CN112365594A - Three-dimensional geological modeling method based on Rhino platform - Google Patents

Three-dimensional geological modeling method based on Rhino platform Download PDF

Info

Publication number
CN112365594A
CN112365594A CN202011268942.XA CN202011268942A CN112365594A CN 112365594 A CN112365594 A CN 112365594A CN 202011268942 A CN202011268942 A CN 202011268942A CN 112365594 A CN112365594 A CN 112365594A
Authority
CN
China
Prior art keywords
rhino
geological
dimensional
platform
dimensional geological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011268942.XA
Other languages
Chinese (zh)
Inventor
梁志峰
刘家琪
李源
王安雯
薛世淮
刘威
赵龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Municipal Engineering Corp
Original Assignee
Shenzhen Municipal Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Municipal Engineering Corp filed Critical Shenzhen Municipal Engineering Corp
Priority to CN202011268942.XA priority Critical patent/CN112365594A/en
Publication of CN112365594A publication Critical patent/CN112365594A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Remote Sensing (AREA)
  • Computer Graphics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Instructional Devices (AREA)

Abstract

The invention relates to the technical field of geological modeling, and discloses a three-dimensional geological modeling method based on a Rhino platform, which comprises the following steps: the geological survey data is deeply arranged into a document with a standard format according to each soil body, so that a Grasshopper program judges; converting the geological survey data into a three-dimensional entity model by utilizing a Grasshopper node programming function and parametric modeling; and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model. The invention can be used repeatedly, greatly quickens the modeling efficiency and improves the working efficiency.

Description

Three-dimensional geological modeling method based on Rhino platform
Technical Field
The invention relates to the technical field of geological modeling, in particular to a three-dimensional geological modeling method based on a Rhino platform.
Background
In the traditional project, project management personnel adopt a two-dimensional CAD drawing to guide field construction, and participating parties cannot feel more intuitional experience on engineering details and final product achievements in advance.
Meanwhile, on one hand, the popularization of the BIM technology only occupies a very large proportion of BIM applications in the BIM modeling stage so far. On the other hand, the site construction is still a rough, original and low-efficiency management mode, and information barriers or information asymmetry exists among all departments. However, the three-dimensional geological model in the current three-dimensional modeling method has large difference with geology and is not accurate enough.
Therefore, how to provide a three-dimensional geological modeling method based on the Rhino platform to meet the actual requirements becomes an urgent technical problem to be solved.
Disclosure of Invention
The invention aims to provide a three-dimensional geological modeling method based on a Rhino platform so as to meet actual requirements.
Therefore, according to a first aspect, the embodiment of the invention discloses a three-dimensional geological modeling method based on a Rhino platform, which comprises the following steps: the geological survey data is deeply arranged into a document with a standard format according to each soil body, so that a Grasshopper program judges; converting the geological survey data into a three-dimensional entity model by utilizing a Grasshopper node programming function and parametric modeling; and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model.
Optionally, the survey data comprises borehole depth data and survey point planform data.
Optionally, the document is an Excel document.
Optionally, the basic distribution condition, the karst cave position, the top elevation of the karst cave, the bottom elevation of the karst cave and the volume of the karst cave of each soil layer can be obtained in the section diagram of the three-dimensional geological model.
Optionally, the pile length can be expressed in the form of a picture through the three-dimensional geological model.
The invention has the following beneficial effects: the embodiment of the invention discloses a three-dimensional geological modeling method based on a Rhino platform, which comprises the steps of arranging geological survey data into a document with a standard format according to the depth of each soil body, utilizing Grasshopper node programming function, and converting the geological survey data into a three-dimensional entity model through parameterized modeling; and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model. Compared with the prior art, the method can be used repeatedly, greatly accelerates the modeling efficiency and improves the working efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a flowchart of a three-dimensional geological modeling method based on a Rhino platform disclosed in the present embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; the two elements may be directly connected or indirectly connected through an intermediate medium, or may be communicated with each other inside the two elements, or may be wirelessly connected or wired connected. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In addition, the technical features involved in the different embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
The embodiment of the invention discloses a three-dimensional geological modeling method based on a Rhino platform, which comprises the following steps of:
s101, deeply arranging the geological survey data into a document with a standard format according to each soil body so as to judge the Grasshopper program;
step S102, converting the geological survey data into a three-dimensional entity model by using a Grasshopper node programming function and parametric modeling;
and step S103, importing the data elevation into a Grasshopper program, and automatically generating a three-dimensional geological model.
It should be noted that the three-dimensional geological modeling method based on the Rhino platform disclosed by the embodiment of the invention converts geological survey data into a three-dimensional solid model by arranging the geological survey data into a document with a standard format according to the depth of each soil body, utilizing the Grasshopper node programming function and carrying out parameterized modeling; and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model. Compared with the prior art, the method can be used repeatedly, greatly accelerates the modeling efficiency and improves the working efficiency.
In particular implementations, the survey data includes borehole depth data and survey point planform data.
In the specific implementation process, the document is an Excel document.
In the specific implementation process, the basic distribution condition, the karst cave position, the top elevation of the karst cave, the bottom elevation of the karst cave and the volume of the karst cave of each soil layer can be obtained in the profile of the three-dimensional geological model.
In the specific implementation process, the pile length can be expressed in the form of pictures through the three-dimensional geological model.
The working principle is as follows: the embodiment of the invention discloses a three-dimensional geological modeling method based on a Rhino platform, which comprises the steps of arranging geological survey data into a document with a standard format according to the depth of each soil body, utilizing Grasshopper node programming function, and converting the geological survey data into a three-dimensional entity model through parameterized modeling; and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model. Compared with the prior art, the method can be used repeatedly, greatly accelerates the modeling efficiency and improves the working efficiency.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the invention.

Claims (5)

1. A three-dimensional geological modeling method based on a Rhino platform is characterized by comprising the following steps:
the geological survey data is deeply arranged into a document with a standard format according to each soil body, so that a Grasshopper program judges;
converting the geological survey data into a three-dimensional entity model by utilizing a Grasshopper node programming function and parametric modeling;
and importing the data elevation into a Grasshopper program to automatically generate a three-dimensional geological model.
2. The Rhino platform-based three-dimensional geological modeling method as recited in claim 1, wherein said geological survey data comprises borehole depth data and survey point planimetric data.
3. The three-dimensional geological modeling method based on the Rhino platform of claim 1, wherein the documents are Excel documents.
4. The three-dimensional geological modeling method based on the Rhino platform as recited in claim 1, wherein basic distribution, cavern position, cavern top elevation, cavern bottom elevation and cavern volume of each soil layer can be obtained in a cross-sectional view of the three-dimensional geological model.
5. The three-dimensional geological modeling method based on the Rhino platform as claimed in claim 1, wherein the pile length can be expressed in the form of pictures through the three-dimensional geological model.
CN202011268942.XA 2020-11-13 2020-11-13 Three-dimensional geological modeling method based on Rhino platform Pending CN112365594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011268942.XA CN112365594A (en) 2020-11-13 2020-11-13 Three-dimensional geological modeling method based on Rhino platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011268942.XA CN112365594A (en) 2020-11-13 2020-11-13 Three-dimensional geological modeling method based on Rhino platform

Publications (1)

Publication Number Publication Date
CN112365594A true CN112365594A (en) 2021-02-12

Family

ID=74515552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011268942.XA Pending CN112365594A (en) 2020-11-13 2020-11-13 Three-dimensional geological modeling method based on Rhino platform

Country Status (1)

Country Link
CN (1) CN112365594A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113468628A (en) * 2021-04-12 2021-10-01 香港华艺设计顾问(深圳)有限公司 Digital automatic generation method for standard nursing unit of hospital building
CN114816381A (en) * 2022-04-21 2022-07-29 中南建筑设计院股份有限公司 Construction engineering MBD three-dimensional labeling method, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108629117A (en) * 2018-05-08 2018-10-09 中国二十二冶集团有限公司 Large-span steel arching surface grids layer Steel Structure modeling method based on Rhino platforms
CN110689615A (en) * 2019-10-18 2020-01-14 中交 (天津) 生态环保设计研究院有限公司 Parameterized three-dimensional geological modeling method and system and information data processing terminal
CN110717214A (en) * 2019-10-18 2020-01-21 中交 (天津) 生态环保设计研究院有限公司 Dredging engineering building parameterized modeling method based on graphical programming
CN110826130A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of BIM modeling in design and construction of special-shaped curved surface structure body
CN110990928A (en) * 2019-12-04 2020-04-10 中南建筑设计院股份有限公司 Software platform-crossing special-shaped space grid structure parameterization design method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108629117A (en) * 2018-05-08 2018-10-09 中国二十二冶集团有限公司 Large-span steel arching surface grids layer Steel Structure modeling method based on Rhino platforms
CN110689615A (en) * 2019-10-18 2020-01-14 中交 (天津) 生态环保设计研究院有限公司 Parameterized three-dimensional geological modeling method and system and information data processing terminal
CN110717214A (en) * 2019-10-18 2020-01-21 中交 (天津) 生态环保设计研究院有限公司 Dredging engineering building parameterized modeling method based on graphical programming
CN110826130A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of BIM modeling in design and construction of special-shaped curved surface structure body
CN110990928A (en) * 2019-12-04 2020-04-10 中南建筑设计院股份有限公司 Software platform-crossing special-shaped space grid structure parameterization design method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李明超;白硕;孔锐;任秋兵;韩帅;田会静;: "工程尺度地质结构三维参数化建模方法", 《岩石力学与工程学报》, vol. 39, no. 1, pages 2848 - 2858 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113468628A (en) * 2021-04-12 2021-10-01 香港华艺设计顾问(深圳)有限公司 Digital automatic generation method for standard nursing unit of hospital building
CN114816381A (en) * 2022-04-21 2022-07-29 中南建筑设计院股份有限公司 Construction engineering MBD three-dimensional labeling method, electronic equipment and storage medium
CN114816381B (en) * 2022-04-21 2024-02-02 中南建筑设计院股份有限公司 Building engineering MBD three-dimensional labeling method, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110222445A (en) Based on BIM and the integrated of design information, collaborative design and delivery method and system
Kutzner et al. CityGML 3.0: New functions open up new applications
CN110704928B (en) Method for converting BIM model into GIS model
Goetz Towards generating highly detailed 3D CityGML models from OpenStreetMap
CN105279792B (en) Railway bed draining BIM design methods based on terrain surface
CN112365594A (en) Three-dimensional geological modeling method based on Rhino platform
van den Brink et al. Establishing a national standard for 3D topographic data compliant to CityGML
CN110069840B (en) Construction method and device of indoor three-dimensional semantic model
CN105320811A (en) Method for establishing topological connected model of urban underground electricity pipe network
CN110543721A (en) indoor location service-oriented navigation network construction method
CN110309618A (en) Modeling method, model building device and the modeling of Building Information Model
CN103093008A (en) System and method for power transmission and transformation project three-dimensional-aided preliminary design
CN110489897B (en) BIM and GIS-based three-dimensional construction site cloth VR panoramic sand table manufacturing method
Eriksson et al. Requirements, development, and evaluation of a national building standard—a Swedish case study
CN105608119A (en) Rapid thematic map drawing technology
CN104008218A (en) Electric power engineering three-dimensional integrated design platform
CN105447253A (en) Three-dimensional process data integration method
Guo et al. The applications and practices of 3D cadastre in Shenzhen
Kolbe et al. CityGML–OGC Standard for Photogrammetry
CN112199750B (en) Multi-format integration method for track traffic construction management and GIS platform
CN112052508A (en) Seamless data fusion method and system in three-dimensional GIS platform
Stoter et al. Considerations for a contemporary 3D cadastre for our times
CN109376404A (en) Build outer profile model generating method, system, device and readable storage medium storing program for executing
KR20160113513A (en) Method for Hierarchical Schema Representation for Road Primary Structures including Tunnel
Fritsch et al. 3D landscape objects for building information models (BIM)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination