CN112081130A - Pile foundation device for civil engineering - Google Patents

Pile foundation device for civil engineering Download PDF

Info

Publication number
CN112081130A
CN112081130A CN202010760049.2A CN202010760049A CN112081130A CN 112081130 A CN112081130 A CN 112081130A CN 202010760049 A CN202010760049 A CN 202010760049A CN 112081130 A CN112081130 A CN 112081130A
Authority
CN
China
Prior art keywords
fixedly connected
pile foundation
plate
civil engineering
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010760049.2A
Other languages
Chinese (zh)
Other versions
CN112081130B (en
Inventor
刘静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN CHENGJIAN INSPECTION AND TESTING TECHNOLOGY CO.,LTD.
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN202010760049.2A priority Critical patent/CN112081130B/en
Publication of CN112081130A publication Critical patent/CN112081130A/en
Application granted granted Critical
Publication of CN112081130B publication Critical patent/CN112081130B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention provides a pile foundation device for civil engineering, and relates to the field of pile foundations. This pile foundation fixing device for civil engineering, including ground, the inside on ground is seted up flutedly, and the stiffening groove that is linked together rather than is seted up to the bottom of recess, and the inside of recess is provided with the foundation member, the high pile foundation of top fixedly connected with of foundation member, and the inboard of high pile foundation is provided with the cushion socket, and the top fixedly connected with cushion cap of high pile foundation, the outside of cushion cap are provided with the mounting. This pile foundation fixing device for civil engineering, through being provided with the cross bar, the connecting cylinder, the cushion collar and pressing from both sides the cover, press from both sides the cover centre gripping in the outside of high pile foundation, the outside of the high pile foundation of cushion collar laminating, the cross bar is transmitted in the vibrations of high pile foundation, the inside extrusion ball of cross bar, the arc seat that resets carries on spacingly, the ball promotes the bolster downwards, cushion and cut down vibrations, the buffer adjustment through the up-and-down motion of adjusting the pole and second reset spring cushions vibrations, thereby reduce the influence of vibrations to the pile foundation.

Description

Pile foundation device for civil engineering
The patent application is divisional application, the application number of a parent application is 201810332943.2, and the application date of the parent application is 2018, 04 and 13.
Technical Field
The invention relates to the technical field of pile foundations, in particular to a pile foundation device for civil engineering.
Background
The deep foundation consisting of piles and pile caps (referred to as caps for short) or the single-pile foundation consisting of columns and pile foundations, referred to as pile foundations for short, is called a low cap pile foundation if the pile body is completely buried in the soil and the bottom surface of the cap is in contact with the soil, is called a high cap pile foundation if the upper part of the pile body is exposed out of the ground and the bottom of the cap is above the ground, and the building pile foundation is usually a low cap pile foundation.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a pile foundation device for civil engineering, which solves the problem that the stability of a pile foundation is relatively poor when a pile body of a high pile foundation is subjected to an earthquake or a common transverse load.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: pile foundation device for civil engineering, including ground, the inside on ground is seted up flutedly, the stiffening groove rather than being linked together is seted up to the bottom of recess, the inside of recess is provided with the basis piece, the high pile foundation of top fixedly connected with of basis piece, the inboard of high pile foundation is provided with the cushion socket, the top fixedly connected with cushion cap of high pile foundation, the outside of cushion cap is provided with the mounting, the equal fixedly connected with damper in left side and the right side of cushion socket, the one end fixedly connected with centre gripping of cushion socket is kept away from to the damper presss from both sides the cover in the high pile foundation outside, the bottom fixedly connected with connecting piece of cushion socket.
Preferably, the shock attenuation piece includes the connecting cylinder, the inside fixedly connected with cutting ferrule of connecting cylinder, the inside cover of connecting cylinder is equipped with the cross rod, the one end of cross rod runs through the inside of cutting ferrule and extends to the outside of connecting cylinder, the inside fixedly connected with of shock attenuation seat and the regulating box that the cross rod is connected, the bottom fixedly connected with bolster of regulating box.
Preferably, the bolster includes a fixed cylinder, the bottom of a fixed cylinder extends to the below of shock mount, the inside joint of a fixed cylinder has the regulation pole, the both ends of adjusting the pole all extend to the outside of a fixed cylinder, the outside cover of adjusting the pole is equipped with second reset spring, the bottom fixedly connected with buffer board of pole.
Preferably, the inner wall of the adjusting box is fixedly connected with a reset arc seat, and a ball is arranged inside the adjusting box.
Preferably, the outer side of the cross rod is fixedly connected with a buffer sleeve, and the outer side of the cross rod is sleeved with a first return spring.
Preferably, the connecting piece comprises a pillar, a support plate is fixedly connected to the bottom end of the pillar, and a fixing rod is arranged inside the support plate.
Preferably, the foundation member includes the concrete bottom plate, the bottom fixedly connected with stiffener of concrete bottom plate, the reinforcing plate has been pour in the outside of concrete bottom plate, the concrete intensity of reinforcing plate is far greater than the concrete intensity of concrete bottom plate.
Preferably, the fixing part comprises an extrusion plate, the left side of the extrusion plate is fixedly connected with a soft strip, the right side of the extrusion plate is fixedly connected with a barrier strip, a support rod is arranged below the barrier strip, and the bottom of the extrusion plate is fixedly connected with a fixing plate.
Preferably, the left side of the extrusion plate is fixedly connected with a collecting piece below the soft strip, the collecting piece comprises a collecting groove plate, the top of the collecting groove plate is fixedly connected with a collecting plate, and the bottom of the collecting groove plate is fixedly connected with a dismounting pipe.
(III) advantageous effects
The invention provides a pile foundation device for civil engineering. The method has the following beneficial effects:
1. this pile foundation fixing device for civil engineering, through being provided with the cross bar, the connecting cylinder, first reset spring, the cutting ferrule, cushion collar and clamp cover, press from both sides the cover centre gripping in the outside of high pile foundation, the outside of the high pile foundation of cushion collar laminating, the cross bar is transmitted in the vibrations of high pile foundation, through being provided with the regulating box, the arc seat resets, ball and buffer, the inside extrusion ball of cross bar, the arc seat that resets carries on spacingly, the ball promotes the bolster downwards, cushion and cut down vibrations, through being provided with second reset spring, the fixed cylinder, regulation pole and buffer plate, the buffer adjustment through the up-and-down motion of adjusting the pole and second reset spring cushions vibrations, thereby reduce the influence of vibrations to the pile foundation.
2. This pile foundation fixing device for civil engineering through being provided with stiffener, concrete bottom plate, reinforcing plate, recess and reinforcement groove, and concrete bottom plate makes foundation plate, save material when the reinforcing plate improves basic strength, and the stiffener improves basic stability with the joint in reinforcement groove.
3. This pile foundation fixing device for civil engineering, through being provided with fixed plate, stripper plate, vaulting pole, blend stop and soft strip, the stripper plate is fixed the cushion cap, further improves the stability of pile foundation, and the vaulting pole supports fixedly with the fixed plate to the stripper plate, and soft strip is convenient for the head of flowing.
4. This pile foundation fixing device for civil engineering through being provided with collecting plate, collection frid, dismantlement pipe and soft strip, collects the grout of frid collection whereabouts, dismantles the dismantlement pipe, and the grove bottom is collected in the intercommunication, is convenient for clear up the slurry of collecting the frid bottom consolidation.
5. This pile foundation fixing device for civil engineering through being provided with pillar, extension board and dead lever, and the support of cushion cap is made to pillar and extension board, and the dead lever carries out the fixed of cushion cap.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
FIG. 2 is a schematic view of the shock mount of the present invention.
Fig. 3 is a schematic view of the structure of the connector of the present invention.
Fig. 4 is a schematic view of the fixing member of the present invention.
In the figure: the concrete pile comprises a ground surface 1, a groove 2, a pile foundation 3, a shock absorber 4, a bearing platform 5, a fixing part 6, a fixing plate 61, an extrusion plate 62, a supporting rod 63, a barrier strip 64, a soft strip 65, a collection piece 66, a collection plate 661, a collection groove plate 662, a disassembly pipe 663, a foundation piece 7, a reinforcing rod 71, a concrete bottom plate 72, a reinforcing plate 73, a buffering piece 8, a second return spring 81, a fixing barrel 82, an adjusting rod 83, a buffering plate 84, a shock absorber 9, a cross rod 91, a connecting barrel 92, a first return spring 93, a clamping sleeve 94, a buffering sleeve 95, an adjusting box 10, a ball 11, a resetting arc seat 12, a clamping sleeve 13, a connecting part 14, a supporting column 141, a supporting plate 142 and a fixing rod 143.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention provides a pile foundation device for civil engineering, which comprises a ground 1, a groove 2 is arranged in the ground 1, a reinforcing groove communicated with the groove 2 is arranged at the bottom of the groove 2, a foundation member 7 is arranged in the groove 2, the foundation member 7 comprises a concrete bottom plate 72, a reinforcing rod 71 is fixedly connected with the bottom of the concrete bottom plate 72, a reinforcing plate 73 is poured outside the concrete bottom plate 72, the concrete strength of the reinforcing plate 73 is far greater than that of the concrete bottom plate 72, the concrete bottom plate 72 is used as the foundation bottom plate by arranging the reinforcing rod 71, the concrete bottom plate 72, the reinforcing plate 73, the groove 2 and the reinforcing groove, the stability of the foundation is improved, the reinforcing plate 73 is filled in a gap between the concrete bottom plate 72 and the groove 2, the strength of the foundation is improved, the use of materials is saved at the same time of the foundation strength is improved, the stability of the foundation is improved by clamping and connecting the reinforcing rod 71 and the, the top of the foundation 7 is fixedly connected with a high pile foundation 3, the inner side of the high pile foundation 3 is provided with a shock absorption seat 4, the top end of the high pile foundation 3 is fixedly connected with a bearing platform 5, the outer side of the bearing platform 5 is provided with a fixing part 6, the fixing part 6 comprises an extrusion plate 62, the left side of the extrusion plate 62 is fixedly connected with a soft strip 65, the right side of the extrusion plate 62 is fixedly connected with a barrier strip 64, a support rod 63 is arranged below the barrier strip 64, the bottom of the extrusion plate 62 is fixedly connected with a fixing plate 61, the support rod 63 and the fixing plate 61 support and fix the extrusion plate 62, the extrusion plate 62 fixes the bearing platform 5, the stability of the high pile foundation 3 is further improved, the soft strip 65 is in contact with the bearing platform and is convenient for pulp flowing, the left side of the extrusion plate 62 and the lower side of the soft strip 65 are fixedly connected with a collecting piece 66, the collecting, the top of the collecting groove plate 662 is fixedly connected with a collecting plate 661, the bottom of the collecting groove plate 662 is fixedly connected with a dismounting pipe 663, the collecting plate 661, the collecting groove plate 662, the dismounting pipe 663 and the soft strip 65 are arranged, the collecting plate 661 guides the flow, the collecting groove plate 662 collects the falling cement slurry, the dismounting pipe 663 is dismounted, the bottom of the collecting groove plate 662 is communicated with the outside air pressure, the collection of the slurry solidified at the bottom of the collecting groove plate 662 is convenient, the left side and the right side of the shock absorption seat 4 are both fixedly connected with a shock absorption member 9, one end of the shock absorption member 9 far away from the shock absorption seat 4 is fixedly connected with a jacket 13 clamped outside the high pile foundation 3, the shock absorption member 9 comprises a connecting cylinder 92, the inside of the connecting cylinder 92 is fixedly connected with a clamping sleeve 94, the inside of the connecting cylinder 92 is sleeved with a cross rod 91, one end of the cross rod 91 penetrates through the inside of the clamping sleeve 94 and, The clamping sleeve 94 and the cross rod 91, the clamping sleeve 13 is clamped and installed on the outer side of the high pile foundation 3, the cross rod 91 transmits the vibration of the high pile foundation 3, the clamping sleeve 94 limits the displacement of the cross rod 91 and prevents the cross rod 91 from falling off the connecting cylinder 92, the outer side of the cross rod 91 is fixedly connected with the buffer sleeve 95, the outer side of the cross rod 91 is sleeved with the first reset spring 93, the inner part of the shock absorption seat 4 is fixedly connected with the adjusting box 10 connected with the cross rod 91, the inner wall of the adjusting box 10 is fixedly connected with the reset arc seat 12, the inner part of the adjusting box 10 is provided with the round ball 11, the buffer sleeve 95, the first reset spring 93, the adjusting box 10, the round ball 11 and the reset arc seat 12 are arranged, the outer side of the buffer sleeve 95 is arc-shaped and is attached to the outer surface of the high pile foundation 3, the vibration is transmitted to the cross rod 91 sufficiently and quickly, the cross rod 91 rebound, the shock is transmitted, the ball 11 rolls to transmit the shock, the reset arc seat 12 limits and rebounds the ball 11, the bottom of the adjusting box 10 is fixedly connected with the buffer member 8, the buffer member 8 comprises a fixed cylinder 82, the bottom end of the fixed cylinder 82 extends to the lower part of the shock absorbing seat 4, the adjusting rod 83 is clamped inside the fixed cylinder 82, two ends of the adjusting rod 83 both extend to the outer side of the fixed cylinder 82, the outer side of the adjusting rod 83 is sleeved with a second reset spring 81, the bottom end of the adjusting rod 83 is fixedly connected with a buffer plate 84, the cross rod 91 extrudes the ball 11 inwards through the adjusting box 10, the reset arc seat 12, the ball 11 and the buffer member 8, the reset arc seat 12 limits the shock, the ball 11 pushes the buffer member 8 downwards to buffer and reduce the shock, the shock is buffered through the second reset spring 81, the fixed cylinder 82, the adjusting rod 83 and the buffer plate 84, the up-down movement of the adjusting rod 83 and the buffer adjustment of the second reset spring 81, thereby reduce the influence of vibrations to high pile foundation 3, the bottom fixedly connected with connecting piece 14 of cushion socket 4, connecting piece 14 includes pillar 141, the bottom fixedly connected with extension board 142 of pillar 141, and the inside of extension board 142 is provided with dead lever 143, and through being provided with pillar 141, extension board 142 and dead lever 143, pillar 141 and extension board 142 make the support of cushion table 4, and dead lever 143 carries out the fixed of cushion table 4.
The working principle is as follows: when the device is used, the concrete bottom plate 72 is used as a foundation bottom plate to improve the stability of a foundation, the pouring reinforcing plate 73 is filled in a gap between the concrete bottom plate 72 and the groove 2 to improve the strength of the foundation and save materials, the reinforcing rod 71 is connected with the reinforcing groove in a clamping manner to improve the stability of the foundation, the supporting rod 63 and the fixing plate 61 support and fix the extrusion plate 62, the extrusion plate 62 fixes the bearing platform 5 to further improve the stability of the high pile foundation 3, the soft strip 65 buffers the slurry flowing while being in contact with the bearing platform, the slurry flowing is convenient to conduct, the slurry flowing is guided by the collecting plate 661, the falling cement slurry is collected by the collecting groove plate 662, the dismounting pipe 663 is dismounted, the bottom of the collecting groove plate 662 is communicated with the outside air pressure to facilitate cleaning of the slurry solidified at the bottom of the collecting groove plate 662, the clamping sleeve 13 clamps the outer side of the high pile foundation 3 to be installed, the cross rod 91 transmits the vibration of the high, prevent that cross rod 91 from deviating from connecting cylinder 92, the cushion collar 95 outside is the arc, the surface of the high pile foundation 3 of laminating, abundant quick give cross rod 91 with vibrations transmission, kick-back cross rod 91 when first reset spring 93 cushioning modulation, make the high pile foundation 3 of cushion collar 95 laminating, vibrations are transmitted, ball 11 rolls and transmits vibrations, arc seat 12 that resets carries out spacingly and kick-backs to ball 11, cross rod 91 inwards extrudes ball 11, arc seat 12 that resets carries on spacingly, ball 11 promotes bolster 8 downwards, buffer and cut down vibrations, the cushioning modulation through the up-and-down motion of adjusting pole 83 and second reset spring 81 cushions vibrations, pillar 141 and extension board 142 do the support of cushion cap 4, dead lever 143 carries out the fixed of cushion cap 4.
To sum up, the pile foundation fixing device for civil engineering is provided with the reinforcing rod 71, the concrete bottom plate 72, the reinforcing plate 73, the groove 2 and the reinforcing groove, wherein the concrete bottom plate 72 is used as a foundation bottom plate to improve the stability of the foundation, the reinforcing plate 73 is poured to fill the gap between the concrete bottom plate 72 and the groove 2, the use of materials is saved while the strength of the foundation is improved, the reinforcing rod 71 is connected with the reinforcing groove in a clamping manner to improve the stability of the foundation, the supporting rod 63, the barrier strip 64 and the soft strip 65 are arranged, the supporting rod 63 and the fixing plate 61 support and fix the pressing plate 62, the pressing plate 62 fixes the bearing platform 5, the stability of the high pile foundation 3 is further improved, the soft strip 65 is in buffer contact with the bearing platform and is convenient for flowing slurry, the collecting plate 661 is arranged to guide the flowing slurry, the collecting groove plate 662 is arranged to guide the flowing slurry, the collecting groove 662 is used to collect the falling cement slurry, dismounting pipe 663 is communicated with the bottom of collecting trough plate 662 and is communicated with external air pressure, slurry solidified at the bottom of collecting trough plate 662 is convenient to clean, the clamp sleeve 13 clamps and is installed on the outer side of high pile foundation 3 through the arrangement of clamp sleeve 13, connecting cylinder 92, clamp sleeve 94 and cross rod 91, the clamp sleeve 13 transmits the vibration of high pile foundation 3, the clamp sleeve 94 limits the displacement of the cross rod 91 and prevents the cross rod 91 from falling off from the connecting cylinder 92, the outer side of the buffer sleeve 95 is arc-shaped through the arrangement of buffer sleeve 95, first reset spring 93, adjusting box 10, ball 11 and reset arc seat 12, the outer surface of the high pile foundation 3 is attached, the vibration is transmitted to the cross rod 91 sufficiently and quickly, the cross rod 91 rebounds while the buffer adjustment is buffered by the first reset spring 93, the buffer sleeve 95 is attached to the high pile foundation 3 to transmit the vibration, the ball 11 rolls to transmit the vibration, the reset arc seat 12 limits and rebounds the ball 11, through being provided with regulating box 10, the arc seat 12 resets, ball 11 and buffer 8, cross rod 91 inwards extrudees ball 11, the arc seat 12 that resets carries on spacingly, ball 11 promotes buffer 8 downwards, cushion and cut down vibrations, through being provided with second reset spring 81, the fixed cylinder 82, adjust pole 83 and buffer plate 84, through the up-and-down motion of adjusting pole 83 and the buffer adjustment of second reset spring 81 to cushioning vibrations, thereby reduce the influence of vibrations to high pile foundation 3, through being provided with pillar 141, extension board 142 and dead lever 143, pillar 141 and extension board 142 make the support of cushion cap 4, dead lever 143 carries out the fixed of cushion cap 4.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Pile foundation device for civil engineering, including ground (1), its characterized in that: the novel pile foundation structure is characterized in that a groove (2) is formed in the ground (1), a reinforcing groove communicated with the groove is formed in the bottom of the groove (2), a base part (7) is arranged in the groove (2), a high pile foundation (3) is fixedly connected to the top of the base part (7), a shock absorption seat (4) is arranged on the inner side of the high pile foundation (3), a bearing platform (5) is fixedly connected to the top end of the high pile foundation (3), a fixing part (6) is arranged on the outer side of the bearing platform (5), shock absorption parts (9) are fixedly connected to the left side and the right side of the shock absorption seat (4), a clamping sleeve (13) clamped on the outer side of the high pile foundation (3) is fixedly connected to one end, far away from the shock absorption seat (4), of the shock absorption part (9), a connecting part (14) is fixedly connected to the bottom of the shock absorption seat (, the shock absorber is characterized in that a clamping sleeve (94) is fixedly connected to the inside of the connecting cylinder (92), a cross rod (91) is sleeved on the inside of the connecting cylinder (92), one end of the cross rod (91) penetrates through the inside of the clamping sleeve (94) and extends to the outer side of the connecting cylinder (92), an adjusting box (10) connected with the cross rod (91) is fixedly connected to the inside of the shock absorbing seat (4), a buffer part (8) is fixedly connected to the bottom of the adjusting box (10), the buffer part (8) comprises a fixed cylinder (82), the bottom end of the fixed cylinder (82) extends to the lower side of the shock absorbing seat (4), an adjusting rod (83) is clamped to the inside of the fixed cylinder (82), two ends of the adjusting rod (83) extend to the outer side of the fixed cylinder (82), a second reset spring (81) is sleeved on the outer side of the adjusting rod (83), and a buffer plate (84) is fixedly connected to the bottom end, the inner wall of the adjusting box (10) is fixedly connected with a reset arc seat (12), and a ball (11) is arranged inside the adjusting box (10).
2. The pile foundation device for civil engineering according to claim 1, wherein: the outside fixedly connected with cushion collar (95) of cross pole (91), the outside cover of cross pole (91) is equipped with first reset spring (93).
3. The pile foundation device for civil engineering according to claim 1, wherein: the connecting piece (14) comprises a support column (141), a support plate (142) is fixedly connected to the bottom end of the support column (141), and a fixing rod (143) is arranged inside the support plate (142).
4. The pile foundation device for civil engineering according to claim 1, wherein: the foundation member (7) comprises a concrete bottom plate (72), the bottom of the concrete bottom plate (72) is fixedly connected with a reinforcing rod (71), a reinforcing plate (73) is poured on the outer side of the concrete bottom plate (72), and the concrete strength of the reinforcing plate (73) is far greater than that of the concrete bottom plate (72).
5. The pile foundation device for civil engineering according to claim 1, wherein: the fixing piece (6) comprises an extrusion plate (62), a left side fixedly connected with soft strip (65) of the extrusion plate (62), a right side fixedly connected with barrier strip (64) of the extrusion plate (62), a support rod (63) is arranged below the barrier strip (64), and a bottom fixedly connected with fixing plate (61) of the extrusion plate (62).
6. The pile foundation device for civil engineering according to claim 5, wherein: the extrusion board (62) left side just is located below fixedly connected with collection piece (66) of soft strip (65), collect piece (66) including collecting frid (662), the top fixedly connected with collection board (661) of collecting frid (662), the bottom fixedly connected with dismantlement pipe (663) of collecting frid (662).
CN202010760049.2A 2018-04-13 2018-04-13 Pile foundation device for civil engineering Active CN112081130B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010760049.2A CN112081130B (en) 2018-04-13 2018-04-13 Pile foundation device for civil engineering

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010760049.2A CN112081130B (en) 2018-04-13 2018-04-13 Pile foundation device for civil engineering
CN201810332943.2A CN108468343B (en) 2018-04-13 2018-04-13 Pile foundation fixing device for civil engineering

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201810332943.2A Division CN108468343B (en) 2018-04-13 2018-04-13 Pile foundation fixing device for civil engineering

Publications (2)

Publication Number Publication Date
CN112081130A true CN112081130A (en) 2020-12-15
CN112081130B CN112081130B (en) 2021-12-21

Family

ID=63263134

Family Applications (3)

Application Number Title Priority Date Filing Date
CN202010760056.2A Active CN111877387B (en) 2018-04-13 2018-04-13 Civil engineering pile foundation auxiliary fixture
CN201810332943.2A Active CN108468343B (en) 2018-04-13 2018-04-13 Pile foundation fixing device for civil engineering
CN202010760049.2A Active CN112081130B (en) 2018-04-13 2018-04-13 Pile foundation device for civil engineering

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN202010760056.2A Active CN111877387B (en) 2018-04-13 2018-04-13 Civil engineering pile foundation auxiliary fixture
CN201810332943.2A Active CN108468343B (en) 2018-04-13 2018-04-13 Pile foundation fixing device for civil engineering

Country Status (1)

Country Link
CN (3) CN111877387B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877387B (en) * 2018-04-13 2022-01-25 安徽携昇建设工程有限公司 Civil engineering pile foundation auxiliary fixture

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284177A (en) * 1995-04-19 1996-10-29 Toyo Constr Co Ltd Base isolation method for existing building
CN203684069U (en) * 2013-12-20 2014-07-02 中铁二院工程集团有限责任公司 Limited constraint damping structure of continuous rigid frame bridge pier
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs
CN106522205A (en) * 2016-12-30 2017-03-22 上海市机械施工集团有限公司 Pile cap
CN206706851U (en) * 2017-05-10 2017-12-05 广州大学 A kind of composite shock-absorbing device
CN206843941U (en) * 2017-04-20 2018-01-05 宁波大学 A kind of two-columned pier
CN107830106A (en) * 2017-10-17 2018-03-23 广州乐信环保科技有限公司 Float-valve type gas-liquid mixing damping shock absorber

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008031682A (en) * 2006-07-27 2008-02-14 Shimizu Corp Aseismically supporting structure during temporary bearing of building, and aseismically supporting method during temporary bearing of building
CN204098055U (en) * 2014-10-09 2015-01-14 上海智方电力工程有限公司 A kind of district structure earthquake proof foundation
CN104632990A (en) * 2014-12-31 2015-05-20 中国人民解放军军械工程学院 Solid particle damper device
JP2017171347A (en) * 2016-03-23 2017-09-28 三菱重工業株式会社 Aseismatic tank structure and construction method of aseismatic tank structure
CN205839751U (en) * 2016-07-13 2016-12-28 温州华路交通建设工程有限公司 A kind of reinforcement protection device of bridge pile foundation
CN106351217B (en) * 2016-09-20 2018-07-17 太原理工大学 A kind of Self-resetting multidimensional damping tube pile group pile foundation and construction method
CN206359995U (en) * 2016-12-26 2017-07-28 中铁第四勘察设计院集团有限公司 Reinforced concrete cast-in-situ retaining wall
CN206521954U (en) * 2016-12-30 2017-09-26 西安五和土木工程新材料有限公司 A kind of reinforced concrete shear wall bracing means
CN108425366B (en) * 2017-03-14 2020-10-20 宁夏盐池巨晖商贸有限公司 Safety support structure for civil engineering foundation pit support
CN107012894A (en) * 2017-05-10 2017-08-04 广州大学 A kind of composite shock-absorbing device and its construction method
CN107859078B (en) * 2017-09-15 2019-10-18 广州市台实防水补强有限公司 The reinforcement means of building pile foundation
CN111877387B (en) * 2018-04-13 2022-01-25 安徽携昇建设工程有限公司 Civil engineering pile foundation auxiliary fixture

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284177A (en) * 1995-04-19 1996-10-29 Toyo Constr Co Ltd Base isolation method for existing building
CN203684069U (en) * 2013-12-20 2014-07-02 中铁二院工程集团有限责任公司 Limited constraint damping structure of continuous rigid frame bridge pier
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs
CN106522205A (en) * 2016-12-30 2017-03-22 上海市机械施工集团有限公司 Pile cap
CN206843941U (en) * 2017-04-20 2018-01-05 宁波大学 A kind of two-columned pier
CN206706851U (en) * 2017-05-10 2017-12-05 广州大学 A kind of composite shock-absorbing device
CN107830106A (en) * 2017-10-17 2018-03-23 广州乐信环保科技有限公司 Float-valve type gas-liquid mixing damping shock absorber

Also Published As

Publication number Publication date
CN108468343B (en) 2020-10-09
CN111877387B (en) 2022-01-25
CN111877387A (en) 2020-11-03
CN112081130B (en) 2021-12-21
CN108468343A (en) 2018-08-31

Similar Documents

Publication Publication Date Title
CN112081130B (en) Pile foundation device for civil engineering
CN110552994A (en) Damping base for reciprocating pump
CN209555762U (en) A kind of Double-joint expansion joint device for bridge
CN212129534U (en) Vibration isolation device for separating upper cover of subway from upper building
CN207830714U (en) A kind of vertical pump line damping fixing device of concrete
CN213296441U (en) Pile feeding device for uplift pile
CN110863423B (en) Bridge butt joint anti-seismic device
CN210623789U (en) Damping device for concrete pumping pipe
CN213204696U (en) Narrow-flange I-shaped steel concrete conversion beam
CN215294103U (en) Damping device for horizontal concrete conveying pipe of ground pump
CN113216640B (en) Vertical pump pipe frame damping system and construction method thereof
CN210263432U (en) Connection structure of steel construction antidetonation factory building
CN211472150U (en) Bridge shock attenuation high damping support of preventing damage
CN209195004U (en) A kind of fixed device of anti-bank
CN210889876U (en) Oil development platform damping device
CN215294105U (en) Vertical concrete pump pipe shock absorber frame system
CN213176637U (en) Shock absorption device of textile machine
CN219731712U (en) Reinforcing and supporting mechanism for bridge
CN216007272U (en) Anti-seismic building steel structure
CN221441799U (en) Steel construction support column antidetonation support
CN221480583U (en) Bridge reinforced structure
CN219733748U (en) Pump body with good vibration reduction effect for water pump
CN217078390U (en) High-performance insulating damping bridge support
CN211645971U (en) Bridge beam supports that shock attenuation is effectual
CN218719765U (en) Damping platform of limiting water pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20211207

Address after: Building 12, zone 2, ruigu innovation center, No. 17, Xincheng Road, Huiji District, Zhengzhou City, Henan Province

Applicant after: HENAN CHENGJIAN INSPECTION AND TESTING TECHNOLOGY CO.,LTD.

Address before: 450000 Lian Yun Road, 27 District, Zhengzhou, Henan Province, No. 123

Applicant before: HUANGHE S & T College

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant