CN111927123B - Anti-falling filling shovel structure for filling cement brick seams for building construction - Google Patents

Anti-falling filling shovel structure for filling cement brick seams for building construction Download PDF

Info

Publication number
CN111927123B
CN111927123B CN202010797939.0A CN202010797939A CN111927123B CN 111927123 B CN111927123 B CN 111927123B CN 202010797939 A CN202010797939 A CN 202010797939A CN 111927123 B CN111927123 B CN 111927123B
Authority
CN
China
Prior art keywords
filling
main body
handle
filling shovel
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010797939.0A
Other languages
Chinese (zh)
Other versions
CN111927123A (en
Inventor
黄杰伊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Yongming
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010797939.0A priority Critical patent/CN111927123B/en
Publication of CN111927123A publication Critical patent/CN111927123A/en
Application granted granted Critical
Publication of CN111927123B publication Critical patent/CN111927123B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • E04G21/201Trowels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

The invention provides an anti-falling filling shovel structure for filling cement brick seams for building construction, relates to the technical field of building construction tools, and solves the problem that the vibration compaction of cement cannot be automatically realized in the smearing process through structural improvement, so that the cement falling probability is reduced; the rapid repair of brick joints at the corners of the wall cannot be realized, and the problem of cleaning the daubing positions in advance cannot be realized. The anti-dropping filling shovel structure for filling cement brick seams for building construction comprises a filling shovel main body; the filling shovel is characterized in that a side plate is installed on the filling shovel main body, and a cleaning brush is further installed on the filling shovel main body. Because of two vibrations structures weld respectively at the left side position and the right side position of handle, and two vibrations structures are crisscross form setting to two vibrations structures are the vibration mode in proper order when the handle slides in the sliding seat, thereby have improved vibration frequency, and then have just also improved the compaction effect.

Description

Anti-falling filling shovel structure for filling cement brick seams for building construction
Technical Field
The invention belongs to the technical field of building construction tools, and particularly relates to an anti-drop filling shovel structure for filling cement brick seams for building construction.
Background
With the development of the economic construction business of China, the number of buildings of various industrial buildings, office buildings and civil and commercial houses is continuously increased, the consumption of cement and concrete is increased day by day, so that the cement plastering amount of wall surfaces and the like presents a continuously rising trend, the labor intensity of a masquerier who is engaged in cement plastering is increased, and the repair of brick joints by using a repair shovel is a basic skill of the masquerier.
As in application No.: CN201510460226.4, a can reduce the confession grey personnel, improve the efficiency of plastering, alleviate intensity of labour and improve the automatic sizing trowel of operating condition. The novel plastering trowel comprises a handle with a built-in slurry conveying channel, a plastering plate for scraping slurry onto a wall surface, and an electric switch arranged on the handle, wherein a trowel box assembly capable of storing the slurry is further arranged between the plastering plate and the handle, and the trowel box assembly comprises a box body and a slurry storage area arranged in the box body. The invention can automatically apply the mortar and store a proper amount of mortar in the mortar storage area in the trowel box assembly in advance, when the hand-held trowelling plate rotates to the extreme position leftwards or rightwards during operation, the mortar stored in the mortar storage area is extruded by the trowelling plate and flows into the mortar outlet groove from the mortar outlet hole and the mortar passing hole, and then flows out from the mortar outlet groove and is smeared on the wall surface, thereby realizing that a mason can easily apply the mortar to the wall surface by one hand, greatly improving the working efficiency of the mason and reducing the labor intensity of the mason.
The brick joint repairing shovel similar to the above application has the following defects at present:
one is that the cement is easy to fall off after the cement is smeared on the brick joints by the existing device, but the vibration compaction of the cement cannot be automatically realized in the smearing process through the structural improvement, so that the falling probability of the cement is reduced; moreover, the function of the existing device is single, on one hand, the quick repair of brick joints at the corners of the wall cannot be realized, and on the other hand, the pre-cleaning of the smearing part cannot be realized.
In view of the above, research and improvement are made on the existing structure and defects, and a drop-proof filling shovel structure for filling cement brick seams for building construction is provided, so as to achieve the purpose of higher practical value.
Disclosure of Invention
In order to solve the technical problems, the invention provides an anti-dropping filling shovel structure for filling cement brick joints for building construction, which aims to solve the problems that cement is easy to drop after cement is coated on the brick joints by the existing device, and the vibration compaction of the cement cannot be automatically realized in the coating process through structural improvement, so that the cement dropping probability is reduced; moreover, the function of the existing device is single, on one hand, the quick repair of brick joints at the corners of the wall cannot be realized, and on the other hand, the problem of cleaning the daubing part in advance cannot be realized.
The invention relates to a purpose and an effect of an anti-falling filling shovel structure for filling cement brick seams for building construction, which are achieved by the following specific technical means:
the anti-dropping filling shovel structure for filling cement brick seams for building construction comprises a filling shovel main body; the filling shovel main body is provided with a side plate, and the filling shovel main body is also provided with a cleaning brush; the filling shovel main body is provided with a handle structure, and the handle structure is provided with two vibration structures; the vibration structure comprises a mounting arm, a cylindrical pipe, a sliding rod B, a baffle ring and an elastic piece B, wherein the mounting arm is welded on the handle, and the cylindrical pipe is welded on the mounting arm; a sliding rod B is connected in the cylindrical pipe in a sliding mode, and a baffle ring is welded on the sliding rod B; the outer wall of the sliding rod B is sleeved with an elastic part B, the head end of the sliding rod B is pushed by the elasticity of the elastic part B to be contacted with the bulge, and the sliding rod B and the bulge are in a vibration state when the grip slides in the sliding seat; two vibrations structures weld respectively at the left side position and the right side position of handle, and two vibrations structures are crisscross form setting to two vibrations structures are the vibration state in proper order when the handle slides in the sliding seat.
Further, the filling shovel main body comprises a clamping groove, the left side of the top end face of the filling shovel main body is provided with the clamping groove, and the clamping groove is of a trapezoidal groove-shaped structure; the curb plate includes the protruding A of joint, the welding has the protruding A of joint on the curb plate, and protruding A of joint and draw-in groove phase-match, and the protruding A of joint and draw-in groove have constituteed the supplementary fixed knot structure of curb plate jointly.
Further, the filling shovel main body further comprises a thread groove, and two thread grooves are symmetrically formed in the left side position of the top end face of the filling shovel main body; the curb plate still includes fixed orifices A, two fixed orifices A have been seted up to the symmetry on the curb plate, and fixed orifices A and thread groove are adjusted well each other when protruding A of joint and draw-in groove joint.
Furthermore, the included angle between the side plate and the filling shovel main body is 90 degrees, and the side plate and the filling shovel main body jointly form a brickwork joint wall corner filling structure.
Furthermore, the right side of the top end face of the filling shovel main body is also provided with a clamping groove and two thread grooves; the cleaning brush comprises a clamping protrusion B and fixing holes B, the clamping protrusion B is welded on the cleaning brush, and the cleaning brush is symmetrically provided with two fixing holes B; when the clamping protrusion B is clamped with the clamping groove formed in the right side of the top end face of the filling shovel main body, the fixing hole B is aligned with the thread groove formed in the right side of the top end face of the filling shovel main body.
Further, the handle structure comprises a sliding seat, sliding rods A, a handle and an elastic piece A, wherein the sliding seat is welded on the top end face of the filling shovel main body, the two sliding rods A are symmetrically welded in the sliding seat, and the handle is connected to the two sliding rods A in a sliding mode; two slide bar A all cup joints an elastic component A on, and two elastic component A have constituteed the elasticity of handle structure that resets jointly.
Furthermore, the handle structure also comprises a rectangular plate A, the rectangular plate A is welded on the handle, and the bottom end face of the rectangular plate A is contacted with the top end face of the sliding seat; the length of the rectangular plate A is larger than that of the sliding seat, and the rectangular plate A forms a shielding protection structure of the sliding seat.
Furthermore, the handle structure also comprises two rectangular plates B and a bulge, wherein the two rectangular plates B are symmetrically welded on the sliding seat; the two rectangular plates B are welded with bulges in a rectangular array shape, and the bulges are of semi-cylindrical bulge structures.
Compared with the prior art, the invention has the following beneficial effects:
the handle structure is improved, the high-frequency vibration of the shovel main body can be automatically filled in the smearing and filling process through the improvement, so that the cement can be vibrated and compacted, and then the anti-falling effect is realized, and the anti-falling device is particularly as follows: firstly, the installation arm is welded on the handle, and a cylindrical pipe is welded on the installation arm; a sliding rod B is connected in the cylindrical pipe in a sliding manner, and a baffle ring is welded on the sliding rod B; the outer wall of the sliding rod B is sleeved with an elastic part B, the head end of the sliding rod B is pushed by the elasticity of the elastic part B to be contacted with the bulge, and the sliding rod B and the bulge are in a vibration state when the grip slides in the sliding seat, so that the vibration of the shovel main body is filled, and the vibration compaction of cement is realized; and secondly, the two vibration structures are welded at the left side position and the right side position of the handle respectively, the two vibration structures are arranged in a staggered manner, and the two vibration structures are in a sequential vibration state when the handle slides in the sliding seat, so that the vibration frequency is improved, and the compaction effect is improved.
Through the setting of curb plate, can realize smearing fast of wall angle department brickwork joint, and the curb plate installation is convenient quick, specifically as follows:
firstly, a clamping groove is formed in the left side of the top end face of the filling shovel main body, and the clamping groove is of a trapezoidal groove-shaped structure; the side plate comprises a clamping protrusion A, the clamping protrusion A is welded on the side plate and matched with the clamping groove, and the clamping protrusion A and the clamping groove jointly form an auxiliary fixing structure of the side plate, so that the stability of the side plate during fixing can be improved; secondly, two thread grooves are symmetrically formed in the left side position of the top end face of the filling shovel main body; the side plate also comprises fixing holes A, two fixing holes A are symmetrically formed in the side plate, and the fixing holes A are aligned with the thread grooves when the clamping protrusions A are clamped with the clamping grooves, so that the convenience of bolt fixing of the side plate is improved; thirdly, because the included angle between the side plate and the filling shovel main body is 90 degrees, and the side plate and the filling shovel main body jointly form a brickwork joint wall corner filling structure, the brickwork joint wall corner can be conveniently and quickly filled.
Drawings
Fig. 1 is a schematic axial view of the present invention.
Fig. 2 is a schematic view of the present invention in an axially disassembled configuration.
Fig. 3 is an enlarged schematic view of fig. 2 at a.
Fig. 4 is an enlarged schematic view of fig. 2B according to the present invention.
Fig. 5 is an enlarged view of the structure of fig. 2C according to the present invention.
Fig. 6 is an enlarged view of fig. 2D of the present invention.
Fig. 7 is an enlarged axial view of the cleaning brush of the present invention.
FIG. 8 is a schematic top view of the handle structure and the vibrating structure of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
1. filling the shovel main body; 101. a card slot; 102. a thread groove; 2. a side plate; 201. clamping the protrusion A; 202. a fixing hole A; 3. a cleaning brush; 301. clamping the bulge B; 302. a fixing hole B; 4. a grip structure; 401. a sliding seat; 402. a slide bar A; 403. a grip; 404. an elastic member A; 405. a rectangular plate A; 406. a rectangular plate B; 407. a protrusion; 5. a vibrating structure; 501. mounting an arm; 502. a cylindrical tube; 503. a slide bar B; 504. a baffle ring; 505. and an elastic member B.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
as shown in figures 1 to 8:
the invention provides a falling-proof filling shovel structure for filling cement brick seams for building construction, which comprises a filling shovel main body 1; the filling shovel main body 1 is provided with a side plate 2, and the filling shovel main body 1 is also provided with a cleaning brush 3; a handle structure 4 is arranged on the filling shovel main body 1, and two vibration structures 5 are arranged on the handle structure 4; referring to fig. 5, the vibration structure 5 includes a mounting arm 501, a cylindrical pipe 502, a sliding rod B503, a baffle ring 504 and an elastic member B505, the mounting arm 501 is welded on the grip 403, and the cylindrical pipe 502 is welded on the mounting arm 501; a sliding rod B503 is connected in the cylindrical pipe 502 in a sliding mode, and a baffle ring 504 is welded on the sliding rod B503; an elastic piece B505 is sleeved on the outer wall of the sliding rod B503, the head end of the sliding rod B503 is pushed to be in contact with the bulge 407 by the elastic force of the elastic piece B505, and when the grip 403 slides in the sliding seat 401, the sliding rod B503 and the bulge 407 are in a vibration state, so that the vibration of the shovel main body 1 is filled, and the vibration compaction of cement is further realized; referring to fig. 8, two vibrating structures 5 are welded at the left and right positions of the handle 403 respectively, and the two vibrating structures 5 are arranged in a staggered manner, and the two vibrating structures 5 are in a sequential vibrating state when the handle 403 slides in the sliding seat 401, so that the vibrating frequency is increased, and the compacting effect is also increased.
Referring to fig. 2, the filling shovel body 1 includes a slot 101, the left side of the top end surface of the filling shovel body 1 is provided with a slot 101, and the slots 101 are all in a trapezoid slot-shaped structure; curb plate 2 includes the protruding A201 of joint, and the welding has the protruding A201 of joint on curb plate 2, and the protruding A201 of joint and draw-in groove 101 phase-match, and the protruding A201 of joint has constituteed 2 supplementary fixed knot of curb plate structure with draw-in groove 101 jointly to steadiness when 2 fixed of curb plate can be improved.
Referring to fig. 2 and 3, the filling shovel body 1 further includes a thread groove 102, and two thread grooves 102 are symmetrically formed in the left side of the top end face of the filling shovel body 1; the side plate 2 further comprises a fixing hole A202, two fixing holes A202 are symmetrically formed in the side plate 2, the fixing holes A202 are aligned with the thread grooves 102 when the clamping protrusions A201 are clamped with the clamping grooves 101, and therefore convenience in bolt fixing of the side plate 2 is improved.
Referring to fig. 2, the included angle between the side plate 2 and the filling shovel main body 1 is 90 degrees, and the side plate 2 and the filling shovel main body 1 jointly form a brickwork joint wall corner filling structure, so that the brickwork joint wall corner can be quickly filled conveniently.
Referring to fig. 2, the right side of the top end surface of the filling shovel body 1 is also provided with a clamping groove 101 and two thread grooves 102; the cleaning brush 3 comprises a clamping protrusion B301 and fixing holes B302, the clamping protrusion B301 is welded on the cleaning brush 3, and the cleaning brush 3 is symmetrically provided with two fixing holes B302; when the clamping protrusion B301 is clamped with the clamping groove 101 formed in the right side of the top end face of the filling shovel main body 1, the fixing hole B302 is aligned with the thread groove 102 formed in the right side of the top end face of the filling shovel main body 1, so that the stability of the cleaning brush 3 during fixing can be improved, and the convenience of bolt fixing of the cleaning brush 3 can be improved.
Referring to fig. 2 and 6, the grip structure 4 includes a sliding seat 401, a sliding rod a402, a grip 403 and an elastic member a404, the sliding seat 401 is welded on the top end surface of the filling shovel body 1, two sliding rods a402 are symmetrically welded in the sliding seat 401, and the two sliding rods a402 are slidably connected with the grip 403; an elastic piece a404 is sleeved on each of the two sliding rods a402, and the two elastic pieces a404 form an elastic reset structure of the grip 403.
Referring to fig. 2, the grip structure 4 further includes a rectangular plate a405, the rectangular plate a405 is welded on the grip 403, and a bottom end surface of the rectangular plate a405 contacts with a top end surface of the sliding seat 401; the length of the rectangular plate A405 is larger than that of the sliding seat 401, and the rectangular plate A405 constitutes a shielding and protecting structure of the sliding seat 401.
Referring to fig. 2 and 5, the grip structure 4 further includes two rectangular plates B406 and a protrusion 407, the two rectangular plates B406 are disposed, and the two rectangular plates B406 are symmetrically welded on the sliding seat 401; the two rectangular plates B406 are welded with protrusions 407 in a rectangular array shape, and the protrusions 407 are in a semi-cylindrical protrusion structure.
The specific use mode and function of the embodiment are as follows:
when the filling shovel is used, when brick joints at the corners of a wall need to be quickly filled, firstly, a clamping groove 101 is formed in the left side of the top end face of the filling shovel main body 1, and the clamping groove 101 is of a trapezoidal groove-shaped structure; the side plate 2 comprises a clamping protrusion A201, the clamping protrusion A201 is welded on the side plate 2, the clamping protrusion A201 is matched with the clamping groove 101, and the clamping protrusion A201 and the clamping groove 101 jointly form an auxiliary fixing structure of the side plate 2, so that the stability of the side plate 2 during fixing can be improved; secondly, two thread grooves 102 are symmetrically formed in the left side position of the top end face of the filling shovel main body 1; the side plate 2 further comprises fixing holes A202, the side plate 2 is symmetrically provided with the two fixing holes A202, and the fixing holes A202 are aligned with the thread grooves 102 when the clamping protrusions A201 are clamped with the clamping grooves 101, so that convenience in bolt fixing of the side plate 2 is improved; thirdly, because the included angle between the side plate 2 and the filling shovel main body 1 is 90 degrees, and the side plate 2 and the filling shovel main body 1 jointly form a brickwork joint wall corner filling structure, the quick filling of the brickwork joint wall corner can be conveniently realized;
in the use process, firstly, the sliding seat 401 is welded on the top end face of the filling shovel main body 1, two sliding rods A402 are symmetrically welded in the sliding seat 401, and a handle 403 is connected to the two sliding rods A402 in a sliding manner; an elastic piece A404 is sleeved on each of the two sliding rods A402, and the two elastic pieces A404 form an elastic reset structure of the grip 403; secondly, two rectangular plates B406 are arranged, and the two rectangular plates B406 are symmetrically welded on the sliding seat 401; the two rectangular plates B406 are welded with bulges 407 in a rectangular array shape, and the bulges 407 are in a semi-cylindrical bulge structure; thirdly, the mounting arm 501 is welded on the grip 403, and the cylindrical pipe 502 is welded on the mounting arm 501; a sliding rod B503 is connected in the cylindrical pipe 502 in a sliding mode, and a baffle ring 504 is welded on the sliding rod B503; an elastic piece B505 is sleeved on the outer wall of the sliding rod B503, the head end of the sliding rod B503 is pushed to be in contact with the bulge 407 by the elastic force of the elastic piece B505, and when the grip 403 slides in the sliding seat 401, the sliding rod B503 and the bulge 407 are in a vibration state, so that the vibration of the shovel main body 1 is filled, and the vibration compaction of cement is further realized; fourthly, because of two vibrations structure 5 weld respectively at the left side position and the right side position of handle 403, and two vibrations structure 5 are the setting of crisscross form to two vibrations structure 5 are the vibration mode in proper order when handle 403 slides in sliding seat 401, thereby have improved vibration frequency, and then have just also improved the compaction effect.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (5)

1. Fill with filling shovel structure of anti-drop formula for cement brick seam for construction, its characterized in that: comprises a filling shovel main body (1); the filling shovel main body (1) is provided with a side plate (2), and the filling shovel main body (1) is also provided with a cleaning brush (3); the filling shovel main body (1) is provided with a handle structure (4), and the handle structure (4) is provided with two vibration structures (5); the vibration structure (5) comprises a mounting arm (501), a cylindrical pipe (502), a sliding rod B (503), a baffle ring (504) and an elastic piece B (505), the mounting arm (501) is welded on the handle (403), and the cylindrical pipe (502) is welded on the mounting arm (501); a sliding rod B (503) is connected in the cylindrical pipe (502) in a sliding mode, and a baffle ring (504) is welded on the sliding rod B (503); the outer wall of the sliding rod B (503) is sleeved with an elastic piece B (505), the head end of the sliding rod B (503) is pushed to be in contact with the protrusion (407) under the elastic force of the elastic piece B (505), and the sliding rod B (503) and the protrusion (407) are in a vibration state when the grip (403) slides in the sliding seat (401); the two vibration structures (5) are respectively welded at the left side position and the right side position of the handle (403), the two vibration structures (5) are arranged in a staggered manner, and the two vibration structures (5) are in a sequential vibration state when the handle (403) slides in the sliding seat (401);
the handle structure (4) comprises a sliding seat (401), sliding rods A (402), a handle (403) and an elastic piece A (404), the sliding seat (401) is welded on the top end face of the filling shovel main body (1), two sliding rods A (402) are symmetrically welded in the sliding seat (401), and the two sliding rods A (402) are connected with the handle (403) in a sliding mode; an elastic piece A (404) is sleeved on each of the two sliding rods A (402), and the two elastic pieces A (404) jointly form an elastic reset structure of the handle (403);
the handle structure (4) further comprises a rectangular plate A (405), the rectangular plate A (405) is welded on the handle (403), and the bottom end face of the rectangular plate A (405) is in contact with the top end face of the sliding seat (401); the length of the rectangular plate A (405) is larger than that of the sliding seat (401), and the rectangular plate A (405) forms a shielding and protecting structure of the sliding seat (401);
the handle structure (4) further comprises rectangular plates B (406) and protrusions (407), the number of the rectangular plates B (406) is two, and the two rectangular plates B (406) are symmetrically welded on the sliding seat (401); the two rectangular plates B (406) are welded with bulges (407) in a rectangular array shape, and the bulges (407) are in semi-cylindrical bulge structures.
2. The anti-falling filling shovel structure for filling cement brick joints for building construction as claimed in claim 1, characterized in that: the filling shovel main body (1) comprises a clamping groove (101), the left side of the top end face of the filling shovel main body (1) is provided with the clamping groove (101), and the clamping groove (101) is of a trapezoid groove-shaped structure; curb plate (2) are including the protruding A (201) of joint, the welding has the protruding A (201) of joint on curb plate (2), and protruding A (201) of joint and draw-in groove (101) phase-match, and the protruding A (201) of joint and draw-in groove (101) have formed the supplementary fixed knot structure of curb plate (2) jointly.
3. The anti-falling filling shovel structure for filling cement brick joints for building construction as claimed in claim 1, characterized in that: the filling shovel main body (1) further comprises a thread groove (102), and two thread grooves (102) are symmetrically formed in the left side position of the top end face of the filling shovel main body (1); curb plate (2) still include fixed orifices A (202), two fixed orifices A (202) have been seted up to the symmetry on curb plate (2), and fixed orifices A (202) and thread groove (102) are adjusted well each other when protruding A (201) of joint and draw-in groove (101) joint.
4. The anti-falling filling shovel structure for filling cement brick joints for building construction as claimed in claim 1, characterized in that: the included angle between the side plate (2) and the filling shovel main body (1) is 90 degrees, and the side plate (2) and the filling shovel main body (1) jointly form a brickwork joint wall corner filling structure.
5. The anti-falling filling shovel structure for filling cement brick joints for building construction as claimed in claim 1, characterized in that: the right side of the top end face of the filling shovel main body (1) is also provided with a clamping groove (101) and two thread grooves (102); the cleaning brush (3) comprises a clamping protrusion B (301) and fixing holes B (302), the clamping protrusion B (301) is welded on the cleaning brush (3), and two fixing holes B (302) are symmetrically formed in the cleaning brush (3); when the clamping protrusion B (301) is clamped with the clamping groove (101) formed in the right side of the top end face of the filling shovel main body (1), the fixing hole B (302) is aligned with the threaded groove (102) formed in the right side of the top end face of the filling shovel main body (1).
CN202010797939.0A 2020-08-10 2020-08-10 Anti-falling filling shovel structure for filling cement brick seams for building construction Expired - Fee Related CN111927123B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010797939.0A CN111927123B (en) 2020-08-10 2020-08-10 Anti-falling filling shovel structure for filling cement brick seams for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010797939.0A CN111927123B (en) 2020-08-10 2020-08-10 Anti-falling filling shovel structure for filling cement brick seams for building construction

Publications (2)

Publication Number Publication Date
CN111927123A CN111927123A (en) 2020-11-13
CN111927123B true CN111927123B (en) 2021-05-14

Family

ID=73307331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010797939.0A Expired - Fee Related CN111927123B (en) 2020-08-10 2020-08-10 Anti-falling filling shovel structure for filling cement brick seams for building construction

Country Status (1)

Country Link
CN (1) CN111927123B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112569121B (en) * 2020-12-28 2022-08-09 黑龙江省医院 Department of respiration patient expectoration is collected and is prevented infection device
CN112726601A (en) * 2020-12-30 2021-04-30 叶华攀 Pile driving device and pile driving device connecting structure for constructional engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0949314A (en) * 1995-08-04 1997-02-18 Yoneo Tsunoda Trowel for plasterer
CN2362955Y (en) * 1998-04-17 2000-02-09 王定海 Hand-held electric vibration iron trowel
US7784143B1 (en) * 2005-03-11 2010-08-31 Kc Holdings, Llc Apparatus for building tools
CN202117295U (en) * 2011-04-21 2012-01-18 深圳广田装饰集团股份有限公司 Trowel capable of plastering, smoothing and napping
CN204781853U (en) * 2015-07-03 2015-11-18 蒋永红 Novel claying knife for building
CN208870362U (en) * 2018-08-09 2019-05-17 湖北昌磊建设工程有限公司 A kind of fitting-out work coater
CN211172957U (en) * 2019-07-17 2020-08-04 江苏弘汉生物科技有限公司 Building wall body flattening device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0949314A (en) * 1995-08-04 1997-02-18 Yoneo Tsunoda Trowel for plasterer
CN2362955Y (en) * 1998-04-17 2000-02-09 王定海 Hand-held electric vibration iron trowel
US7784143B1 (en) * 2005-03-11 2010-08-31 Kc Holdings, Llc Apparatus for building tools
CN202117295U (en) * 2011-04-21 2012-01-18 深圳广田装饰集团股份有限公司 Trowel capable of plastering, smoothing and napping
CN204781853U (en) * 2015-07-03 2015-11-18 蒋永红 Novel claying knife for building
CN208870362U (en) * 2018-08-09 2019-05-17 湖北昌磊建设工程有限公司 A kind of fitting-out work coater
CN211172957U (en) * 2019-07-17 2020-08-04 江苏弘汉生物科技有限公司 Building wall body flattening device

Also Published As

Publication number Publication date
CN111927123A (en) 2020-11-13

Similar Documents

Publication Publication Date Title
CN111927123B (en) Anti-falling filling shovel structure for filling cement brick seams for building construction
CN206607821U (en) A kind of trowel
CN209244197U (en) A kind of ceramic tile filling-up device of indoor decoration
CN208415869U (en) A kind of wall plaster device with environmental protection
CN104863342A (en) Cylinder plastering device and method
CN212128759U (en) Road surface floating device for road construction
CN214462671U (en) Universal leveling ruler that shakes
CN214658575U (en) Plastering device for housing construction
CN211850910U (en) Concrete vibrating spear for building engineering
CN110549440B (en) Iron nail fixed point installation auxiliary assembly
CN206189879U (en) Plaster and get rid of thick liquid device
CN208152506U (en) A kind of masonry stuff up a crack equipment
CN207332262U (en) Brick-setting shuttering
CN208920386U (en) A kind of dismountable spigot-and-socket air-conditioning outrigger
CN215407227U (en) Replaceable plastering tool
CN219196821U (en) Glue injection device for exterior wall heat insulation engineering construction
CN213979956U (en) Tamping device for concrete mortar
CN106166726A (en) A kind of multi-functional rubber hammer
CN213626706U (en) Civil engineering construction is with bayonet vibrting spear
CN218374969U (en) Plastering gypsum punching rib calibration leveling instrument
CN210659150U (en) Trowel with mud
CN219654323U (en) Masonry slurry-placing device
CN220319056U (en) Efficient fluidity terrace mortar scraper blade
CN217859542U (en) Cutting of assembled steel construction thick plate and groove mounting structure for steel construction building
CN220117774U (en) General simple and convenient concrete strickle device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210305

Address after: No. 402, door 4, building 5, yanchuanli, Tanggu District, Binhai New Area, Tianjin 300450

Applicant after: Wang Yongming

Address before: Zhejiang University of technology, 18 Chaowang Road, Xiacheng District, Hangzhou City, Zhejiang Province, 310018

Applicant before: Huang Jieyi

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210514

Termination date: 20210810

CF01 Termination of patent right due to non-payment of annual fee