Prior art keywords
deformation
model
total
compensation value
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011243527.9A
Other languages
Chinese (zh)
Other versions
CN112100729B (en
Inventor
龚剑
李鑫奎
黄玉林
况中华
何光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN202011243527.9A priority Critical patent/CN112100729B/en
Publication of CN112100729A publication Critical patent/CN112100729A/en
Application granted granted Critical
Publication of CN112100729B publication Critical patent/CN112100729B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention provides a vertical deformation and differential deformation control method for a super high-rise structure, aiming at solving the problem that vertical deformation and differential deformation simulation of a super high-rise are inconvenient. According to the control method for vertical deformation and differential deformation of the super high-rise structure, the height of the structure model is adjusted in a mode of simulating and adjusting the temperature, so that the purpose of simulating vertical deformation and differential deformation can be achieved under the condition that a compensation structure is not generated. Thereby solving the problem of inconvenient vertical deformation and differential deformation simulation of the super high-rise.

Description

Vertical deformation and differential deformation control method for super high-rise structure
Technical Field
The invention belongs to the field of vertical deformation control of super high-rise building engineering construction structures, and particularly relates to a vertical deformation and differential deformation control method for a super high-rise structure.
Background
Because the number of layers of the super high-rise structure is large and the height of the super high-rise structure is high, along with the progress of construction, the vertical load is gradually increased, and the vertical elastic compression deformation of the structure is increased. Meanwhile, the vertical deformation increases with time due to the shrinkage creep characteristic of concrete. The super high-rise core tube is mainly of a reinforced concrete structure, and the peripheral frame column is mainly of a section steel concrete structure. The core cylinder and the frame column have different integral elastic moduli, and the core cylinder and the frame column have different digital display deformations to form deformation differences under the actions of load, concrete shrinkage and creep and the like. The deformation of the core barrel and the differential deformation of the barrel columns affect the safety and quality of structural elevation, curtain walls, electromechanical pipelines, floor levelness, structural members and the like. In order to eliminate various influences caused by deformation, pre-deformation control is required in the super high-rise construction process.
The current general idea of pre-deformation control is to simulate a structural model by a computer, calculate to obtain a deformation value, and then generate a compensation structure according to a certain rule. However, when the computer simulates the deformation of the structural model, the compensation structure often needs to be modeled again, and when the compensation structure is complex, the simulation of the structural model is inconvenient.
In addition, the methods adopted by the current pre-deformation control measures mainly comprise a regulation and control method of each layer, a compensation method in a construction section, a one-time compensation method at the top of the construction section and the like. The method does not well consider the influence on the internal force of the structure after elevation compensation.
Disclosure of Invention
The invention provides a vertical deformation and differential deformation control method for a super high-rise structure, aiming at solving the problem that vertical deformation and differential deformation simulation of a super high-rise are inconvenient.
The technical scheme of the control method for vertical deformation and differential deformation of the super high-rise structure comprises the following steps:
s1, determining a structural model according to a drawing, wherein the structural model comprises a core barrel model and a frame column model;
s2, determining the position of each leveling floor in the structural model according to the actual working conditions;
s3, establishing a structural model from bottom to top by taking the leveling floor as a boundary;
s4, when the structural model is built to the nth leveling floor position, calculating to obtain the height L of the deformed structural modelnCore barrel model deformation valueXnAnd a frame column model deformation value Yn
S5, adjusting the height of the current structure model to the height of a design layer in a mode of simulating and adjusting temperature;
s6, continuing to establish the structural model to the (n + 1) th leveling floor position;
and S7, repeating S4 to S6 until the building of the structure model is completed.
According to the control method for vertical deformation and differential deformation of the super high-rise structure, the height of the structure model is adjusted in a mode of simulating and adjusting the temperature, so that the purpose of simulating vertical deformation and differential deformation can be achieved under the condition that a compensation structure is not generated. Thereby solving the problem of inconvenient vertical deformation and differential deformation simulation of the super high-rise.
Further, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, S5 includes:
setting the temperature expansion coefficient of the core tube line as S1 and the temperature expansion coefficient of the frame column as S2;
core barrel model temperature difference TXn=(Xn-Xn-1)/(S1*Ln);
Temperature difference TY of frame column modeln=(Yn-Yn-1)/(S2*Ln);
Imposing TX on a current core barrel modelnThe back height reaches the design layer height;
applying TY on current framework column modelnThe back height is up to the design level height.
The calculation method can accurately calculate the temperature difference value required by the core barrel model and the frame column model to reach the designed layer height, thereby providing data basis for simulating and adjusting the temperature.
Further, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, in order to more accurately simulate a building structure, in S5, in the structural model, the expansion direction of the plate unit members is the vertical direction of the structural model, and the expansion direction of the beam unit members is the length direction of the beam units.
Further, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, the method further includes:
s8, calculating the structure model to obtain the accumulated deformation value A of the core barrel when the structure model is built to each floormAnd frame column accumulated deformation value Bm
S9, determining the position of each leveling position layer and the core barrel compensation value HX of the leveling position layerjAnd frame column compensation value HYj
Cumulative deformation value A of core barrelmAnd frame column accumulated deformation value BmAnd can provide basis for determining each leveling position layer.
Further, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, S9 includes:
s9-1, starting calculation from the 1 st floor of the structural model, and setting the total compensation value of the core cylinder as HXtotalThe total compensation value of the frame column is HYtotal
S9-2, calculating the mth floor of the structural model, and if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) And if the floor is more than or equal to 3mm, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjAnd frame column compensation value HYj
S9-3, core tube compensation value HXjAdding to the total compensation value HX of the core barreltotal(ii) a Compensation value HY of frame columnjTotal compensation value HY accumulated to frame columntotal
S9-4, continuously calculating the (m + 1) th floor of the structural model;
and S9-5, repeating S9-2 to S9-4 until the whole structure model is calculated, and determining the leveling position layer.
Accumulating the deformation value A by the core barrelmAnd frame column accumulated deformation value BmDetermining the position of each leveling position layer and determining the core barrel compensation value HX of the leveling position layerjAnd frame column compensation value HYjThe influence of elevation compensation on the internal force of the structure can be taken into consideration, so that the vertical direction can be determined more accurately and reasonablyDeformation and differential deformation compensation.
Further, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, specifically, S8 further includes calculating the structural model to obtain a structural internal force variation value C caused by differential deformation when the structural model is built to each floorm
S9-2 further includes calculating the mth layer of the structure model, if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) Not less than 3mm or CmMore than or equal to 10 percent, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjFrame column compensation value HYj
Further, in the control method for vertical deformation and differential deformation of the super high-rise structure, specifically, the method further includes S10, and the compensation value HX of the core barrel of each leveling position layer is compensated in a mode of simulating and adjusting temperaturejAnd frame column compensation value HYjAnd (6) carrying out verification.
Drawings
Fig. 1 is a schematic diagram of a structural model of the control method for vertical deformation and differential deformation of a super high-rise structure.
Detailed Description
The invention is described in further detail below with reference to the figures and specific examples. Advantages and features of the present invention will become apparent from the following description and from the claims. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention.
Example 1:
referring to fig. 1, the present embodiment provides a method for controlling vertical deformation and differential deformation of a super high-rise structure, and the technical scheme includes the following steps:
s1, determining a structural model according to a drawing, wherein the structural model comprises a core barrel model and a frame column model;
s2, determining the position of each leveling floor in the structural model according to the actual working conditions;
s3, establishing a structural model from bottom to top by taking the leveling floor as a boundary;
s4, when the structural model is built to the nth leveling floor position, calculating to obtain the height L of the deformed structural modelnCore barrel model deformation value XnAnd a frame column model deformation value Yn;XnEstablishing an overall deformation value, Y, of the core barrel model for the structural model up to the nth leveling floor positionnEstablishing an integral deformation value of the frame column model from the nth leveling floor position for the structural model;
s5, adjusting the height of the current structure model to the height of a design layer in a mode of simulating and adjusting temperature;
s6, continuing to establish the structural model to the (n + 1) th leveling floor position;
and S7, repeating S4 to S6 until the building of the structure model is completed.
According to the control method for vertical deformation and differential deformation of the super high-rise structure, the height of the structure model is adjusted in a mode of simulating and adjusting the temperature, so that the purpose of simulating vertical deformation and differential deformation can be achieved under the condition that a compensation structure is not generated. Thereby solving the problem of inconvenient vertical deformation and differential deformation simulation of the super high-rise.
In a preferred embodiment, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, S5 includes:
setting the temperature expansion coefficient of the core tube line as S1 and the temperature expansion coefficient of the frame column as S2;
due to the temperature expansion coefficient S, the temperature difference T, the model expansion degree X and the model height LtotalPresence, X = S LtotalT, so:
core barrel model temperature difference TXn=(Xn-Xn-1)/(S1*Ln);
Temperature difference TY of frame column modeln=(Yn-Yn-1)/(S2*Ln);
Imposing TX on a current core barrel modelnThe back height reaches the design layer height;
applying TY on current framework column modelnThe back height is up to the design level height.
Finally, when the building of the structural model is completed:
the core barrel model applied temperature in the leveling floor range of the 1 st is TX1+TX2+…+TXn
The core barrel model applied temperature in the 2 nd leveling floor range is TX2+TX3+…+TXn
……;
The core barrel model in the nth leveling floor range applies the temperature of TXn
Also:
1 st leveling of the temperature TY applied to the framework column model in the floor area1+TY2+…+TYn
2 nd leveling the applied temperature of the frame column model in the floor range is TY2+TY3+…+TYn
……;
The temperature applied by the frame column model in the nth leveling floor range is TYn
The calculation method can accurately calculate the temperature difference value required by the core tube model and the frame column model to reach the designed layer height, thereby providing data basis for simulating and adjusting the temperature.
In a preferred embodiment, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, in order to more accurately simulate a building structure, in S5, in the structural model, the expansion direction of the plate unit members is the vertical direction of the structural model, and the expansion direction of the beam unit members is the longitudinal direction of the beam units.
As a preferred embodiment, the method for controlling vertical deformation and differential deformation of a super high-rise structure further includes:
s8, calculating the structure model to obtain the accumulated deformation value A of the core barrel when the structure model is built to each floormAnd frame column accumulated deformation value Bm
S9, determining the position of each leveling position layerCore barrel compensation value HX of leveling position layerjAnd frame column compensation value HYj
Cumulative deformation value A of core barrelmAnd frame column accumulated deformation value BmAnd can provide basis for determining each leveling position layer.
In a preferred embodiment, the method for controlling vertical deformation and differential deformation of a super high-rise structure, in S9, includes:
s9-1, starting calculation from the 1 st floor of the structural model, and setting the total compensation value of the core cylinder as HXtotalThe total compensation value of the frame column is HYtotal
S9-2, calculating the mth floor of the structural model, and if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) And if the floor is more than or equal to 3mm, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjAnd frame column compensation value HYj
S9-3, core tube compensation value HXjAdding to the total compensation value HX of the core barreltotal(ii) a Compensation value HY of frame columnjTotal compensation value HY accumulated to frame columntotal
S9-4, continuously calculating the (m + 1) th floor of the structural model;
and S9-5, repeating S9-2 to S9-4 until the whole structure model is calculated, and determining the leveling position layer.
Accumulating the deformation value A by the core barrelmAnd frame column accumulated deformation value BmDetermining the position of each leveling position layer and determining the core barrel compensation value HX of the leveling position layerjAnd frame column compensation value HYjThe method can give consideration to the influence of elevation compensation on the internal force of the structure, thereby more accurately and reasonably determining the compensation mode of vertical deformation and differential deformation.
As a preferred embodiment, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, S8 further includes calculating the structural model, and when the structural model is built to each floor, the method for controlling vertical deformation and differential deformation of a super high-rise structure further includes calculating the structural model to obtain the structural model due to differential deformationResulting in a value of change of internal force Cm
S9-2 further includes calculating the mth layer of the structure model, if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) Not less than 3mm or CmMore than or equal to 10 percent, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjFrame column compensation value HYj
As a preferred embodiment, in the method for controlling vertical deformation and differential deformation of a super high-rise structure, specifically, the method further includes S10, where the method includes adjusting the temperature in a simulated manner to compensate the core tube compensation value HX for each leveling position layerjAnd frame column compensation value HYjAnd (6) carrying out verification.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, and any variations and modifications made by those skilled in the art based on the above disclosure are within the scope of the appended claims.

Claims (7)

1. A vertical deformation and differential deformation control method for a super high-rise structure is characterized by comprising the following steps:
s1, determining a structural model according to a drawing, wherein the structural model comprises a core barrel model and a frame column model;
s2, determining the position of each leveling floor in the structural model according to the actual working conditions;
s3, establishing a structural model from bottom to top by taking the leveling floor as a boundary;
s4, when the structural model is built to the nth leveling floor position, calculating to obtain the height L of the deformed structural modelnCore barrel model deformation value XnAnd a frame column model deformation value Yn
S5, adjusting the height of the current structure model to the height of a design layer in a mode of simulating and adjusting temperature;
s6, continuing to establish the structural model to the (n + 1) th leveling floor position;
and S7, repeating S4 to S6 until the building of the structure model is completed.
2. The method for controlling vertical deformation and differential deformation of a super high-rise structure according to claim 1, wherein S5 includes:
setting the temperature expansion coefficient of the core tube line as S1 and the temperature expansion coefficient of the frame column as S2;
core barrel model temperature difference TXn=(Xn-Xn-1)/(S1*Ln);
Temperature difference TY of frame column modeln=(Yn-Yn-1)/(S2*Ln);
Imposing TX on a current core barrel modelnThe back height reaches the design layer height;
applying TY on current framework column modelnThe back height is up to the design level height.
3. The vertical deformation and differential deformation control method for a super high-rise structure according to claim 2, wherein in S5, the expansion direction of the plate unit members in the structural model is the vertical direction of the structural model, and the expansion direction of the beam unit members is the length direction of the beam units.
4. The method for controlling vertical deformation and differential deformation of a super high-rise structure according to claim 1, further comprising:
s8, calculating the structure model to obtain the accumulated deformation value A of the core barrel when the structure model is built to each floormAnd frame column accumulated deformation value Bm
S9, determining the position of each leveling position layer and the core barrel compensation value HX of the leveling position layerjAnd frame column compensation value HYj
5. The method for controlling vertical deformation and differential deformation of a super high-rise structure according to claim 4, wherein the step S9 comprises:
s9-1, starting calculation from the 1 st floor of the structural model, and setting the total compensation value of the core barrel asHXtotalThe total compensation value of the frame column is HYtotal
S9-2, calculating the mth floor of the structural model, and if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) And if the floor is more than or equal to 3mm, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjAnd frame column compensation value HYj
S9-3, core tube compensation value HXjAdding to the total compensation value HX of the core barreltotal(ii) a Compensation value HY of frame columnjTotal compensation value HY accumulated to frame columntotal
S9-4, continuously calculating the (m + 1) th floor of the structural model;
and S9-5, repeating S9-2 to S9-4 until the whole structure model is calculated, and determining the leveling position layer.
6. The method for controlling vertical deformation and differential deformation of a super high-rise structure according to claim 5, wherein S8 further comprises calculating the structural model to obtain the structural internal force variation value C caused by differential deformation when the structural model is built to each floorm
S9-2 further includes calculating the mth layer of the structure model, if A is satisfiedm-HXtotalNot less than 7mm or (A)m-HXtotal)-(Bm-HYtotal) Not less than 3mm or CmMore than or equal to 10 percent, determining the floor as the jth leveling position layer, and setting a corresponding core barrel compensation value HXjFrame column compensation value HYj
7. The method for controlling vertical deformation and differential deformation of a super high-rise structure according to claim 4, further comprising S10, wherein the compensation value HX of the core barrel of each leveling position layer is compensated by simulating temperature adjustmentjAnd frame column compensation value HYjAnd (6) carrying out verification.
CN202011243527.9A 2020-11-10 2020-11-10 Vertical deformation and differential deformation control method for super high-rise structure Active CN112100729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011243527.9A CN112100729B (en) 2020-11-10 2020-11-10 Vertical deformation and differential deformation control method for super high-rise structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011243527.9A CN112100729B (en) 2020-11-10 2020-11-10 Vertical deformation and differential deformation control method for super high-rise structure

Publications (2)

Publication Number Publication Date
CN112100729A true CN112100729A (en) 2020-12-18
CN112100729B CN112100729B (en) 2021-01-29

Family

ID=73784898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011243527.9A Active CN112100729B (en) 2020-11-10 2020-11-10 Vertical deformation and differential deformation control method for super high-rise structure

Country Status (1)

Country Link
CN (1) CN112100729B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796420A (en) * 2021-03-26 2021-05-14 上海建工集团股份有限公司 Difference deformation compensation device, difference deformation compensation system and using method thereof
CN113609612A (en) * 2021-07-27 2021-11-05 上海建工一建集团有限公司 Method and equipment for predicting vertical deformation of super high-rise structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789525A (en) * 2012-07-10 2012-11-21 同济大学建筑设计研究院(集团)有限公司 High-rise building structure inelastic time-varying analysis method
CN103577693A (en) * 2013-11-07 2014-02-12 重庆大学 Actual load measuring method of ultra-high-rise steel and concrete combination structure
CN104573202A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Structural analysis method of whole construction process of frame-core tube structure system
CN109944335A (en) * 2019-04-04 2019-06-28 河南绿建建筑科技有限公司 Frame and the combination assembled structural system of shear wall Core Walls Structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789525A (en) * 2012-07-10 2012-11-21 同济大学建筑设计研究院(集团)有限公司 High-rise building structure inelastic time-varying analysis method
CN103577693A (en) * 2013-11-07 2014-02-12 重庆大学 Actual load measuring method of ultra-high-rise steel and concrete combination structure
CN104573202A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Structural analysis method of whole construction process of frame-core tube structure system
CN109944335A (en) * 2019-04-04 2019-06-28 河南绿建建筑科技有限公司 Frame and the combination assembled structural system of shear wall Core Walls Structure

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
任瑞 等: "《超高层混合结构考虑施工过程的竖向变形差异计算和分析》", 《结构工程师》 *
刘丰宁: "《超高层框架核心筒结构考虑施工过程的竖向差异变形分析与控制》", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
周绪红 等: "《钢框架—钢筋混凝土核心筒体系竖向变形差异补偿对结构性能的影响》", 《土木工程学报》 *
王化杰 等: "《超高层结构施工竖向变形规律及预变形控制研究》", 《工程力学》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796420A (en) * 2021-03-26 2021-05-14 上海建工集团股份有限公司 Difference deformation compensation device, difference deformation compensation system and using method thereof
CN113609612A (en) * 2021-07-27 2021-11-05 上海建工一建集团有限公司 Method and equipment for predicting vertical deformation of super high-rise structure
CN113609612B (en) * 2021-07-27 2024-05-28 上海建工一建集团有限公司 Method and equipment for predicting vertical deformation of super high-rise structure

Also Published As

Publication number Publication date
CN112100729B (en) 2021-01-29

Similar Documents

Publication Publication Date Title
CN112100729B (en) Vertical deformation and differential deformation control method for super high-rise structure
CN105740560B (en) A kind of continuous assembling construction simulation assembling method of steel tube arch rib segment jig frame
Balkaya et al. Nonlinear seismic response evaluation of tunnel form building structures
Veenendaal et al. 35 Computational form-finding of fabric formworks: an overview and discussion
Imanpour et al. Development and application of multi-axis hybrid simulation for seismic stability of steel braced frames
Moni et al. Real-time aeroelastic hybrid simulation of a base-pivoting building model in a wind tunnel
CN116484699A (en) Method for accurately designing stress-free state line shape and space position of steel truss tied arch bridge
Shi et al. Essential stressing state features of a large-curvature continuous steel box-girder bridge model revealed by modeling experimental data
Fan et al. Investigation of construction vertical deformation and pre-deformation control for three super high-rise buildings
CN108256247A (en) A kind of servo support system forced deformation computing method using amendment stiffness matrix
CN110362872B (en) Three-direction positioning high-precision control method for hanging grandstand
CN110909500A (en) Unconditionally stable multi-point excitation collapse explicit analysis method for oversized bridge span
Daniels Combined load analysis of unbraced frames
CN112560321B (en) Calculation method for ring-divided segmented pouring length of concrete wrapped outside arch ring of stiffened framework concrete arch bridge
Chen et al. Analytical development and experimental investigation of the casting multi-plate damper (CMPD)
Sepulveda et al. Performance assessment of a mixed displacement and force control mode for hybrid simulation
CN113779749B (en) Evaluation method for influence of settlement of construction site on upper module of ocean platform
CN114996831A (en) Lean construction method of large-span suspended ridge hyperbolic inverted arch diagonal grid structure
Li et al. A recursive algorithm for determining the profile of the spatial self-anchored suspension bridges
CN111159946B (en) Discontinuous problem partition solving method based on minimum potential energy principle
Szafran et al. From full-scale testing of steel lattice towers to stochastic reliability analysis
CN115048703B (en) High-rise building construction method for iterative deviation correcting structural deformation and high-rise building
Sepulveda et al. Performance Assessment of Mixed Displacement and Force Control Framework for Hybrid Simulation
Farshi et al. Buckling analysis of structural steel frames with inelastic effects according to codes
Sideris et al. A generalized normal flow method with online step controls for pushover analysis of nonlinear softening structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant