data;
and analyzing and processing the grid service data to obtain the analysis data.
In one embodiment, the associating the power distribution network service data with the power supply grid to obtain grid service data includes:
and distributing the power distribution network service data to each power supply grid to obtain grid service data of each power supply grid.
In one embodiment, the analyzing the grid service data to obtain the analysis data includes:
and according to different dimensionality indexes, counting and analyzing the grid service data to obtain analysis data of different power distribution network services corresponding to each power supply grid.
In one embodiment, the determining monitoring information according to the analysis data includes:
comparing the analysis data with a preset working threshold value of the power distribution network service;
and determining transaction information of the power distribution network service in the power supply grid according to the comparison result so as to manage the power supply grid according to the transaction information.
A distribution network service gridding supervision apparatus, the apparatus comprising:
the service data acquisition module is used for acquiring the service data of the power distribution network in the power supply area of the power distribution network;
the region division module is used for dividing the power supply region of the power distribution network according to a preset strategy to obtain a power supply grid;
the data analysis module is used for analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and the monitoring information determining module is used for determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
A computer device comprising a memory and a processor, the memory storing a computer program, the processor implementing the following steps when executing the computer program:
acquiring power distribution network service data of a power distribution network power supply area;
dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
A storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of:
acquiring power distribution network service data of a power distribution network power supply area;
dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
The distribution network service gridding supervision method, the distribution network service gridding supervision device, the computer equipment and the storage medium provided by the embodiment comprise the following steps: acquiring power distribution network service data of a power distribution network power supply area, dividing the power distribution network power supply area according to a preset strategy to obtain power supply grids, analyzing the power distribution network service data and the power supply grids to obtain analysis data of the power supply grids, and determining monitoring information according to the analysis data so as to manage the power supply grids through the monitoring information; according to the method, the power supply area can be meshed, and then the power distribution network services in the power supply grid are analyzed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, and all power distribution network services are uniformly monitored and managed, so that different power distribution network services are prevented from being respectively supervised and managed in the traditional technology, and the supervision efficiency of the power distribution network services is improved.
Drawings
Fig. 1 is a schematic application environment diagram of a grid monitoring method for distribution network services in an embodiment;
fig. 2 is a schematic flow chart of a network distribution service gridding supervision method in an embodiment;
FIG. 3 is a flow diagram illustrating a method for obtaining a power grid in one embodiment;
FIG. 4 is a flow chart illustrating a method for obtaining analysis data of a power grid according to another embodiment;
FIG. 5 is a block diagram of a network distribution service gridding monitor device according to an embodiment;
FIG. 6 is a diagram illustrating an internal structure of a computer device according to an embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
The distribution network service gridding supervision method provided by the application can be applied to the application environment shown in fig. 1. Wherein the computer device communicates with the power distribution network system over a network. The computer equipment can be but is not limited to various personal computers, notebook computers, smart phones, tablet computers and portable wearable equipment, and the power distribution network system comprises power distribution network service systems of different specialties.
In an embodiment, as shown in fig. 2, a schematic flow chart of a network distribution service gridding supervision method is provided. The present embodiment relates to a process of how to divide a power supply area to implement grid management of a power distribution network, and is described by taking an example that the method is applied to a computer device in fig. 1, where the method can be implemented by the following steps:
s100, acquiring power distribution network service data of a power distribution network power supply area.
Specifically, the computer device may obtain distribution network service data of a distribution network power supply area. Optionally, the power supply area of the power distribution network may be a power supply partition divided from the perspective of power distribution network service management. Optionally, the power distribution network service may be a service such as marketing, power distribution, scheduling, planning, and the like; the distribution network service data can be all distribution network service data in the whole power supply area.
And S200, dividing power supply areas of the power distribution network according to a preset strategy to obtain power supply grids.
Specifically, the computer device may divide the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid, where the preset strategy may be a basis for dividing the power supply area. Optionally, the preset policy may be a related policy based on geographical features such as roads, rivers, hills, and the like. Optionally, a plurality of different distribution grid services may be included within each power grid. Alternatively, the area of all the power supply grids may be equal to the area of the power supply area of the power distribution network.
And S300, analyzing and processing the service data of the power distribution network and the power supply grid to obtain the analysis data of the power supply grid.
Specifically, the computer device may analyze and process each power supply grid through the power distribution network service data to obtain analysis data corresponding to each power distribution network service in each power supply grid. Alternatively, the analysis process may be an assignment process, an association process, an alignment process, or the like. Optionally, the analysis data may represent fault information of the power distribution network service or normal operation information of the power distribution network service, and the like.
And S400, determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
Specifically, the computer device may determine monitoring information of each power supply grid according to the acquired analysis data corresponding to each power distribution network service in each power supply grid, and then manage the power supply grids through the acquired monitoring information. Monitoring information can be notified to workers in a power distribution area, and the workers carry out first-aid repair on faults in each power supply grid; the power distribution equipment can be triggered according to the monitoring information, so that the power distribution equipment can be automatically overhauled, maintained and the like.
The computer device may perform processing such as arithmetic operation or comparison operation on the analysis data to determine the monitoring information.
In the distribution network service gridding supervision method, distribution network service data of a distribution network power supply area are obtained, the distribution network power supply area is divided according to a preset strategy to obtain a power supply grid, analysis processing is carried out on the distribution network service data and the power supply grid to obtain analysis data of the power supply grid, monitoring information is determined according to the analysis data, and the power supply grid is managed through the monitoring information; according to the method, the power supply area can be meshed, then the power distribution network services in the power supply grid are analyzed, monitoring information is further acquired, the whole service process is managed according to the monitoring information, and all the power distribution network services are uniformly monitored and managed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, the supervision efficiency of the power distribution network services is improved, and meanwhile the overall operation analysis and coordination management and control capability of different power distribution network services is improved.
As an embodiment, the step of dividing the power supply area of the power distribution network according to a preset strategy to obtain the power supply grid in S200 may be implemented by the following steps: dividing a power supply area of the power distribution network by combining electronic map data according to a preset strategy to obtain a power supply grid; wherein, distribution network service data includes: safety production data, marketing service data, electronic map data, fault emergency repair data and voltage monitoring data of a power distribution network power supply area.
Specifically, the computer device may divide the power distribution network power supply area according to a preset strategy and in combination with electronic map data of the power distribution network power supply area to obtain a power supply grid. Optionally, the area of each divided power supply grid may be the same or different. Optionally, the preset strategy may be different urban and rural areas, different plant areas, different power supply wiring areas, and the like. Alternatively, the electronic map data may be presented as an electronic map.
In this embodiment, the power distribution network service data may include safety production data, marketing service data, electronic map data, failure emergency repair data, and voltage monitoring data in a power supply area of the power distribution network, and may further include other professional data, and these professional data are analyzed to determine failures of different power distribution network services. The computer equipment can acquire professional data from the power distribution network system; the power distribution network system can comprise a plurality of professional systems of a power grid, such as a production system, a marketing system, an electronic map system, an emergency repair command system, a voltage monitoring system and the like; the production system, the marketing system, the electronic map system, the emergency repair command system, the voltage monitoring system and other professional systems of the power distribution network can form a basic application system for power distribution network operation management and control, and basic capacity of data and process service is provided for the whole process management and construction of the intelligent power distribution network.
Wherein, the above-mentioned according to predetermined strategy, combine electronic map data to divide the distribution network power supply region, obtain the step of power supply grid, can specifically include: and dividing the power supply area of the power distribution network by combining the electronic map data according to the independent power supply area, the physical street and the standard power supply connection wire to obtain a power supply grid.
In this embodiment, the preset policy may be a related policy according to an independent power supply area, a physical street and a standard power supply wiring. The computer equipment can automatically divide the power supply area of the power distribution network by combining electronic map data according to the related strategies of the independent power supply area, the physical street and the standard power supply wiring to obtain the power supply grid. For example, the power supply area is divided into a plurality of power supply grids on the principle that the total load in each power supply grid does not exceed 3 groups of standard wires, wherein each power supply grid can directly and independently supply power.
It should be noted that, the obtained power supply grid is automatically divided, and a user can appropriately adjust the power supply grid according to the division result to meet the actual demand. Alternatively, the boundaries of the power grid may include physical street and space coordinates.
According to the network distribution service gridding supervision method, the power supply area can be gridded, the power distribution network services in the power supply grid are further analyzed, the monitoring information is further obtained, the whole service process is managed according to the monitoring information, and all the power distribution network services are uniformly monitored and managed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, the supervision efficiency of the power distribution network services is improved, and meanwhile, the overall operation analysis and coordination management and control capability of different power distribution network services is improved.
As an embodiment, as shown in fig. 3, the step of obtaining the analysis data of the power grid by analyzing and processing the distribution network service data and the power grid in S300 may be implemented by the following steps:
and S310, associating the power distribution network service data with a power supply grid to obtain grid service data.
In particular, the computer device may associate power distribution grid traffic data with a power grid. Alternatively, the distribution grid service data may be associated with one or more power grids. Optionally, the grid services data may correspond to one or more power grids.
In S310, the step of associating the power distribution network service data with the power supply grid to obtain grid service data may specifically include: and distributing the power distribution network service data to each power supply grid to obtain the grid service data of each power supply grid.
In this embodiment, the computer device may allocate the power distribution network service data to each power supply grid to obtain grid service data corresponding to each power supply grid. Optionally, the computer device may further store a correspondence relationship and correspondence information between the grid service data and the corresponding power supply grid.
And S320, analyzing and processing the grid service data to obtain analysis data.
Specifically, the computer device may analyze and process grid service data to obtain analysis data corresponding to each power distribution network service in each power supply grid. Alternatively, the analysis processing may be comparison processing, arithmetic operation processing, or the like. Optionally, the analysis data may be displayed by a drawing, or may be a specific analysis result. Optionally, the grid service data may include grid basic information, performance indicator information, asset scale information, power outage condition information, operation condition information, emergency maintenance condition information, and load condition information.
The step of analyzing and processing the grid service data in S320 to obtain the analysis data may specifically include: and according to different dimensionality indexes, carrying out statistics and analysis on the grid service data to obtain analysis data of different power distribution network services corresponding to each power supply grid.
The dimension indicators may include grid basic attributes, performance indicators, asset sizes, power outage situations, work situations, emergency maintenance situations, and load situations. For the basic attributes of the grids, the computer equipment can perform drawing visual display on the divided power supply grids according to the grid types, grid codes, grid boundaries and other data of the power supply grids and by combining electronic map data of a power supply area; for the performance indexes, the computer equipment can also carry out statistics, calculation and analysis on the performance indexes such as trip times, power failure times, number of households in power failure, average power failure duration, defect elimination rate, complaint times, inspection arrival rate, plan execution rate and the like based on a power supply grid; for the asset scale, the computer equipment can also perform statistics and analysis on the number of power distribution network equipment such as lines, cables, switches, power distribution rooms and the like in each power distribution grid and asset planning based on the power distribution grids; for the power failure condition, the computer equipment can also carry out statistics and analysis on the power failure conditions such as the power failure times, repeated power failure users, power failure influence range, average power failure duration and the like in each power supply grid; for the operation condition, the computer equipment can also carry out statistics and analysis on the operation conditions such as maintenance, test, inspection and the like in each power supply grid; for the emergency repair condition, the computer equipment can also carry out statistics and analysis on the emergency repair conditions such as the trip times, the site in-place time, the power restoration time, the fault types and the like in the power supply grid; for the load situation, the computer device may also perform statistical analysis on the current load situation and the trend of the power supply grid from dimensions such as time and area by taking the power supply grid as a unit.
In the network distribution service gridding supervision method, analysis processing can be carried out on the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid, monitoring information is further obtained, the whole service process is managed according to the monitoring information, and all the power distribution network services are uniformly monitored and managed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, resource waste caused by chimney-type management of different power distribution network services is effectively avoided, the supervision efficiency of the power distribution network services is improved, and meanwhile, the overall operation analysis and coordination management and control capability of different power distribution network services is improved.
As an embodiment, as shown in fig. 4, the step of determining the monitoring information according to the analysis data in S400 may specifically include the following steps:
and S410, comparing the analysis data with a preset working threshold value of the power distribution network service.
Specifically, the computer device may compare the analysis data of different dimensional indexes corresponding to different power distribution network services with a preset working threshold corresponding to the power distribution network services. Optionally, the comparison method may be to determine whether the analysis data is greater than or equal to a preset working threshold corresponding to the power distribution network service, or may be to determine whether the analysis data is smaller than the preset working threshold corresponding to the power distribution network service. In this embodiment, the comparison method may be to determine whether the analysis data is greater than or equal to a preset working threshold corresponding to the power distribution network service. Optionally, the preset working threshold may be understood as a working threshold of the power distribution network service in a normal operating state, and the specific numerical value may be a factory default numerical value or a numerical value customized according to an actual operating state.
And S420, determining transaction information of the power distribution network service in the power supply grid according to the comparison result, and managing the power supply grid according to the transaction information.
It should be noted that the monitoring information may include transaction information of the power distribution network service and normal information of the power distribution network service, but in this embodiment, the monitoring information is only transaction information of the power distribution network service. Optionally, the computer device may determine transaction information of the power distribution network service in the power supply grid according to the comparison result, and then manage each power supply grid according to the transaction information. In this embodiment, if the comparison result is that the analysis data is greater than or equal to the preset working threshold corresponding to the power distribution network service, the transaction information of different power distribution network services in each power supply grid can be obtained. Optionally, the transaction information may be fault information of the power distribution network service. Optionally, after obtaining the transaction information of the power distribution network service, the computer device may output the transaction information, and inform all the workers in the power distribution network grid of the transaction information in order to give an early warning in advance, so that the workers can timely troubleshoot and repair the fault problem. Optionally, the output mode of the transaction information may be a voice broadcasting mode, an information displaying mode, and the like, that is, the computer device may output the transaction information in a voice broadcasting mode, and may display the transaction information on a display screen of the computer device for a worker to check in time.
According to the network distribution service gridding supervision method, the monitoring information can be acquired, the whole service process is managed according to the monitoring information, and all the power distribution network services are uniformly monitored and managed, so that different power distribution network services in the power supply grid can be coordinated, fused and linked with one another, resource waste caused by chimney type management of different power distribution network services is effectively avoided, the supervision efficiency of the power distribution network services is improved, and the overall operation analysis and coordination management and control capability of different power distribution network services is improved.
In order to facilitate understanding of those skilled in the art, the distribution network service grid supervision method provided by the present disclosure is described by taking an execution subject as a computer device as an example, and specifically, the method includes:
acquiring power distribution network service data of a power distribution network power supply area;
dividing power supply areas of a power distribution network according to an independent power supply area, a physical street and a standard power supply connection wire in combination with electronic map data to obtain a power supply grid; wherein, distribution network service data includes: safety production data, marketing service data, electronic map data, fault first-aid repair data and voltage monitoring data of a power distribution network power supply area;
distributing the power distribution network service data to each power supply grid to obtain grid service data of each power supply grid;
according to different dimensionality indexes, carrying out statistics and analysis on grid service data to obtain analysis data of different power distribution network services corresponding to each power supply grid;
comparing the analysis data with a preset working threshold value of the power distribution network service;
and determining transaction information of the power distribution network service in the power supply grid according to the comparison result so as to manage the power supply grid according to the transaction information.
It should be understood that although the various steps in the flowcharts of fig. 2-4 are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least some of the steps in fig. 2-4 may include multiple steps or multiple stages, which are not necessarily performed at the same time, but may be performed at different times, which are not necessarily performed in sequence, but may be performed in turn or alternately with other steps or at least some of the other steps or stages.
In one embodiment, as shown in fig. 5, there is provided a distribution network service gridding monitoring apparatus, including: a service data acquisition module 11, an area division module 12, a data analysis module 13, and a monitoring information determination module 14, wherein:
the service data acquisition module 11 is configured to acquire power distribution network service data in a power distribution network power supply area;
the region division module 12 is configured to divide a power supply region of the power distribution network according to a preset strategy to obtain a power supply grid;
the data analysis module 13 is configured to perform analysis processing on the distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and the monitoring information determining module 14 is used for determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the area dividing module 12 includes: a mesh partitioning unit, wherein:
the grid division unit is used for dividing a power supply area of the power distribution network by combining electronic map data according to a preset strategy to obtain a power supply grid; wherein, distribution network service data includes: safety production data, marketing service data, electronic map data, fault emergency repair data and voltage monitoring data of a power distribution network power supply area.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the grid dividing unit is specifically configured to divide the power supply area of the power distribution network according to an independent power supply area, a physical street and a standard power supply connection, and by combining with electronic map data, obtain a power supply grid.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the data analysis module 13 includes: a correlation unit and an analysis unit, wherein:
the association unit is used for associating the power distribution network service data with the power supply grid to obtain grid service data;
and the analysis unit is used for analyzing and processing the grid service data to obtain analysis data.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the association unit is specifically configured to allocate the power distribution network service data to each power supply grid, and acquire grid service data of each power supply grid.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the analysis unit is specifically configured to perform statistics and analysis on grid service data according to different dimension indexes to obtain analysis data of different power distribution network services corresponding to each power supply grid.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
In one embodiment, the monitoring information determining module 14 includes: a comparison unit and a monitoring information acquisition unit, wherein:
the comparison unit is used for comparing the analysis data with a preset working threshold value of the power distribution network service;
and the monitoring information acquisition unit is used for determining the abnormal information of the power distribution network service in the power supply grid according to the comparison result so as to manage the power supply grid according to the abnormal information.
The distribution network service gridding monitoring device provided by this embodiment may implement the above method embodiments, and the implementation principle and technical effect thereof are similar, and are not described herein again.
For specific limitations of the distribution network service gridding monitoring device, reference may be made to the above limitations on the distribution network service gridding monitoring method, which is not described herein again. All modules in the distribution network service gridding monitoring device can be completely or partially realized by software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
In one embodiment, a computer device is provided, the internal structure of which may be as shown in FIG. 6. The computer device includes a processor, a memory, and a network interface connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The database of the computer equipment is used for storing power distribution network service data and the like. The computer program is executed by a processor to realize a network distribution service gridding supervision method.
Those skilled in the art will appreciate that the architecture shown in fig. 6 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.
In one embodiment, a computer device is provided, comprising a memory and a processor, the memory having a computer program stored therein, the processor implementing the following steps when executing the computer program:
acquiring power distribution network service data of a power distribution network power supply area;
dividing power supply areas of the power distribution network according to a preset strategy to obtain power supply grids;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
In one embodiment, a storage medium is provided having a computer program stored thereon, the computer program when executed by a processor implementing the steps of:
acquiring power distribution network service data of a power distribution network power supply area;
dividing power supply areas of the power distribution network according to a preset strategy to obtain power supply grids;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database or other medium used in the embodiments provided herein can include at least one of non-volatile and volatile memory. Non-volatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical storage, or the like. Volatile Memory can include Random Access Memory (RAM) or external cache Memory. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM), among others.
The technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, but should be considered as the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A network distribution service gridding supervision method is characterized by comprising the following steps:
acquiring power distribution network service data of a power distribution network power supply area;
dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid;
analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
2. The method according to claim 1, wherein the dividing the power supply area of the power distribution network according to a preset strategy to obtain a power supply grid comprises:
dividing the power supply area of the power distribution network by combining electronic map data according to the preset strategy to obtain the power supply grid; the power distribution network service data comprises: safety production data, marketing service data, electronic map data, fault emergency repair data and voltage monitoring data of a power distribution network power supply area.
3. The method according to claim 2, wherein the dividing the power distribution network power supply area by combining the electronic map data according to the preset strategy to obtain the power supply grid comprises:
and dividing the power supply area of the power distribution network by combining the electronic map data according to an independent power supply area, a physical street and a standard power supply connection wire to obtain the power supply grid.
4. The method of claim 1, wherein the analyzing the distribution grid service data with the power grid to obtain the analysis data of the power grid comprises:
associating the power distribution network service data with the power supply grid to obtain grid service data;
and analyzing and processing the grid service data to obtain the analysis data.
5. The method of claim 4, wherein associating the distribution grid service data with the power grid to obtain grid service data comprises:
and distributing the power distribution network service data to each power supply grid to obtain grid service data of each power supply grid.
6. The method of claim 4, wherein said analyzing said grid services data to obtain said analysis data comprises:
and according to different dimensionality indexes, counting and analyzing the grid service data to obtain analysis data of different power distribution network services corresponding to each power supply grid.
7. The method according to any one of claims 1-6, wherein said determining monitoring information from said analysis data comprises:
comparing the analysis data with a preset working threshold value of the power distribution network service;
and determining transaction information of the power distribution network service in the power supply grid according to the comparison result so as to manage the power supply grid according to the transaction information.
8. A distribution network service gridding supervision device is characterized by comprising:
the service data acquisition module is used for acquiring the service data of the power distribution network in the power supply area of the power distribution network;
the region division module is used for dividing the power supply region of the power distribution network according to a preset strategy to obtain a power supply grid;
the data analysis module is used for analyzing and processing the power distribution network service data and the power supply grid to obtain analysis data of the power supply grid;
and the monitoring information determining module is used for determining monitoring information according to the analysis data so as to manage the power supply grid through the monitoring information.
9. A computer device comprising a memory and a processor, the memory storing a computer program, wherein the processor implements the steps of the method of any one of claims 1 to 7 when executing the computer program.
10. A storage medium having a computer program stored thereon, the computer program, when being executed by a processor, realizing the steps of the method of any one of claims 1 to 7.
CN202011493737.3A 2020-12-17 2020-12-17 Network distribution service gridding supervision method and device, computer equipment and storage medium Pending CN112580977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011493737.3A CN112580977A (en) 2020-12-17 2020-12-17 Network distribution service gridding supervision method and device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011493737.3A CN112580977A (en) 2020-12-17 2020-12-17 Network distribution service gridding supervision method and device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN112580977A true CN112580977A (en) 2021-03-30

Family

ID=75135783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011493737.3A Pending CN112580977A (en) 2020-12-17 2020-12-17 Network distribution service gridding supervision method and device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN112580977A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113315173A (en) * 2021-06-15 2021-08-27 国网安徽省电力有限公司经济技术研究院 Power distribution network planning method, equipment, system and storage medium based on big data analysis and supply and demand bilateral collaborative optimization
CN115630830A (en) * 2022-12-01 2023-01-20 北京忠业兴达科技有限公司 Power supply and distribution method, device, equipment and storage medium for data center

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056482A (en) * 2016-07-22 2016-10-26 国网上海市电力公司 Electric power community grid service platform based internet
CN106251064A (en) * 2016-07-28 2016-12-21 国网江苏省电力公司镇江供电公司 Power distribution network dispatching and monitoring method based on gridding
CN107995049A (en) * 2017-12-25 2018-05-04 广州供电局有限公司 The transregional synchronous fault monitoring method of the power ampere whole district, device and system
CN108182194A (en) * 2017-11-22 2018-06-19 国电南瑞科技股份有限公司 The management method that a kind of gridding based on power grid GIS divides
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056482A (en) * 2016-07-22 2016-10-26 国网上海市电力公司 Electric power community grid service platform based internet
CN106251064A (en) * 2016-07-28 2016-12-21 国网江苏省电力公司镇江供电公司 Power distribution network dispatching and monitoring method based on gridding
CN108182194A (en) * 2017-11-22 2018-06-19 国电南瑞科技股份有限公司 The management method that a kind of gridding based on power grid GIS divides
CN107995049A (en) * 2017-12-25 2018-05-04 广州供电局有限公司 The transregional synchronous fault monitoring method of the power ampere whole district, device and system
CN112036766A (en) * 2020-09-11 2020-12-04 上海国泉科技有限公司 Gridding distribution network service management method and device, computer equipment and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113315173A (en) * 2021-06-15 2021-08-27 国网安徽省电力有限公司经济技术研究院 Power distribution network planning method, equipment, system and storage medium based on big data analysis and supply and demand bilateral collaborative optimization
CN115630830A (en) * 2022-12-01 2023-01-20 北京忠业兴达科技有限公司 Power supply and distribution method, device, equipment and storage medium for data center

Similar Documents

Publication Publication Date Title
Nurre et al. Restoring infrastructure systems: An integrated network design and scheduling (INDS) problem
US9230289B2 (en) Method for estimating power outages and restoration during natural and man-made events
CN112580977A (en) Network distribution service gridding supervision method and device, computer equipment and storage medium
CN113191687B (en) Elastic power distribution network panoramic information visualization method and system
Timko et al. Monte Carlo simulation of power system stability
CN111835083B (en) Power supply information monitoring system, method and device, computer equipment and storage medium
CN115689207A (en) Wind power plant operation and maintenance management method and device, computer equipment and storage medium
CN112668225A (en) Distribution network grid planning method and device, computer equipment and storage medium
US10931107B2 (en) System and method for management of an electricity distribution grid
CN116167599B (en) Information platform management method and system based on BIM data and field data
CN112732490A (en) Information determination method, device, equipment and storage medium
Javadi et al. Identification of simultaneously congested transmission lines in power systems operation and market analysis
CN115935201B (en) Monitoring method and device for GPS and electric quantity data acquisition of key emergency equipment
CN116930652A (en) Public building energy consumption monitoring system and energy saving effect monitoring method
CN109739719A (en) A kind of communications equipment room infrastructure management method and device
CN116227911A (en) Risk monitoring and early warning method, device, equipment and medium for fault power failure event
Przygrodzki et al. The use of probabilistic approach in power system security analyses
Reilly et al. Using data envelopment analysis to evaluate the performance of post-hurricane electric power restoration activities
CN114418237A (en) Distribution network power supply safety capability evaluation standard quantification method, system, equipment and medium
CN112184487A (en) Method and device for predicting power supply index
CN114997760B (en) Method and device for analyzing vulnerability of urban infrastructure group
CN117955245B (en) Method and device for determining running state of power grid, storage medium and electronic equipment
CN114549229B (en) Safety intelligent monitoring management system and method for park
CN117371920A (en) Work order processing method, device, equipment and storage medium
CN118054397A (en) Regional power outage method, regional power outage device, regional power outage equipment, regional power outage storage medium and regional power outage computer product

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination