CN112184335A - Electric power grid connection method and regulation and control node based on block chain - Google Patents

Electric power grid connection method and regulation and control node based on block chain Download PDF

Info

Publication number
CN112184335A
CN112184335A CN202011173824.0A CN202011173824A CN112184335A CN 112184335 A CN112184335 A CN 112184335A CN 202011173824 A CN202011173824 A CN 202011173824A CN 112184335 A CN112184335 A CN 112184335A
Authority
CN
China
Prior art keywords
grid
node
distributed
distributed power
nodes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011173824.0A
Other languages
Chinese (zh)
Other versions
CN112184335B (en
Inventor
程刚
赵文东
王源野
邹贵祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN202011173824.0A priority Critical patent/CN112184335B/en
Publication of CN112184335A publication Critical patent/CN112184335A/en
Application granted granted Critical
Publication of CN112184335B publication Critical patent/CN112184335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0202Market predictions or forecasting for commercial activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Databases & Information Systems (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Computing Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a block chain-based power grid-connected method and a regulation node, wherein the method comprises the following steps: determining grid-connected electric quantity of the distributed electric power nodes according to rewards acquired by the distributed electric power nodes in the block chain network within a preset time period, the total number of the rewards sent to each distributed electric power node by the regulation and control node within the preset time period and preset maximum grid-connected electric quantity; and sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity. The method can ensure normal power supply of the power nodes, the condition that the power supplied by the power nodes is short or wasted is avoided, the grid-connected efficiency of each distributed power node can be improved to the maximum extent so as to improve the subsequent grid-connected benefit of each distributed power node, the nodes do not need to be concentrated together to carry out power grid connection simultaneously according to a uniform rule, and the operation is simple.

Description

Electric power grid connection method and regulation and control node based on block chain
Technical Field
The invention relates to the technical field of block chain networks, in particular to a block chain-based power grid-connected method and a regulation node.
Background
Distributed power is becoming more and more widely used as the price of electricity production is continually declining. The dispatching of the distributed power has direct influence on the safe, reliable, stable and efficient operation of the power system. Therefore, the design of the efficient and reliable power dispatching optimization method has important significance.
The existing common power grid connection method mainly comprises an intermittent power grid connection method and a centralized power grid connection method. The basic idea of the intermittent power grid-connection method is that power nodes perform power grid-connection at intervals, but the method has the defects that grid-connection cannot be performed according to the actual conditions of the power nodes, and the phenomena of power shortage supplied by the power nodes and power waste supplied by the power nodes are caused. The basic idea of the concentrated power grid-connection method is to concentrate all power nodes together for power grid-connection, but the method has the disadvantage of complicated operability.
Disclosure of Invention
Therefore, the invention provides a block chain-based power grid-connection method and a regulation node, which aim to solve the problems of power supply shortage, power supply waste and complex operability caused by unreasonable grid-connection method in the prior art.
In order to achieve the above object, a first aspect of the present invention provides a power grid connection method based on a block chain, including:
determining grid-connected electric quantity of distributed electric nodes according to rewards acquired by the distributed electric nodes in a block chain network within a preset time period, total number of rewards sent by the regulation and control node to each distributed electric node within the preset time period and preset maximum grid-connected electric quantity;
and sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity.
In some embodiments, the method further comprises:
issuing a computing task in a blockchain network;
receiving a calculation result of the calculation task broadcasted by each distributed power node;
and determining distributed power nodes to be rewarded according to the calculation result, and sending out the rewards to the distributed power nodes to be rewarded.
In some embodiments, the determining, according to the calculation result, a distributed power node to be awarded comprises:
in response to the fact that the calculation results of a plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded;
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
In some embodiments, after the sending the grid-connected power amount to the distributed power nodes, the method further includes:
and determining grid-connected income according to the grid-connected electric quantity and the cost price in the preset time period, and sending the grid-connected income to the distributed power nodes.
In some embodiments, the grid-connected electricity quantity of the distributed power nodes is determined according to the following formula:
Figure BDA0002748140120000021
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtThe total number of rewards sent to each distributed power node by the regulation node in the preset time period is Q (P), which is the preset maximum grid-connected electric quantity, Q (P)j) Is divided intoAnd grid-connected electric quantity of the distributed electric power node j.
In order to achieve the above object, a first aspect of the present invention provides a regulation node based on a blockchain, the regulation node comprising:
the processing module is used for determining grid-connected electric quantity of the distributed electric power nodes according to rewards acquired by the distributed electric power nodes in the block chain network within a preset time period, the total number of the rewards sent to each distributed electric power node by the regulation and control node within the preset time period and preset maximum grid-connected electric quantity;
and the sending module is used for sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity.
In some embodiments, the regulation node further comprises a publishing module and a receiving module;
the issuing module is used for issuing a calculation task in a block chain network;
the receiving module is used for receiving the calculation results of the calculation tasks broadcasted by each distributed power node;
the processing module is further used for determining distributed power nodes to be rewarded according to the calculation result;
the sending module is further used for sending the reward to the distributed power nodes to be rewarded.
In some embodiments, the processing module is to:
in response to the fact that the calculation results of a plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded;
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
In some embodiments, the processing module is further configured to determine grid-connection income according to the grid-connection electric quantity and the cost price within the preset time period;
the sending module is further configured to send the grid-connected benefit to the distributed power nodes.
In some embodiments, the processing module is configured to determine grid-connected power quantities of the distributed power nodes according to the following formula:
Figure BDA0002748140120000031
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtThe total number of rewards sent to each distributed power node by the regulation node in the preset time period is Q (P), which is the preset maximum grid-connected electric quantity, Q (P)j) The grid-connected electric quantity of the distributed electric power node j is obtained.
The invention has the following advantages:
the block chain-based power grid-connection method provided by the embodiment of the invention determines the grid-connection electric quantity of the distributed power nodes according to the rewards acquired by the distributed power nodes in the block chain network within the preset time period, the total number of the rewards sent by the regulation and control node to each distributed power node within the preset time period and the preset maximum grid-connection electric quantity, can distribute the electric quantity according to the actual situation of each distributed power node, and the rewards acquired by the distributed power nodes within the preset time period can reflect the grid-connection capacity of the distributed power nodes, so that the normal power supply of the power nodes can be ensured, the situation of power shortage or waste supplied by the power nodes can not occur, the grid-connection efficiency of each distributed power node can be improved to the maximum extent so as to improve the subsequent grid-connection benefit acquired by each distributed power node, and the grid-connected electric quantity of each distributed electric power node is respectively determined so that each distributed electric power node can carry out electric grid connection according to the grid-connected electric quantity determined by the control node, the nodes do not need to be concentrated together and electric grid connection is carried out simultaneously according to a uniform rule, and the operation is simple.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention.
Fig. 1 is a first flowchart of a block chain-based power grid connection method according to embodiment 1 of the present invention;
fig. 2 is a schematic flow chart of issuing a reward to a distributed power node according to embodiment 2 of the present invention;
fig. 3 is a second flowchart of a block chain-based power grid connection method according to embodiment 3 of the present invention;
fig. 4 is a first schematic structural diagram of a regulation node provided in embodiment 4 of the present invention;
fig. 5 is a schematic structural diagram of a regulation node provided in embodiment 5 of the present invention.
Detailed Description
The following detailed description of embodiments of the invention refers to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the present invention, are given by way of illustration and explanation only, not limitation.
The embodiment of the invention provides a power grid-connected method based on a block chain, which can be applied to a regulation node, and as shown in fig. 1, the method can comprise the following steps:
and 11, determining grid-connected electric quantity of the distributed electric power nodes according to rewards acquired by the distributed electric power nodes in the block chain network within a preset time period, the total number of the rewards sent to the distributed electric power nodes by the regulation and control node within the preset time period and preset maximum grid-connected electric quantity.
The preset maximum grid-connected electric quantity can be the sum of grid-connected electric quantities which can be provided by all distributed electric power nodes in the block chain network.
In the embodiment of the invention, the power local area network in the power supply network mainly comprises a plurality of large distributed power nodes. And the regulation and control node and a plurality of large distributed power nodes also form a block chain network. The regulation and control node is responsible for coordinating and controlling the grid connection of the distributed power nodes, and the safety and the reliability of the power system are ensured. The regulation and control node is used as a central node in the block chain network, the release right of the block chain is shared independently, the calculation task of the new block can be released, and each distributed power node in an idle state in the block chain network can obtain rewards from the regulation and control node by feeding back the calculation result of the calculation task.
And step 12, sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity.
And after the grid-connected electric quantity is sent to the distributed electric power nodes by the regulating and controlling nodes, the distributed electric power nodes carry out electric power grid connection according to the grid-connected electric quantity determined by the regulating and controlling nodes.
It can be seen from the above steps 11 to 12 that, in the block chain-based power grid connection method provided in the embodiment of the present invention, grid-connected power quantities of distributed power nodes are determined according to rewards obtained by the distributed power nodes in the block chain network within a preset time period, the total number of rewards sent by the control node to each distributed power node within the preset time period, and a preset maximum grid-connected power quantity, and power quantities can be distributed according to actual conditions of each distributed power node, respectively, and the rewards obtained by the distributed power nodes within the preset time period can reflect the grid-connected capacity of the distributed power nodes, so that normal power supply of the power nodes can be ensured, the situation of power shortage or waste supplied by the power nodes does not occur, and the grid-connected efficiency of each distributed power node can be improved to the greatest extent so as to improve the grid-connected benefit that each distributed power node can obtain subsequently, and the grid-connected electric quantity of each distributed electric power node is respectively determined so that each distributed electric power node can carry out electric grid connection according to the grid-connected electric quantity determined by the control node, the nodes do not need to be concentrated together and electric grid connection is carried out simultaneously according to a uniform rule, and the operation is simple.
In some embodiments, as shown in fig. 2, the method may further comprise the steps of:
step 21, a computation task is issued in the blockchain network.
The regulating node may periodically issue the computational tasks of the new tiles in the blockchain network.
And step 22, receiving the calculation result of the calculation task broadcasted by each distributed power node.
After the distributed power nodes in the idle state in the block chain network receive the calculation tasks issued by the regulation nodes, the calculation tasks can be completed to obtain calculation results, and the calculation results of the nodes are broadcasted to the block chain network. The regulation and control nodes in the block chain network can receive the calculation results broadcasted by each distributed power node.
And step 23, determining the distributed power nodes to be rewarded according to the calculation result, and sending the rewards to the distributed power nodes to be rewarded.
The regulation and control node can determine distributed power nodes capable of obtaining rewards according to the calculation results of all the distributed power nodes, and then sends corresponding rewards to the distributed power nodes.
In the embodiment of the invention, the calculation task may be a solution of an optimal scheduling plan, the scheduling plan may be a sequence of performing power grid connection on each distributed power node, and an optimal scheduling plan may be determined from the calculation results obtained by respectively solving each distributed power node, so that after grid-connected power is sent to the distributed power nodes, each distributed power node may perform power grid connection according to the sequence in the optimal scheduling plan, thereby avoiding that all distributed power nodes perform power grid connection simultaneously, and simplifying operation complexity of power grid connection.
It should be noted that the computing task may be other types of computing tasks, and the invention is not limited thereto.
In some embodiments, the determining the distributed power node to be awarded according to the calculation result (i.e. step 23) may include:
in response to the fact that the calculation results of a plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded;
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
After each distributed power node broadcasts the calculation result of the node to the block chain network, the regulation and control node can verify the accuracy of each calculation result through a consensus mechanism, and the calculation result with the largest occurrence frequency is used as an accurate calculation result.
For example, there are 5 distributed power nodes in the blockchain network, which are respectively node 1, node 2, node 3, node 4, and node 5, and if the calculation results of node 1 and node 2 are both a, but the calculation results of node 3, node 4, and node 5 are B, C and D, respectively, and the same calculation result is only a at this time, the calculation result a of node 1 and node 2 can be used as an accurate calculation result, and node 1 and node 2 can be used as distributed power nodes to be rewarded. If the calculation results of the node 1, the node 2 and the node 3 are all a, but the calculation results of the node 4 and the node 5 are all B, and at this time, the same calculation results include a and B, but the number of a is the largest, and is 3, the calculation results a of the node 1, the node 2 and the node 3 can be used as accurate calculation results, and the node 1, the node 2 and the node 3 can be used as distributed power nodes to be rewarded.
In some embodiments, as shown in fig. 3, after the grid-connected power amount is sent to the distributed power nodes (i.e. step 12), the method may further include the following steps:
and step 13, determining grid-connected income according to the grid-connected electric quantity and the cost price in a preset time period, and sending the grid-connected income to the distributed power nodes.
Assuming that the update interval of the demand power in the market is Δ T, the preset time period may be Ti~Ti+ Δ t, the regulation node can be based on the grid-connected electricity quantity Q (P) of the distributed power node jj) And Ti~TiDetermining grid-connected benefit sigma (P) of distributed power node j by cost price beta in + delta t time periodj),In particular, it may be according to the formula σ (P)j)=βQ(Pj) And (4) determining.
In some embodiments, the determining, according to the reward obtained by the distributed power nodes in the blockchain network within a preset time period, the total number of rewards sent by the regulation and control node to each distributed power node within the preset time period, and a preset maximum grid-connected power amount (i.e. step 11), the determining the grid-connected power amount of the distributed power nodes may include:
determining grid-connected electric quantity of the distributed electric power nodes according to the following formula:
Figure BDA0002748140120000081
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtFor the regulation and control node in a preset time period Ti~TiThe total number of rewards sent to each distributed power node within + delta t, Q (P), is a preset maximum grid-connected electric quantity, Q (P)j) The grid-connected electric quantity of the distributed electric power node j is obtained.
In the embodiment of the invention, each distributed power node can upload the grid-connected information to a newly generated empty block in the block chain network according to a preset period and link the block to the longest block chain. The grid-connected information may include information of grid-connected electric quantity, grid-connected income, current time and the like of the distributed power nodes in the period. Finally, the newly generated empty block will include a block header and a block body, the block header includes the version number of the current block, the information of the previous block, a timestamp, a merkel (Merkle) root, and the power interaction capacity in the period (i.e., the sum of the actual grid-connected power of each distributed power node), and the block body will include the transaction information in the intelligent contract.
Based on the same technical concept, an embodiment of the present invention further provides a regulation node based on a block chain, as shown in fig. 4, where the regulation node may include:
the processing module 101 is configured to determine grid-connected electric quantity of the distributed electric power nodes according to rewards acquired by the distributed electric power nodes in the block chain network within a preset time period, a total number of rewards sent by the regulation and control node to each distributed electric power node within the preset time period, and a preset maximum grid-connected electric quantity.
The sending module 102 is configured to send the grid-connected electric quantity to the distributed electric power nodes, so that the distributed electric power nodes perform electric power grid connection according to the grid-connected electric quantity.
In some embodiments, as shown in fig. 5, the regulation node may further include a publishing module 103 and a receiving module 104.
The publishing module 103 is configured to publish the computing task in the blockchain network.
The receiving module 104 is configured to receive a calculation result of the calculation task broadcasted by each distributed power node.
The processing module 101 is further configured to determine, according to the calculation result, a distributed power node to be awarded.
The sending module 102 is further configured to send out the reward to the distributed power node to be awarded.
In some embodiments, the processing module 101 is configured to:
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded.
And in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
In some embodiments, the processing module 101 is further configured to determine grid-connection income according to the grid-connection electric quantity and the cost price within a preset time period.
The sending module 102 is further configured to send grid-connection benefits to the distributed power nodes.
In some embodiments, the processing module 101 is configured to determine grid-connected power of the distributed power nodes according to the following formula:
Figure BDA0002748140120000091
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtThe total number of rewards sent to each distributed power node by the regulation node in a preset time period is Q (P), the preset maximum grid-connected electric quantity is Q (P)j) The grid-connected electric quantity of the distributed electric power node j is obtained.
It will be understood that the above embodiments are merely exemplary embodiments taken to illustrate the principles of the present invention, which is not limited thereto. It will be apparent to those skilled in the art that various modifications and improvements can be made without departing from the spirit and substance of the invention, and these modifications and improvements are also considered to be within the scope of the invention.

Claims (10)

1. A power grid-connection method based on a block chain is characterized by comprising the following steps:
determining grid-connected electric quantity of distributed electric nodes according to rewards acquired by the distributed electric nodes in a block chain network within a preset time period, total number of rewards sent by the regulation and control node to each distributed electric node within the preset time period and preset maximum grid-connected electric quantity;
and sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity.
2. The method of claim 1, wherein the method further comprises:
issuing a computing task in a blockchain network;
receiving a calculation result of the calculation task broadcasted by each distributed power node;
and determining distributed power nodes to be rewarded according to the calculation result, and sending out the rewards to the distributed power nodes to be rewarded.
3. The method of claim 2, wherein determining distributed power nodes to be rewarded based on the calculation comprises:
in response to the fact that the calculation results of a plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded;
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
4. The method of claim 1, wherein after the sending the grid-tied power amount to the distributed power nodes, the method further comprises:
and determining grid-connected income according to the grid-connected electric quantity and the cost price in the preset time period, and sending the grid-connected income to the distributed power nodes.
5. The method according to any one of claims 1 to 4, wherein the grid-connected electricity quantity of the distributed power nodes is determined according to the following formula:
Figure FDA0002748140110000021
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtThe total number of rewards sent to each distributed power node by the regulation node in the preset time period is Q (P), which is the preset maximum grid-connected electric quantity, Q (P)j) The grid-connected electric quantity of the distributed electric power node j is obtained.
6. A blockchain-based regulation node, the regulation node comprising:
the processing module is used for determining grid-connected electric quantity of the distributed electric power nodes according to rewards acquired by the distributed electric power nodes in the block chain network within a preset time period, the total number of the rewards sent to each distributed electric power node by the regulation and control node within the preset time period and preset maximum grid-connected electric quantity;
and the sending module is used for sending the grid-connected electric quantity to the distributed electric power nodes so that the distributed electric power nodes can carry out electric power grid connection according to the grid-connected electric quantity.
7. The regulation node of claim 6, wherein the regulation node further comprises a publishing module and a receiving module;
the issuing module is used for issuing a calculation task in a block chain network;
the receiving module is used for receiving the calculation results of the calculation tasks broadcasted by each distributed power node;
the processing module is further used for determining distributed power nodes to be rewarded according to the calculation result;
the sending module is further used for sending the reward to the distributed power nodes to be rewarded.
8. The regulation node of claim 7, wherein the processing module is to:
in response to the fact that the calculation results of a plurality of distributed power nodes are the same and the same calculation result is one, taking the plurality of distributed power nodes as distributed power nodes to be rewarded;
and in response to the fact that the calculation results of the plurality of distributed power nodes are the same and the same calculation results are multiple, determining the same calculation result with the largest number, and taking the distributed power node corresponding to the same calculation result with the largest number as the distributed power node to be rewarded.
9. The control node according to claim 6, wherein the processing module is further configured to determine grid-connection revenue according to the grid-connection electricity quantity and the cost price within the preset time period;
the sending module is further configured to send the grid-connected benefit to the distributed power nodes.
10. The control node according to any one of claims 6 to 9, wherein the processing module is configured to determine the grid-connected electricity quantity of the distributed power node according to the following formula:
Figure FDA0002748140110000031
wherein, coinjReward, coin, for a distributed power node j to obtain within a preset time periodΔtThe total number of rewards sent to each distributed power node by the regulation node in the preset time period is Q (P), which is the preset maximum grid-connected electric quantity, Q (P)j) The grid-connected electric quantity of the distributed electric power node j is obtained.
CN202011173824.0A 2020-10-28 2020-10-28 Power grid-connected method based on block chain and regulation node Active CN112184335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011173824.0A CN112184335B (en) 2020-10-28 2020-10-28 Power grid-connected method based on block chain and regulation node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011173824.0A CN112184335B (en) 2020-10-28 2020-10-28 Power grid-connected method based on block chain and regulation node

Publications (2)

Publication Number Publication Date
CN112184335A true CN112184335A (en) 2021-01-05
CN112184335B CN112184335B (en) 2024-03-05

Family

ID=73916134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011173824.0A Active CN112184335B (en) 2020-10-28 2020-10-28 Power grid-connected method based on block chain and regulation node

Country Status (1)

Country Link
CN (1) CN112184335B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377733A (en) * 2014-11-26 2015-02-25 武汉大学 Distributed power source multi-point dynamic connecting-in optimization distribution method
CN109034480A (en) * 2018-07-31 2018-12-18 湘潭大学 A kind of interconnection microgrid distributed optimization dispatching method based on intelligent contract
CN109494810A (en) * 2017-09-12 2019-03-19 国网吉林省电力有限公司 Dispatch evaluation method and the power limiting distribution method of the evaluation in intermittent energy source power station
KR20190058013A (en) * 2017-11-21 2019-05-29 홍익대학교 산학협력단 HILS development system of ESS and operation method of ESS using the same
WO2020055411A1 (en) * 2018-09-13 2020-03-19 General Electric Company Systems and methods for rapidly responding to commanded power profiles
CN111008795A (en) * 2020-03-09 2020-04-14 国网电子商务有限公司 Block chain-based power dispatching system data processing method and device
CN111178682A (en) * 2019-12-10 2020-05-19 国网天津市电力公司 Control method of demand response management platform based on block chain technology
CN111275578A (en) * 2020-02-17 2020-06-12 海南电网有限责任公司电力科学研究院 Dispatching automation system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377733A (en) * 2014-11-26 2015-02-25 武汉大学 Distributed power source multi-point dynamic connecting-in optimization distribution method
CN109494810A (en) * 2017-09-12 2019-03-19 国网吉林省电力有限公司 Dispatch evaluation method and the power limiting distribution method of the evaluation in intermittent energy source power station
KR20190058013A (en) * 2017-11-21 2019-05-29 홍익대학교 산학협력단 HILS development system of ESS and operation method of ESS using the same
CN109034480A (en) * 2018-07-31 2018-12-18 湘潭大学 A kind of interconnection microgrid distributed optimization dispatching method based on intelligent contract
WO2020055411A1 (en) * 2018-09-13 2020-03-19 General Electric Company Systems and methods for rapidly responding to commanded power profiles
CN111178682A (en) * 2019-12-10 2020-05-19 国网天津市电力公司 Control method of demand response management platform based on block chain technology
CN111275578A (en) * 2020-02-17 2020-06-12 海南电网有限责任公司电力科学研究院 Dispatching automation system
CN111008795A (en) * 2020-03-09 2020-04-14 国网电子商务有限公司 Block chain-based power dispatching system data processing method and device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
徐斌 等: "间歇性能源优先调度评价模型研究", 《电气工程学报》, vol. 12, no. 12, 25 December 2017 (2017-12-25), pages 45 - 51 *
王冠男;杨镜非;王硕;端凌立;张嘉;武雅桐;: "考虑EV换电站调度和区块链数据存储的电网分布式优化", 电力***自动化, no. 08, 25 April 2019 (2019-04-25), pages 110 - 116 *
邵炜晖 等: "基于区块链的虚拟电厂模型研究", 《计算机科学》, vol. 45, no. 2, pages 25 - 31 *

Also Published As

Publication number Publication date
CN112184335B (en) 2024-03-05

Similar Documents

Publication Publication Date Title
CN106844916B (en) Power generation and power utilization organization method and device based on peak regulation auxiliary service market
KR20150029120A (en) Device for generating optimal scheduling model about virtual power plant, and method of generating optimal management model using the same
US11029652B2 (en) Systems, methods and devices for managing/controlling energy production and/or energy storage systems
CN102156815A (en) Method for optimizing power generation plan in mode of tracing scheduling of annual electric quantity progress
WO2007024508A1 (en) Aggregation of distributed energy resources
CN108462175A (en) A kind of electric heating equipment demand response interactive approach, system and device
CN110163689A (en) Excitation calculation method based on the unilateral virtual plant system bidded of user side
CN110707758A (en) Distributed energy storage system scheduling method for improving new energy consumption
Li et al. A coordinated peak shaving strategy using neural network for discretely adjustable energy-intensive load and battery energy storage
CN110543696A (en) Method for enabling unmodeled small unit to participate in clearing and safety check of power market
CN114243691A (en) Low-carbon optimized scheduling method for power system
CN117526454B (en) Virtual power plant operation management method, device and storage medium
CN112184335A (en) Electric power grid connection method and regulation and control node based on block chain
CN110190635A (en) More power dispatching station AGC of frequency modulation assisted hatching are supported to unify frequency modulation control methods, devices and systems
CN112184069A (en) Electric power grid connection method and regulation and control node based on block chain
CN112348274B (en) Electric power spot market clearing method, system, equipment and medium considering peak shaving
CN115994626B (en) Power transmission line maintenance method and device, computer equipment and medium
JP7474368B2 (en) Power management system, power management server, control device, and power management method
CN117439171A (en) Intelligent scheduling method, system and medium based on virtual power plant
JP2012198889A (en) Systems and methods for generating bill
TWI725606B (en) Distributed electric energy management method for electric vehicle charging station
CN103187730B (en) Advanced control method related to automatic generation control
CN110929959A (en) Power grid local depth peak regulation cost allocation method
CN112803401B (en) Regulation and control method and device of virtual distributed energy cluster and terminal equipment
CN210428523U (en) Energy management gateway and energy network system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant