CN111957142A - Novel construction site dust fall for building engineering device - Google Patents
Novel construction site dust fall for building engineering device Download PDFInfo
- Publication number
- CN111957142A CN111957142A CN202010956922.5A CN202010956922A CN111957142A CN 111957142 A CN111957142 A CN 111957142A CN 202010956922 A CN202010956922 A CN 202010956922A CN 111957142 A CN111957142 A CN 111957142A
- Authority
- CN
- China
- Prior art keywords
- plate
- control box
- construction site
- water
- novel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D47/00—Separating dispersed particles from gases, air or vapours by liquid as separating agent
- B01D47/06—Spray cleaning
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D47/00—Separating dispersed particles from gases, air or vapours by liquid as separating agent
- B01D47/06—Spray cleaning
- B01D47/08—Spray cleaning with rotary nozzles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2247/00—Details relating to the separation of dispersed particles from gases, air or vapours by liquid as separating agent
- B01D2247/08—Means for controlling the separation process
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a novel construction site dust falling device for construction engineering, which comprises a base, wherein wheels are arranged at the lower end of the base, a side plate, a water tank and a lifting platform are arranged at the upper end of the base, a connecting block is arranged on one side of the side plate, a fixed platform is arranged at the upper end of the base, a spraying device is arranged at the upper end of the fixed platform, a control box and a lifting frame are arranged in the fixed platform, a water outlet and a water valve are arranged in the control box, a hose is arranged on one side of the control box, a fixed plate is arranged at the upper end of the lifting frame, a rotating plate is arranged at the upper end of the fixed plate, and a connecting pipe is arranged in the fixed plate. According to the novel construction site dust falling device for the building engineering, the height of dust falling is controlled through the arranged lifting platform, the dust falling range is enlarged through the arranged spraying device by swinging up and down, left and right, and a better use prospect is brought.
Description
Technical Field
The invention relates to the field of constructional engineering, in particular to a novel construction site dust falling device for constructional engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, and a large amount of dust exists on the construction site of the building engineering, so that if people suck too much dust, the physical and mental health of people can be not facilitated.
Present novel for building engineering job site dust device is when installing the use, generally earlier in the water injection water tank, carry out the dust fall through atomizing ejection water again, but the water injection need connect the water pipe when getting into the water tank, if there is not the water pipe on one's side just hardly to carry out this operation, and the water pipe needs to be good to accomodate after using, so that next use, dust density is little, and is small, raise very easily and fly to the upper air, but the required dust fall of different dust volumes highly also different, general dust device height is unified, can't adjust, certain adverse effect has been brought to people's use, for this, we propose a novel for building engineering job site dust device.
Disclosure of Invention
Solves the technical problem
Aiming at the defects of the prior art, the invention provides a novel construction site dust falling device for constructional engineering, which has the advantages of lifting, rotating, large dust falling range, convenience in water adding and the like, and can effectively solve the problems in the background art.
Technical scheme
In order to achieve the purpose, the invention adopts the technical scheme that: the utility model provides a novel construction site dust fall for building engineering device, the on-line screen storage device comprises a base, the lower extreme of base is provided with the wheel, the upper end of base is provided with curb plate, water tank, elevating platform, one side of curb plate is provided with the connecting block, the upper end of base is provided with the fixed station, the upper end of fixed station is provided with atomizer, the inside of fixed station is provided with control box and crane, the inside of control box is provided with delivery port and water valve, one side of control box is provided with the hose, the upper end of crane is provided with decides the board, the upper end of deciding the board is provided with changes the board, decide the board and be provided with the connecting pipe with the inside of changeing the board, the upper end of changeing the board is provided with the fixed plate, the upper end of.
Preferably, the lifting platform comprises a cover, a control box, a hose, a water outlet, a water valve, a lifting frame and a fixing platform, wherein the control box is positioned on one side of the lifting frame, and the hose is positioned inside the lifting frame.
Preferably, the one end of delivery port is run through the one end of control box and hose and is connected for dismantling, the other end of hose and the upper end internal surface of crane are connected for dismantling, set up in the hinge between lid and the control box, the upper end that hinge and control box are passed through to one side of lid is swing joint.
Preferably, the spraying device comprises a connecting shaft, an atomizing nozzle, a fixing plate, a rotating plate, a connecting pipe and a fixing plate, wherein the connecting pipe is inserted into the rotating plate and the fixing plate, and the connecting shaft is inserted into the fixing plate.
Preferably, be provided with the rotation axis between fixed plate and the axle that links, the inner wall of fixed plate is swing joint through the outer wall of rotation axis and axle that links, it is provided with the rotation axis to change the board and decide between the board, the lower extreme of changeing the board is swing joint through the upper end of rotation axis and fixed board, the upper end of connecting pipe is fixed connection with atomizer's lower extreme.
Preferably, one side of water tank is provided with support body, reelpipe wheel and water inlet, the water inlet is located the lower extreme of support body, the reelpipe wheel is located the lower extreme of water inlet, one side of support body is provided with the crank, the surface all around of reelpipe wheel is provided with the water pipe.
Preferably, one side that support body and crank were run through to one side of reelpipe wheel is fixed connection, be provided with the rotation axis between support body and the reelpipe wheel, the inner wall of support body is swing joint through the outer wall of rotation axis with the reelpipe wheel, one side of water pipe and the surface all around of reelpipe wheel are for dismantling the connection.
Advantageous effects
Compared with the prior art, the invention provides a novel construction site dust falling device for constructional engineering, which has the following beneficial effects:
1. this novel job site dust device for building engineering, through the elevating platform that sets up, the crane oscilaltion, the height of dust fall is controlled to adjustable atomizer's height, all can play the dust fall effect to the dust of co-altitude.
2. This novel job site dust device for building engineering sprays water smoke through the atomizer that sets up, carries out the dust fall to the job site and handles, and the board is changeed through the rotation axis messenger to the fixed board and rotates, drives atomizer bilateral rotation, and the fixed plate makes even axle rotation through the rotation axis, drives atomizer luffing motion, increase dust fall scope.
3. This novel construction site dust device for building engineering through the water pipe that sets up, connects the water inlet, in pouring water into the water tank, conveniently carries out the dust fall and handles, rotates the crank and makes the reelpipe wheel rotate, takes turns to the reelpipe with the water pipe winding, is convenient for accomodate the water pipe.
Drawings
Fig. 1 is a schematic overall structure diagram of a novel construction site dust settling device for construction engineering.
Fig. 2 is a schematic structural view of a lifting platform of the novel construction site dust-settling device for the building engineering.
Fig. 3 is a schematic structural view of a spraying device of the novel construction site dust-settling device for the building engineering.
Fig. 4 is a schematic side view structure diagram of a water tank and a frame body of the novel construction site dust settling device for the building engineering.
In the figure: 1. a base; 2. a wheel; 3. connecting blocks; 4. a side plate; 5. a water tank; 6. a spraying device; 601. a connecting shaft; 602. an atomizing spray head; 603. a fixing plate; 604. rotating the plate; 605. a connecting pipe; 606. fixing a plate; 7. a lifting platform; 701. a cover; 702. a control box; 703. a hose; 704. a water outlet; 705. a water valve; 706. a lifting frame; 707. a fixed table; 8. a frame body; 9. a crank; 10. a pipe coiling wheel; 11. a water pipe; 12. a water inlet.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in fig. 1-4, a novel construction site dust-settling device for construction engineering comprises a base 1, wheels 2 are arranged at the lower end of the base 1, a side plate 4, a water tank 5 and a lifting platform 7 are arranged at the upper end of the base 1, a connecting block 3 is arranged at one side of the side plate 4, the connecting block 3 can connect the dust-settling device with a mobile vehicle so as to facilitate the movement of the dust-settling device, a fixed platform 707 is arranged at the upper end of the base 1, a spraying device 6 is arranged at the upper end of the fixed platform 707, a control box 702 and a lifting frame 706 are arranged inside the fixed platform 707, a water outlet 704 and a water valve 705 are arranged inside the control box 702, a hose 703 is arranged at one side of the control box 702, a fixed plate 606 is arranged at the upper end of the fixed plate 606, a rotating plate 604 is arranged at the upper end of the fixed plate 606 and the rotating plate 604, a connecting pipe 605 is arranged, the atomizing nozzle 602 is provided with connecting shafts 601 at both sides.
Further, the lifting platform 7 comprises a cover 701, a control box 702, a hose 703, a water outlet 704, a water valve 705, a lifting frame 706 and a fixing platform 707, the control box 702 is positioned at one side of the lifting frame 706, the hose 703 is positioned inside the lifting frame 706, and water enters the spraying device 6 from the water outlet 704 through the hose 703 to be subjected to dust settling treatment.
Furthermore, one end of the water outlet 704 penetrates through the control box 702 and is detachably connected with one end of the hose 703, the other end of the hose 703 is detachably connected with the inner surface of the upper end of the lifting frame 706, the cover 701 and the control box 702 are arranged on a hinge, one side of the cover 701 is movably connected with the upper end of the control box 702 through the hinge, the lifting frame 706 is lifted up and down through the lifting platform 7, and the height of the spraying device 6 can be adjusted.
Further, the spraying device 6 includes a coupling shaft 601, an atomizing head 602, a fixed plate 603, a rotating plate 604, a connecting pipe 605 and a fixed plate 606, the connecting pipe 605 is inserted into the rotating plate 604 and the fixed plate 606, the coupling shaft 601 is inserted into the fixed plate 603, and dust fall treatment is performed on the construction site by the spraying device 6 provided.
Furthermore, a rotating shaft is arranged between the fixed plate 603 and the connecting shaft 601, the inner wall of the fixed plate 603 is movably connected with the outer wall of the connecting shaft 601 through the rotating shaft, the rotating shaft is arranged between the rotating plate 604 and the fixed plate 606, the lower end of the rotating plate 604 is movably connected with the upper end of the fixed plate 606 through the rotating shaft, the upper end of the connecting pipe 605 is fixedly connected with the lower end of the atomizing nozzle 602, the fixed plate 606 rotates the rotating plate 604 through the rotating shaft to drive the atomizing nozzle 602 to rotate left and right, and the fixed plate 603 rotates the connecting shaft 601 through the rotating shaft to drive the atomizing nozzle 602 to swing up and down, so that the dust fall range.
Further, one side of water tank 5 is provided with support body 8, reelpipe wheel 10 and water inlet 12, and water inlet 12 is located the lower extreme of support body 8, and reelpipe wheel 10 is located the lower extreme of water inlet 12, one side of support body 8 is provided with crank 9, and the surface all around of reelpipe wheel 10 is provided with water pipe 11, through the reelpipe wheel 10 that sets up, convolutes water pipe 11 on its surface, is convenient for accomodate water pipe 11.
Further, one side that support body 8 and crank 9 are run through to one side of reelpipe wheel 10 is fixed connection, is provided with the rotation axis between support body 8 and the reelpipe wheel 10, and the inner wall of support body 8 is swing joint through the outer wall of rotation axis and reelpipe wheel 10, and one side of water pipe 11 and the surface all around of reelpipe wheel 10 are for dismantling to be connected, wave crank 9 and make reelpipe wheel 10 rotatory, convolute or loosen water pipe 11.
Principle of operation
Firstly, a connecting device is used for connecting a movable vehicle and the dust falling device together from a connecting block 3 at one side of a side plate 4, the movable vehicle is started, a wheel 2 at the lower end of a base 1 starts to rotate to drive the device to move forwards, the movable vehicle is driven to a water source, a crank 9 is shaken by hands, a water pipe 11 is put down from a pipe coiling wheel 10, one end of the water pipe 11 is connected with the water source, the other end of the water pipe 11 is connected with a water inlet 12 at one side of a water tank 5, the water source is injected into the water tank 5, the water pipe 11 is taken down after the water tank is filled, one end of the water pipe 11 is placed on the pipe coiling wheel 10, the crank 9 is remotely controlled by hands, the water pipe 11 is coiled on the pipe coiling wheel 10, one end of a hose 703 is connected and fastened with a water outlet 704, the other end of the hose 703 is connected and fastened with the inner surface of the upper end of, the height of the dustfall is adjusted according to the height of the dust, if the dust is more in the upper air, the lifting platform 7 can be adjusted, the lifting platform 706 in the fixed platform 707 is lifted upwards to drive the spraying device 6 to lift upwards, the height of the spraying device 6 is increased, the dustfall treatment can be carried out on the dust in the higher air, if the dustfall height is required to be reduced, the height of the spraying device 6 can be slightly reduced, water mist is sprayed by the arranged spraying device 6 to carry out the dustfall treatment on a construction site, the fixed plate 606 rotates the rotating plate 604 through the rotating shaft to drive the atomizing nozzle 602 to rotate left and right, the fixed plate 603 rotates the connecting shaft 601 through the rotating shaft to drive the atomizing nozzle 602 to swing up and down, the dustfall range is enlarged, the mobile vehicle is started again, the dragging device operates, and the dustfall treatment is carried out while moving.
It is noted that, herein, relational terms such as first and second (a, b, etc.) and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a novel construction site dust device for building engineering, includes base (1), its characterized in that: the lower end of the base (1) is provided with wheels (2), the upper end of the base (1) is provided with a side plate (4), a water tank (5) and a lifting platform (7), one side of the side plate (4) is provided with a connecting block (3), the upper end of the base (1) is provided with a fixed platform (707), the upper end of the fixed platform (707) is provided with a spraying device (6), the inside of the fixed platform (707) is provided with a control box (702) and a lifting frame (706), the inside of the control box (702) is provided with a water outlet (704) and a water valve (705), one side of the control box (702) is provided with a hose (703), the upper end of the lifting frame (706) is provided with a fixed plate (606), the upper end of the fixed plate (606) is provided with a rotating plate (604), the inside of the fixed plate (606) and the rotating plate (604) is provided with a connecting pipe (605), the upper end of the connecting pipe (605) is provided with an atomizing nozzle (602), and two sides of the atomizing nozzle (602) are provided with connecting shafts (601).
2. The novel construction site dust falling device for the building engineering of claim 1, characterized in that: the lifting platform (7) comprises a cover (701), a control box (702), a hose (703), a water outlet (704), a water valve (705), a lifting frame (706) and a fixing platform (707), wherein the control box (702) is positioned on one side of the lifting frame (706), and the hose (703) is positioned inside the lifting frame (706).
3. The novel construction site dust falling device for the building engineering of claim 2, characterized in that: one end of the water outlet (704) penetrates through the control box (702) and is detachably connected with one end of the hose (703), the other end of the hose (703) is detachably connected with the inner surface of the upper end of the lifting frame (706), the cover (701) and the control box (702) are arranged on a hinge, and one side of the cover (701) is movably connected with the upper end of the control box (702) through the hinge.
4. The novel construction site dust falling device for the building engineering of claim 1, characterized in that: the spraying device (6) comprises a connecting shaft (601), an atomizing spray head (602), a fixing plate (603), a rotating plate (604), a connecting pipe (605) and a fixing plate (606), wherein the connecting pipe (605) is inserted into the rotating plate (604) and the fixing plate (606), and the connecting shaft (601) is inserted into the fixing plate (603).
5. The novel construction site dust falling device for the building engineering of claim 4, characterized in that: a rotating shaft is arranged between the fixed plate (603) and the connecting shaft (601), the inner wall of the fixed plate (603) is movably connected with the outer wall of the connecting shaft (601) through the rotating shaft, the rotating shaft is arranged between the rotating plate (604) and the fixed plate (606), the lower end of the rotating plate (604) is movably connected with the upper end of the fixed plate (606) through the rotating shaft, and the upper end of the connecting pipe (605) is fixedly connected with the lower end of the atomizing nozzle (602).
6. The novel construction site dust falling device for the building engineering of claim 1, characterized in that: one side of water tank (5) is provided with support body (8), reelpipe wheel (10) and water inlet (12), water inlet (12) are located the lower extreme of support body (8), reelpipe wheel (10) are located the lower extreme of water inlet (12), one side of support body (8) is provided with crank (9), the surface all around of reelpipe wheel (10) is provided with water pipe (11).
7. The novel construction site dust falling device for the building engineering of claim 6, characterized in that: one side that support body (8) and crank (9) were run through to one side of reelpipe wheel (10) is fixed connection, be provided with the rotation axis between support body (8) and reelpipe wheel (10), the inner wall of support body (8) is swing joint through the outer wall of rotation axis and reelpipe wheel (10), one side of water pipe (11) is connected for dismantling with the surface all around of reelpipe wheel (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010956922.5A CN111957142A (en) | 2020-09-12 | 2020-09-12 | Novel construction site dust fall for building engineering device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010956922.5A CN111957142A (en) | 2020-09-12 | 2020-09-12 | Novel construction site dust fall for building engineering device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111957142A true CN111957142A (en) | 2020-11-20 |
Family
ID=73393028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010956922.5A Withdrawn CN111957142A (en) | 2020-09-12 | 2020-09-12 | Novel construction site dust fall for building engineering device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111957142A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112657296A (en) * | 2020-12-19 | 2021-04-16 | 浙江广厦建设职业技术大学 | Building engineering dust device that spraying coverage is wide |
-
2020
- 2020-09-12 CN CN202010956922.5A patent/CN111957142A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112657296A (en) * | 2020-12-19 | 2021-04-16 | 浙江广厦建设职业技术大学 | Building engineering dust device that spraying coverage is wide |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107029909A (en) | A kind of construction site ground device for reducing dust | |
CN108744810A (en) | A kind of working environmental protection device | |
CN110369200A (en) | A kind of intelligent flush coater of adjustable spray range | |
CN205755507U (en) | A kind of booth vegetable cultivation fertilizer apparatus | |
CN208852598U (en) | A kind of construction dust-extraction unit | |
CN111957142A (en) | Novel construction site dust fall for building engineering device | |
CN204934159U (en) | A kind of automatic cleaner | |
CN206716302U (en) | A kind of mobile paint spraying apparatus of wind power tower drum | |
CN212594705U (en) | Novel construction site dust fall for building engineering device | |
CN214513473U (en) | Spraying device for building construction is dustproof | |
CN211537039U (en) | Factory building dust fall fog gun | |
CN209403223U (en) | A kind of gardens watering device | |
CN208786043U (en) | A kind of working environmental protection device | |
CN216800941U (en) | A dust clean-up equipment for environmental protection equipment maintenance | |
CN114471028B (en) | Automatic water mist dust settling device for green building construction | |
CN216142351U (en) | High-efficient room is built fitment and is used environmental protection paint spraying apparatus | |
CN214717590U (en) | Spraying dust device for road and bridge construction | |
CN213907844U (en) | Automatic swinging device of sprinkling gun of greening sprinkling vehicle | |
CN206028007U (en) | Transmission shaft paint spraying apparatus | |
CN219622183U (en) | Wall paint spraying device | |
CN220176421U (en) | Dust fall device for building engineering | |
CN216551577U (en) | Dotting device for road and bridge construction | |
CN216572172U (en) | Automatic spray dust removal device of thermal power plant's defeated coal | |
CN219722320U (en) | Dust fall device for municipal road engineering building with adjustable spray head angle | |
CN216799186U (en) | Facade watering device for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20201120 |
|
WW01 | Invention patent application withdrawn after publication |