CN112116332A - Task management system and method for wind tunnel test of aerospace aerodynamic technology - Google Patents

Task management system and method for wind tunnel test of aerospace aerodynamic technology Download PDF

Info

Publication number
CN112116332A
CN112116332A CN202011043500.5A CN202011043500A CN112116332A CN 112116332 A CN112116332 A CN 112116332A CN 202011043500 A CN202011043500 A CN 202011043500A CN 112116332 A CN112116332 A CN 112116332A
Authority
CN
China
Prior art keywords
task
test
information
project
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011043500.5A
Other languages
Chinese (zh)
Inventor
逯瑶
刘丽荣
梁继良
赵春学
张丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Youxuan Intelligent Technology Co ltd
Original Assignee
Suzhou Youxuan Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Youxuan Intelligent Technology Co ltd filed Critical Suzhou Youxuan Intelligent Technology Co ltd
Priority to CN202011043500.5A priority Critical patent/CN112116332A/en
Publication of CN112116332A publication Critical patent/CN112116332A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The task management system and the task management method for the wind tunnel test of the aerospace aerodynamic technology provided by the embodiment of the invention comprise a login module, a task management module and a task management module, wherein the login module is used for receiving login information of a user so as to log in a corresponding user account; the management module is used for initiating a project or a task and issuing the task to a designated person; the system is also used for viewing the detailed information of the project or task initiated by the current user and the detailed information of the project or task sent to the current user; the test module is used for issuing starting instruction information to corresponding personnel and equipment in the field collaborative test process and monitoring the progress of each task and the running condition of the equipment; and the large-screen display module is used for displaying the progress of the current project or the current task being executed and shared cooperation information used in the multi-position cooperation test process, and providing a management and cooperation tool for personnel participating in the task test.

Description

Task management system and method for wind tunnel test of aerospace aerodynamic technology
Technical Field
The invention relates to the technical field of aviation tests, in particular to a task management system and method for a wind tunnel test of an aerospace aerodynamic technology.
Background
The wind tunnel experiment refers to an aerodynamic experiment method for arranging an aircraft or other object model in a wind tunnel, researching gas flow and interaction between the gas flow and the model, and knowing aerodynamic characteristics of the actual aircraft or other objects. During the aerospace aerodynamic research, wind tunnel tests are carried out, and the existing wind tunnel tests establish a whole set of flow of project test task book assignment, scheme formulation, model assembly, balance calibration and blowing field cooperative management.
However, as the wind tunnel test batches are gradually increased, the current test process is only managed by paper files and oral transmission, and the test process is difficult to transmit instantly, so that the problems of low coordination efficiency, inconvenience in information search, difficulty in tracing historical documents and the like are caused.
Therefore, how to establish a digital wind tunnel test management and control information scheme for establishing multiple batches of tasks provides management and cooperation tools for personnel participating in task tests, and better solves the problems of remote maintenance and the paperless operation requirement.
Disclosure of Invention
The embodiment of the invention provides a task management system and method for a wind tunnel test of an aerospace aerodynamic technology, which are used for providing management and cooperation tools for personnel participating in the task test.
The embodiment of the invention provides a task management system for a wind tunnel test of an aerospace aerodynamic technology, which comprises:
the login module is used for receiving login information of a user so as to log in a corresponding user account;
the management module is used for initiating a project or a task and issuing the task to a designated person, wherein the project comprises one or more tasks; the system is also used for viewing the detailed information of the project or task initiated by the current user and the detailed information of the project or task sent to the current user;
the test module is used for issuing starting instruction information to corresponding personnel and equipment in the field collaborative test process and monitoring the progress of each task and the running condition of the equipment;
and the large-screen display module is used for displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation test process.
Further, still include:
the resource module is used for checking hardware resources and software resources used in the test process;
a scale module to view first details of a scale for use in a project or task, the first details including: designing load, sensitivity, characteristic dimension and balance production process information, wherein the balance production process information comprises processing information, pasting information, static comparison information and dynamic correction information.
Further, still include:
the project viewing module is used for viewing the second detailed information of the current project; the second detailed information comprises task information included in the current project, the current progress of the current project and a designated execution team group of the current project;
the task viewing module is used for viewing the third detailed information of the current task; the third detailed information comprises the project of the current task, the current progress of the current task and the appointed execution team of the current task.
Further, still include:
the data storage module is used for storing project information and task information initiated by the user account;
and the data management module is used for inquiring historical task information or project information.
Further, still include: a user setting module;
the user setting module includes:
the user account operating unit is used for adding or deleting a user account;
and the authority setting unit is used for setting the authority to the target account.
Further, still include: a system setting module;
the system setting module specifically comprises one or more of the following units:
the user role configuration unit is used for configuring a user account and a corresponding user group by a user;
the authority menu configuration is used for configuring the authority of departments, teams and individuals;
the department configuration unit is used for configuring the number of groups and the authority of the department;
the test type maintenance configuration unit is used for maintaining the test types;
the large-screen data resetting configuration unit is used for resetting the large-screen shared data to an initial state;
the user modifying password unit is used for modifying the password of the user account;
the data modification unit is used for modifying the basic data of the user account;
the business group configuration unit is used for configuring the business group to departments;
and the service personnel configuration unit is used for configuring the service personnel to the service group.
Further, the test item phase information includes at least one of the following states: the device comprises a preparation state, a state to be blown, a blowing state, a blowing ending state and a finishing state.
Further, still include:
the node changing module is used for recording at least one of the following forms according to the completion condition of the current task: the system comprises a test task coordination record form, a test task review confirmation form, a test planning book, a balance measurement and control preparation form, a test model preparation form, a first blowing confirmation form and a data checking record form;
the test module is also used for changing test parameters, project information and workers on duty in the test process.
Further, still include: the assessment module is used for counting task completion amounts of departments, groups and individuals in a preset time period, wherein the departments comprise one or more groups, and the groups comprise one or more individuals;
the assessment module comprises:
the department assessment unit is used for counting whether the task completion amount of each department in a preset time period is greater than a first threshold value;
the team assessment unit is used for counting whether the task completion amount of each team in a preset time period is greater than a second threshold value;
and the individual assessment unit is used for counting whether the task completion amount of each person in the preset time period is greater than a third threshold value.
On the other hand, an embodiment of the present invention provides a task management method for an aerospace aerodynamic technology wind tunnel test, which is applied to any one of the task management systems for an aerospace aerodynamic technology wind tunnel test described above, and includes:
receiving login information of a user so as to log in a corresponding user account;
initiating a project or a task, and issuing the task to a designated person, wherein the project comprises one or more tasks;
sending indication information for starting appointed personnel and equipment to start a test; modifying the personnel information of the current test team and group in the process of the on-site multi-station cooperative test after the test starts, and modifying the test project stage information from the start to the end of the test;
and displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation experiment process.
The task management system and the method for the wind tunnel test of the aerospace aerodynamic technology provided by the embodiment of the invention electronically initiate the project and the task of the wind tunnel test through the login module and the management module, push the project and the task to the appointed personnel, after sending the indication information for starting the appointed personnel and starting the test of the equipment, the appointed personnel modify the information of the current team post personnel in the field multi-post cooperation test process after the test is started, modify the test project stage information from the beginning to the end of the test, thereby realizing the information electronization of the wind tunnel test, and the large-screen display module displays the progress of the current project or the current task being executed and the shared cooperation information used in the multi-post cooperation test process, thereby being convenient for the working personnel to write the task and providing the management and cooperation tools for the personnel participating in the task test, the network tracking statistical mode can realize paperless project progress recording of operators in the test process, and can count the work progress of the updated personnel in real time, so that the cost can be reduced, the work efficiency can be improved, fine service management and large service volume promotion can be supported, and the problems of remote maintenance and paperless operation can be solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of a user configuration module of a task management system for an aerospace aerodynamic wind tunnel test according to an embodiment of the present invention;
fig. 5 is a schematic diagram of a system configuration module of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
FIG. 6 is a schematic diagram of an assessment module of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
FIG. 7 is a use interaction diagram of a task management system for an aerospace aerodynamic wind tunnel test according to an embodiment of the present invention;
fig. 8 is a flowchart of a task management method for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention;
fig. 9 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The task management system for the wind tunnel test of the aerospace aerodynamic technology according to the embodiment of the invention is described below with reference to fig. 1 to 6.
Fig. 1 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention; fig. 2 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention; fig. 3 is a schematic structural diagram of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention; FIG. 4 is a schematic diagram of a user configuration module of a task management system for an aerospace aerodynamic wind tunnel test according to an embodiment of the present invention; fig. 5 is a schematic diagram of a system configuration module of a task management system for an aerospace aerodynamic technology wind tunnel test according to an embodiment of the present invention; fig. 6 is a schematic structural diagram of an assessment module of a task management system for a wind tunnel test in an aerospace aerodynamic technology according to an embodiment of the present invention.
The embodiment of the invention provides a task management system 100 for a wind tunnel test of an aerospace aerodynamic technology, which comprises:
a login module 110, configured to receive login information of a user so as to log in to a corresponding user account;
the management module 120 is used for initiating a project or a task and issuing the task to a designated person, wherein the project comprises one or more tasks; the system is also used for viewing the detailed information of the project or task initiated by the current user and the detailed information of the project or task sent to the current user;
the test module 130 is used for issuing starting instruction information to corresponding personnel and equipment in the field collaborative test process and monitoring the progress of each task and the running condition of the equipment;
and the large-screen display module 140 is used for displaying the progress of the current project or the current task being executed and shared collaboration information used in the multi-position collaboration testing process.
Of course, the above-mentioned functional modules are not all functional modules in the embodiment of the present invention, and other application modules may be dynamically adjusted and expanded according to the requirement of service development. Specifically, the large-screen display module 140 displays on a large screen, so that the large screen can be hung in different comprehensive offices, and is convenient for people to check; the assigned personnel can receive the issued tasks through the terminal computer, certainly can also receive the tasks through other personal terminals, the comprehensive information is displayed on the large screen, the progress is not limited to the personal task, and the large screen display module 140 is a functional module of the system, can be displayed independently and can also be opened for the individual to browse at the terminal. The test item phase information includes at least one of the following states: the device comprises a preparation state, a state to be blown, a blowing state, a blowing ending state and a finishing state.
The project is built based on the current paper test flow of the wind tunnel test, a more convenient working environment is provided for users by providing a humanized function in the building process, the project is particularly suitable for solving the management problem of multiple batches of tasks of the wind tunnel test of the aerospace aerodynamic technology, the design of the system is mainly designed according to the project, the task initiation, the receiving, the blowing, the execution, the statistics and the like in the time dimension, the business activities mainly comprise the project initiation, the project task management, the project resource management, the project communication and cooperation and the like, system managers can give different user operation authorities according to requirements, and the users can check related working information according to the authorities.
Furthermore, in order to facilitate online checking of the resource condition of the current wind tunnel test, a resource module 150 may be further configured to check hardware resources and software resources used in the test process; a scale module 160 for viewing first details of a scale for use in a project or task, the first details comprising: designing load, sensitivity, characteristic dimension and balance production process information, wherein the balance production process information comprises processing information, pasting information, static comparison information and dynamic correction information.
Specifically, the resource module is equivalent to a machine account, and the module maintains software and hardware data resources required in the process of executing the test project and the task, and specifically includes: balance, strut, joint, support; these are all hardware, and basic information and performance information of the hardware and production and maintenance process data of the resource, i.e., history information, are maintained. Of course, the resources also include: public drawings, calculation formula numbers and other software resources.
Furthermore, in order to facilitate the user to view the current project and the current task, the following steps can be set: a project viewing module 170 for viewing second detailed information of the current project; the second detailed information comprises task information included in the current project, the current progress of the current project and a designated execution team group of the current project; the task viewing module 180 is used for viewing the third detailed information of the current task; the third detailed information comprises the project of the current task, the current progress of the current task and the appointed execution team of the current task.
In another embodiment of the present invention, in order to facilitate retrieval of the history data, it may further be configured to: the data storage module 190 is configured to store project information and task information initiated by the user account, for example, data summary generated and generated in a test process and a post cooperation process provides functions of viewing, tracing, exporting, archiving and the like; and a data management module 1100, configured to query historical task information or project information. Specifically, each user can release projects and tasks and track task stages according to business requirements through existing rules of the wind tunnel platform, and can call various required data and historical documents from the system.
Certainly, the user who can log in the task management system needs to be managed, for example, when the employee enters the job, the account can be added, and when the employee leaves the job, the account can be deleted, so that the consistency of the user account and the staff is guaranteed. Specifically, a user setting module 1110 may be configured to add or delete a user account and set a user right; the user setting module 1110 includes: a user account operation unit 1111 configured to add or delete a user account; a right setting unit 1112, configured to set a right to the target account.
In addition, in order to conveniently set all the configurable options of the task management system, a special system configuration module 1120 may be configured to comprehensively configure the system; the system setting module 1120 specifically includes one or more of the following units: a user role configuration unit 1121, which configures a user account and a corresponding user group; a permissions menu configuration 1122 to configure the permissions of departments, teams, and individuals; a department configuration unit 1123, configured to configure the number of teams and department rights of the department; a test type maintenance configuration unit 1124 for maintaining test types; a large screen data reset configuration unit 1125 for resetting the large screen shared data to an initial state; a user modified password unit 1126 for modifying the password of the user account; a data modification unit 1127, configured to modify basic data of the user account; a business group configuration unit 1128, configured to configure the business group to a department; an attendant configuration unit 1129 for configuring an attendant to the service group. Of course, other situations that can be set up in the system are also possible and are not listed here.
Specifically, in the process of performing the task, the condition of the task needs to be recorded, and at this time, the node change module 1130 may be used to change the node of the task, specifically, the node change module is configured to record at least one of the following forms according to the completion condition of the current task: the system comprises a test task coordination record form, a test task review confirmation form, a test planning book, a balance measurement and control preparation form, a test model preparation form, a first blowing confirmation form and a data checking record form. Of course, there may be other nodes and files corresponding to the nodes that need to be filled in by the task performer, for example, a live photograph of the task and live participants may be taken, so that the administrator may conveniently view the task on line.
Of course, the test module 130 may also be used to change the test parameters, the project information and the working personnel on duty during the test process, so as to implement the on-line indication function during the test process.
On the basis of the above embodiment, in this embodiment, in order to facilitate the administrator to check the task completion status of each department, team, and individual, the following may be further set: and the assessment module 1140 is used for counting the task completion amount of departments, groups and individuals in a preset time period, wherein the departments comprise one or more groups, and the groups comprise one or more individuals.
Specifically, the assessment module comprises: a department assessment unit 1141, configured to count whether a task completion amount of each department within a preset time period is greater than a first threshold; the team assessment unit 1142 is used for counting whether the task completion amount of each team in a preset time period is greater than a second threshold value; and the individual assessment unit 1143 is used for counting whether the task completion amount of each person in the preset time period is greater than a third threshold value.
That is, the manager can input the time period by himself, inquire about task completion conditions of the door team and the individual within the time period, and if the threshold task amount is not reached, the task can be realized by using red or other highlighted colors, so that the manager can conveniently supervise the tasks.
Referring to fig. 7, fig. 7 is a usage interaction diagram of a task management system for an aerospace aerodynamic wind tunnel test according to an embodiment of the present invention.
In this embodiment, the user 701 logs into the task management system through a browser, creates a new blowing project, and issues a preparation task, the browser requests a new project and task to the JAVA background, and writes data into the UXDB database, reads data from the UXDB database, and send the published items and tasks to the designated person, designated person 702 receives instructions at the browser side and completes the task, when the project and the task are completed, the state of the project can be switched, the node table is filled according to the progress of the task, after all tasks in the project are completed, the project is ended, at this time, the node table filled by the appointed personnel is sent to the JAVA background through the browser, a modification request is sent to change the project and the task, and storing the changed items, task information and the like into a UXDB database, reading data and ending the blowing item after the writing is finished.
The task management method for the wind tunnel test of the aerospace aerodynamic technology provided by the embodiment of the invention is described below, and the task management method for the wind tunnel test of the aerospace aerodynamic technology described below and the task management system for the wind tunnel test of the aerospace aerodynamic technology described above can be referred to correspondingly.
Referring to fig. 8, fig. 8 is a flowchart of a task management method for an aerospace aerodynamic wind tunnel test according to an embodiment of the present invention.
The embodiment of the invention provides a task management method for a wind tunnel test of an aerospace aerodynamic technology, which is applied to a task management system for the wind tunnel test of the aerospace aerodynamic technology in any one of the embodiments, and comprises the following steps:
step S81: receiving login information of a user so as to log in a corresponding user account;
step S82: initiating a project or a task, and issuing the task to a designated person, wherein the project comprises one or more tasks;
step S83: sending indication information for starting appointed personnel and equipment to start a test; modifying the personnel information of the current test team and group in the process of the on-site multi-station cooperative test after the test starts, and modifying the test project stage information from the start to the end of the test;
step S84: and displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation experiment process.
The embodiment of the invention provides a task management system and a task management method for a wind tunnel test of an aerospace aerodynamic technology, the project and task of the wind tunnel test are initiated electronically through the login module and the management module and are pushed to appointed personnel, after the instruction information for starting the appointed personnel and equipment to start the test is sent, the appointed personnel modifies the personnel information of the current test team and team in the process of the on-site multi-station cooperative test after the test is started, modifies the test project stage information from the start to the end of the test, thereby realizing the electronization of the information of the wind tunnel test, displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation test process by the large-screen display module, therefore, the writing task can be conveniently performed by the staff, and a management and cooperation tool is provided for the staff participating in the task test.
Fig. 9 illustrates a physical structure diagram of an electronic device, and as shown in fig. 9, the electronic device may include: a processor (processor)910, a communication Interface (Communications Interface)920, a memory (memory)930, and a communication bus 940, wherein the processor 910, the communication Interface 920, and the memory 930 communicate with each other via the communication bus 940. Processor 910 may invoke logic instructions in memory 930 to perform a method of task management for an aerospace aerodynamic tunnel test, the method comprising: receiving login information of a user so as to log in a corresponding user account; initiating a project or a task, and issuing the task to a designated person, wherein the project comprises one or more tasks; sending indication information for starting appointed personnel and equipment to start a test; modifying the personnel information of the current test team and group in the process of the on-site multi-station cooperative test after the test starts, and modifying the test project stage information from the start to the end of the test; and displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation experiment process.
Furthermore, the logic instructions in the memory 930 may be implemented in software functional units and stored in a computer readable storage medium when the logic instructions are sold or used as independent products. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
In another aspect, an embodiment of the present invention further provides a non-transitory computer-readable storage medium, on which a computer program is stored, where the computer program is implemented by a processor to execute the task management method for an aerospace aerodynamic wind tunnel test provided in each of the above embodiments, where the method includes: receiving login information of a user so as to log in a corresponding user account; initiating a project or a task, and issuing the task to a designated person, wherein the project comprises one or more tasks; sending indication information for starting appointed personnel and equipment to start a test; modifying the personnel information of the current test team and group in the process of the on-site multi-station cooperative test after the test starts, and modifying the test project stage information from the start to the end of the test; and displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation experiment process.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A task management system for a wind tunnel test of an aerospace aerodynamic technology is characterized by comprising:
the login module is used for receiving login information of a user so as to log in a corresponding user account;
the management module is used for initiating a project or a task and issuing the task to a designated person, wherein the project comprises one or more tasks; the system is also used for viewing the detailed information of the project or task initiated by the current user and the detailed information of the project or task sent to the current user;
the test module is used for issuing starting instruction information to corresponding personnel and equipment in the field collaborative test process and monitoring the progress of each task and the running condition of the equipment;
and the large-screen display module is used for displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation test process.
2. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising:
the resource module is used for checking hardware resources and software resources used in the test process;
a scale module to view first details of a scale for use in a project or task, the first details including: designing load, sensitivity, characteristic dimension and balance production process information, wherein the balance production process information comprises processing information, pasting information, static comparison information and dynamic correction information.
3. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising:
the project viewing module is used for viewing the second detailed information of the current project; the second detailed information comprises task information included in the current project, the current progress of the current project and a designated execution team group of the current project;
the task viewing module is used for viewing the third detailed information of the current task; the third detailed information comprises the project of the current task, the current progress of the current task and the appointed execution team of the current task.
4. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising:
the data storage module is used for storing project information and task information initiated by the user account;
and the data management module is used for inquiring historical task information or project information.
5. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising: a user setting module;
the user setting module includes:
the user account operating unit is used for adding or deleting a user account;
and the authority setting unit is used for setting the authority to the target account.
6. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising: a system setting module;
the system setting module specifically comprises one or more of the following units:
the user role configuration unit is used for configuring a user account and a corresponding user group by a user;
the authority menu configuration is used for configuring the authority of departments, teams and individuals;
the department configuration unit is used for configuring the number of groups and the authority of the department;
the test type maintenance configuration unit is used for maintaining the test types;
the large-screen data resetting configuration unit is used for resetting the large-screen shared data to an initial state;
the user modifying password unit is used for modifying the password of the user account;
the data modification unit is used for modifying the basic data of the user account;
the business group configuration unit is used for configuring the business group to departments;
and the service personnel configuration unit is used for configuring the service personnel to the service group.
7. The task management system for an aerospace aerodynamic technology wind tunnel test of claim 1, wherein the test project phase information comprises at least one of: the device comprises a preparation state, a state to be blown, a blowing state, a blowing ending state and a finishing state.
8. The task management system for an aerospace aerodynamic technology wind tunnel test according to claim 1, further comprising:
the node changing module is used for recording at least one of the following forms according to the completion condition of the current task: the system comprises a test task coordination record form, a test task review confirmation form, a test planning book, a balance measurement and control preparation form, a test model preparation form, a first blowing confirmation form and a data checking record form;
the test module is also used for changing test parameters, project information and workers on duty in the test process.
9. The task management system for an aerospace aerodynamic technology wind tunnel test according to any one of claims 1 to 8, further comprising: the assessment module is used for counting task completion amounts of departments, groups and individuals in a preset time period, wherein the departments comprise one or more groups, and the groups comprise one or more individuals;
the assessment module comprises:
the department assessment unit is used for counting whether the task completion amount of each department in a preset time period is greater than a first threshold value;
the team assessment unit is used for counting whether the task completion amount of each team in a preset time period is greater than a second threshold value;
and the individual assessment unit is used for counting whether the task completion amount of each person in the preset time period is greater than a third threshold value.
10. A task management method for an aerospace aerodynamic technology wind tunnel test is applied to the task management system for the aerospace aerodynamic technology wind tunnel test according to any one of claims 1 to 9, and is characterized by comprising the following steps:
receiving login information of a user so as to log in a corresponding user account;
initiating a project or a task, and issuing the task to a designated person, wherein the project comprises one or more tasks;
sending indication information for starting appointed personnel and equipment to start a test; modifying the personnel information of the current test team and group in the process of the on-site multi-station cooperative test after the test starts, and modifying the test project stage information from the start to the end of the test;
and displaying the progress of the current project or the current task being executed and the shared cooperation information used in the multi-position cooperation experiment process.
CN202011043500.5A 2020-09-28 2020-09-28 Task management system and method for wind tunnel test of aerospace aerodynamic technology Pending CN112116332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011043500.5A CN112116332A (en) 2020-09-28 2020-09-28 Task management system and method for wind tunnel test of aerospace aerodynamic technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011043500.5A CN112116332A (en) 2020-09-28 2020-09-28 Task management system and method for wind tunnel test of aerospace aerodynamic technology

Publications (1)

Publication Number Publication Date
CN112116332A true CN112116332A (en) 2020-12-22

Family

ID=73797264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011043500.5A Pending CN112116332A (en) 2020-09-28 2020-09-28 Task management system and method for wind tunnel test of aerospace aerodynamic technology

Country Status (1)

Country Link
CN (1) CN112116332A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113033671A (en) * 2021-03-29 2021-06-25 武汉艺洁环保科技有限公司 Laboratory process management auxiliary system
CN113688179A (en) * 2021-08-16 2021-11-23 北京科豆加速器科技有限公司 User data management system based on front-end APP and back-end platform
CN116147878A (en) * 2023-04-14 2023-05-23 中国空气动力研究与发展中心设备设计与测试技术研究所 Large-scale low-temperature wind tunnel safety interlocking method, device and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109814840A (en) * 2018-12-17 2019-05-28 北京机电工程研究所 A kind of customizable collaborative design and development platform for supporting resource quickly to apply and method
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109814840A (en) * 2018-12-17 2019-05-28 北京机电工程研究所 A kind of customizable collaborative design and development platform for supporting resource quickly to apply and method
CN110599007A (en) * 2019-08-28 2019-12-20 西安市创新人才研究院 Project progress management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
强喆: "基于C/S的风洞试验数据信息管理***的设计与实现", 中国优秀硕士学位论文全文数据库 信息科技辑, vol. 2019, no. 01, pages 4 - 60 *
邹琼芬 等: "风洞试验信息管理***的开发与应用", 中国空气动力学会测控技术专委会第六届四次学术交流会论文集, pages 1 - 6 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113033671A (en) * 2021-03-29 2021-06-25 武汉艺洁环保科技有限公司 Laboratory process management auxiliary system
CN113688179A (en) * 2021-08-16 2021-11-23 北京科豆加速器科技有限公司 User data management system based on front-end APP and back-end platform
CN116147878A (en) * 2023-04-14 2023-05-23 中国空气动力研究与发展中心设备设计与测试技术研究所 Large-scale low-temperature wind tunnel safety interlocking method, device and storage medium
CN116147878B (en) * 2023-04-14 2023-07-28 中国空气动力研究与发展中心设备设计与测试技术研究所 Large-scale low-temperature wind tunnel safety interlocking method, device and storage medium

Similar Documents

Publication Publication Date Title
CN112116332A (en) Task management system and method for wind tunnel test of aerospace aerodynamic technology
US9679038B2 (en) Systems and methods for construction field management and operations with building information modeling
JP5475203B1 (en) Workflow management apparatus and workflow management method
US20140279628A1 (en) Systems and methods of managing employee teams
CN109214784A (en) A kind of method, client, server and the system of fire-fighting inspection management
WO2010109331A1 (en) Systems and methods for managing organizational information
CN112801607A (en) Management service platform and construction method
CN114138639A (en) Robot process automation management system and method
CN112070388A (en) Petrochemical engineering supervision, inspection, detection and consultation management system
CN102945628A (en) Accident consequence information acquiring method, device and training system
CN102710546A (en) Instant communication data processing method based on institutional framework
US20140278658A1 (en) Systems and methods for cloning employee teams
CN104778545A (en) Work task management system based on mobile equipment
CN116664060A (en) Method, system and device for generating expense reimbursement basic data
CN110210761A (en) Structure adjusting is matched and information management system
CN109683860A (en) A kind of computer software project management platform, equipment and readable storage medium storing program for executing
CN111353760B (en) Personnel account management method, device and system applied to enterprise
CN114691337A (en) Digital factory production management system
CN112541030A (en) Intelligent patrol management tool based on mobile platform
CN111950024A (en) System platform capable of realizing electronic material management
CN111899144A (en) Government affair management method and device, storage medium and electronic equipment
CN111953583A (en) Information processing system and method, electronic device, and computer-readable storage medium
CN110782218A (en) Rail transit design contact method, system, device and storage medium
TWI778861B (en) System and method of analyzing employee attitude based on user behavior of enterprise messages
CN114255005A (en) Middle platform service management system based on business scene and activity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination