CN111951557A - Regional short-term traffic flow prediction method and system based on Internet of vehicles big data - Google Patents
Regional short-term traffic flow prediction method and system based on Internet of vehicles big data Download PDFInfo
- Publication number
- CN111951557A CN111951557A CN202010848663.4A CN202010848663A CN111951557A CN 111951557 A CN111951557 A CN 111951557A CN 202010848663 A CN202010848663 A CN 202010848663A CN 111951557 A CN111951557 A CN 111951557A
- Authority
- CN
- China
- Prior art keywords
- vehicles
- vehicle
- internet
- traffic flow
- types
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000004891 communication Methods 0.000 claims description 5
- 239000011159 matrix material Substances 0.000 claims description 4
- 238000010187 selection method Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000006855 networking Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- DMBHHRLKUKUOEG-UHFFFAOYSA-N diphenylamine Chemical compound C=1C=CC=CC=1NC1=CC=CC=C1 DMBHHRLKUKUOEG-UHFFFAOYSA-N 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000012417 linear regression Methods 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/01—Detecting movement of traffic to be counted or controlled
- G08G1/0104—Measuring and analyzing of parameters relative to traffic conditions
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Traffic Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a regional short-term traffic flow prediction method and a regional short-term traffic flow prediction system based on Internet of vehicles big data, which can be used for predicting the types and the number of various vehicles flowing through a target region, improving the traffic control capability of a park, the resource utilization efficiency of commercial vehicles and providing guidance for production arrangement of merchants, and meanwhile, the predicted amount of unit time is divided into a plurality of time zones, and a time zone method is adopted for prediction, so that the time zone with lower prediction accuracy is diluted, and the prediction accuracy of the unit time is obviously improved.
Description
Technical Field
The invention relates to the technical field of vehicle flow prediction, in particular to a regional short-term traffic flow prediction method and system based on Internet of vehicles big data.
Background
The commercial vehicle networking is through big dipper/GPS, RFID, the sensor, devices such as camera image processing, accomplish the collection of self environment and state information, assemble the various information transmission of vehicle self to server (high in the clouds) through the internet, these have the information of a large amount of vehicle positions and running state, commercial vehicle networking big data has been constituted, utilize big data analysis technique, go to analyze and handle these information through the computer, can extend numerous, valuable application scene, for example can do commercial vehicle's best route planning in the ITS field, timely road conditions information reports, the traffic signal lamp dynamic adjustment on the dangerous goods transport vechicle route and so on.
ITS is an abbreviation of Intelligent Transportation System (Intelligent Transportation System), and traffic flow refers to the number of traffic entities passing through a certain area, a certain road section or a certain lane in a selected time zone. The prediction information of the traffic flow is the key for intelligent traffic control, dynamic traffic state identification and prediction and real-time traffic flow dynamic induction in the ITS. The current traffic flow prediction technical methods mainly comprise two types: the method comprises the following steps of firstly, modeling based on artificial intelligence, namely a machine learning algorithm; the second is a statistical prediction algorithm model, such as moving average, autoregressive moving average, kalman filter, linear regression, and the like.
Because the existing traffic flow prediction technical method mainly focuses on the traffic flow prediction of a certain road section or a certain lane, few technical methods are used for the traffic flow prediction of specific areas, such as large logistics park, mines and other areas. In the traffic environment of such areas, the movement change of the vehicles is strong periodically, and at the same period, some areas have higher traffic flow, while some areas have lower traffic flow, and the imbalance of the traffic flow in these areas can bring serious influence (such as long loading and unloading time) to the traffic control of the park and the resource utilization efficiency of the commercial vehicles. Particularly, in an industrial park, commercial freight vehicles are of multiple types, and the set parking spaces are respectively used for parking, unloading and loading different types of vehicles, (the parking spaces in the park are basically unloaded fully automatically, but the types of trucks are multiple, the trucks of different types are different, and the configured unloading manipulators are inconsistent, so that the trucks of corresponding types need to be parked in corresponding parking spaces for unloading), and the types and the corresponding quantity of the vehicles are difficult to predict in the conventional prediction technology.
Disclosure of Invention
The invention aims to: aiming at the problem that the prediction cannot be carried out on various types of vehicles in a fixed area in the prior art, a regional short-term traffic flow prediction method and a regional short-term traffic flow prediction system based on vehicle networking big data are provided.
In order to achieve the purpose, the invention adopts the technical scheme that:
a regional short-term traffic flow prediction method based on Internet of vehicles big data comprises the following steps:
s100, acquiring continuous X periods of vehicle conditions in a target area based on the Internet of vehicles big data, wherein X is larger than 1;
s200, dividing the vehicle conditions into m types of vehicles to obtain the number of each type of vehicle, wherein m is greater than or equal to 1;
s300, predicting by adopting a statistical matrix method, calculating the average condition of the vehicle types and the corresponding quantity in X periods, and considering the influence of uncontrollable factors on the vehicle to obtain the preliminary prediction result of the vehicle types and the corresponding quantity in the next period; wherein the uncontrollable factors include weather, vehicle failure, loading and unloading equipment failure;
s400, aiming at one or more types of vehicles, forecasting by adopting a time division method according to the preliminary forecasting result of the next period, dividing each period of X periods into a plurality of time zones, calculating the average value of X periods of each time zone, multiplying the ratio of the average value of X periods of each time zone to the average value of X periods of the next period by the preliminary forecasting result of the next period to obtain the preliminary forecasting value of each time zone, multiplying the preliminary forecasting value of each time zone by the corresponding forecasting accuracy, and then summing to obtain the final forecasting result of the number of vehicles in the next period.
A regional short-term traffic flow prediction method and system based on Internet of vehicles big data are provided, the types and the number of multi-type vehicles flowing through a target region are predicted, the campus traffic control capacity and the resource utilization efficiency of commercial vehicles are improved, guidance is provided for production arrangement of merchants, the predicted quantity per unit time is divided into a plurality of time zones, a time zone division method is adopted for prediction, the time zone with low prediction accuracy is diluted, and therefore the prediction accuracy per unit time is obviously improved.
Preferably, the step S200 includes:
the vehicle situation is divided into m types of vehicles, which are represented by a vehicle flow set V:
V={V11,V12,…,V1i;V21,V22,…,V2j;…;Vm1,Vm2,…,Vmk}
dividing a period into n time zones, and using the time zones to jointly represent:
T={T1,T2,…,Tn}
the type of vehicle and corresponding number P of the k-th cyclek:
Wherein the content of the first and second substances,indicated as the number of occurrences of the type of vehicle in section Vi during the k-th cycle Tj.
Preferably, the step S300 includes:
s310, unbiased estimation is carried out to obtain unbiased prediction results of the types and the corresponding number of the vehicles in the (k + 1) th cycle
S320, introducing a deviation factor to obtain the vehicle type of the (k + 1) th cycle and a corresponding number of preliminary prediction results; wherein the deviation factor represents the degree of influence of the vehicle by the uncontrollable factor.
Preferably, the step S310 includes:
when unbiased estimation is performed, the unbiased prediction result of the k +1 th period is consideredVehicle types and corresponding number P equal to the k-th cyclekAverage condition in X daysNamely:
preferably, the step S320 includes:
introducing deviation factorsSelecting the deviation factor of the (k + 1) th period by a roulette selection methodThe types and corresponding quantities of the vehicles in the X +1 th cycle are predicted, namely:
obtaining the types and the corresponding number of the vehicles in the X +1 th cycle:
predicted deviation η of k-th cyclek:
Preferably, the step S400 includes:
final prediction of the number of vehicles in the next cycle for one or more types of vehicles, Nk+1:
Wherein (N)k+1) ' is the number of vehicles in the preliminary prediction result;is an average value of the number of real vehicles in the Ti time zones of 1 to K cycles, the number of vehicles actually collected for the ith time zone of the jth period;is the average value of the number of real vehicles per period from 1 to K periods,
Njthe number of vehicles actually acquired in the j period;the average accuracy of the prediction accuracy for the number of vehicles in the Ti time zones of 1 to K cycles,Pi jthe prediction accuracy for the ith time zone of the jth cycle,if Pi j<0, then P is orderedi j=0。
Preferably, the period is one day, one week, or one month.
A regional short-term traffic flow prediction system based on Internet of vehicles big data comprises at least one processor, a memory and a display, wherein the memory and the display are in communication connection with the at least one processor; the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method of any one of the above; the processor is provided with a data input/output interface, is connected with the display, the keyboard, the mouse and the electronic equipment with the USB interface through the data input/output interface and is used for inputting and outputting data; the results of the instructions being executed by the at least one processor are displayed via a display while the results are transmitted to a vehicle network system.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
the regional short-term traffic flow prediction method and system based on the Internet of vehicles big data, disclosed by the invention, can be used for predicting the types and the number of various vehicles flowing through a target region, improving the traffic control capability of a park, improving the resource utilization efficiency of commercial vehicles and providing guidance for production arrangement of merchants, and meanwhile, the predicted quantity per unit time is divided into a plurality of time zones, and a time zone with low prediction accuracy is diluted by adopting a time zone division method, so that the prediction accuracy per unit time is obviously improved.
Drawings
FIG. 1 is a schematic flow diagram of the process of the present invention.
Fig. 2 is a schematic structural diagram of the system provided by the present invention.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
Aiming at the problems that commercial freight vehicles are multiple in types and the arranged parking spaces are respectively used for parking, unloading and loading different types of vehicles in an industrial park, (the parking spaces in the park basically adopt full-automatic unloading, but the types of the trucks are multiple, the trucks in different types are different in the configured unloading mechanical arms, so that the trucks in the corresponding types need to be parked in the corresponding parking spaces for unloading) the existing prediction technology is difficult to predict the types of the vehicles and the corresponding quantity of the vehicles, if a certain type of commercial freight vehicle in a certain time section in the park is already parked at all the parking spaces for parking the type of the vehicles, if a merchant still commissions the type of the freight vehicles to distribute goods in the time section, the merchant obviously needs to wait due to the fact that the empty parking spaces for parking and unloading the type of the vehicles are not already available, and the allocation of the goods cannot be completed in time.
Therefore, the regional short-term traffic flow prediction method based on the internet of vehicles big data in the embodiment 1, as shown in fig. 1, includes the following steps:
s100, continuously acquiring X days for vehicles entering and leaving the park by a front-section data acquisition system of a big data platform of the Internet of vehicles to obtain vehicle condition data of the X days.
S200, obtaining the vehicle condition in one day in a park, processing the vehicle condition, classifying according to types to obtain m types of vehicles, and obtaining the quantity (i, j, k are equal or unequal) of each type of vehicles, so that the park vehicle flow set can be expressed as:
V={V11,V12,…,V1i;V21,V22,…,V2j;…;Vm1,Vm2,…,Vmk};
dividing a day into n time segments, the set of time segments being represented as: t ═ T1,T2,…,Tn};
Statistics were started on the occurrence of the campus vehicles on the first day, as shown in the table below,
in the table, the middle number 1 is represented as: at time T1, 1 vehicle of the V1 type was present on the campus. 0 indicates that the time zone is absent for that type of vehicle.
With PkIndicating the situation of the park vehicle on day k,expressed as the number of occurrences of a vehicle of the type section Vi on day k Tj, in a matrix representation of:
average for S300X days, calculated as follows:
by following the principles of statistics, it is possible to determine,the above is an unbiased estimation, but in practical situations, there is often a bias factor, and therefore, a bias factor is introducedThe deviation factor represents the influence degree of uncontrollable factors (weather, vehicle fault, equipment unloading (loading) fault and the like) on a certain type of vehicle, and the deviation factor of the (k + 1) th day is selected and valued by adopting a roulette selection method, includingTo predict the vehicle condition on day X +1, there are:
and (3) simultaneously (2) and (3) can be solved, and the situation of the park vehicle on the X +1 th day is obtained:
predicted deviation on day k: etakEqual to vehicle predicted conditions minus acquisitionsThe square root of the true condition of the arriving vehicle is as follows:
the smaller the prediction deviation value is, the higher the prediction accuracy is.
S400, a time division method is further adopted to predict the traffic flow in unit time, specifically, one unit time is divided into a plurality of time zones, the prediction number in the unit time is equal to the prediction number in each time zone multiplied by the accuracy of the time zone prediction, and then superposition and summation are carried out. Because the vehicle flow prediction accuracy rate is greatly different in different sections within a unit time, such as in the morning, noon, evening and the like, the time division method is adopted, so that the prediction accuracy in the whole unit time is improved after the time section with lower prediction accuracy rate is effectively calculated, and the specific method is as follows:
the traffic flow situation of the whole day of the next day is predicted by taking the day as a unit and obtaining the traffic flow situation of the past day,
a day is divided into T time segments,
the predicted number of the next day is summed up { the predicted number obtained by a statistical method × [ (the average value of the actual traffic flow in each time zone in the past/the average value of the actual traffic flow in each time zone in the past) × (the predicted accuracy in each time zone in accordance with the past) ] }
It is formulated as:
in the formula, Nk+1For the final predicted number obtained by the time-division method,
(Nk+1) ' obtaining a predicted number by using an algorithm such as a statistical matrix method;
ti time zones of 1 to K days are trueThe average value of the number of vehicles, the number of vehicles actually collected for the ith time zone on the jth day;
the average value of the number of real vehicles per day in 1 to K days,Njthe number of vehicles actually collected on the jth day;
the average accuracy of the prediction accuracy for the number of vehicles in the Ti time zones of 1 to K days,Pi jthe prediction accuracy for the ith time segment on day j, if Pi j<0, then P is orderedi j=0。
As shown in FIG. 2, a system (e.g., a computer server with program execution functionality) according to an exemplary embodiment of the present invention includes at least one processor, a power source, and a memory and display in communication with the at least one processor, the at least one processor being in communication with an Internet of vehicles system to obtain vehicle traffic data on a campus; the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method disclosed in any one of the preceding embodiments; the processor is provided with a data input/output interface, is connected with the display, the keyboard, the mouse and the electronic equipment with the USB interface through the data input/output interface and is used for inputting and outputting data; the results of the instructions being executed by the at least one processor are displayed via a display. And meanwhile, the result is sent to a vehicle network system, and each user can obtain the traffic flow condition of the park through the vehicle networking system so as to carry out respective arrangement. The power supply is used for supplying electric energy to the system.
Those skilled in the art will understand that: all or part of the steps for realizing the method embodiments can be completed by hardware related to program instructions, the program can be stored in a computer readable storage medium, and the program executes the steps comprising the method embodiments when executed; and the aforementioned storage medium includes: various media that can store program codes, such as a removable Memory device, a Read Only Memory (ROM), a magnetic disk, or an optical disk.
When the integrated unit of the present invention is implemented in the form of a software functional unit and sold or used as a separate product, it may also be stored in a computer-readable storage medium. Based on such understanding, the technical solutions of the embodiments of the present invention may be essentially implemented or a part contributing to the prior art may be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the methods described in the embodiments of the present invention. And the aforementioned storage medium includes: a removable storage device, a ROM, a magnetic or optical disk, or other various media that can store program code.
Example 2
The present embodiment is different from embodiment 1 in that, if the traffic flow rate of the next week is predicted in a unit time of one week, the time zone of one week may be divided into 7 days, and the predicted number of the next week is 7 days in total { the predicted number obtained by the statistical method × [ (the average value of the actual traffic flow rates of the previous days per week/the average value of the actual traffic flow rates of the previous days per week) × the accuracy of the traffic flow rate prediction for each day ] }.
Example 3
The difference between this embodiment and embodiment 1 is that, if the traffic flow in the next month is predicted in units of months, the time zone of one month can be divided into four weeks or 30 days.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.
Claims (8)
1. A regional short-term traffic flow prediction method based on Internet of vehicles big data is characterized by comprising the following steps:
s100, acquiring continuous X periods of vehicle conditions in a target area based on the Internet of vehicles big data, wherein X is larger than 1;
s200, dividing the vehicle conditions into m types of vehicles to obtain the number of each type of vehicle, wherein m is greater than or equal to 1;
s300, predicting by adopting a statistical matrix method, calculating the average condition of the vehicle types and the corresponding quantity in X periods, and considering the influence of uncontrollable factors on the vehicle to obtain the preliminary prediction result of the vehicle types and the corresponding quantity in the next period; wherein the uncontrollable factors include weather, vehicle failure, loading and unloading equipment failure;
s400, aiming at one or more types of vehicles, forecasting by adopting a time division method according to the preliminary forecasting result of the next period, dividing each period of X periods into a plurality of time zones, calculating the average value of X periods of each time zone, multiplying the ratio of the average value of X periods of each time zone to the average value of X periods of the next period by the preliminary forecasting result of the next period to obtain the preliminary forecasting value of each time zone, multiplying the preliminary forecasting value of each time zone by the corresponding forecasting accuracy, and then summing to obtain the final forecasting result of the number of vehicles in the next period.
2. The area short-term traffic flow prediction method based on Internet of vehicles big data according to claim 1, wherein the step S200 comprises:
the vehicle situation is divided into m types of vehicles, which are represented by a vehicle flow set V:
V={V11,V12,…,V1i;V21,V22,…,V2j;…;Vm1,Vm2,…,Vmk}
dividing a period into n time sections, wherein n is greater than or equal to 1 and is represented by the combination of the time sections:
T={T1,T2,…,Tn}
the type of vehicle and corresponding number P of the k-th cyclek:
3. The area short-term traffic flow prediction method based on Internet of vehicles big data according to claim 2, wherein the step S300 comprises:
s310, unbiased estimation is carried out to obtain unbiased prediction results of the types and the corresponding number of the vehicles in the (k + 1) th cycle
S320, introducing a deviation factor to obtain the vehicle type of the (k + 1) th cycle and a corresponding number of preliminary prediction results; wherein the deviation factor represents the degree of influence of the vehicle by the uncontrollable factor.
4. The area short-term traffic flow prediction method based on Internet of vehicles big data according to claim 3, wherein the step S310 comprises:
unbiased prediction result of the k +1 th cycle when unbiased estimation is performedVehicle types and corresponding number P equal to the k-th cyclekAverage condition in X daysNamely:
5. the area short-term traffic flow prediction method based on Internet of vehicles big data according to claim 4, wherein the step S320 comprises:
introducing deviation factorsSelecting the deviation factor of the (k + 1) th period by a roulette selection methodThe types and corresponding quantities of the vehicles in the X +1 th cycle are predicted, namely:
obtaining the types and the corresponding number of the vehicles in the X +1 th cycle:
period kPredicted deviation η ofk:
6. The area short-term traffic flow prediction method based on Internet of vehicles big data according to claim 4, wherein the step S400 comprises:
final prediction of the number of vehicles in the next cycle for one or more types of vehicles, Nk+1:
Wherein (N)k+1) ' is the number of vehicles in the preliminary prediction result;is an average value of the number of real vehicles in the Ti time zones of 1 to K cycles, the number of vehicles actually collected for the ith time zone of the jth period;is the average value of the number of real vehicles per period from 1 to K periods,Njthe number of vehicles actually acquired in the j period;ti of 1 to K periodThe average accuracy of the time zone vehicle number prediction accuracy,Pi jthe prediction accuracy for the ith time zone of the jth cycle,if Pi j<0, then P is orderedi j=0。
7. The regional short-term traffic flow prediction method based on Internet of vehicles big data according to any one of claims 1-6, characterized in that the period is one day, one week or one month.
8. A regional short-term traffic flow prediction system based on internet of vehicles big data, characterized in that the system comprises at least one processor, and a memory and a display which are in communication connection with the at least one processor; the processor is provided with a data input/output interface and is in communication connection with the Internet of vehicles system to acquire vehicle flow data in the park; the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method of any one of claims 1 to 7; the processor is connected with the display, the keyboard, the mouse and the electronic equipment with the USB interface through the data input and output interface and is used for inputting and outputting data; the result of the instruction executed by the at least one processor is displayed through a display, and meanwhile, the result is transmitted to the Internet of vehicles system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010848663.4A CN111951557B (en) | 2020-08-21 | 2020-08-21 | Regional short-term traffic flow prediction method and system based on Internet of vehicles big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010848663.4A CN111951557B (en) | 2020-08-21 | 2020-08-21 | Regional short-term traffic flow prediction method and system based on Internet of vehicles big data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111951557A true CN111951557A (en) | 2020-11-17 |
CN111951557B CN111951557B (en) | 2022-05-24 |
Family
ID=73359651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010848663.4A Active CN111951557B (en) | 2020-08-21 | 2020-08-21 | Regional short-term traffic flow prediction method and system based on Internet of vehicles big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111951557B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100082226A1 (en) * | 2008-09-30 | 2010-04-01 | International Business Machines Corporation | System and Methods For Providing Predictive Traffic Information |
CN104183134A (en) * | 2014-08-27 | 2014-12-03 | 重庆大学 | Expressway short-time traffic flow forecast method based on intelligent car type classification |
CN108280998A (en) * | 2018-01-30 | 2018-07-13 | 浙江大学 | Short-time Traffic Flow Forecasting Methods based on historical data dynamic select |
US20190164418A1 (en) * | 2017-11-30 | 2019-05-30 | Volkswagen Ag | System and method for predicting and maximizing traffic flow |
US20190172344A1 (en) * | 2017-12-04 | 2019-06-06 | Bluesignal Corporation | System for forecasting traffic condition pattern by analysis of traffic data and forecasting method thereof |
CN110009429A (en) * | 2019-04-10 | 2019-07-12 | 金瓜子科技发展(北京)有限公司 | A kind of method, apparatus and computer equipment of predicted flow rate data |
CN110517485A (en) * | 2019-08-09 | 2019-11-29 | 大连理工大学 | A kind of Short-time Traffic Flow Forecasting Methods based on Time segments division |
CN111179586A (en) * | 2019-10-24 | 2020-05-19 | 广州市高科通信技术股份有限公司 | Traffic guidance method, equipment and storage medium based on big data analysis |
CN111311913A (en) * | 2020-02-26 | 2020-06-19 | 清华大学 | Control method and system for improving traffic efficiency of road narrowed section |
-
2020
- 2020-08-21 CN CN202010848663.4A patent/CN111951557B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100082226A1 (en) * | 2008-09-30 | 2010-04-01 | International Business Machines Corporation | System and Methods For Providing Predictive Traffic Information |
CN104183134A (en) * | 2014-08-27 | 2014-12-03 | 重庆大学 | Expressway short-time traffic flow forecast method based on intelligent car type classification |
US20190164418A1 (en) * | 2017-11-30 | 2019-05-30 | Volkswagen Ag | System and method for predicting and maximizing traffic flow |
US20190172344A1 (en) * | 2017-12-04 | 2019-06-06 | Bluesignal Corporation | System for forecasting traffic condition pattern by analysis of traffic data and forecasting method thereof |
CN108280998A (en) * | 2018-01-30 | 2018-07-13 | 浙江大学 | Short-time Traffic Flow Forecasting Methods based on historical data dynamic select |
CN110009429A (en) * | 2019-04-10 | 2019-07-12 | 金瓜子科技发展(北京)有限公司 | A kind of method, apparatus and computer equipment of predicted flow rate data |
CN110517485A (en) * | 2019-08-09 | 2019-11-29 | 大连理工大学 | A kind of Short-time Traffic Flow Forecasting Methods based on Time segments division |
CN111179586A (en) * | 2019-10-24 | 2020-05-19 | 广州市高科通信技术股份有限公司 | Traffic guidance method, equipment and storage medium based on big data analysis |
CN111311913A (en) * | 2020-02-26 | 2020-06-19 | 清华大学 | Control method and system for improving traffic efficiency of road narrowed section |
Non-Patent Citations (6)
Title |
---|
JIAN LIU;LIJUAN LIU: "An Improved Car-Following Model Car with Leading Acceleration Considered", 《IEEE》, 31 December 2010 (2010-12-31), pages 1 - 6, XP031841564 * |
***: "基于时间序列模型的短时交通流预测的研究与应用", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
***: "基于时间序列模型的短时交通流预测的研究与应用", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 11, 16 October 2014 (2014-10-16), pages 034 - 24 * |
翟冬梅: "基于深度学习的短时交通流预测研究", 《工程科技Ⅱ辑; 信息科技》, 15 January 2020 (2020-01-15), pages 1 - 77 * |
邢珊珊: "基于时空关联的城市快速路短时交通流预测方法研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
邢珊珊: "基于时空关联的城市快速路短时交通流预测方法研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 01, 15 January 2018 (2018-01-15), pages 034 - 597 * |
Also Published As
Publication number | Publication date |
---|---|
CN111951557B (en) | 2022-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | A proactive material handling method for CPS enabled shop-floor | |
Labadi et al. | Stochastic petri net modeling, simulation and analysis of public bicycle sharing systems | |
CN115511194B (en) | Agricultural data processing method, system, device and medium | |
Li et al. | Deep learning based parking prediction on cloud platform | |
CN107978148A (en) | A kind of traffic status prediction method based on multi-source traffic data dynamic reliability | |
CN116777328A (en) | Logistics line and loading management method, device, equipment and storage medium | |
Seo et al. | Rebalancing docked bicycle sharing system with approximate dynamic programming and reinforcement learning | |
Irfan et al. | Week Ahead Electricity Power and Price Forecasting Using Improved DenseNet-121 Method. | |
CN111951557B (en) | Regional short-term traffic flow prediction method and system based on Internet of vehicles big data | |
CN116911717A (en) | Method and system for distributing capacity in urban trade | |
Chang et al. | Dynamic traffic prediction for insufficient data roadways via automatic control theories | |
CN116882673A (en) | Coal supply chain system and scheduling method | |
CN114626766B (en) | Shared electric vehicle scheduling method, device, equipment and medium based on big data | |
CN115640986A (en) | Robot scheduling method, device, equipment and medium based on rewards | |
CN116027741A (en) | Edge cloud collaborative artificial intelligence framework for complex manufacturing scene | |
Biagioni et al. | From model-based to model-free: Learning building control for demand response | |
CN114399344B (en) | Data processing method and data processing device | |
CN112308344A (en) | Method and device for predicting reservation value of non-departure flight and electronic equipment | |
CN114327840B (en) | Data processing method and data processing device | |
CN111047354A (en) | Time-sharing pricing implementation method and device, electronic equipment and storage medium | |
Anbazhagan et al. | RETRACTED CHAPTER: Short-Term Load Forecasting Using Wavelet De-noising Signal Processing Techniques | |
Ma et al. | The stochastic and dynamic vehicle routing problem: A literature review | |
CN118098000B (en) | Urban comprehensive management method based on artificial intelligence | |
CN116594358B (en) | Multi-layer factory workshop scheduling method based on reinforcement learning | |
CN114463075A (en) | Method and device for predicting price of commodity on automatic driving vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231030 Address after: Room 801, 85 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province Patentee after: Yami Technology (Guangzhou) Co.,Ltd. Address before: 610031 Sichuan province Chengdu City Street No. 2 Patentee before: CHENGDU TECHNOLOGICAL University |