CN111910665A - Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit - Google Patents

Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit Download PDF

Info

Publication number
CN111910665A
CN111910665A CN202010794216.5A CN202010794216A CN111910665A CN 111910665 A CN111910665 A CN 111910665A CN 202010794216 A CN202010794216 A CN 202010794216A CN 111910665 A CN111910665 A CN 111910665A
Authority
CN
China
Prior art keywords
grouting
pit
water
foundation pit
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010794216.5A
Other languages
Chinese (zh)
Other versions
CN111910665B (en
Inventor
姚西平
倪吉栋
张存
张昌伟
胡清茂
张国良
翟可
李龙
王怀东
梅展军
杨晓猛
李舸鹏
孙浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Urban Rail Transit Co ltd
China Railway Liuyuan Group Co Ltd
Original Assignee
Xuzhou Urban Rail Transit Co ltd
China Railway Liuyuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Urban Rail Transit Co ltd, China Railway Liuyuan Group Co Ltd filed Critical Xuzhou Urban Rail Transit Co ltd
Priority to CN202010794216.5A priority Critical patent/CN111910665B/en
Publication of CN111910665A publication Critical patent/CN111910665A/en
Application granted granted Critical
Publication of CN111910665B publication Critical patent/CN111910665B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a precipitation treatment method for a steeply inclined strip-shaped interbedded composite stratum foundation pit; the invention comprises an open cut hall shallow pit, an open cut hall deep pit, a station shallow pit, a deep-shallow pit boundary, an end well deep pit area, a track-passing cable deepening area, a water collecting pit, an underground continuous wall, inner side limestone crack grouting, wall bottom limestone crack grouting, a depressurization well, a drainage well, a pressure-bearing water observation well and emergency recharge well and a downward turning beam pit groove. The invention is particularly suitable for treating underground water of the foundation pit of the composite stratum of the upper old city miscellaneous fill, the middle hard plastic clay and the lower bedrock. The invention can be summarized as follows: the method comprises the steps of totally closing, local grouting, upper drainage, lower depressurization, bottom drainage and external measurement irrigation. The invention can reduce the number of dewatering wells and the water pumping amount, and save the construction period and the manufacturing cost; meanwhile, the safety of the foundation pit and the surrounding environment can be ensured, and good economic and safety benefits are obtained.

Description

Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit
Technical Field
The invention relates to the technical field of constructional engineering, urban rail transit, tunnels and underground engineering, in particular to a precipitation treatment method for a steeply inclined strip interbedded bedrock composite stratum foundation pit.
Background
With the development of urbanization, underground foundation pit engineering is more and more, and encountered engineering and hydrogeology are more and more complex. The treatment of underground water is of great importance to foundation pit engineering, and the successful treatment of underground water is the premise of safety of the foundation pit engineering.
The composite stratum is usually a stratum with a soil layer at the upper part and a rock layer at the lower part, and foundation pit dewatering is carried out in the stratum according to similar engineering investigation at home and abroad, so that the dewatering design is more conservative, the manufacturing cost is increased, and the construction period is prolonged; in addition, if upper diving and lower confined water exist, the confined water can cause the change of the upper diving and the surrounding environment, and even cause engineering and surrounding environment safety accidents.
The invention provides a precipitation treatment method for a foundation pit with a steeply inclined strip-shaped interbedded composite stratum, which is suitable for treating underground water of the foundation pit with an upper old city miscellaneous fill, a middle hard plastic clay and a bedrock with a steeply inclined strip-shaped interbedded part, wherein the underground water of the foundation pit with a higher confined water composite stratum exists in the limestone. And is suitable for foundation pit dewatering in other composite stratums. The number of dewatering wells and the water pumping amount can be reduced, and the construction period and the construction cost are saved; meanwhile, the safety of the foundation pit and the surrounding environment can be ensured, and good economic and safety benefits are obtained.
Disclosure of Invention
Aiming at the problem of foundation pit precipitation in the existing composite stratum, the method is suitable for treating the underground water of the foundation pit in the composite stratum of the upper old city miscellaneous fill, the middle hard plastic clay and the lower bedrock; the invention provides a precipitation treatment method for a steeply inclined strip interbedded composite stratum foundation pit, which can be summarized as follows: "totally closed, local grouting, upper drainage, lower depressurization, bottom drainage and external irrigation"; the number of dewatering wells and the water pumping amount are reduced, and the construction period and the construction cost are saved; meanwhile, the safety of the foundation pit and the surrounding environment can be ensured, and good economic and safety benefits are obtained.
The technical scheme adopted by the invention is as follows: a precipitation treatment method for a foundation pit with a steeply inclined strip-shaped interbedded composite stratum comprises the following specific construction methods:
step 1, constructing an underground continuous wall of a foundation pit; the foundation pit consists of an open cut hall shallow pit, an open cut hall deep pit and a station shallow pit; the open cut hall deep pit adopts slope excavation, and the open cut hall shallow pit and the open cut hall deep pit are connected through a shallow-deep pit boundary;
step 2, drilling grouting holes in a sleeve embedded in the underground continuous wall, and grouting limestone cracks at the bottom of the wall in combination with the situation of a karst cave at the bottom of the wall; the grouting holes are steel perforated pipes, the grouting depth is 5m from the soil-rock junction surface to the bottom of the underground continuous wall, and the grouting depth is 9.5 m;
constructing a grouting hole at the inner side of the underground continuous wall, wherein the grouting range is 13.5m below the bottom of the foundation pit, and grouting the limestone cracks at the inner side of the underground continuous wall;
the distance between the adjacent grouting holes is 2m, and the effective diffusion radius of the grouting holes is 1.5 m; grouting final pressure is not less than 3 MPa; adopting cement-water glass double-liquid slurry; the mass ratio of cement to water glass of the double-liquid slurry is 1: 1-1: 0.5, wherein the modulus of the water glass is 2.4-2.8, and the Baume degree is 30-42 Be; before formal construction, field test is carried out, and grouting parameters are adjusted according to test results; the slip casting pipe adopts ∅ 90mm steel floral tube slip casting;
and (5) finishing grouting standard: the single-hole grouting pressure reaches the design final pressure and grouting is continued for more than 20min, and the hole grouting can be finished; the single-hole grouting amount is approximately the same as the designed grouting amount, and the hole grouting can be finished when the grouting amount is less than 20-30L/min;
and (3) grouting effect inspection: after the grouting holes of one grouting section are completely injected, 2-3 holes are drilled every 50 square meters to check the grouting effect, a core is taken to observe the filling condition of the grout, the water inflow in the holes is not more than 0.2L/min.m, and the water leakage at a certain position is not more than 10L/min; or carrying out a pressurized water test, wherein the water inflow of the inspection hole is less than 10L/min.m under the pressure of 1.0 MPa. Otherwise, drilling and grouting are encrypted;
after grouting and grouting inspection are finished, hole sealing work of a grouting hole and an inspection hole is needed, and hole sealing is strictly executed according to geological requirements;
step 3, upper drainage, wherein before the soil body in the foundation pit is excavated, drainage well construction is firstly carried out, the diving in the upper filling is drained, and the diving in the pit is required to be lowered to a position 1m below the excavation surface;
step 4, reducing pressure, wherein before the soil body in the foundation pit is excavated, pressure reduction well construction is required, and confined water in the limestone is reduced as required;
step 5, bottom collection and drainage, namely arranging a deep pit area at the end of the open cut hall, a track-passing cable, an air duct deepening area and a water collecting pit in the foundation pit, draining bed rock fracture water in a foundation pit rock layer into the water collecting pit through a bottom plate downward turning beam pit groove, pumping the water to the ground through a water pump, and draining the water to a municipal pipe network;
step 6, external measurement and irrigation, namely constructing a pressure-bearing water observation well and an emergency recharge well on the outer side of the foundation pit, wherein the depth of the pressure-bearing water observation well and the emergency recharge well is the same as the depth of a depressurization well on the inner side of the foundation pit; the pressure reduction effect of the pressure reduction well in the foundation pit is observed, and the pressure-bearing water observation well and the emergency recharge well can be used for observing the pressure-bearing water level outside the pit, so that the pressure reduction as required is ensured; if the deformation of the surrounding ground surface and the environment is large due to the pressure reduction in the pit, the pressure-bearing water observation well and the emergency recharge well can be used for recharging.
Compared with the prior art, the invention has the beneficial effects that:
(1) the type of underground water is determined, and the underground water is diving in the miscellaneous filling soil of the old city at the upper part and fracture water in bedrock; the diving is supplied by atmospheric precipitation, and the confined water is supplied by formation underground water and surrounding bedrock fracture water; and the confined water of the bedrock is not in hydraulic connection with the diving of the upper part, and the confined water precipitation cannot influence the surrounding environment.
(2) The distribution range of the strips of the foundation rock of the pit bottom and the water-rich performance of the strips are determined. The shale and the sand page are water-resisting layers and are weakly connected with the limestone; the pressure bearing is positioned in the limestone strip, the limestone has karst caves and cracks, the pressure bearing water is supplied along the trend of the rock strip in the supply direction, and is supplied in the northeast → southwest direction; limestone fissure water at the upper section of the steamed bun group is most intense in vertical runoff along joints and bedding planes; poor hydraulic communication between the strips.
(3) And local grouting is performed on the upper section of the steamed bun group with larger confined water to fill rock cracks, the confined water bypass path length is increased, the confined water supply on the north side of the foundation pit is reduced, and finally the pumping capacity of the confined water is reduced.
(4) The water-rich limestone stripe range is combined, the depressurization wells are arranged in the limestone stripes, and compared with the conventional composite stratum foundation pit, the depressurization wells are fewer in number, better in depressurization effect and more targeted.
(5) After the pit bottom is excavated, a deepened area of a station structure is utilized, large-area pressure relief is realized, water collection and open drainage are realized, the confined water level is effectively reduced, the number of dewatering wells is reduced, and investment and construction period are saved.
(6) An observation well and an emergency recharge well are arranged outside the pit, so that the pressure reduction effect of the confined water well in the pit and the change of confined water outside the pit can be observed at any time, and precipitation as required is ensured;
in conclusion, the invention is based on similar composite strata, can reduce the number of dewatering wells and the water pumping amount, and saves the construction period and the construction cost; meanwhile, the safety of the foundation pit and the surrounding environment can be ensured, and good economic and safety benefits are obtained.
Drawings
FIG. 1 is a reduced horizontal floor plan of the present invention;
FIG. 2 is a longitudinal section of the precipitation A-A of the present invention;
FIG. 3 is a sectional view of the precipitation B-B of the present invention;
fig. 4 is a sectional view of the precipitation C-C according to the invention.
In the figure: the method comprises the following steps of 1-open cut hall shallow pit, 2-open cut hall deep pit, 3-station shallow pit, 4-deep-shallow pit boundary, 5-end well deep pit area, 6-track-passing cable channel deepening area, 7-sump pit, 8-underground diaphragm wall, 9-inner side limestone crack grouting, 10-wall bottom limestone crack grouting, 12-dry well, 11-depressurization well, 13-pressure bearing water observation well and emergency recharge well, and 14-downward beam turning pit groove.
Detailed Description
In order to make the technical solutions of the present invention better understood, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Example 1
As shown in fig. 1-4, a precipitation treatment method for a foundation pit with a steeply inclined strip-shaped interbedded composite stratum comprises the following specific construction methods:
step 1, constructing an underground continuous wall 8 of a foundation pit; the foundation pit consists of an open cut hall shallow pit 1, an open cut hall deep pit 2 and a station shallow pit 3; the open cut hall deep pit 2 adopts slope excavation, and the open cut hall shallow pit 1 and the open cut hall deep pit 2 are connected through a shallow-deep pit boundary 4;
2, drilling grouting holes in a sleeve embedded in the underground continuous wall 8, and grouting limestone cracks at the bottom of the wall 10 according to the situation of a karst cave at the bottom of the wall; the grouting holes are steel perforated pipes, the grouting depth is 5m from the soil-rock junction surface to the bottom of the underground continuous wall 8, and the grouting depth is 9.5 m;
constructing grouting holes in the inner side of the underground continuous wall 8, wherein the grouting range is 13.5m from the bottom of a foundation pit to the bottom downwards, and performing inner side limestone crack grouting 9 on the underground continuous wall 8;
the distance between the adjacent grouting holes is 2m, and the effective diffusion radius of the grouting holes is 1.5 m; grouting final pressure is not less than 3 MPa; adopting cement-water glass double-liquid slurry; the mass ratio of cement to water glass of the double-liquid slurry is 1: 1-1: 0.5, wherein the modulus of the water glass is 2.4-2.8, and the Baume degree is 30-42 Be; before formal construction, field test is carried out, and grouting parameters are adjusted according to test results; the slip casting pipe adopts ∅ 90mm steel floral tube slip casting;
and (5) finishing grouting standard: the single-hole grouting pressure reaches the design final pressure and grouting is continued for more than 20min, and the hole grouting can be finished; the single-hole grouting amount is approximately the same as the designed grouting amount, and the hole grouting can be finished when the grouting amount is less than 20-30L/min;
and (3) grouting effect inspection: after the grouting holes of one grouting section are completely injected, 2-3 holes are drilled every 50 square meters to check the grouting effect, a core is taken to observe the filling condition of the grout, the water inflow in the holes is not more than 0.2L/min.m, and the water leakage at a certain position is not more than 10L/min; or carrying out a pressurized water test, wherein the water inflow of the inspection hole is less than 10L/min.m under the pressure of 1.0 MPa. Otherwise, drilling and grouting are encrypted;
after grouting and grouting inspection are finished, hole sealing work of a grouting hole and an inspection hole is needed, and hole sealing is strictly executed according to geological requirements;
step 3, upper drainage, wherein before the soil body in the foundation pit is excavated, a drainage well 12 is constructed, the diving in the upper filling is drained, and the diving in the pit is required to be lowered to a position 1m below the excavation surface;
step 4, reducing pressure, wherein before the soil body in the foundation pit is excavated, a pressure reduction well 11 is required to be constructed, and the confined water in the limestone is reduced as required;
step 5, bottom collection and drainage, wherein an open cut hall end deep pit area 5, a track-passing cable and air duct deepening area 6 and a water collection pit 7 are arranged in the foundation pit, bedrock fracture water in the foundation pit rock stratum is drained into the water collection pit 7 through a bottom plate downward turning beam pit groove 14, then is pumped to the ground through a water pump and is drained into a municipal pipe network;
step 6, external measurement and irrigation, namely constructing a pressure-bearing water observation well and an emergency recharge well 13 on the outer side of the foundation pit, wherein the depth of the pressure-bearing water observation well and the emergency recharge well is the same as that of a depressurization well 11 on the inner side of the foundation pit; observing the depressurization effect of the depressurization well 11 in the foundation pit, and simultaneously observing the water level of the confined water outside the pit by using the confined water observation well and the emergency recharge well 13 to ensure depressurization as required; if the deformation of the surrounding earth surface and the environment is large due to the pressure reduction in the pit, the pressure-bearing water observation well and the emergency recharging well 13 can be used for recharging.
Taking the foundation pit of the Xuzhou No. 1 and No. 2 line transfer station Pengcheng square station as a typical special-shaped pit-in-pit as an example, the soil layers from top to bottom in the foundation pit construction are as follows: the upper part of the old city is filled with miscellaneous earth, the middle part of the old city is made of hard plastic clay, and the lower part of the old city is made of middle weathered limestone, shale, mudstone and sandstone with strip interbedded layers. The strips of the rock are layered with each other at a large angle, the vertical inclination angle is 65-80 degrees, and the horizontal direction is in the north-south-west direction; the shale, the mudstone and the sandstone are water-resisting layers, the limestone contains a large amount of underground confined water, the confined water is supplied along strips, the hydraulic supply among the rock strips is weak, and no hydraulic connection exists between the confined water of the bedrock and the diving of the upper layer. If a 28-mouth pressure water dewatering well, a 45-mouth dewatering well and a 34-mouth pressure water observation well which is also an emergency recharging well are required to be arranged in the foundation pit according to the conventional design, the total manufacturing cost is about 495 thousands; after the invention is adopted, the confined water precipitation well only needs to be provided with 8 ports, the drainage well is provided with 10 ports, and the confined water observation well is provided with 7 ports, so that the manufacturing cost is saved by about 379 thousands, and the economic benefit is obvious.
Meanwhile, the invention is convenient for the partitioned and segmented excavation of the foundation pit, greatly improves the unearthing efficiency and saves the construction period by about 3 months.
The present invention has been described in detail with reference to the embodiments, but the description is only illustrative of the present invention and should not be construed as limiting the scope of the invention. The scope of the invention is defined by the claims. The technical solutions of the present invention or those skilled in the art, based on the teaching of the technical solutions of the present invention, should be considered to be within the scope of the present invention, and all equivalent changes and modifications made within the scope of the present invention or equivalent technical solutions designed to achieve the above technical effects are also within the scope of the present invention. It should be noted that for the sake of clarity, parts of the description of the invention have been omitted where there is no direct explicit connection with the scope of protection of the invention, but where components and processes are known to those skilled in the art.

Claims (2)

1. A precipitation treatment method for a steeply inclined strip-shaped interbedded composite stratum foundation pit is characterized by comprising the following steps of: the specific construction method comprises the following steps:
step 1, constructing an underground continuous wall (8) of a foundation pit; the foundation pit consists of an open cut hall shallow pit (1), an open cut hall deep pit (2) and a station shallow pit (3); the open cut hall deep pit (2) adopts slope excavation, and the open cut hall shallow pit (1) and the open cut hall deep pit (2) are connected through a shallow-deep pit boundary (4);
2, drilling grouting holes in a sleeve embedded in the underground continuous wall (8), and grouting limestone cracks at the bottom of the wall (10) according to the situation of a karst cave at the bottom of the wall; the grouting holes are steel perforated pipes, the grouting depth is 5m below the soil-rock junction surface to the wall bottom of the underground continuous wall (8), and the grouting depth is 9.5 m;
constructing a grouting hole on the inner side of the underground continuous wall (8), wherein the grouting range is 13.5m below the bottom of the foundation pit, and performing grouting (9) on the inner side of the limestone cracks of the underground continuous wall (8);
the distance between the adjacent grouting holes is 2m, and the effective diffusion radius of the grouting holes is 1.5 m; grouting final pressure is not less than 3 MPa; adopting cement-water glass double-liquid slurry; the mass ratio of cement to water glass of the double-liquid slurry is 1: 1-1: 0.5, wherein the modulus of the water glass is 2.4-2.8, and the Baume degree is 30-42 Be; before formal construction, field test is carried out, and grouting parameters are adjusted according to test results; the slip casting pipe adopts ∅ 90mm steel floral tube slip casting;
and (5) finishing grouting standard: the single-hole grouting pressure reaches the design final pressure and grouting is continued for more than 20min, and the hole grouting can be finished; the single-hole grouting amount is approximately the same as the designed grouting amount, and the hole grouting can be finished when the grouting amount is less than 20-30L/min;
and (3) grouting effect inspection: after the grouting holes of one grouting section are completely injected, 2-3 holes are drilled every 50 square meters to check the grouting effect, a core is taken to observe the filling condition of the grout, the water inflow in the holes is not more than 0.2L/min.m, and the water leakage at a certain position is not more than 10L/min; or carrying out a pressurized water test, wherein the water inflow of the inspection hole is less than 10L/min.m under the pressure of 1.0 MPa.
2. Otherwise, drilling and grouting are encrypted;
after grouting and grouting inspection are finished, hole sealing work of a grouting hole and an inspection hole is needed, and hole sealing is strictly executed according to geological requirements;
step 3, upper drainage, wherein before the soil body in the foundation pit is excavated, a drainage well (12) is constructed, the diving in the upper filling is drained, and the diving in the pit is required to be reduced to a position 1m below the excavation surface;
step 4, reducing pressure, wherein before the soil body in the foundation pit is excavated, a pressure reduction well (11) is constructed, and the confined water in the limestone is reduced as required;
step 5, bottom collection and drainage, namely arranging a deep pit area (5) at the end of the open cut hall, a track-crossing cable, an air duct deepening area (6) and a water collection pit (7) in the foundation pit, draining bedrock fracture water in the foundation pit rock stratum into the water collection pit (7) through a bottom plate downward turning beam pit groove (14), pumping the water to the ground through a water pump, and draining the water to a municipal pipe network;
step 6, external measurement and irrigation, namely constructing a pressure-bearing water observation well and an emergency recharge well (13) on the outer side of the foundation pit, wherein the depth of the pressure-bearing water observation well and the emergency recharge well is the same as that of a depressurization well (11) on the inner side of the foundation pit; the pressure reduction effect of the pressure reduction well (11) in the foundation pit is observed, and the pressure-bearing water level outside the pit can be observed by using the pressure-bearing water observation well and the emergency recharge well (13) to ensure the pressure reduction as required; if the deformation of the surrounding earth surface and the environment is large due to the pressure reduction in the pit, the pressure-bearing water observation well and the emergency recharge well (13) can be used for recharging.
CN202010794216.5A 2020-08-10 2020-08-10 Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit Expired - Fee Related CN111910665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010794216.5A CN111910665B (en) 2020-08-10 2020-08-10 Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010794216.5A CN111910665B (en) 2020-08-10 2020-08-10 Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit

Publications (2)

Publication Number Publication Date
CN111910665A true CN111910665A (en) 2020-11-10
CN111910665B CN111910665B (en) 2021-11-02

Family

ID=73284693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010794216.5A Expired - Fee Related CN111910665B (en) 2020-08-10 2020-08-10 Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit

Country Status (1)

Country Link
CN (1) CN111910665B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463672A (en) * 2021-08-09 2021-10-01 中国建筑第四工程局有限公司 Precipitation structure for aquifer and water-resisting layer slowly-inclined interbed and construction method
CN115288174A (en) * 2022-09-01 2022-11-04 中铁第六勘察设计院集团有限公司 Dewatering well plugging device and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225306A (en) * 2013-03-26 2013-07-31 西安建筑科技大学 Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN206815356U (en) * 2017-04-28 2017-12-29 北京市勘察设计研究院有限公司 Water control system is synthetically descended in multi-aquifer area drainage pressure-reducing, ejection for water plugging

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225306A (en) * 2013-03-26 2013-07-31 西安建筑科技大学 Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN206815356U (en) * 2017-04-28 2017-12-29 北京市勘察设计研究院有限公司 Water control system is synthetically descended in multi-aquifer area drainage pressure-reducing, ejection for water plugging

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
熊彩霞等: "徐州地铁1号线彭城广场站急倾斜灰岩岩溶承压含水层水文地质特征及降水可行性评价", 《地质灾害与环境保护》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463672A (en) * 2021-08-09 2021-10-01 中国建筑第四工程局有限公司 Precipitation structure for aquifer and water-resisting layer slowly-inclined interbed and construction method
CN115288174A (en) * 2022-09-01 2022-11-04 中铁第六勘察设计院集团有限公司 Dewatering well plugging device and construction method thereof

Also Published As

Publication number Publication date
CN111910665B (en) 2021-11-02

Similar Documents

Publication Publication Date Title
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN106761835A (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN111910665B (en) Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit
CN108797620A (en) A kind of OPT construction method of interlocking pile
CN108825247B (en) External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method
CN110067597A (en) A kind of mine angle of depression negative pressure visits the method for putting old dead zone ponding
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN114876572A (en) Underground gas storage and site selection and transformation method thereof
CN106245621A (en) A kind of electric osmose inverted well construction method
CN109139057B (en) Coal mining roadway floor water absorption bottom heave treatment method
CN102979105A (en) Underground water control method of wellhole grouting and seepage insulation
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
CN113279729B (en) Gas extraction method for leaking stoppage and concentration
CN111577292B (en) Double-branch road construction method for underground excavation station of local water-rich sand layer
CN107905219A (en) The construction method of ultra-deep hand excavation stake holes under a kind of complex geological condition
CN203475453U (en) Deeply-buried type bearing platform curtain structure of bridge
CN108457306B (en) Pile tube cooperated vertical side wall horizontal bottom-making basin-shaped freezing water stop construction method for 4/6 pilot tunnel PBA construction method
CN111827326B (en) Rapid water lowering device and method for multi-aquifer-multi-aquifer penetrating submerged well
CN113107579B (en) Directional long drilling combined bottom plate cross drilling stereoscopic gas extraction method
CN203066062U (en) Seepage isolating bored pile
CN116024999B (en) Strong water-rich loose layer coal mine inclined shaft water-gushing curtain water interception treatment method
CN117248962B (en) Method for treating presbyopia water among small kiln roadway column type residual coal pillars
CN117703398A (en) Construction method for large-section rectangular jacking pipe in shallow soil-covered water-rich composite stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102