CN112508315A - Flood prevention consultation system - Google Patents

Flood prevention consultation system Download PDF

Info

Publication number
CN112508315A
CN112508315A CN201910871773.XA CN201910871773A CN112508315A CN 112508315 A CN112508315 A CN 112508315A CN 201910871773 A CN201910871773 A CN 201910871773A CN 112508315 A CN112508315 A CN 112508315A
Authority
CN
China
Prior art keywords
reservoir
flood
information
forecast
scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910871773.XA
Other languages
Chinese (zh)
Inventor
***
李秀丽
杨添平
刘袆凡
陈福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhixin Baida Technology Co ltd
Original Assignee
Shenyang Zhixin Baida Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Zhixin Baida Technology Co ltd filed Critical Shenyang Zhixin Baida Technology Co ltd
Priority to CN201910871773.XA priority Critical patent/CN112508315A/en
Publication of CN112508315A publication Critical patent/CN112508315A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

The embodiment of the application discloses a flood prevention consultation system, which comprises the following steps: collecting data and transmitting the data to a unified data platform; step two: the unified data platform is combined with the GIS and related data to carry out unified information display; step three: obtaining reservoir warehousing forecast results according to the information displayed by the unified information; step four: generating a reservoir adjustment scheme according to the reservoir warehousing forecast result, simulating the adjustment scheme according to the reservoir adjustment scheme, and further performing flood prevention and drought resistance adjustment on the reservoir so as to control the reservoir delivery process; step five: combining the regional production convergence and regional river inflow flood forecast to the reservoir and the hydrological station in the reservoir outlet process; and the comprehensive early warning of the society and economy is provided by combining the flood forecast; step six: and (4) the social economy completes the analysis of the flood by combining risk analysis and three-dimensional simulation, further evaluates the scheme, selects an optimal scheduling scheme to form a flood control plan, and feeds back the decision execution condition of the scheme.

Description

Flood prevention consultation system
Technical Field
The invention relates to the field of hydrology and water resource monitoring, in particular to a flood prevention consultation system.
Background
The data range related to flood prevention consultation is wide, the data range is mainly provided by a plurality of parts such as weather, hydrology, agriculture and the like, and the data range is complex, variable and strong in instantaneity. Flood prevention consultants often spend a great deal of time and effort in organizing and analyzing data. The method has many defects in the aspects of information integration, service connection, forecast scheduling, scheme application, achievement display and the like, for example, (1) a whole set of system platform and template mainly based on flood prevention consultation is lacked, and the existing service process is complicated.
(2) In the process of flood prevention and consultation, services of flood prevention functional departments such as weather, hydrology, reservoirs and the like are not closely linked, the efficiency of the consultation is seriously influenced, and the timeliness of the consultation cannot be met.
(3) Each county-level system takes a county region as a boundary, and cannot be interconnected and communicated with provinces and cities, so that information sharing is realized.
(4) A large amount of achievements are not effectively utilized in the flood prevention and consultation process.
(5) The established flood control professional subsystems operate independently, all kinds of information are too loose, and are not fully integrated and utilized, so that the inquiry of all kinds of information in flood control consultation is not facilitated.
(6) Forecasting and scheduling results of each control station in the drainage basin are distributed respectively, and the consideration that joint forecasting and scheduling among rivers and reservoirs are less and a flood control system taking the drainage basin as a unit is lacked.
(7) And the method lacks the links of scheme analysis and evaluation such as comprehensive early warning, risk analysis, social and economic statistics and the like.
(8) The result display form is single, mostly takes a chart as a main part, and lacks of intuitive three-dimensional simulation.
Due to the defects, the demand of modern flood prevention is difficult to meet.
The flood prevention consultation platform applies technologies such as GIS, remote sensing and the like, real-time data are quickly and accurately organized, data retrieval and real-time graph drawing work such as satellite cloud pictures, typhoon path pictures, contour lines and the like are simplified, workers can provide consultation analysis data to leaders and experts at the highest speed, and all levels of leaders and experts have more plenty of decision analysis on real-time conditions.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a flood prevention consultation system, which comprises the following steps:
the method comprises the following steps: collecting data and transmitting the data to a unified data platform;
step two: the unified data platform is combined with the GIS and related data to carry out unified information display;
step three: obtaining reservoir warehousing forecast results according to the information displayed by the unified information;
step four: generating a reservoir adjustment scheme according to the reservoir warehousing forecast result, simulating the adjustment scheme according to the reservoir adjustment scheme, and further performing flood prevention and drought resistance adjustment on the reservoir so as to control the reservoir delivery process;
step five: combining the regional production convergence and regional river inflow flood forecast to the reservoir and the hydrological station in the reservoir outlet process; and the comprehensive early warning of the society and economy is provided by combining the flood forecast;
step six: and (4) combining social and economic risk analysis and three-dimensional simulation to complete flood analysis, further evaluating the reservoir adjustment scheme, selecting an optimal scheduling scheme to form a flood control plan, and feeding back decision execution conditions of the scheme.
Further, the information collected in the step one is specifically: reservoir work condition information, rainwater condition information, hydrological weather information, dangerous condition information, mountain torrents information and video information.
Further, the related data in the second step includes: cases, manuals, documents.
Further, the information displayed by the unified information in the third step is specifically: real-time forecasting, simulation forecasting, joint forecasting and result reporting.
Furthermore, the flood control plan in the sixth step comprises the steps of issuing flood early warning, issuing scheduling instructions, scheduling personnel and materials and various emergency measures.
The beneficial effect of this application: the flood prevention consultation system applies technologies such as GIS, remote sensing and the like, real-time data are quickly and accurately organized, data retrieval and real-time graph drawing work such as satellite cloud pictures, typhoon path pictures, contour lines and the like are simplified, and staff can provide consultation analysis data to leaders and experts at the highest speed, so that the leaders and the experts at all levels are more abundant in that the leaders and the experts make decision analysis on real-time conditions.
The scheme can help leaders and experts to make flood prevention and drought resistance decisions quickly, thereby saving precious time in the aspects of disaster prevention and decision saving, and providing basis for decision makers in the aspects of material and personnel scheduling.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
Fig. 1 is a flowchart of a flood prevention consultation system.
Detailed Description
As shown in fig. 1, the present invention provides a flood prevention consultation system, which includes the following steps:
the method comprises the following steps: collecting data and transmitting the data to a unified data platform;
step two: the unified data platform is combined with the GIS and related data to carry out unified information display;
step three: obtaining reservoir warehousing forecast results according to the information displayed by the unified information;
step four: generating a reservoir adjustment scheme according to the reservoir warehousing forecast result, simulating the adjustment scheme according to the reservoir adjustment scheme, and further performing flood prevention and drought resistance adjustment on the reservoir so as to control the reservoir delivery process;
step five: combining the regional production convergence and regional river inflow flood forecast to the reservoir and the hydrological station in the reservoir outlet process; and the comprehensive early warning of the society and economy is provided by combining the flood forecast;
step six: and (4) combining social and economic risk analysis and three-dimensional simulation to complete flood analysis, further evaluating the reservoir adjustment scheme, selecting an optimal scheduling scheme to form a flood control plan, and feeding back decision execution conditions of the scheme.
Further, the information collected in the step one is specifically: reservoir work condition information, rainwater condition information, hydrological weather information, dangerous condition information, mountain torrents information and video information.
Further, the related data in the second step includes: cases, manuals, documents.
Further, the information displayed by the unified information in the third step is specifically: real-time forecasting, simulation forecasting, joint forecasting and result reporting.
Furthermore, the flood control plan in the sixth step comprises the steps of issuing flood early warning, issuing scheduling instructions, scheduling personnel and materials and various emergency measures.
The beneficial effect of this application: the flood prevention consultation system applies technologies such as GIS, remote sensing and the like, real-time data are quickly and accurately organized, data retrieval and real-time graph drawing work such as satellite cloud pictures, typhoon path pictures, contour lines and the like are simplified, and staff can provide consultation analysis data to leaders and experts at the highest speed, so that the leaders and the experts at all levels are more abundant in that the leaders and the experts make decision analysis on real-time conditions.
The scheme can help leaders and experts to make flood prevention and drought resistance decisions quickly, thereby saving precious time in the aspects of disaster prevention and decision saving, and providing basis for decision makers in the aspects of material and personnel scheduling.
It will be understood that the invention is not limited to the precise arrangements described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the invention is limited only by the appended claims.

Claims (5)

1. A flood prevention consultation system is characterized by comprising the following steps: the method comprises the following steps: collecting data and transmitting the data to a unified data platform; step two: the unified data platform is combined with the GIS and related data to carry out unified information display; step three: obtaining reservoir warehousing forecast results according to the information displayed by the unified information; step four: generating a reservoir adjustment scheme according to the reservoir warehousing forecast result, simulating the adjustment scheme according to the reservoir adjustment scheme, and further performing flood prevention and drought resistance adjustment on the reservoir so as to control the reservoir delivery process; step five: combining the regional production convergence and regional river inflow flood forecast to the reservoir and the hydrological station in the reservoir outlet process; and the comprehensive early warning of the society and economy is provided by combining the flood forecast; step six: and (4) combining social and economic risk analysis and three-dimensional simulation to complete flood analysis, further evaluating the reservoir adjustment scheme, selecting an optimal scheduling scheme to form a flood control plan, and feeding back decision execution conditions of the scheme.
2. The flood prevention consultation system according to claim 1, wherein the information collected in the first step is specifically: reservoir work condition information, rainwater condition information, hydrological weather information, dangerous condition information, mountain torrents information and video information.
3. The flood prevention consultation system according to claim 1, wherein the related data in the second step comprises: cases, manuals, documents.
4. The flood prevention consultation system according to claim 1, wherein the information displayed in the unified manner in the third step is specifically: real-time forecasting, simulation forecasting, joint forecasting and result reporting.
5. The flood prevention consultation system according to claim 1, wherein the flood prevention plan in the sixth step comprises flood early warning, dispatching of dispatching instructions, personnel and material dispatching and various emergency measures.
CN201910871773.XA 2019-09-16 2019-09-16 Flood prevention consultation system Pending CN112508315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910871773.XA CN112508315A (en) 2019-09-16 2019-09-16 Flood prevention consultation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910871773.XA CN112508315A (en) 2019-09-16 2019-09-16 Flood prevention consultation system

Publications (1)

Publication Number Publication Date
CN112508315A true CN112508315A (en) 2021-03-16

Family

ID=74923876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910871773.XA Pending CN112508315A (en) 2019-09-16 2019-09-16 Flood prevention consultation system

Country Status (1)

Country Link
CN (1) CN112508315A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113888137A (en) * 2021-10-26 2022-01-04 天津大学 Flood-control drought-resisting emergency management system
CN114048947A (en) * 2021-10-09 2022-02-15 中国电建集团华东勘测设计研究院有限公司 Emergency support aid decision-making system and application

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101789161A (en) * 2010-02-05 2010-07-28 福州四创软件开发有限公司 Emergency and disaster prevention integrated machine system
CN105139325A (en) * 2015-09-25 2015-12-09 福建四创软件有限公司 Management method of self-starting disaster recovery plans and searching system
CN106844531A (en) * 2016-12-29 2017-06-13 福建四创软件有限公司 A kind of flood control command based on grid studies and judges system
CN107451716A (en) * 2017-06-28 2017-12-08 宁波市水利水电规划设计研究院 A kind of flood control decision support method, electronic equipment, storage medium and system
CN107622113A (en) * 2017-09-18 2018-01-23 广西宏智科技有限公司 Reservoir safety intellectualized management system
CN110059910A (en) * 2019-02-18 2019-07-26 北京兴泰科技有限公司 Production safety emergency rescue command centre comprehensive management platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101789161A (en) * 2010-02-05 2010-07-28 福州四创软件开发有限公司 Emergency and disaster prevention integrated machine system
CN105139325A (en) * 2015-09-25 2015-12-09 福建四创软件有限公司 Management method of self-starting disaster recovery plans and searching system
CN106844531A (en) * 2016-12-29 2017-06-13 福建四创软件有限公司 A kind of flood control command based on grid studies and judges system
CN107451716A (en) * 2017-06-28 2017-12-08 宁波市水利水电规划设计研究院 A kind of flood control decision support method, electronic equipment, storage medium and system
CN107622113A (en) * 2017-09-18 2018-01-23 广西宏智科技有限公司 Reservoir safety intellectualized management system
CN110059910A (en) * 2019-02-18 2019-07-26 北京兴泰科技有限公司 Production safety emergency rescue command centre comprehensive management platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114048947A (en) * 2021-10-09 2022-02-15 中国电建集团华东勘测设计研究院有限公司 Emergency support aid decision-making system and application
CN113888137A (en) * 2021-10-26 2022-01-04 天津大学 Flood-control drought-resisting emergency management system

Similar Documents

Publication Publication Date Title
CN107622113B (en) Reservoir safety intelligent management system
CN103714426B (en) Medium and small radial-flow type GROUP OF HYDROPOWER STATIONS integrated dispatching system
CN112070286B (en) Precipitation forecast and early warning system for complex terrain river basin
CN103713336B (en) Based on the hydropower station basin areal rainfall meteorology forecast of GIS subarea
CN103793795B (en) Hydropower station hydropower dispatching plan generation and simulation method based on GIS technology
CN113434565A (en) Water conservancy flood control drought and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN107609787A (en) Automatic scheduling method is combined based on the lock pump group for automatically generating prediction scheme
CN102411729B (en) Wind power prediction method based on adaptive linear logic network
CN105184455A (en) High dimension visualized analysis method facing urban electric power data analysis
CN106951674B (en) A kind of no historical summary Flood of small drainage area return period calculation method
CN102184490A (en) System and system for real-time monitoring and managing urban water resources
CN106875048A (en) Emergent Flood Forecasting Method based on success experience pattern
CN109784540A (en) A kind of water supply layout optimization system and optimization method based on DMA subregion
CN109271465B (en) Hydrological data analysis and display method based on cloud computing
CN111401732B (en) Hierarchical identification method for water resource supply and demand situation
CN105868868A (en) Method for process adjustment and risk identification of operation of water resource system of Internet of water
CN109933637A (en) A kind of flood risk Dynamic Display and analysis system
CN112508315A (en) Flood prevention consultation system
CN103218536A (en) Great-leap-forward development area water demand prediction method
CN104345705A (en) Ship energy consumption optimizing and monitoring system
CN105354613A (en) Distributed photovoltaic operation and maintenance mode selection system
CN110111538B (en) Dynamic monitoring, early warning and analyzing system for mountain torrent disasters
Gourbesville et al. Decision support system architecture for real-time water management
Laganis et al. Sensitivity analysis of the emergy flows at the solar salt production process in Slovenia
Dessu et al. Development and application of a priority rated optimization model (PROM) for multi-sector water resource management systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210316

WD01 Invention patent application deemed withdrawn after publication