CN112110300B - Electric power communication construction pay off rack - Google Patents

Electric power communication construction pay off rack Download PDF

Info

Publication number
CN112110300B
CN112110300B CN202010952948.2A CN202010952948A CN112110300B CN 112110300 B CN112110300 B CN 112110300B CN 202010952948 A CN202010952948 A CN 202010952948A CN 112110300 B CN112110300 B CN 112110300B
Authority
CN
China
Prior art keywords
rack
workbench
rod
rotating shaft
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010952948.2A
Other languages
Chinese (zh)
Other versions
CN112110300A (en
Inventor
张阳
张鑫
刘涛
刘双喜
王世强
孙爱东
黄志新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010952948.2A priority Critical patent/CN112110300B/en
Publication of CN112110300A publication Critical patent/CN112110300A/en
Application granted granted Critical
Publication of CN112110300B publication Critical patent/CN112110300B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/40Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material mobile or transportable
    • B65H75/403Carriage with wheels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/02Arrangements for removing spent cores or receptacles and replacing by supply packages at paying-out stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a power communication construction pay-off rack which comprises a moving wheel and a bottom plate, wherein the moving wheel is installed at the bottom of the bottom plate, a supporting block, a handrail and a lifting mechanism are installed on the bottom plate, the handrail is installed at one end of the bottom plate, the supporting block is installed at one end, close to the handrail, of the bottom plate, the lifting mechanism is installed at the other end of the bottom plate, a workbench is installed on the lifting mechanism, and one end of the workbench is installed on the supporting block. The lifting mechanism can drive one end of the workbench to lift, and is matched with the action of the supporting plate, so that a worker can conveniently convey the cable roller to the fixing mechanism, the labor intensity of the worker is reduced, the working efficiency is improved, the fixing mechanism can fix the cable roller, the normal rotation of the cable roller is guaranteed, the paying-off efficiency is improved, the working efficiency is improved, the cable on the cable roller can be straightened by the straightening mechanism, the worker can conveniently lay the cable, and the working efficiency is greatly improved.

Description

Electric power communication construction pay off rack
Technical Field
The invention belongs to the technical field of paying off, and particularly relates to a paying off rack for power communication construction.
Background
Electric power engineering, i.e. engineering related to the production, transmission, distribution of electric energy, also broadly includes engineering of electricity as a power and energy source for applications in various fields. Meanwhile, the method can be understood to the transmission and transformation business expansion project. Electric power, a form of energy, has many advantages such as easy conversion, convenient transportation, easy control, convenient use, cleanliness, and economy. The insufficient power seriously hinders the development of national economy. Experience in all countries around the world shows that the development speed of power generation is higher than that of other departments so as to promote the coordinated development of national economy, so the power industry is also called "forerunner" of national economy.
The existing pay-off rack for power communication construction has the following defects: in power communication's work progress, people often use dedicated wire defense device to lay the cable conductor to make things convenient for people to carry out further electric power construction, but current power communication construction pay off rack is inconvenient goes up unloading to the cable roller, and can not follow the line to the cable conductor, the practicality is relatively poor.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, and provides a pay-off rack for power communication construction.
In order to achieve the purpose, the invention adopts the technical scheme that:
the utility model provides an electric power communication construction pay off rack, is including removing wheel and bottom plate, remove the wheel and install supporting shoe, handrail and elevating system in the bottom of bottom plate, install the one end at the bottom plate at the handrail, the supporting shoe is installed and is close to the one end of handrail on the bottom plate, elevating system installs the other end at the bottom plate, installs the workstation on elevating system, the one end of workstation is installed on the supporting shoe, the other end is installed on elevating system, installs hangers and installation piece on the workstation, the installation piece is installed at the top of workstation, and installs the mechanism of following the line on the installation piece, the one end at the workstation is installed to the hangers, and installs the backup pad on the hangers, and it has the bar groove to open on the lateral wall of workstation, the internally mounted in bar groove has fixed establishment.
Preferably, the fixed block is installed to the one end bottom of workstation, the fixed block passes through the fixed axle and is connected with the supporting shoe rotation, the installation piece is equipped with two, and two installation piece symmetries are installed on two lateral walls of workstation, and the workstation can guarantee the normal operating of unwrapping wire roller, has improved work efficiency, has guaranteed construction quality.
Preferably, the fairing mechanism comprises a first rotating shaft, a second rotating shaft, a first connecting rod, a second connecting rod, a first rotating shaft, a second rotating shaft, two mounting discs and three fairing rollers, one end of the first rotating shaft is mounted on one mounting block, one end of the first connecting rod is rotatably mounted on the first rotating shaft, the other end of the first connecting rod is mounted on the first rotating shaft, the other end of the first rotating shaft is mounted on one mounting disc, the three fairing rollers are mounted between the two mounting discs and rotatably connected with the two mounting discs, one end of the second rotating shaft is mounted on the other mounting block, one end of the second connecting rod is rotatably mounted on the second rotating shaft, the other end of the second connecting rod is mounted on the second rotating shaft, the other end of the second rotating shaft is mounted on the other mounting disc, and the fairing mechanism can straighten bent cables, so that the cable erection efficiency is greatly improved, the labor intensity of workers is reduced, and the working efficiency is improved.
Preferably, the lifting mechanism comprises two fixed seats, a rotating handle, a first sliding block, a second sliding block, a first supporting rod, a second supporting rod and two mounting seats, the two fixed seats are symmetrically mounted on two sides of the bottom plate, two guide rods and a first threaded rod are mounted between the two fixed seats, one end of the first threaded rod is mounted at the center of one fixed seat, the other end of the first threaded rod penetrates through the center of the other fixed seat and extends to the outer side of the fixed seat, the first threaded rod and the second threaded rod are connected with the rotating handle, the two guide rods are symmetrically mounted on two sides of the first threaded rod, two ends of the guide rods are fixedly connected with the two fixed seats, the first sliding block and the second sliding block are symmetrical about the center line of the guide rods, threaded holes and two through holes are formed in the middle parts of the first sliding block and the second sliding block, the rotating directions of the threaded holes are opposite, and the threaded holes in the first sliding block and the second sliding block are in threaded fit with the first threaded rod, two through-holes cooperate with two guide arms, the bottom at the workstation is evenly installed to two mount pads, the one end and the first slider of first bracing piece rotate to be connected, the other end rotates with one of them mount pad to be connected, the one end and the second slider of second bracing piece rotate to be connected, the other end rotates with another mount pad to be connected, and elevating system can drive the one end of workstation and go up and down, and the effect of cooperation backup pad makes things convenient for the worker to carry the fixed establishment department with the cable rod, greatly reduced staff's intensity of labour, improved work efficiency.
Preferably, the bar groove is equipped with two, and two bar groove evenly distributed are on the both sides wall of workstation, and fixing device's normal work can be guaranteed in the bar groove, and can play the effect of protection fixed establishment, has improved fixed establishment's safety greatly, has guaranteed the normal clear of unwrapping wire, has improved work efficiency greatly.
Preferably, fixing mechanism is equipped with two, two fixing mechanism and two bar groove one-to-one, and fixing mechanism can be fixed to the cable rod, has guaranteed the normal work of cable rod, has improved work efficiency.
Preferably, the fixing mechanism comprises a guide rod, a second threaded rod, a support frame, a rotating handle and a support frame, the guide rod is arranged in the strip-shaped groove, the upper end and the lower end of the guide rod are fixedly arranged on the upper side wall and the lower side wall of the strip-shaped groove, the second threaded rod is arranged in the strip-shaped groove and one side of the guide rod, one end of the second threaded rod is arranged at the bottom of the strip-shaped groove and is rotatably connected with the strip-shaped groove, the other end of the second threaded rod penetrates through the top of the strip-shaped groove and is connected with the rotating handle, the support frame is provided with a mounting hole and a threaded hole, the mounting hole is matched with the guide rod, the threaded hole is in threaded fit with the second threaded rod, a connecting shaft is arranged on the support frame, the support frame is provided with a driving motor, the driving motor is fixedly arranged at one side of the support frame, and a first rack, a second rack, a driving gear and a driven gear are arranged in the support frame, one end of the connecting shaft is fixedly arranged on the supporting frame, the other end of the connecting shaft penetrates through the bracket and extends to the other side of the bracket, the first rack and the second rack are arranged on two sides of the driven gear, the driven gear is arranged on the connecting shaft and is meshed with the first rack and the second rack, the driving gear is arranged on an output shaft of the driving motor and is meshed with the driven gear, two waist-shaped grooves are formed in the bracket, a first fixing rod is arranged on the first rack, one end of the first fixing rod is arranged on the first rack, the other end of the first fixing rod penetrates through one of the waist-shaped grooves and extends to the outer side of the bracket, a second fixing rod is arranged on the second rack, one end of the second fixing rod is arranged on the second rack, and the other end of the second fixing rod penetrates through the other waist-shaped groove and extends to the outer side of the bracket; the fixing mechanism can fix the cable roller, and can prevent the cable roller from falling off during operation on the premise of ensuring normal rotation of the cable roller, so that the paying-off efficiency is greatly improved, and the working efficiency is improved.
Preferably, still install the conveyer belt on the workstation, the conveyer belt is installed on the bottom plate of workstation, and with the backup pad cooperatees, and the setting up of conveyer belt is convenient to carry fixed establishment department with the cable roller, greatly reduced intensity of labour, improved work efficiency.
The invention has the beneficial effects that:
1) this device elevating system can drive the one end of workstation and go up and down, the effect of cooperation backup pad makes things convenient for the staff to carry the cable roller fixed establishment on, staff's intensity of labour has been reduced, work efficiency is improved, fixed establishment can be fixed with the cable roller, the normal rotation of cable roller has been guaranteed, pay-off efficiency has been improved, thereby work efficiency has been improved, it can straighten the cable conductor pressure on the cable roller to follow the straight line mechanism, thereby make things convenient for the staff to lay, work efficiency has been improved greatly.
2) The fixed block is installed to the one end bottom of this device workstation, the fixed block rotates through pivot and supporting shoe to be connected, the installation piece is equipped with two, and two installation piece symmetries are installed on two lateral walls of workstation, and the workstation can guarantee the normal operating of unwrapping wire roller, has improved work efficiency, has guaranteed construction quality.
3) The cable straightening mechanism can straighten the bent cable, greatly improves the cable erecting efficiency, reduces the labor intensity of workers and improves the working efficiency.
4) This device elevating system can drive the one end lift of workstation, and the effect of cooperation backup pad makes things convenient for the worker to organize the personnel and carries fixed establishment department with the cable rod, greatly reduced staff's intensity of labour, improved work efficiency.
5) This device bar groove is equipped with two, and two bar groove evenly distributed are on the both sides wall of workstation, and fixing device's normal work can be guaranteed in the bar groove, and can play the effect of protection fixed establishment, has improved fixed establishment's safety greatly, has guaranteed the normal clear of unwrapping wire, has improved work efficiency greatly.
6) The fixing mechanisms correspond to the two strip-shaped grooves one by one, and can fix the cable rod, so that the normal work of the cable rod is ensured, and the working efficiency is improved; the fixing mechanism can fix the cable roller, and can prevent the cable roller from falling off during operation on the premise of ensuring normal rotation of the cable roller, so that the paying-off efficiency is greatly improved, and the working efficiency is improved.
7) The conveying belt is further installed on the workbench, the conveying belt is installed on the bottom plate of the workbench, the conveying belt is matched with the supporting plate, the cable roller is conveniently conveyed to the fixing mechanism through the conveying belt, labor intensity is greatly reduced, and working efficiency is improved.
Drawings
FIG. 1 is a schematic structural view of a pay-off stand for power communication construction.
Fig. 2 is a schematic structural view of the lifting mechanism of the present invention.
FIG. 3 is a schematic structural diagram of the fairing mechanism of the present invention.
Fig. 4 is a schematic structural view of the fixing mechanism of the present invention.
Fig. 5 is an installation view of the first and second racks in the present invention.
FIG. 6 is a schematic structural view of the stent of the present invention.
Fig. 7 is a schematic view of the present invention in a configuration for mounting a cable roll.
In the figure: 1. a moving wheel; 2. a base plate; 3. a lifting mechanism; 301. a first support bar; 302. rotating the handle; 303. a fixed seat; 304. a first slider; 305. a second slider; 306. a guide bar; 307. a second support bar; 308. a mounting seat; 4. a support plate; 5. hanging a lug; 6. a conveyor belt; 7. a line arranging mechanism; 701. a first rotating shaft; 702. a first link; 703. a first rotating shaft; 704. an in-line roller; 705. mounting a disc; 706. a second rotating shaft; 707. a second link; 708. a second rotating shaft; 8. mounting blocks; 9. a fixing mechanism; 901. rotating the handle; 902. a second threaded rod; 903. a guide bar; 904. a support frame; 905. a support; 906. a first rack; 907. a second fixing bar; 908. a drive motor; 909. a first fixing lever; 9010. a second rack; 9011. a driven gear; 9012. a driving gear; 9013. a connecting shaft; 10. a handrail; 11. a strip-shaped groove; 12. a support block; 13. a fixed block; 14. and fixing the shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to fig. 1 to 7, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, are merely for convenience of description of the present invention, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Example 1
A pay-off stand for power communication construction comprises a moving wheel 1 and a bottom plate 2, wherein the moving wheel 1 is arranged at the bottom of the bottom plate 2, a supporting block 12, an armrest 10 and a lifting mechanism 3 are arranged on the bottom plate 2, the armrest 10 is arranged at one end of the bottom plate 2, the supporting block 12 is arranged at one end of the bottom plate 2 close to the handrail 10, the lifting mechanism 3 is arranged at the other end of the bottom plate 2, a workbench is arranged on the lifting mechanism 3, one end of the workbench is arranged on the supporting block 12, the other end is arranged on the lifting mechanism 3, the working table is provided with a hanging lug 5 and a mounting block 8, the mounting block 8 is arranged at the top of the working table, and a thread arranging mechanism 7 is arranged on the mounting block 8, the hanging lug 5 is arranged at one end of the workbench, a supporting plate 4 is arranged on the hanging lug 5, a strip-shaped groove 11 is formed in the side wall of the workbench, and a fixing mechanism 9 is installed inside the strip-shaped groove 11; this device elevating system 3 can drive the one end of workstation and go up and down, the effect of cooperation backup pad 4 makes things convenient for the staff to carry the cable roller on the fixed establishment 9, staff's intensity of labour has been reduced, work efficiency is improved, fixed establishment 9 can be fixed the cable roller, the normal rotation of cable roller has been guaranteed, the efficiency of paying-off has been improved, thereby work efficiency has been improved, it can straighten the cable conductor pressure on the cable roller to follow traditional thread binding putting 7, thereby make things convenient for the staff to lay, work efficiency is greatly improved.
Fixed block 13 is installed to the one end bottom of workstation, fixed block 13 rotates with supporting shoe 12 through fixed axle 14 to be connected, installation piece 8 is equipped with two, and two installation pieces 8 symmetry are installed on two lateral walls of workstation, and the workstation can guarantee the normal operating of unwrapping wire roller, has improved work efficiency, has guaranteed construction quality.
The following line mechanism 7 comprises a first rotating shaft 701, a second rotating shaft 708, a first connecting rod 702, a second connecting rod 707, a first rotating shaft 703, a second rotating shaft 706, two mounting discs 705 and three following line rollers 704, wherein one end of the first rotating shaft 701 is mounted on one of the mounting blocks 8, one end of the first connecting rod 702 is rotatably mounted on the first rotating shaft 701, the other end of the first rotating shaft 703 is mounted on the first rotating shaft 703, the other end of the first rotating shaft 703 is mounted on one of the mounting discs 705, the three following line rollers 704 are mounted between the two mounting discs 705 and are rotatably connected with the two mounting discs 705, one end of the second rotating shaft 708 is mounted on the other mounting block 8, one end of the second connecting rod 707 is rotatably mounted on the second rotating shaft 708, the other end of the second connecting rod 707 is mounted on the second rotating shaft 706, and the other end of the second rotating shaft 706 is mounted on the other mounting disc 705, the straightening mechanism 7 can straighten the bent cable, so that the cable erection efficiency is greatly improved, the labor intensity of workers is reduced, and the working efficiency is improved.
During operation, the cable penetrates out of the three wire arranging rollers 704, so that the purpose of straightening the cable is achieved, the wire laying efficiency is improved, and the working efficiency is improved
The lifting mechanism 3 comprises two fixed seats 303, a rotating handle 302, a first sliding block 304, a second sliding block 305, a first supporting rod 301, a second supporting rod 307 and two installation seats 308, the two fixed seats 303 are symmetrically installed at two sides of the bottom plate 2, two guide rods 306 and a first threaded rod are installed between the two fixed seats 303, one end of the first threaded rod is installed at the center of one fixed seat 303, the other end of the first threaded rod penetrates through the center of the other fixed seat 303 to extend to the outer side of the fixed seat 303 and is connected with the rotating handle 302, the two guide rods 306 are symmetrically installed at two sides of the first threaded rod, two ends of each guide rod 306 are fixedly connected with the two fixed seats 303, the first sliding block 304 and the second sliding block 305 are symmetrical about the center line of each guide rod 306, threaded holes and two through holes are formed in the middles of the first sliding block 304 and the second sliding block 305, and the rotation directions of the threaded holes are opposite, threaded holes in the first sliding block 304 and the second sliding block 305 are in threaded fit with the first threaded rod, two through holes are matched with the two guide rods 306, the two installation seats 308 are uniformly installed at the bottom of the workbench, one end of the first supporting rod 301 is rotatably connected with the first sliding block 304, the other end of the first supporting rod 301 is rotatably connected with one of the installation seats 308, one end of the second supporting rod 307 is rotatably connected with the second sliding block 305, the other end of the second supporting rod is rotatably connected with the other installation seat 308, the lifting mechanism 3 can drive one end of the workbench to lift, and the fixing mechanism 9 is conveniently conveyed by workers under the action of the supporting plate 4, so that the labor intensity of the workers is greatly reduced, and the working efficiency is improved.
Wherein, when needs install the cable roller on the device, the staff drives first threaded rod through rotating rotatory handle 302 and rotates, first threaded rod rotates and drives first slider 304 and second slider 305 outwards simultaneously, thereby realize driving the one end decline of workstation, then rotate backup pad 4 and make backup pad 4 slope place in one side of workstation, and the bottom and the ground contact of backup pad 4, the staff pushes the cable roller into the fixed establishment 9 department on the workstation from backup pad 4, through the fixed establishment 9 fixed cable roller, reset the workstation through rotatory handle 302 of staff upset at last, reach the purpose of cable roller installation.
The bar groove 11 is equipped with two, and two bar groove 11 evenly distributed are on the both sides wall of workstation, and fixing device's normal work can be guaranteed in bar groove 11, and can play the effect of protection fixed establishment 9, has improved fixed establishment 9's safety greatly, has guaranteed the normal clear of unwrapping wire, has improved work efficiency greatly.
Fixing mechanism 9 is equipped with two, two fixing mechanism 9 and two bar grooves 11 one-to-one, and fixing mechanism 9 can be fixed to the cable rod, has guaranteed the normal work of cable rod, has improved work efficiency.
Fixing mechanism 9 includes guide bar 903, second threaded rod 902, support frame 904, twist grip 901, support 905, guide bar 903 is installed in bar groove 11, and the upper and lower both ends fixed mounting of guide bar 903 is on the upper and lower both sides wall of bar groove 11, second threaded rod 902 is installed in bar groove 11, one side of guide bar 903, and the one end of second threaded rod is installed in the bottom of bar groove 11 to rotate with bar groove 11 and be connected, the other end runs through the top of bar groove 11 and is connected with twist grip 901, it has mounting hole and screw hole to open on the support frame 904, and the mounting hole cooperatees with guide bar 903, screw hole and second threaded rod 902 screw-thread fit, installs connecting axle 9013 on support frame 904, install driving motor 908 on support frame 905, driving motor 908 fixed mounting is in one side of support 905, and the internally mounted of support frame 905 has first rack 906, second rack 906, One end of the connecting shaft 9013 is fixedly mounted on the supporting frame 904, the other end of the connecting shaft 9013 penetrates through the support 905 and extends to the other side of the support 905, the first rack 906 and the second rack 9010 are mounted on two sides of the driven gear 9011, the driven gear 9011 is mounted on the connecting shaft 9013 and is meshed with the first rack 906 and the second rack 9010, the driving gear is mounted on an output shaft of the driving motor 908 and is meshed with the driven gear 9011, the support 905 is provided with two waist-shaped grooves, the first rack 906 is provided with a first fixing rod, one end of the first fixing rod 909 is mounted on the first rack 906, the other end of the first fixing rod 909 penetrates through one of the waist-shaped grooves and extends to the outer side of the support 905, the second rack 9010 is provided with a second fixing rod 907, one end of the second fixing rod 907 is mounted on the second rack 9010, The other end extends to the outer side of the bracket 905 by penetrating through the other waist-shaped groove; fixing mechanism 9 can be fixed the cable roller, guarantees under the cable roller normal pivoted prerequisite, can also prevent that the cable roller from droing at the during operation, has improved unwrapping wire efficiency greatly, has improved work efficiency.
The cable roller is placed between the two fixing mechanisms 9, then the bracket 905 is pushed to move on the connecting shaft 9013, it is ensured that the first fixing rod 909 and the second fixing rod 907 on the two fixing mechanisms 9 are located inside a middle ring of the cable roller, then the driving motor 908 is turned on to drive the first rack 906 and the second rack 9010 to move outwards, so that the first fixing rod 909 and the second fixing rod 907 are driven to move towards two sides until the first fixing rod 909 and the second fixing rod 907 are supported on the wall of the middle ring of the cable roller, and the purpose of fixing the cable roller is achieved.
Example 2
The difference with embodiment 1 lies in still installing conveyer belt 6 on the workstation, conveyer belt 6 install on the bottom plate 2 of workstation, and with backup pad 4 cooperatees, and fixing mechanism 9 department is carried to the convenient cable roller that sets up of conveyer belt 6, greatly reduced intensity of labour, improved work efficiency.
The working process of the device is as follows: when the device works, firstly, a worker rotates the rotating handle 901 to enable the first sliding block 304 and the second sliding block 305 to simultaneously move outwards to lower one end of the workbench and ensure that one end of the supporting plate 4 is contacted with the ground, the worker rolls the cable roller onto the workbench from the supporting plate 4, the worker drives the first sliding block 304 and the second sliding block 305 to move inwards by rotating the rotating handle 901 in the reverse direction so as to jack up one end of the workbench and ensure that the workbench is recovered, then the worker pushes the cable roller into the fixing mechanisms 9 to adjust the brackets 905 on the two fixing mechanisms 9 to ensure that the first fixing rod 909 and the second fixing rod 907 on the two fixing mechanisms 9 are in the inner part of the middle circular ring of the cable roller, then the driving motor 908 is opened to drive the driving gear 9012 to move, the driving gear 9012 drives the driven gear 9011 to rotate, the driven gear 9011 is meshed with the first rack 906 and the second rack 9010, the first rack 906 and the second rack 9010 are driven to move outwards, the first fixing rod 909 and the second fixing rod 907 are finally driven to move towards two sides until the first fixing rod 909 and the second fixing rod 907 are supported on the wall of a middle ring of the cable roller, so that the cable roller is fixed, and finally one end of a cable is led out of three wire arranging rollers 704 on the wire arranging mechanism 7, and the cable can be laid.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the present invention as defined in the accompanying claims.

Claims (7)

1. A power communication construction pay-off rack comprises a moving wheel and a bottom plate, wherein the moving wheel is installed at the bottom of the bottom plate, and the power communication construction pay-off rack is characterized in that a supporting block, a handrail and a lifting mechanism are installed on the bottom plate, the handrail is installed at one end of the bottom plate, the supporting block is installed at one end, close to the handrail, of the bottom plate, the lifting mechanism is installed at the other end of the bottom plate, a workbench is installed on the lifting mechanism, one end of the workbench is installed on the supporting block, the other end of the workbench is installed on the lifting mechanism, a hanging lug and an installation block are installed on the workbench, the installation block is installed at the top of the workbench, a line following mechanism is installed on the installation block, the hanging lug is installed at one end of the workbench, a supporting plate is installed on the hanging lug, a strip-shaped groove is formed in the side wall of the workbench, and a fixing mechanism is installed inside the strip-shaped groove;
the fixing mechanism comprises a guide rod, a second threaded rod, a support frame, a rotating handle and a support, the guide rod is installed in a strip-shaped groove, the upper end and the lower end of the guide rod are fixedly installed on the upper side wall and the lower side wall of the strip-shaped groove, the second threaded rod is installed in the strip-shaped groove and one side of the guide rod, one end of the second threaded rod is installed at the bottom of the strip-shaped groove and is connected with the strip-shaped groove in a rotating mode, the other end of the second threaded rod penetrates through the top of the strip-shaped groove and is connected with the rotating handle, the support frame is provided with a mounting hole and a threaded hole, the mounting hole is matched with the guide rod, the threaded hole is in threaded fit with the second threaded rod, a connecting shaft is installed on the support frame, the support frame is provided with a driving motor, the driving motor is fixedly installed on one side of the support frame, a first rack, a second rack, a driving gear and a driven gear are installed inside the support frame, The other end runs through the opposite side that the support extends to the support, first rack and second rack are installed in driven gear's both sides, driven gear installs on the connecting axle to mesh mutually with first rack, second rack, the driving gear is installed on driving motor's output shaft to mesh mutually with driven gear, it has two waist type grooves to open on the support, installs first dead lever on first rack, the one end of first dead lever is installed on first rack, the other end runs through one of them waist type groove and extends to the outside of support, installs the second dead lever on the second rack, the one end of second dead lever is installed on the second rack, the other end runs through another waist type groove and extends to the outside of support.
2. The electric power communication construction pay-off rack as claimed in claim 1, wherein a fixed block is mounted at the bottom of one end of the workbench and rotatably connected with the supporting block through a fixed shaft, two mounting blocks are provided, and the two mounting blocks are symmetrically mounted on two side walls of the workbench.
3. The electric power communication construction pay-off rack according to claim 2, wherein the in-line mechanism comprises a first rotating shaft, a second rotating shaft, a first connecting rod, a second connecting rod, a first rotating shaft, a second rotating shaft, two mounting discs and three in-line rollers, one end of the first rotating shaft is arranged on one of the mounting blocks, one end of the first connecting rod is rotatably arranged on the first rotating shaft, the other end of the first connecting rod is arranged on the first rotating shaft, the other end of the first rotating shaft is arranged on one of the mounting discs, the three in-line rollers are arranged between the two mounting discs, and is rotationally connected with the two mounting discs, one end of the second rotating shaft is arranged on the other mounting block, one end of the second connecting rod is rotatably installed on the second rotating shaft, the other end of the second connecting rod is installed on the second rotating shaft, and the other end of the second rotating shaft is installed on the other installation disc.
4. The electric power communication construction pay-off rack as claimed in claim 1, wherein the lifting mechanism comprises two fixing seats, a rotating handle, a first sliding block, a second sliding block, a first supporting rod, a second supporting rod and two mounting seats, the two fixing seats are symmetrically mounted on two sides of the bottom plate, two guide rods and a first threaded rod are mounted between the two fixing seats, one end of the first threaded rod is mounted in the center of one fixing seat, the other end of the first threaded rod penetrates through the center of the other fixing seat and extends to the outer side of the fixing seat and is connected with the rotating handle, the two guide rods are symmetrically mounted on two sides of the first threaded rod, two ends of each guide rod are fixedly connected with the two fixing seats, the first sliding block and the second sliding block are symmetrical about the center line of each guide rod, and threaded holes and two through holes are formed in the middle parts of the first sliding block and the second sliding block, and the screw hole revolve to opposite, first slider with the screw hole on the second slider with first threaded rod screw-thread fit, two through-holes cooperate with two guide arms, two mount pads are evenly installed in the bottom of workstation, the one end of first bracing piece rotates with first slider to be connected, the other end rotates with one of them mount pad to be connected, the one end and the second slider of second bracing piece rotate to be connected, the other end rotates with another mount pad to be connected.
5. The electric power communication construction pay-off rack as claimed in claim 4, wherein there are two strip-shaped grooves, and the two strip-shaped grooves are uniformly distributed on two side walls of the workbench.
6. The electric power communication construction pay-off rack as claimed in claim 5, wherein there are two fixing mechanisms, and the two fixing mechanisms correspond to the two strip-shaped grooves one to one.
7. The electric power communication construction pay-off rack as claimed in claim 1, wherein a conveyor belt is further installed on the workbench, and the conveyor belt is installed on the workbench and is matched with the support plate.
CN202010952948.2A 2020-09-11 2020-09-11 Electric power communication construction pay off rack Active CN112110300B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010952948.2A CN112110300B (en) 2020-09-11 2020-09-11 Electric power communication construction pay off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010952948.2A CN112110300B (en) 2020-09-11 2020-09-11 Electric power communication construction pay off rack

Publications (2)

Publication Number Publication Date
CN112110300A CN112110300A (en) 2020-12-22
CN112110300B true CN112110300B (en) 2022-06-14

Family

ID=73802501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010952948.2A Active CN112110300B (en) 2020-09-11 2020-09-11 Electric power communication construction pay off rack

Country Status (1)

Country Link
CN (1) CN112110300B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113690799B (en) * 2021-08-04 2022-10-11 国网山东省电力公司菏泽市定陶区供电公司 Pipeline laying auxiliary device for electric power construction
CN113860005B (en) * 2021-09-27 2023-06-16 国网山东省电力公司曹县供电公司 Cable reel get-on/off device for power construction
CN114162665B (en) * 2021-11-19 2023-07-14 江西省邮电建设工程有限公司 Communication engineering construction device capable of positioning cable placement position
CN116914640B (en) * 2023-09-12 2023-11-24 山东新纪源电力技术有限公司 Laying device for cable in cable trench

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205526995U (en) * 2016-03-09 2016-08-31 国网山东省电力公司巨野县供电公司 Power communication erects construction and uses pay off rack
CN107840185A (en) * 2017-10-30 2018-03-27 东莞市天合机电开发有限公司 A kind of cable hank disposes convenient and strength-saving cable laying equipment
CN108545541A (en) * 2018-05-14 2018-09-18 国家电网公司 A kind of high speed payout device applied to grain producing region power distribution network
CN209730652U (en) * 2019-06-28 2019-12-03 青岛国凯电力工程有限公司 A kind of power construction cable laying apparatus
CN210074624U (en) * 2019-07-31 2020-02-14 河北辰瑞电力工程有限公司 Cable laying device that stability is high
CN211393322U (en) * 2019-12-31 2020-09-01 河北凯强建筑安装工程有限公司 Cable pay-off device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140312156A1 (en) * 2013-04-23 2014-10-23 Bazooka Farmstar, Inc. Base and spool for managing hose

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205526995U (en) * 2016-03-09 2016-08-31 国网山东省电力公司巨野县供电公司 Power communication erects construction and uses pay off rack
CN107840185A (en) * 2017-10-30 2018-03-27 东莞市天合机电开发有限公司 A kind of cable hank disposes convenient and strength-saving cable laying equipment
CN108545541A (en) * 2018-05-14 2018-09-18 国家电网公司 A kind of high speed payout device applied to grain producing region power distribution network
CN209730652U (en) * 2019-06-28 2019-12-03 青岛国凯电力工程有限公司 A kind of power construction cable laying apparatus
CN210074624U (en) * 2019-07-31 2020-02-14 河北辰瑞电力工程有限公司 Cable laying device that stability is high
CN211393322U (en) * 2019-12-31 2020-09-01 河北凯强建筑安装工程有限公司 Cable pay-off device

Also Published As

Publication number Publication date
CN112110300A (en) 2020-12-22

Similar Documents

Publication Publication Date Title
CN112110300B (en) Electric power communication construction pay off rack
CN110116394B (en) A subdivision wall-hung type walking fixture for transmission line patrols and examines robot
CN214692728U (en) Cable drum support frame
CN211393011U (en) Contour plate clamping device convenient to adjust
CN113788358A (en) Cable pay-off for electric power construction
CN213831801U (en) Copper pole mounting structure for cable
CN205023730U (en) Portal frame
CN213171204U (en) Construction equipment hoisting device
CN211870985U (en) Power cable pay-off
CN204823445U (en) Cable automatic conveying system
CN216519952U (en) Water conservancy construction pipeline laying device
CN215160297U (en) Steel bar hoisting and clamping device for building engineering
CN214880001U (en) Strutting arrangement is used in water conservancy water and electricity construction
CN115117783A (en) Power transmission and transformation line hanging device and using method
CN212799368U (en) Large-scale power equipment hoisting mounting frame
CN211225833U (en) Cable draw gear for electric power construction
CN107696257A (en) It is a kind of can the integral type movable cutting machine that cuts vertically of synchronous bidirectional
CN113872072A (en) Construction cubical switchboard suspension type installed part
CN111807152A (en) Large-scale cable coiling mechanism
CN220098464U (en) Installation lifting mechanism for photovoltaic power generation
CN215050934U (en) Professional lifting device for roving creel of spinning frame
CN221396862U (en) Hoisting platform for new energy power station construction
CN215722706U (en) Intelligent movable type lifting high-pole lamp
CN215564330U (en) Safety device for high-voltage power engineering operation
CN218779902U (en) Scaffold for multi-use architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant