CN111966332A - BIM-based custom building construction site form business processing method - Google Patents

BIM-based custom building construction site form business processing method Download PDF

Info

Publication number
CN111966332A
CN111966332A CN202010685036.3A CN202010685036A CN111966332A CN 111966332 A CN111966332 A CN 111966332A CN 202010685036 A CN202010685036 A CN 202010685036A CN 111966332 A CN111966332 A CN 111966332A
Authority
CN
China
Prior art keywords
controls
bim
control
line
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010685036.3A
Other languages
Chinese (zh)
Inventor
丁杰超
刘哲
付梦威
蔡永娟
谢如意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yizhu Information Technology Shanghai Co ltd
Original Assignee
Yizhu Information Technology Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yizhu Information Technology Shanghai Co ltd filed Critical Yizhu Information Technology Shanghai Co ltd
Priority to CN202010685036.3A priority Critical patent/CN111966332A/en
Publication of CN111966332A publication Critical patent/CN111966332A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/20Software design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Geometry (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Software Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Quality & Reliability (AREA)
  • Architecture (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Primary Health Care (AREA)
  • Pure & Applied Mathematics (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a BIM-based custom building construction site form service processing method, which is characterized in that form tools are independently developed according to service requirements, offline services are moved to the online in combination with a flow, and the problems of multiple, messy and miscellaneous offline forms are effectively solved; the form is bound with the model by combining with the BIM model, so that the follow-up problem tracing corresponding responsibility is facilitated, and the form is assigned to a person; the form template is converted on the line and is placed off the line, so that the form is really created on the line, the form is different from other technical patents needing to be created again on the line, and the form template is really simple, quick and accurate.

Description

BIM-based custom building construction site form business processing method
Technical Field
The invention relates to a BIM-based custom building construction site form business processing method.
Background
The existing field business generally finishes inspection and acceptance at a construction field, records the field acceptance condition by a paper form, and then finishes signature, seal and file reservation offline.
Due to the complex business and the multiple forms, corresponding personnel are required to keep the forms in files. Once a form lookup occurs, it is then replicated in a large number of paper archive files. Although the data staff can classify according to different lines, the situations of long investigation time, list missing and the like still exist. Due to the fact that the number of services is large, the number of lines is large, the number of forms is large, and therefore spot check is not easy to conduct. Based on the above, it is necessary to move the site table offline to online.
Disclosure of Invention
The purpose of the invention is: and moving the single offline service of the field meter to the online.
In order to achieve the above purpose, the technical scheme of the invention is to provide a BIM-based custom building construction site form service processing method, which is characterized by comprising the following steps:
step 1, converting the three-dimensional model into a BIM lightweight model and displaying the BIM lightweight model on a client/mobile terminal;
step 2, finishing the process of descending the single line of the meter to the line through the introduction of the list under the line;
step 3, developing a form control through a web front end and dragging the form control into an imported form template, and displaying and processing contents needing to be filled by each online person in a control form;
step 4, combining the form controls in the form template with a flow, and appointing corresponding departments/individuals to fill in corresponding form control data;
step 5, the server automatically generates variables for the corresponding form controls according to the dragged form controls and gives the variables to the imported form template, and the later variable information automatically fills and writes the contents filled on line into the form template imported in the step 2, so that the conversion of the forms on line is completed;
and 6, setting a form template filing path.
Preferably, in the step 2, the server draws the offline data into a table with the same size by analyzing the data content and through the web front end, and converts the text information in the offline data into corresponding online data.
Preferably, the form controls include single line text, time controls, address controls, descriptive text controls, numerical controls, dataform controls, parting lines, single-choice controls, multiple-line text controls, picture controls, stamp controls, signature controls, attachment controls, personnel controls, and department controls.
Preferably, in the step 4, the content of the form control operable by each flow node person is controlled by setting whether the flow node is visible or editable for the form control.
Preferably, the flow in step 4 supports manual setting, and supports parallel flow and branch flow.
Preferably, the form control is associated with the content of the form template, and whether to be presented or not is controlled by creating conditions between the form control and the form control.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, form tools are independently developed according to the business requirements, and offline businesses are moved to the online in combination with the process, so that the problems of multiple, messy and miscellaneous offline forms are effectively solved; the form is bound with the model by combining with the BIM model, so that the follow-up problem tracing corresponding responsibility is facilitated, and the form is assigned to a person; the form template is converted on the line and is placed off the line, so that the form is really created on the line, the form is different from other technical patents needing to be created again on the line, and the form template is really simple, quick and accurate.
Detailed Description
In order to make the invention more comprehensible, preferred embodiments are described in detail below.
The form service of the invention mainly comprises several contents:
1. how to create forms
2. How to solve the problem that corresponding contents are filled on line under the condition of not influencing the existing form template and the form template is converted into a desired form electronic edition;
3. after the electronic form is available, how to set the flow is to fill in different contents, sign on line, seal and the like according to different personnel.
4. And after the online form is generated, if the online filing is realized, the business is filed.
5. How to convert an online form into an offline document (partial document needs offline signature and stamping) by means of printing and the like, rather than through online solution.
6. How to combine the online form with our BIM model really realizes that the corresponding model component information and the corresponding form document description can be checked by checking the model.
Based on the above 5 points, some similar technologies exist in the market at present, and the following description is emphasized.
1. Creating form templates-splitting different form controls (e.g., single line text controls, time controls, signature controls, address controls, digital controls, form controls, single-choice controls, multi-choice controls, etc.)
2. The flow engine, there are corresponding flow guidance books (e.g.: go deep and shallow wpf, workflow engine development document, etc.) on the market at present
The invention relates to a BIM-based custom building construction site form business processing method, which comprises the following steps:
step 1, converting the three-dimensional model into a BIM lightweight model and displaying the BIM lightweight model on a client/mobile terminal;
step 2, completing the process of the table from single line to online by importing an offline form (word or excel), drawing the offline form into a table (what you see is what you get) with the same size by the server in a way of analyzing the data content for the offline data and through the web front end, and converting the text information in the offline form into corresponding online data (what you see is what you get);
step 3, developing a form control through a web front end and dragging the form control into an imported form template, and displaying and processing contents required to be filled by each online person in a control form, wherein the form control comprises a single-row text, a time control, an address control, a description character control, a digital control, a data form control, a dividing line, a single-option control, a multi-row text control, a picture control, a stamp control, a signature control, an accessory control, a person control and a department control;
step 4, combining the form controls in the form template with a process, designating corresponding departments/individuals to fill in corresponding form control data, and controlling the form control content which can be operated by each process node personnel by setting whether the process node is visible or editable for the form controls, wherein the process supports manual setting and supports parallel processes and branch processes;
branch flow-the trend of the flow is controlled by setting a certain rule at the connection between the flow node and the flow node, such as: when one process node meets the conditions of single/multiple conditions, the next process is carried out, and when the current process rule is not met, the other process is carried out; when the flow A needs to judge whether to walk the flow B or the flow C, a rule needs to be set, when the digital control is equal to 3, the flow A can walk to the flow B, and if the digital control is not equal to 3, the flow A can walk to the flow C;
step 5, the server automatically generates regular variables (such as image { A } representing picture controls) for the corresponding form controls through corresponding rules according to the dragged form controls, and endows the regular variables to the imported form template, and the later variable information automatically fills and writes the contents filled on line into the form template imported in the step 2, so as to complete the conversion of the forms on line;
and 6, setting a form template filing path.
The above 6 steps correspond to the setting of the form template in the system platform, which is completed at the web side, and how to create the form instance through each side (pc side, mobile side, web side) and perform form circulation and final filing through the set corresponding flow is described below.
1. Each end (pc end, mobile end and web end) selects a form template to create a form instance;
2. filling in form basic information (fixed information) form name, form deadline, form association BIM (build, option set, viewport), adding accessories;
3. the creator fills the contents required to be filled in by the flow node;
4. selecting a node responsible person and a corresponding node copying person;
5. submitting a form example (the form example can be circulated according to a flow set by a template);
6. the corresponding responsible person of the node receives the form and fills corresponding content according to the control authority of the form of the node;
7. in the process of the process node, the process refuge, handover and closing are supported;
8. all the flow operations can keep operation logs, and new creation, viewing, editing, deleting, commenting and closing are supported;
9. and after filling corresponding contents, submitting the form, and if the subsequent process nodes exist, continuing to circulate. Finally, the node is ended, and the form example is finished;
10. the instance-completed form is automatically converted into an electronic document and archived to the corresponding path folder.
And (5) creating form examples for each end in the steps of 10, and constructing contents by selecting a BIM (building information modeling) model, so as to achieve the correlation of the correlation model and the forms.
The following sets forth the rules for form controls derived when creating form templates:
1. whether the form control is displayed or not can be controlled by creating conditions between the form controls (the control B sets display conditions-when the content of the control A is XXX, the control B is displayed);
2. the form control is associated with the content of a form template (the control A is set to be associated with the contents of a control B and a control C in an XX form template, and after the form target creates an example, the content displayed by the control A is the filling content of the control B and the control C in the XX form);
3. the data source control can display the content to be extracted by selecting default data in the platform system and data in a database built by an administrator, such as: the data source control a in the form a needs to extract some built attributes in the XX model, and at this time, the corresponding model and the corresponding component can be selected through the data source control, and then the attributes in the component are selected.

Claims (6)

1. A BIM-based custom building construction site form business processing method is characterized by comprising the following steps:
step 1, converting the three-dimensional model into a BIM lightweight model and displaying the BIM lightweight model on a client/mobile terminal;
step 2, finishing the process of descending the single line of the meter to the line through the introduction of the list under the line;
step 3, developing a form control through a web front end and dragging the form control into an imported form template, and displaying and processing contents needing to be filled by each online person in a control form;
step 4, combining the form controls in the form template with a flow, and appointing corresponding departments/individuals to fill in corresponding form control data;
step 5, the server automatically generates variables for the corresponding form controls according to the dragged form controls and gives the variables to the imported form template, and the later variable information automatically fills and writes the contents filled on line into the form template imported in the step 2, so that the conversion of the forms on line is completed;
and 6, setting a form template filing path.
2. The BIM-based custom building construction site form business processing method of claim 1, wherein: in the step 2, the server draws the offline list into a table with the same size through a mode of analyzing data content and the web front end, and converts the text information in the offline list into corresponding online data.
3. The BIM-based custom building construction site form business processing method of claim 1, wherein: the form controls include single line text, time controls, address controls, descriptive text controls, numerical controls, data form controls, parting lines, single-choice controls, multi-line text controls, picture controls, stamp controls, signature controls, attachment controls, personnel controls, and department controls.
4. The BIM-based custom building construction site form business processing method of claim 1, wherein: in the step 4, the form control content which can be operated by each process node person is controlled by setting whether the process node is visible or editable for the form control.
5. The BIM-based custom building construction site form business processing method of claim 1, wherein: the flow in the step 4 supports manual setting and supports parallel flows and branch flows.
6. The BIM-based custom building construction site form business processing method of claim 1, wherein: the form control is associated with the content of the form template, and whether the form control is displayed or not is controlled by creating conditions between the form control and the form control.
CN202010685036.3A 2020-07-16 2020-07-16 BIM-based custom building construction site form business processing method Pending CN111966332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010685036.3A CN111966332A (en) 2020-07-16 2020-07-16 BIM-based custom building construction site form business processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010685036.3A CN111966332A (en) 2020-07-16 2020-07-16 BIM-based custom building construction site form business processing method

Publications (1)

Publication Number Publication Date
CN111966332A true CN111966332A (en) 2020-11-20

Family

ID=73361481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010685036.3A Pending CN111966332A (en) 2020-07-16 2020-07-16 BIM-based custom building construction site form business processing method

Country Status (1)

Country Link
CN (1) CN111966332A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112230938A (en) * 2020-12-09 2021-01-15 长沙树根互联技术有限公司 Method and device for configuring rental products of industrial Internet
CN112965988A (en) * 2021-02-20 2021-06-15 杭州品茗安控信息技术股份有限公司 Data interaction method, device and equipment and computer readable storage medium
CN115563111A (en) * 2022-09-27 2023-01-03 国网江苏省电力有限公司超高压分公司 Method and system for configuring dynamic model of converter station system
CN118154138A (en) * 2024-05-10 2024-06-07 中国电建集团市政规划设计研究院有限公司 Paperless management method, paperless management device, paperless management system and paperless management storage medium based on BIM

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440264A (en) * 2013-08-01 2013-12-11 广东电网公司 Method and system for implementing electric power field operation form
CN105046408A (en) * 2015-06-25 2015-11-11 国网山东省电力公司 Configurable workflow realization method and system
CN105373523A (en) * 2015-10-14 2016-03-02 浪潮软件集团有限公司 Workflow solution method based on user-defined form and Activiti
CN107748951A (en) * 2017-09-26 2018-03-02 中国建筑第八工程局有限公司 Building engineering construction inspection of quality method and system based on BIM
CN110286908A (en) * 2019-07-01 2019-09-27 广州凡科互联网科技股份有限公司 A method of based on control formula customizing form

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440264A (en) * 2013-08-01 2013-12-11 广东电网公司 Method and system for implementing electric power field operation form
CN105046408A (en) * 2015-06-25 2015-11-11 国网山东省电力公司 Configurable workflow realization method and system
CN105373523A (en) * 2015-10-14 2016-03-02 浪潮软件集团有限公司 Workflow solution method based on user-defined form and Activiti
CN107748951A (en) * 2017-09-26 2018-03-02 中国建筑第八工程局有限公司 Building engineering construction inspection of quality method and system based on BIM
CN110286908A (en) * 2019-07-01 2019-09-27 广州凡科互联网科技股份有限公司 A method of based on control formula customizing form

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
詹宏生;: "基于电子表单的工商信息化业务***新模式探析", 通讯世界, no. 06 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112230938A (en) * 2020-12-09 2021-01-15 长沙树根互联技术有限公司 Method and device for configuring rental products of industrial Internet
CN112230938B (en) * 2020-12-09 2021-03-23 长沙树根互联技术有限公司 Method and device for configuring rental products of industrial Internet
CN112965988A (en) * 2021-02-20 2021-06-15 杭州品茗安控信息技术股份有限公司 Data interaction method, device and equipment and computer readable storage medium
CN115563111A (en) * 2022-09-27 2023-01-03 国网江苏省电力有限公司超高压分公司 Method and system for configuring dynamic model of converter station system
CN118154138A (en) * 2024-05-10 2024-06-07 中国电建集团市政规划设计研究院有限公司 Paperless management method, paperless management device, paperless management system and paperless management storage medium based on BIM

Similar Documents

Publication Publication Date Title
CN111966332A (en) BIM-based custom building construction site form business processing method
Abdirad Metric-based BIM implementation assessment: a review of research and practice
US6055551A (en) Computer system and method for process safety management hazard reviews
CN109035060A (en) A kind of structured processes management system and management method
CN112232761A (en) Infrastructure application system and method
Graham et al. Defining geometry levels for optimizing BIM for VR: Insights from traditional architectural media
Pfarr-Harfst Typical workflows, documentation approaches and principles of 3D digital reconstruction of cultural heritage
Garyaeva Application of BIM modeling for the organization of collective work on a construction project
Liu et al. The information requirements for transportation industry’s facilities management based on BIM
Martin Problem Framing: Identifying the right models for the job
US20140115433A1 (en) Business management system and method
CN110531972B (en) Editing method and device for resource arrangement resource attribute
CN117454864A (en) Display method based on template and data fusion
JP6530330B2 (en) Loan administration automatic check system and method
CN114139521A (en) Online visualization template file based generation method
Ven et al. The introduction of OpenOffice. org in the Brussels Public Administration
Kabaca et al. BIM-Based Value Engineering: Creating a Plug-In System for Time Saving and Quantity Management
Matsumoto et al. Use of process maps to develop a management briefing sheet for a design consultancy
Mendenhall et al. Creating planning documents
Agapiou et al. The development of a smart mobile app for building façade defects inspections
Fosse et al. Deploying BIM in a Heavy Civil Project
Ostárek Digitization of construction industry through BIM
JPH08180110A (en) Operation process defining method
Patacas et al. Supporting building owners and facility managers in the visualisation of an Integrated Asset Information model (AIM) based on open standards
Stalsberg et al. 8.3. 1 Increasing the value of model‐assisted communication: Modeling for understanding, exploration and verification in production line design projects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination