CN112342330A - 用于高炉冷却壁的安装方法 - Google Patents
用于高炉冷却壁的安装方法 Download PDFInfo
- Publication number
- CN112342330A CN112342330A CN202011163624.7A CN202011163624A CN112342330A CN 112342330 A CN112342330 A CN 112342330A CN 202011163624 A CN202011163624 A CN 202011163624A CN 112342330 A CN112342330 A CN 112342330A
- Authority
- CN
- China
- Prior art keywords
- cooling wall
- variable
- hanging scaffold
- blast furnace
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Blast Furnaces (AREA)
Abstract
本发明涉及高炉技术领域,尤其涉及一种用于高炉冷却壁的安装方法,该方法通过设置吊耳、可变径圆形吊盘、钢丝绳、葫芦吊构成冷却壁的安装***,可变径圆形吊盘为冷却壁的安装作业平台,当完成一层冷却壁安装后,葫芦吊使可变径圆形吊盘向上移动即可进行上一层冷却壁安装,不再需要一层一层地搭建脚手架平台,降低钢材的使用量,降低了安装的成本,也方便进行冷却壁的安装,提高了安装的效率,同时,通过液压顶推器将冷却壁管道接头推入高炉炉壳上的安装孔中,不再是通过人工推入,降低了工人的劳动强度,进一步提高了冷却壁的安装效率。
Description
技术领域
本发明涉及高炉技术领域,尤其涉及一种用于高炉冷却壁的安装方法。
背景技术
目前,高炉冷却壁的安装是通过在高炉中搭建脚手架平台进行安装,每安装一层冷却壁再搭建下一层冷却壁安装用的脚手架平台,搭建脚手架平台需要使用大量的钢材和时间,导致高炉冷却壁安装成本较高,且效率较低。
发明内容
本发明解决的技术问题是提供一种成本较低、效率较高的高炉冷却壁的安装方法。
本发明解决其技术问题所采用的技术方案是:用于高炉冷却壁的安装方法,包括如下步骤:
a、制作可变径圆形吊盘,可变径圆形吊盘的直径可以变化;
b、制作可旋转式顶推器,可旋转式顶推器包括旋转盘、液压顶推器,液压顶推器水平设置在旋转盘上,且液压顶推器能够在旋转盘上旋转;
c、将可旋转式顶推器可拆卸设置在可变径圆形吊盘上;
d、在炉顶内侧表面上焊接至少两个吊耳,且一根钢丝绳穿过一个吊耳设置;
e、在每根钢丝绳上悬挂一个葫芦吊,并将可变径圆形吊盘悬挂在每个葫芦吊的挂钩上,葫芦吊能够使可变径圆形吊盘上下移动;
f、冷却壁进行安装,吊装设备每次吊装一块待安装的冷却壁,待安装的冷却壁输送到安装位置后,通过液压顶推器将冷却壁管道接头推入高炉炉壳上的安装孔中后,再对冷却壁进行紧固;
通过葫芦吊带动可变径圆形吊盘向上移动,可变径圆形吊盘的直径根据高炉截面直径的大小而变化,液压顶推器根据待安装的冷却壁安装位置而进行变化,冷却壁从下至上一层一层地进行安装,直至所有冷却壁安装完成;
g、冷却壁安装完成后,拆除吊耳、可变径圆形吊盘、可旋转式顶推器、钢丝绳、葫芦吊。
进一步的是,在步骤d中,吊耳的数量为2个或者4个。
进一步的是,在步骤f中,吊装设备为履带吊或者塔吊。
进一步的是,在步骤f中,每层冷却壁进行安装前,先通过4根固定杆对可变径圆形吊盘进行加固,固定杆一端与高炉炉壳相连接,另一端与可变径圆形吊盘相连接。
进一步的是,在步骤f中,相邻两块冷却壁之间设置有间隙板。
本发明的有益效果是:通过设置吊耳、可变径圆形吊盘、钢丝绳、葫芦吊构成冷却壁的安装***,可变径圆形吊盘为冷却壁的安装作业平台,当完成一层冷却壁安装后,葫芦吊使可变径圆形吊盘向上移动即可进行上一层冷却壁安装,不再需要一层一层地搭建脚手架平台,降低钢材的使用量,降低了安装的成本,也方便进行冷却壁的安装,提高了安装的效率,同时,通过液压顶推器将冷却壁管道接头推入高炉炉壳上的安装孔中,不再是通过人工推入,降低了工人的劳动强度,进一步提高了冷却壁的安装效率。
附图说明
图1是本发明的示意图;
标记为:可变径圆形吊盘1、旋转盘2、液压顶推器3、钢丝绳4、葫芦吊5、冷却壁6、高炉炉壳7、固定杆8。
具体实施方式
下面结合附图和具体实施方式对本发明进一步说明。
如图1所示,本发明用于高炉冷却壁的安装方法,包括如下步骤:
a、制作可变径圆形吊盘1,可变径圆形吊盘1的直径可以变化;
b、制作可旋转式顶推器,可旋转式顶推器包括旋转盘2、液压顶推器3,液压顶推器3水平设置在旋转盘2上,且液压顶推器3能够在旋转盘2上旋转;
c、将可旋转式顶推器可拆卸设置在可变径圆形吊盘1上;
d、在炉顶内侧表面上焊接至少两个吊耳,且一根钢丝绳4穿过一个吊耳设置;
e、在每根钢丝绳4上悬挂一个葫芦吊5,并将可变径圆形吊盘1悬挂在每个葫芦吊5的挂钩上,葫芦吊5能够使可变径圆形吊盘1上下移动;
f、冷却壁6进行安装,吊装设备每次吊装一块待安装的冷却壁6,待安装的冷却壁6输送到安装位置后,通过液压顶推器3将冷却壁6管道接头推入高炉炉壳7上的安装孔中后,再对冷却壁6进行紧固;
通过葫芦吊5带动可变径圆形吊盘1向上移动,可变径圆形吊盘1的直径根据高炉截面直径的大小而变化,液压顶推器3根据待安装的冷却壁6安装位置而进行变化,冷却壁6从下至上一层一层地进行安装,直至所有冷却壁6安装完成;
g、冷却壁6安装完成后,拆除吊耳、可变径圆形吊盘1、可旋转式顶推器、钢丝绳4、葫芦吊5。
由于高炉的截面直径的大小是变化的,通常是下端大,上端小,可变径圆形吊盘1作为冷却壁6的安装作业平台,可变径圆形吊盘1的直径可以变化能够使其适用于各层冷却壁6的安装,更进一步,在可变径圆形吊盘1向上移动过程中,可将可变径圆形吊盘1的直径变小,方便其向上移动。
高炉的截面为圆形,一层冷却壁6也就是一圈冷却壁6,液压顶推器3能够在旋转盘2旋转,使得液压顶推器3能够作用于各个位置的冷却壁6安装。
为了保证可变径圆形吊盘1的稳定性,降低其在冷却壁6安装产生晃动的可能性,在步骤d中,吊耳的数量为2个或者4个,使得葫芦吊5的数量也为2个或者4个,葫芦吊5优选为t手扳葫芦,便于使可变径圆形吊盘1上下移动。更进一步,在步骤f中,每层冷却壁6进行安装前,先通过4根固定杆8对可变径圆形吊盘1进行加固,固定杆8一端与高炉炉壳7相连接,另一端与可变径圆形吊盘1相连接,4根固定杆8分布在可变径圆形吊盘1的四周。
在步骤f中,吊装设备为履带吊或者塔吊,液压顶推器3将冷却壁6管道接头推入高炉炉壳7上的安装孔中时应当慢慢推入,避免对冷却壁6造成损害。压顶推器3将冷却壁6管道接头推入高炉炉壳7上的安装孔中后,应当及时把紧套管安装螺帽,并在两块冷却壁6横向和纵向缝隙之间装入间隙板,间隙板固定后,把Ф5mm的嵌压圆钢割成与冷却壁内侧表面平齐。冷却壁6进行紧固步骤为:将冷却壁6的固定节点垫圈与高炉炉壳7焊接好,固定节点的连接螺栓必须均匀把紧,垫板与高炉炉壳7,水管与垫板,螺母与垫板,螺栓与螺母必须层层焊满,不得泄漏煤气。
综上所述,可变径圆形吊盘1作为冷却壁6的安装作业平台,当完成一层冷却壁6安装后,葫芦吊5使可变径圆形吊盘1向上移动即可进行上一层冷却壁6安装,不再需要一层一层地搭建脚手架平台,降低钢材的使用量,降低了安装的成本,也方便进行冷却壁6的安装,提高了安装的效率,同时,通过液压顶推器3将冷却壁6管道接头推入高炉炉壳上的安装孔中,不再是通过人工推入,降低了工人的劳动强度,进一步提高了冷却壁6的安装效率。
Claims (5)
1.用于高炉冷却壁的安装方法,其特征在于:包括如下步骤:
a、制作可变径圆形吊盘(1),可变径圆形吊盘(1)的直径可以变化;
b、制作可旋转式顶推器,可旋转式顶推器包括旋转盘(2)、液压顶推器(3),液压顶推器(3)水平设置在旋转盘(2)上,且液压顶推器(3)能够在旋转盘(2)上旋转;
c、将可旋转式顶推器可拆卸设置在可变径圆形吊盘(1)上;
d、在炉顶内侧表面上焊接至少两个吊耳,且一根钢丝绳(4)穿过一个吊耳设置;
e、在每根钢丝绳(4)上悬挂一个葫芦吊(5),并将可变径圆形吊盘(1)悬挂在每个葫芦吊(5)的挂钩上,葫芦吊(5)能够使可变径圆形吊盘(1)上下移动;
f、冷却壁(6)进行安装,吊装设备每次吊装一块待安装的冷却壁(6),待安装的冷却壁(6)输送到安装位置后,通过液压顶推器(3)将冷却壁(6)管道接头推入高炉炉壳(7)上的安装孔中后,再对冷却壁(6)进行紧固;
通过葫芦吊(5)带动可变径圆形吊盘(1)向上移动,可变径圆形吊盘(1)的直径根据高炉截面直径的大小而变化,液压顶推器(3)根据待安装的冷却壁(6)安装位置而进行变化,冷却壁(6)从下至上一层一层地进行安装,直至所有冷却壁(6)安装完成;
g、冷却壁(6)安装完成后,拆除吊耳、可变径圆形吊盘(1)、可旋转式顶推器、钢丝绳(4)、葫芦吊(5)。
2.如权利要求1所述的用于高炉冷却壁的安装方法,其特征在于:在步骤d中,吊耳的数量为2个或者4个。
3.如权利要求1所述的用于高炉冷却壁的安装方法,其特征在于:在步骤f中,吊装设备为履带吊或者塔吊。
4.如权利要求1所述的用于高炉冷却壁的安装方法,其特征在于:在步骤f中,每层冷却壁(6)进行安装前,先通过4根固定杆(8)对可变径圆形吊盘(1)进行加固,固定杆(8)一端与高炉炉壳(7)相连接,另一端与可变径圆形吊盘(1)相连接。
5.如权利要求1至4任意一项所述的用于高炉冷却壁的安装方法,其特征在于:在步骤f中,相邻两块冷却壁(6)之间设置有间隙板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011163624.7A CN112342330A (zh) | 2020-10-27 | 2020-10-27 | 用于高炉冷却壁的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011163624.7A CN112342330A (zh) | 2020-10-27 | 2020-10-27 | 用于高炉冷却壁的安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112342330A true CN112342330A (zh) | 2021-02-09 |
Family
ID=74359084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011163624.7A Pending CN112342330A (zh) | 2020-10-27 | 2020-10-27 | 用于高炉冷却壁的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112342330A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113549718A (zh) * | 2021-07-19 | 2021-10-26 | 鞍钢建设集团有限公司 | 一种高炉冷却壁的更换方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101509049A (zh) * | 2009-03-27 | 2009-08-19 | 二十三冶建设集团有限公司 | 高炉炉内冷却壁及炉衬的施工方法 |
CN102212630A (zh) * | 2011-05-23 | 2011-10-12 | 北京首钢建设集团有限公司 | 利用活动吊盘的方式更换高炉冷却壁的施工方法 |
JP2011231409A (ja) * | 2011-07-11 | 2011-11-17 | Jfe Steel Corp | シャフト炉型冶金炉のステーブ配置構造 |
CN208472129U (zh) * | 2018-06-26 | 2019-02-05 | 五冶集团上海有限公司 | 一种用于高炉冷却壁更换的伸缩吊盘 |
CN111451764A (zh) * | 2020-05-19 | 2020-07-28 | 中国十七冶集团有限公司 | 一种热风炉下部炉壳与炉内设备交错安装方法 |
-
2020
- 2020-10-27 CN CN202011163624.7A patent/CN112342330A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101509049A (zh) * | 2009-03-27 | 2009-08-19 | 二十三冶建设集团有限公司 | 高炉炉内冷却壁及炉衬的施工方法 |
CN102212630A (zh) * | 2011-05-23 | 2011-10-12 | 北京首钢建设集团有限公司 | 利用活动吊盘的方式更换高炉冷却壁的施工方法 |
JP2011231409A (ja) * | 2011-07-11 | 2011-11-17 | Jfe Steel Corp | シャフト炉型冶金炉のステーブ配置構造 |
CN208472129U (zh) * | 2018-06-26 | 2019-02-05 | 五冶集团上海有限公司 | 一种用于高炉冷却壁更换的伸缩吊盘 |
CN111451764A (zh) * | 2020-05-19 | 2020-07-28 | 中国十七冶集团有限公司 | 一种热风炉下部炉壳与炉内设备交错安装方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113549718A (zh) * | 2021-07-19 | 2021-10-26 | 鞍钢建设集团有限公司 | 一种高炉冷却壁的更换方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103470093B (zh) | 砼烟囱拆除方法 | |
CN112342330A (zh) | 用于高炉冷却壁的安装方法 | |
CN110159057B (zh) | 技改厂房烟筒安装施工方法 | |
CN107916316A (zh) | 一种可以进行整体砌筑的转炉炉衬砖砌筑装置和方法 | |
CN104531931B (zh) | 高炉出铁场下部除尘管道安装方法 | |
CN210266161U (zh) | 一种水平钢顶管内垂直顶升装置 | |
CN106429824B (zh) | 储罐倒装法用提升紧固胀圈的安装方法 | |
CN110512910B (zh) | 一种炼钢主厂房高跨钢结构整体加高安装方法 | |
CN204371359U (zh) | 一种用于隧道水沟电缆槽砼灌注施工的台车 | |
CN103982046A (zh) | 一种屈曲约束支撑的吊装和安装方法 | |
CN107487423B (zh) | 一种船用悬挂式脚手架及其建造方法 | |
CN114278113A (zh) | 一种复杂环境下钢筋混凝土烟囱拆除施工方法 | |
CN206174481U (zh) | 风管及悬挂式安装的风机吊装用起重工具 | |
CN104555833B (zh) | 一种吊装烟囱钢内筒的方法 | |
CN110077963B (zh) | 一种大型罐体的安装方法 | |
CN102494239A (zh) | 一种稀油密封干式煤气柜安装方法 | |
EP3425119B1 (en) | Demolishing an offshore jacket | |
CN108644471B (zh) | 一种大面积水域上的管道滑移运输结构***及其施工方法 | |
JP2007321357A (ja) | 貯槽側板の更新施工法 | |
JP2010242425A (ja) | 鉄塔支持型煙突解体工法 | |
JP6954753B2 (ja) | 管持ち上げ装置 | |
CN113832275B (zh) | 一种不进人更换整圈高炉铜冷却壁的方法 | |
CN220830301U (zh) | 一种煤矿井下电缆吊挂支架 | |
CN213011539U (zh) | 一种alc挂板快速吊装工具 | |
CN221216870U (zh) | 基坑降水井无砂管施工辅助装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210209 |