CN112257150B CN202011117370.5A CN202011117370A CN112257150B CN 112257150 B CN112257150 B CN 112257150B CN 202011117370 A CN202011117370 A CN 202011117370A CN 112257150 B CN112257150 B CN 112257150B
Authority
CN
China
Prior art keywords
raft foundation
plate
reinforcing ribs
foundation
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011117370.5A
Other languages
Chinese (zh)
Other versions
CN112257150A (en
Inventor
王军凯
陈大刚
郭军
黄骥
安吉福
韩宏帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202011117370.5A priority Critical patent/CN112257150B/en
Publication of CN112257150A publication Critical patent/CN112257150A/en
Application granted granted Critical
Publication of CN112257150B publication Critical patent/CN112257150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/12Geometric CAD characterised by design entry means specially adapted for CAD, e.g. graphical user interfaces [GUI] specially adapted for CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention provides a method for finely calculating the reinforcing rib of a raft foundation slab band based on BIM modeling, which is used for establishing a raft foundation component and a shear wall component when BIM modeling is carried out on the raft foundation slab with the reinforcing rib; defining plate and belt reinforcing ribs and setting nodes; elongating the raft foundation to make it exceed the shear wall foundation, forming a raft foundation with an overhanging structure; and arranging the plate and strip reinforcing ribs, arranging the stressed reinforcing bars of the raft foundation after the plate and strip reinforcing ribs are arranged and calculated according to the relevant node setting, and forming a complete three-dimensional model of the stressed reinforcing bars of the raft foundation and the plate and strip reinforcing ribs and obtaining accurate reinforcing steel engineering quantity after the summarized calculation is completed. Aiming at the problem that the existing BIM electric calculation software cannot process complex node building components through conventional functions, the method of the invention enables sporadic irregular complex building components to be drawn through the BIM electric calculation technology through flexible combination and application of a modeling method, and ensures the integrity and accuracy of the steel bar engineering quantity of the building components.

Description

BIM modeling-based raft foundation slab band reinforcing rib refined calculation method
Technical Field
The invention relates to the technical field of underground comprehensive pipe racks, in particular to a raft foundation slab band reinforcing rib refined calculation method based on BIM modeling.
Background
At present, with the development and prosperity of national economic construction, infrastructure engineering is greatly advanced, and particularly, the comprehensive pipe rack engineering funds are huge, so that the control of the engineering cost is particularly important, and the engineering metering work is used as a core foundation link of the engineering cost and is more highly valued. The BIM electric calculation technology changes the manual calculation mode of engineering cost personnel, liberates partial human resources, improves the efficiency of engineering cost, has great positive effect on engineering construction, and better saves cost and controls investment. Various BIM modeling calculation software in the current market is in a state of hundreds of flowers and rings, but is mainly developed and optimized for house construction engineering. In addition, due to the technical development problem of the current underground utility tunnel professional BIM modeling calculation software or the reasons that a software engineer is not familiar with relevant professional engineering specifications and rules to a depth and the like, the development of the professional engineering BIM modeling calculation software function is not thorough enough, and the practical use requirements of engineering participants cannot be met.
Disclosure of Invention
In view of the above, the invention provides a raft foundation slab band reinforcing rib refined calculation method based on BIM modeling, which aims to solve the problem of complex node calculation difficulty of a non-building engineering part during BIM modeling.
In one aspect, the invention provides a method for refining the calculation amount of reinforcing ribs of a raft foundation plate strip based on BIM modeling, when BIM modeling is carried out on the raft foundation plate with the reinforcing ribs, the method comprises the following steps:
according to the design requirement of the drawing, building raft foundation components and shear wall components;
defining plate and belt reinforcing ribs and setting nodes;
after the plate and strip reinforcing rib arrangement calculation is completed and locked, the stressed steel bars of the raft foundation components are arranged, and after the summarized calculation, a complete three-dimensional model of the stressed steel bars of the raft foundation and the plate and strip reinforcing rib steel bars is formed, and accurate steel bar engineering quantity is obtained.
Further, when building the raft foundation member and the shear wall member, the thickness and elevation of the shear wall foundation are the same as those of the raft foundation.
Further, when building the raft foundation member and the shear wall member, the edges of the foundation of the shear wall member are flush with the edges of the raft foundation.
Further, the raft foundation member is divided when building the raft foundation member and the shear wall member.
Further, when dividing the raft foundation member, the range division is performed according to the length of the slab band reinforcing bars within the raft foundation, and the edge portions of the raft foundation are separated from the entire raft foundation, forming the arrangement range of the slab band reinforcing bars.
Further, when the definition and drawing of the plate band reinforcing ribs are performed, attribute editing is performed on the plate band reinforcing ribs.
Further, after attribute editing is performed on the panel band reinforcing ribs, node requirements of the panel band reinforcing ribs are set.
Further, when the joints of the slab band reinforcing bars are arranged, the length of the slab bottom bars extending into the wall member at the lower side of the non-overhanging end part of the raft foundation is modified, and the anchoring length of the reinforcing bars is modified.
Further, after the definition of the plate and strip reinforcing ribs is finished, the plate and strip reinforcing ribs are arranged and summarized, engineering data are acquired, and the plate and strip reinforcing ribs are locked by using a locking function, so that subsequent operation is prevented, and the length of the plate and strip reinforcing ribs is changed.
Further, the raft foundation is elongated according to the design requirement of the drawing so that the raft foundation exceeds the shear wall foundation by 500mm.
Compared with the prior art, the method has the beneficial effects that the problem that the modeling calculation amount of additional reinforcing steel bars such as plate and strip reinforcing ribs can not be performed by a conventional method and functions when BIM electric calculation software in the current market is modeled by flexibly applying BIM modeling and a fine reinforcing steel bar adjusting method is solved. By the method for innovating BIM modeling calculation, the length of the bent anchor of the reinforcing steel bar is edited and adjusted according to the node mark of the drawing, so that BIM modeling is attached to field production practice, and the problem that the existing BIM electric calculation software cannot directly draw and calculate additional reinforcing steel bars such as reinforcing steel bars of a plate and a strip through the existing functions and methods is solved. The complex engineering calculation work is changed into simple and orderly work, the work efficiency is greatly improved, the work intensity of budgeting staff is lightened, accurate engineering quantity data is provided for all parties involved in the construction engineering, the cost and the control investment are effectively saved, and the huge market demand is met.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to designate like parts throughout the figures. In the drawings:
FIG. 1 is a flow chart of a method for refining the amount of reinforcement of a raft foundation slab band modeled by BIM according to an embodiment of the invention;
FIG. 2 is a slab band reinforcing rib node diagram provided by an embodiment of the invention;
fig. 3 is a schematic view of a raft foundation provided by an embodiment of the invention forming a raft foundation without overhanging construction inside a shear wall;
fig. 4 is a schematic view of a raft foundation end node provided by an embodiment of the invention;
FIG. 5 is a schematic diagram of comparing the calculated result of the engineering quantity of the plate and strip reinforcing rib with the nodes of the drawing;
FIG. 6 is a schematic view of an elongated raft foundation shear wall foundation provided by an embodiment of the invention;
fig. 7 is a schematic view of a complete raft foundation reinforcement mesh formed by the long raft foundation reinforcement bars and the plate and strip reinforcement bars provided by the embodiment of the invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other. The invention will be described in detail below with reference to the drawings in connection with embodiments.
As shown in fig. 1, the present embodiment provides a method for refining the amount of reinforcement of a raft foundation slab band based on BIM modeling, when performing BIM modeling on a raft foundation slab with reinforcement, the method includes the following steps:
step one S101: building raft foundation components and shear wall components;
step two S102: defining plate and belt reinforcing ribs and setting nodes;
step three S103: after the plate and strip reinforcing rib arrangement calculation is completed and locked, elongating the raft foundation to exceed the shear wall foundation to form an overhanging-structured raft foundation;
step four, S104: and arranging the whole gluten, the bottom gluten and other stressed steel bars of the raft foundation member, and forming a complete raft foundation stressed steel bar and plate reinforcing steel bar three-dimensional model and obtaining accurate steel bar engineering quantity after summarizing and calculating.
Specifically, according to the design requirements of the drawing, a raft foundation member and a shear wall member are established. When the raft foundation component and the shear wall foundation are established, the thickness and elevation of the shear wall foundation are the same as those of the raft foundation.
In particular, when building raft foundations and shear wall foundations, the edges of the shear wall foundations are flush with the edges of the raft foundations.
Specifically, the raft foundation member is divided when the raft foundation member and the shear wall member are established.
In particular, when dividing the raft foundation member, the range division is performed according to the length of the slab band reinforcing bars within the raft foundation, and the edge portions of the raft foundation are separated from the entire raft foundation, forming the arrangement range of the slab band reinforcing bars.
Specifically, when defining and drawing the plate band reinforcing ribs, attribute editing is performed on the plate band reinforcing ribs.
Specifically, after attribute editing is performed on the panel strip reinforcing ribs, node requirements of the panel strip reinforcing ribs are set.
In particular, when the joints of the slab band reinforcing bars are arranged, the length of the slab bottom bars extending into the wall member at the lower side of the non-overhanging end part of the raft foundation is modified, and the anchoring length of the reinforcing bars is modified.
Specifically, after the definition of the plate and strip reinforcing ribs is finished, the plate and strip reinforcing ribs are arranged and summarized, engineering data are acquired, and then the plate and strip reinforcing ribs are locked by using a locking function, so that subsequent operation is prevented, and the length of the plate and strip reinforcing ribs is changed.
Specifically, the raft foundation is elongated according to the design requirement of the drawing so that the raft foundation exceeds the shear wall foundation by 500mm.
It can be seen that the problem that the modeling calculation of additional reinforcing steel bars such as plate and strip reinforcing steel bars cannot be performed by conventional methods and functions in BIM modeling in the current market is solved by flexibly applying BIM modeling and fine-tuning methods of the reinforcing steel bars. By adopting the method for creating BIM modeling calculation, the length of the bent anchor of the reinforcing steel bar is edited and adjusted according to the node mark of the drawing, so that BIM modeling is attached to field production practice, and the problem that the existing BIM electric calculation software cannot directly draw and calculate additional reinforcing steel bars through the existing functions and methods is solved. The complex engineering calculation work is changed into simple and orderly work, the work efficiency is greatly improved, the work intensity of budgeting staff is reduced, accurate engineering quantity data are provided for all parties involved in construction engineering, the cost and the control investment are effectively saved, the huge market demand is met, the optimization thought of functions of BIM electric calculation software development engineers is provided, and the update of the BIM electric calculation software on the function application is facilitated.
The method of the embodiment aims at the problem that the existing BIM electric calculation software cannot process complex node building components through conventional functions, and aims at drawing sporadic, unconventional and complex building components through BIM electric calculation technology through flexible combination and application of a modeling method, and the integrity and accuracy of the steel bar engineering quantity of the sporadic, unconventional and complex building components are guaranteed. And the BIM electric calculation software development engineer is provided with an optimization idea of the functions of the BIM electric calculation software development engineer, and the BIM electric calculation software development engineer is beneficial to upgrading the BIM electric calculation software on the function application.
When the embodiment is specifically implemented, as shown in fig. 2, the raft foundation member and the wallboard-tape reinforcing ribs are used for finely adjusting the reinforcing steel bars through BIM modeling to meet the requirements of drawing nodes and specifications, so that the accurate data of the concrete engineering quantity of the reinforced template are obtained. And (3) carrying out BIM modeling of reinforced civil engineering integration, carrying out fine splitting on the raft foundation member and the wallboard belt reinforcing rib structure diagram for facilitating the visualization of the model, wherein the raft foundation member and the external wallboard belt reinforcing rib C16@150 extend into the base layer for bending 3820mm, and the board belt reinforcing rib at the bottom of the outer wall is bent up 1460mm (with the thickness of a bottom board of 600 mm). The method can be implemented in the following ways:
1. referring to fig. 3, according to the design requirements of the drawing, firstly, building a raft foundation member and a shear wall member, wherein the foundation thickness and elevation of the shear wall member are equal to those of the raft foundation member, the foundation edge of the shear wall member is equal to the edge of the raft foundation member (the raft foundation member forms a non-overhanging structural edge), then, adopting a dividing function to divide the range according to the length (3820 mm) of the plate-band reinforcing rib in the raft foundation, and separating the edge part of the raft foundation from the integral raft foundation to form the arrangement range of the plate-band reinforcing rib. The method aims at forming the overall shape of the shear wall component and the raft foundation component, and making a vowel for the subsequent arrangement of the plate and strip reinforcing ribs.
2. With reference to fig. 4 and 5, the definition and drawing of the reinforcing ribs of the plate and strip are performed, and as the function of arranging the reinforcing ribs of the traditional software raft foundation has no function of arranging the overhanging structural reinforcing steel bar bending of the wall-contacting member, the purposes of drawing and refining the reinforcing ribs of the plate and strip are achieved indirectly by flexibly utilizing the reinforcing steel bar adjusting function. Firstly, performing attribute editing in the steel bar service attribute, defining a plate and strip reinforcing rib C16@150, changing the length of a plate bottom rib extending into a wall member of a raft foundation end part non-extending lower steel bar structure from 15 x d to 1460mm in the node setting in the steel bar service attribute, and changing the anchoring length of the steel bar extending into an adjacent raft foundation member to 0. After definition is completed, plate and strip reinforcing ribs are arranged at corresponding positions of a modeling interface and are summarized and calculated, a three-dimensional reinforcing steel bar model is formed, corresponding engineering data are obtained, and the plate and strip reinforcing ribs are locked by using a locking function, so that the possibility that the length of the plate and strip reinforcing ribs is changed or the arrangement positions are offset due to subsequent operation is avoided. The step is the core content of the patent, so that the arrangement position, the structural shape and the size of the plate and strip reinforcing ribs completely meet the design requirement of the drawing, the reinforcing steel bars can be displayed in three dimensions, and the engineering quantity can be conveniently checked.
3. Referring to fig. 6, an elongated raft foundation is 500mm over the shear wall foundation, forming an overhanging construction of the raft foundation. This step is to ensure the integrity of the model structure and meet the design requirements of the drawing structure size.
4. And (3) after the plate and strip reinforcing rib arrangement calculation is completed and summarized, the whole gluten, the bottom gluten and other stress reinforcing bars of the raft foundation are arranged, and the calculation is summarized. The step enables the stress bars of the integral raft foundation and the plate and strip reinforcing bars to form a complete raft foundation reinforcing mesh, which is completely consistent with the design requirements of drawings, and ensures the precision requirements and the integrity of engineering quantity.
Specifically, the difficulty of BIM modeling of the underground utility tunnel is that the existing BIM calculation software cannot directly calculate part of scattered components or additional reinforcing steel bars and dynamically display three-dimensionally through the existing modeling function and a conventional method, for example, the engineering quantity of the reinforcing steel bars of the raft foundation slab band of the utility tunnel is generally finished only through a conventional manual calculation mode or calculation results are directly input into the software, and BIM refinement calculation technology cannot be fully embodied, so that the data transmission between the later stage and a BIM5D platform is affected. Aiming at the problems, the embodiment provides an effective drawing and calculating method for the plate and strip reinforcing ribs through repeated practice of continuous exploration and research and comparison with drawings, and ensures that the three-dimensional model of the reinforcing steel bar can meet the requirements of drawing design and standard nodes. Compared with the traditional manual calculation method and a mode of directly inputting calculation results by software, the engineering calculation efficiency is greatly improved, the difference between the budgeted engineering quantity of a construction drawing and the actual field sample-turning is reduced, the short board of the operation function of the existing BIM calculation software is solved, and accurate data support is provided for all parties involved in engineering.
It can be seen that the above embodiment solves the problem that the BIM municipal calculation software in the current market cannot perform modeling calculation of additional reinforcing steel bars such as plate and strip reinforcing steel bars by using the conventional method and function by flexibly applying the BIM modeling and the fine adjustment method of the reinforcing steel bars. With the rapid development of the economy and the great improvement of the comprehensive national force in China, the decision and the confidence of the government decision layer in building the underground comprehensive pipe rack are further promoted. The scale of the currently built comprehensive pipe rack in China is small in combination with the current situation of China, and the current situation of a large gap exists compared with the scale in developed western countries, so that the potential market scale of the urban underground comprehensive pipe rack in China can be seen, once the opportunity is mature, the comprehensive pipe rack can develop at an ultra-conventional speed, and the working quality and efficiency of engineering cost keep up with the rhythm and speed adapting to the development of the comprehensive pipe rack. By the method for creating BIM modeling calculation, the length of the bent anchor of the reinforcing steel bar is edited and adjusted according to the node mark of the drawing, so that BIM modeling is attached to field production practice, and the problem that BIM calculation software cannot directly draw and calculate additional reinforcing steel bars through the existing functions and methods is solved. The complex engineering calculation work is changed into simple and orderly work, the work efficiency is greatly improved, the work intensity of budgeting staff is reduced, accurate engineering quantity data are provided for all parties involved in construction engineering, the cost and the control investment are effectively saved, the huge market demand is met, the optimization thought of functions of BIM electric calculation software development engineers is provided, and the update of the BIM electric calculation software on the function application is facilitated.
It will be appreciated by those skilled in the art that embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical aspects of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the above embodiments, it should be understood by those of ordinary skill in the art that: modifications and equivalents may be made to the specific embodiments of the invention without departing from the spirit and scope of the invention, which is intended to be covered by the claims.

Claims (3)

1. A method for refining a calculation amount of a raft foundation slab band reinforcing rib based on BIM modeling, which is characterized by comprising the following steps when BIM modeling is carried out on a raft foundation slab with the reinforcing rib:
according to the design requirement of the drawing, building raft foundation components and shear wall components;
defining plate and belt reinforcing ribs and setting nodes;
after the plate and strip reinforcing rib arrangement calculation is completed and locked, the stressed steel bars of the raft foundation member are arranged, and after the summarized calculation, a complete three-dimensional model of the stressed steel bars of the raft foundation and the plate and strip reinforcing rib steel bars is formed, and accurate steel bar engineering quantity is obtained;
elongating raft foundation according to drawing design requirement to make it exceed shear wall foundation by 500mm;
when the raft foundation component and the shear wall component are built, the thickness and elevation of the shear wall foundation are the same as those of the raft foundation;
when building the raft foundation member and the shear wall member, the edge of the foundation of the shear wall member is flush with the edge of the raft foundation;
when the definition and the drawing of the plate and strip reinforcing ribs are carried out, carrying out attribute editing on the plate and strip reinforcing ribs;
after attribute editing is carried out on the plate reinforcing ribs, setting node requirements of the plate reinforcing ribs;
when the joints of the plate-band reinforcing bars are arranged, the plate-bottom bars at the lower side of the end parts which are not overhanging to the raft foundation extend into the wall member
Modifying the length of the steel bar and modifying the anchoring length of the steel bar;
after the definition of the plate and strip reinforcing ribs is completed, the plate and strip reinforcing ribs are arranged and summarized and calculated, after engineering data are obtained,
the locking function is used for locking the plate and strip reinforcing ribs, so that subsequent operation is prevented, and the length of the plate and strip reinforcing ribs is changed.
2. A method of refining a raft foundation slab band reinforcement based on BIM modeling according to claim 1, wherein the raft foundation elements are divided when building the raft foundation elements and the shear wall elements.
3. A method for refining the amount of reinforcement of a raft foundation slab band based on BIM modeling according to claim 2, wherein in splitting the raft foundation components, the range splitting is performed according to the length of the slab band reinforcement in the raft foundation, and the edge portions of the raft foundation are separated from the overall raft foundation to form the arrangement range of the slab band reinforcement.
CN202011117370.5A 2020-10-19 2020-10-19 BIM modeling-based raft foundation slab band reinforcing rib refined calculation method Active CN112257150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011117370.5A CN112257150B (en) 2020-10-19 2020-10-19 BIM modeling-based raft foundation slab band reinforcing rib refined calculation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011117370.5A CN112257150B (en) 2020-10-19 2020-10-19 BIM modeling-based raft foundation slab band reinforcing rib refined calculation method

Publications (2)

Publication Number Publication Date
CN112257150A CN112257150A (en) 2021-01-22
CN112257150B true CN112257150B (en) 2024-01-19

Family

ID=74243848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011117370.5A Active CN112257150B (en) 2020-10-19 2020-10-19 BIM modeling-based raft foundation slab band reinforcing rib refined calculation method

Country Status (1)

Country Link
CN (1) CN112257150B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113343333B (en) * 2021-05-21 2022-07-29 中国二十冶集团有限公司 Method and system for finely calculating amount of additional ribs of pipe gallery concrete wall based on BIM technology
CN113378268B (en) * 2021-06-07 2022-11-11 中国二十冶集团有限公司 Underground pipe gallery deformation joint reinforcing steel bar refined electric calculation method and system based on BIM
CN113821851A (en) * 2021-06-25 2021-12-21 中国二十冶集团有限公司 Three-dimensional modeling-based fine adjustment method for reinforcing ribs at corners of pool wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110096800A (en) * 2019-04-30 2019-08-06 中国二十冶集团有限公司 PC rectangular beam and Cast-in-situ Beam realize the method that materials are estimated by BIM
CN110147589A (en) * 2019-04-30 2019-08-20 中国二十冶集团有限公司 PC profiled beam and Cast-in-situ Beam BIM compositional modeling calculation amount method
CN110704932A (en) * 2019-10-09 2020-01-17 北京中外建建筑设计有限公司 Revit software-based prefabricated staircase detailed graph rapid plotting method
CN111008420A (en) * 2019-11-26 2020-04-14 中民筑友有限公司 BIM-based steel bar data generation method, device, equipment and medium
CN111177831A (en) * 2019-12-26 2020-05-19 沈阳工业大学 BIM technology-based steel bar three-dimensional modeling and automatic calculation method
KR20200072176A (en) * 2018-12-12 2020-06-22 주식회사 대성이엔씨 Reinforcing bar classification code usage system and its application method for effective BIM

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200072176A (en) * 2018-12-12 2020-06-22 주식회사 대성이엔씨 Reinforcing bar classification code usage system and its application method for effective BIM
CN110096800A (en) * 2019-04-30 2019-08-06 中国二十冶集团有限公司 PC rectangular beam and Cast-in-situ Beam realize the method that materials are estimated by BIM
CN110147589A (en) * 2019-04-30 2019-08-20 中国二十冶集团有限公司 PC profiled beam and Cast-in-situ Beam BIM compositional modeling calculation amount method
CN110704932A (en) * 2019-10-09 2020-01-17 北京中外建建筑设计有限公司 Revit software-based prefabricated staircase detailed graph rapid plotting method
CN111008420A (en) * 2019-11-26 2020-04-14 中民筑友有限公司 BIM-based steel bar data generation method, device, equipment and medium
CN111177831A (en) * 2019-12-26 2020-05-19 沈阳工业大学 BIM technology-based steel bar three-dimensional modeling and automatic calculation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
常斐等.基于广联达GGJ-2013剪力墙中钢筋细节处理探讨.《四川建材》.2017,第43卷(第05期),正文第1-5节,第237-238页. *

Also Published As

Publication number Publication date
CN112257150A (en) 2021-01-22

Similar Documents

Publication Publication Date Title
CN112257150B (en) BIM modeling-based raft foundation slab band reinforcing rib refined calculation method
CN111177831A (en) BIM technology-based steel bar three-dimensional modeling and automatic calculation method
CN105488301A (en) Three-dimensional reinforcing steel bar lofting method
CN104715117A (en) Method for locating continuous box girder prestressed pipeline based on BIM
CN108416162A (en) A kind of construction method of the spiral formula reinforced concrete structure based on BIM
CN112069564B (en) Basic seriation computer combined modeling adjustment method for rectangular slab continuous casting equipment
CN109977481B (en) Method for creating concrete assembly template and member steel bar based on CATIA
CN112560147B (en) BIM modeling calculation method and system for special-shaped roof lower column structure
CN109306664A (en) A kind of Thin-walled Hollow Pier slide type inner template
CN108829954A (en) A kind of reinforcing bar configuration method based on structural model profile features
CN108629057A (en) A method of generating BIM models
CN106709184A (en) Generation method of inner model curve face of wing wall panel
CN117235844A (en) Tunnel BIM model parameterized modeling method based on Dynamo plugin
CN110135100B (en) Rapid modeling method for tunnel primary support
CN115952231A (en) BIM technology-based foundation pit visualization and earthwork measurement method
CN112417575B (en) BIM combined modeling method and system for special-shaped wall and special-shaped top plate
CN116226970A (en) Method for establishing slope BIM model based on 3DEXPERIENCE platform
CN112647528B (en) BIM-based special-shaped cup opening modeling method and system
CN112035906B (en) Diversified slag flushing ditch inlet electric calculation combined modeling refinement adjustment method
CN112464355A (en) BIM-based modeling method and system for special-shaped roof
CN113505411A (en) Digital formation method of structure construction drawing
CN112560148A (en) BIM-based wall modeling method and system for wall end processing
CN112464356B (en) Modeling method and system for equipment foundation special-shaped bottom plate based on BIM
CN112035914B (en) Outer arc tangent line electric calculation combined modeling refinement adjustment method
CN107133379B (en) Modeling system and method for extra-high voltage tower column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant