CN111851318A - Cantilever bridge side span formwork system and construction method thereof - Google Patents

Cantilever bridge side span formwork system and construction method thereof Download PDF

Info

Publication number
CN111851318A
CN111851318A CN202010920835.4A CN202010920835A CN111851318A CN 111851318 A CN111851318 A CN 111851318A CN 202010920835 A CN202010920835 A CN 202010920835A CN 111851318 A CN111851318 A CN 111851318A
Authority
CN
China
Prior art keywords
support
side span
longitudinal beam
construction method
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010920835.4A
Other languages
Chinese (zh)
Other versions
CN111851318B (en
Inventor
豆德存
崔芳胜
王勇
弓永涛
权龙�
黄玉娟
汪传福
钱江
郜超群
张敏
章焕
马正峰
关珊
鲁劲松
苏陈明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Gourgen Traffic Construction Co Ltd
Original Assignee
Anhui Gourgen Traffic Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Gourgen Traffic Construction Co Ltd filed Critical Anhui Gourgen Traffic Construction Co Ltd
Priority to CN202010920835.4A priority Critical patent/CN111851318B/en
Publication of CN111851318A publication Critical patent/CN111851318A/en
Application granted granted Critical
Publication of CN111851318B publication Critical patent/CN111851318B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a cantilever bridge side span formwork system and a construction method thereof, belonging to the technical field of bridge construction.A pre-buried steel plate is arranged at the top of a side span buttress, support frames are welded and installed on the pre-buried steel plate, a reinforcing support is arranged between adjacent support frames, a temporary fixed pier, a top longitudinal beam, a support longitudinal beam, a rear upper cross beam, a rear lower cross beam and a front cross beam are installed between the support frames and a poured bridge section, and a transverse distribution beam is arranged on a bottom longitudinal beam; the bottom die is mainly paved on the transverse distribution beam, the other part of the bottom die is paved between the support frame and the permanent support and is supported by the inner temporary support, the outer die support is arranged on the support longitudinal beam, the flange bottom die and the outer die are arranged on the outer die support and are respectively fixed through the opposite pull rods, the bottom die is provided with the inner die, and the top support frame of the side span buttress and the poured bridge section are used as gravity support structures for construction of the side span closure section of the cantilever bridge, so that the hoisting workload is reduced, and the construction period and the cost are reduced.

Description

Cantilever bridge side span formwork system and construction method thereof
Technical Field
The invention belongs to the technical field of bridge construction, and particularly relates to a cantilever bridge side span formwork system and a construction method thereof.
Background
With the continuous development of social economy in China, bridge construction enters a high-speed development period, the construction investment scale of the current roads and bridges is larger and larger, the requirements on related construction technical levels are higher and higher, and the structural complexity is deepened gradually. The cantilever beam bridge refers to a beam bridge which takes a simple beam with one end or two ends freely hanging outwards as a main bearing component of an upper structure. The cantilever beam bridge is generally a statically determinate structure, the internal force of the structure is not influenced by the deformation of the foundation, and the requirement on the foundation is lower. In the porous bridge, only one support needs to be arranged on the pier, so that the size of the pier is correspondingly reduced, the material consumption of basic engineering is also saved, and the porous bridge is widely applied to bridge construction.
The cantilever bridge is not easy to adopt assembly type construction, and a hanging basket method is usually adopted when the cantilever bridge with a large span is poured, so that the cantilever operation is segmented on site. For example, in the side span closure segment construction, the prior patent CN103556578B utilizes the side span pier top and the hanging basket as the gravity support structure for casting the continuous beam straight-line segment and the side span closure segment by the cantilever, instead of setting up the side span cast-in-place support on the ground as the gravity support structure of the concrete project. However, the patent only describes how to support the outer mold, but does not describe how to support the inner mold, and for the support of the inner mold, a complex hanging basket system needs to be erected, and the hanging basket system is cast in situ on a support template which is expensive, complicated to build and slow in speed.
Therefore, it is important to find a cantilever bridge side-span formwork system with high construction efficiency, good economic benefit and simple and stable structure and a construction method thereof.
Disclosure of Invention
The invention aims to overcome the defects and provides a cantilever bridge side span formwork system and a construction method thereof.
In order to solve the technical problems, the invention is realized by the following technical scheme:
the invention relates to a construction method of a cantilever bridge side span formwork system, which comprises the following steps:
the method comprises the following steps that firstly, an embedded steel plate is embedded in the top of a pouring side-span buttress, a support frame with an upper support beam, a middle support beam and a lower support beam is installed on the embedded steel plate, and an external temporary support is installed on the top of the pouring side-span buttress;
step two, mounting a temporary fixing pier above a top plate of a poured bridge section, fixing a rear upper crossbeam below the top plate of the poured bridge section through a rear sling, anchoring a rear lower crossbeam below a bottom plate of the poured bridge section, respectively connecting two ends of a top longitudinal beam to the temporary fixing pier and a supporting crossbeam on the upper way of a supporting frame, respectively connecting two ends of a support longitudinal beam to the supporting crossbeam on the middle way of the supporting frame and the sling arranged on the top plate, respectively connecting two ends of a bottom longitudinal beam to the rear sling arranged on an outer temporary support and the bottom plate, and fully paving a transverse distribution beam on the bottom longitudinal beam;
thirdly, mounting front hanging strips in the middle areas of the top longitudinal beam and the support longitudinal beam, and hanging a front cross beam on the front hanging strips;
fourthly, mounting a bottom die on the transverse distribution beam, and paving the bottom die between the support frame and the permanent support and supporting the bottom die by the inner temporary support;
fifthly, mounting an outer mold support on the support longitudinal beam, and fixing the flange bottom die and the outer side die on the outer mold support through a counter-pull rod;
and step six, binding steel bars on the bottom plate of the side span section, and mounting the inner mold on the bottom film.
Furthermore, the inner die is arranged above the bottom die in a hanging mode through support angle steel, one end of the support angle steel is arranged on a support cross beam of a lower channel of the support frame, and the other end of the support angle steel is fixed above a poured bridge section bottom plate through an anchoring rod.
Further, the internal mold comprises support angle steel, a lower internal mold, an internal side mold, an upper internal mold, connecting angle steel and an internal support, the lower internal mold, the upper internal mold and the two internal side molds form a rectangular cylinder, the corners of the rectangular cylinder are fixed through the connecting angle steel, the support angle steel is connected to the lower internal mold and is provided with two pieces of support angle steel, and the support angle steel and the connecting angle steel at the edge of the upper internal mold are connected through the internal support.
The top of the side span buttress is provided with two embedded steel plates, the support frame is composed of two support longitudinal beams and an upper support cross beam, a middle support cross beam and a lower support cross beam which are arranged between the support longitudinal beams, the bottom of each support longitudinal beam is arranged on the embedded steel plates, the number of the support frames is two, and the two support frames are connected through a reinforcing support.
Furthermore, the top of the side span buttress is divided into two mounting positions by the support frame, and an inner temporary support, a permanent support and an outer temporary support are sequentially arranged at the edge from the support frame to the top surface of the side span buttress on each mounting position.
Further, the bottom die and the top of the permanent support are flush.
Further, the front cross member and the rear lower cross member are at the same level.
Further, an end die is installed on the side surface of the support frame.
The cantilever bridge side span formwork system is built through the steps.
The invention has the following beneficial effects:
the side span closure segment construction is carried out by adopting a hanging basket-free mode, and the side span buttress top support frame and the poured bridge segment are used as gravity support structures for the side span closure segment construction of the cantilever bridge, so that the hoisting workload is reduced, and the construction period and the construction cost are reduced.
The support frame is formed by welding the support longitudinal beam and the support cross beam, the structure is simple, synchronous construction of the side span section cast-in-place beams on two sides of the side span buttress is facilitated, the construction period is shortened, the side span buttress is reinforced through the reinforcing support, and the stability of the support structure is further improved.
Need not inner support frame during centre form installation, the structure is firm simple, simple to operate, reduces steel use amount and can high-efficient quick construction simultaneously.
Of course, it is not necessary for any product in which the invention is practiced to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic diagram of a cantilever bridge edge-span formwork system;
FIG. 2 is a schematic view of a pier top support frame;
FIG. 3 is a schematic view of a side span buttress top support system;
FIG. 4 is a schematic view of a template holder system;
FIG. 5 is a schematic view of a bottom die arrangement;
FIG. 6 is a schematic illustration of a flange bottom die and an outer die arrangement;
FIG. 7 is a schematic cross-sectional view of the inner mold;
FIG. 8 is a schematic cross-sectional view of a cantilever bridge side-span formwork system;
in the drawings, the components represented by the respective reference numerals are listed below:
1-reinforcing support; 2-supporting the beam; 3-end mold; 4-supporting the longitudinal beam; 5, pre-burying a steel plate; 6-inner temporary support; 7-permanent support; 8-an outer temporary support; 9-top stringer; 10-bottom die; 11-bottom stringer; 12-transverse distribution beams; 13-front sling; 14-support angle steel; 15-a bracket stringer; 16-a lower inner mold; 17-a front cross beam; 18-temporary anchor blocks; 19-rear upper beam; 20-an anchor rod; 21-rear sling; 22-rear lower beam; 23-side span buttress; 24-an inner mold; 25-an outer mold support; 26-inner side mold; 27-upper inner mold; 28-connecting angle steel; 29-inner support; 30-a bridge section is poured; 31-flange bottom die; 32-outside die.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "opening," "upper," "lower," "thickness," "top," "middle," "length," "inner," "peripheral," and the like are used in an orientation or positional relationship that is merely for convenience in describing and simplifying the description, and do not indicate or imply that the referenced component or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be considered as limiting the present invention.
The invention does not need to describe the technical requirements of welding between the reinforcing steel bars, concrete pouring key points, rammed earth, pile foundation construction quality standards and the like, and mainly explains the implementation mode of the structure of the invention.
Referring to fig. 1-8, the present invention is a cantilever bridge side span formwork system:
the top of the side span buttress 23 is provided with two pre-buried steel plates 5, and weld the support longerons 4 on two pre-buried steel plates 5, link together through three horizontal setting of the way supporting beam 2 between two support longerons 4 on the corresponding position on two pre-buried steel plates 5, constitute the support frame by support longeron 4 and supporting beam 2, later link together through strengthening support 1 between the support frame that forms, and cut apart into two parts with the top of side span buttress 23, have set gradually interior temporary support 6 by support frame to side span buttress 23 edge in each part, permanent support 7, outer temporary support 8.
The end of the poured bridge section 30 has a top plate and a bottom plate, wherein a rear upper beam 19 is fixed below the top plate by a rear sling 21, a rear lower beam 22 is fixed below the bottom plate by a rear sling 21, wherein a bottom longitudinal beam 11 is erected on the rear lower beam 22 and an outer temporary support 8, wherein the bottom longitudinal beam 11 is provided with a row, a support longitudinal beam 15 is erected between a support beam 2 and the rear upper beam 19 in the middle on the support frame, a temporary fixing pier 18 is further arranged on the upper surface of the top plate, a top longitudinal beam 9 is erected on the temporary fixing pier 18 and the support beam 2 positioned at the top of the support frame, a front sling 13 is installed in the middle area of the corresponding top longitudinal beam 9 and support longitudinal beam 15, a front beam 17 is fixed on the front sling 13, wherein the rear lower beam 22 of the front beam 17 is at the same horizontal height, a row of transverse distribution beams 12 is erected on the bottom longitudinal beam 11, a bottom die 10 is laid, a bottom die 10 is also laid between the support frame and the permanent support 7, the bottom die 10 is supported by the inner temporary support 6, an outer die support 25 is erected on the support longitudinal beam 15, a flange bottom die 31 and an outer side die 32 are mounted on the outer die support 25, the cross section of the specific outer die support 25 is in a step shape, the outer side die is mounted on the outer surface of the specific outer die support 25, the flange bottom die 31 is arranged on the step surface, the specific outer die support is tensioned and fixed through a pull rod, and the support longitudinal beam 15 abuts against the lower surface of the flange bottom die 31.
The internal mold 24 is arranged above the bottom mold 10 through the suspension of the support angle steel 14, one end of the support angle steel 14 is arranged on the support beam 2 at the lowest part of the support frame, the other end of the support angle steel is fixed above the bottom plate of the poured bridge section 30 through the anchoring rod 20, and the end mold 3 is arranged on the side surface of the support frame.
The inner die 24 comprises support angle steel 14, a lower inner die 16, an inner die 26, an upper inner die 27, connecting angle steel 28 and an inner support 29, which are integrally welded.
The lower inner mold 16, the upper inner mold 27 and the two inner side molds 26 form a rectangular cylinder, and the corners thereof are fixed by connecting angle steels 28.
The support angle 14 is connected to the lower inner mold 16, and two support angles 14 are provided and connected to two connecting angles 28 at two edges of the upper inner mold 27 through inner supports 29.
The construction method of the cantilever bridge side span formwork system comprises the following steps:
firstly, pre-embedding a pre-embedded steel plate 5 at the top of a poured side-span buttress 23, installing a support frame with an upper supporting beam, a middle supporting beam and a lower supporting beam 2 on the pre-embedded steel plate 5, wherein the upper supporting beam, the middle supporting beam and the lower supporting beam 2 arranged between the two supporting beams 4 can be assembled in advance, then hoisting the support frame to the top surface of the side-span buttress 23 and installing the support frame on the pre-embedded steel plate 5, and in addition, connecting and reinforcing the two support frames through a reinforcing support 1 again, wherein after the subsequent building process is finished, an end mold 3 is installed on one side of the support frame;
wherein, pour the installation of 23 tops of side span buttress and set up outer temporary support 8, outer temporary support 8 still sets gradually permanent support 7 and interior temporary support 6 near the side span buttress 23 top of interior department.
Step two, mounting a temporary fixing pier 18 above a top plate of a poured bridge section 30, fixing a rear upper cross beam 19 below the top plate of the poured bridge section 30 through a rear sling 21, anchoring a rear lower cross beam 22 below a bottom plate of the poured bridge section 30, and then erecting a bottom longitudinal beam 11, a support longitudinal beam 15 and a part longitudinal beam 9;
the two ends of a top longitudinal beam 9 are respectively connected with a temporary fixed pier 18 and a supporting cross beam 2 on the upper track of the supporting frame, the two ends of a support longitudinal beam 15 are respectively connected with the supporting cross beam 2 on the middle track of the supporting frame and a hanging strip 21 arranged on a top plate, the two ends of a bottom longitudinal beam 11 are respectively connected with an outer temporary support 8 and a rear hanging strip 21 arranged on a bottom plate, and a transverse distribution beam 12 is fully paved on the bottom longitudinal beam 11.
And step three, mounting a front hanging strip 13 in the middle area of the top longitudinal beam 9 and the support longitudinal beam 15, and hanging a front cross beam 17 on the front hanging strip 13.
And step four, mounting a bottom die 10 on the transverse distribution beam 12, laying the bottom die 10 between the support frame and the permanent support 7, and supporting the bottom die by the inner temporary support 6.
And step five, installing an outer mold support 25 on the support longitudinal beam 15, and fixing the flange bottom mold 31 and the outer mold 32 on the outer mold support 25 through a counter-pull rod.
And step six, binding steel bars on the bottom plate of the side span section, and installing an inner die 24 on the bottom film 10, wherein the inner die 24 is prefabricated or manufactured on the bottom film 10 on site, specifically, the inner die 10 is suspended above the bottom die 10 through support angle steel 14, one end of the support angle steel 14 is arranged on the support beam 2 at the lowest part of the support frame, and the other end of the support angle steel is fixed above the bottom plate of the poured bridge section 30 through an anchor rod 20.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (9)

1. The construction method of the cantilever bridge side span formwork system is characterized by comprising the following steps:
firstly, pre-burying a steel plate (5) at the top of a pouring side span buttress (23), mounting a support frame with an upper support beam, a middle support beam and a lower support beam (2) on the pre-buried steel plate (5), and mounting and arranging an outer temporary support (8) at the top of the pouring side span buttress (23);
step two, installing a temporary fixing pier (18) above a top plate of a poured bridge section (30), fixing a rear upper cross beam (19) below the top plate of the poured bridge section (30) through a rear hanging strip (21), anchoring a rear lower cross beam (22) below a bottom plate of the poured bridge section (30), respectively connecting two ends of a top longitudinal beam (9) to the temporary fixing pier (18) and a supporting cross beam (2) of an upper way of a supporting frame, respectively connecting two ends of a support longitudinal beam (15) to the supporting cross beam (2) of a middle way of the supporting frame and the hanging strip (21) arranged on the top plate, respectively connecting two ends of a bottom longitudinal beam (11) to an outer temporary support (8) and the rear hanging strip (21) arranged on the bottom plate, and fully paving a transverse distribution beam (12) on the bottom longitudinal beam (11);
thirdly, mounting a front hanging strip (13) in the middle area of the top longitudinal beam (9) and the support longitudinal beam (15), and hanging a front cross beam (17) on the front hanging strip (13);
fourthly, mounting a bottom die (10) on the transverse distribution beam (12), laying the bottom die (10) between the support frame and the permanent support (7), and supporting the bottom die (10) by the inner temporary support (6);
fifthly, an outer mold support (25) is installed on the support longitudinal beam (15), and the flange bottom die (31) and the outer mold (32) are fixed on the outer mold support (25) through a counter-pulling pull rod;
and sixthly, binding steel bars on the bottom plate of the side span section, and installing the inner mold (24) on the bottom film (10).
2. The cantilever bridge side span formwork system construction method according to claim 1, wherein the inner formwork (24) is suspended above the bottom formwork (10) through a support angle steel (14), one end of the support angle steel (14) is arranged on a support cross beam (2) of a lower course of the support frame, and the other end is fixed above a bottom plate of a poured bridge section (30) through an anchoring rod (20).
3. The cantilever bridge side span formwork system construction method according to claim 2, wherein the inner mold (24) comprises support angle steel (14), a lower inner mold (16), inner side molds (26), an upper inner mold (27), connecting angle steel (28) and inner supports (29), the lower inner mold (16), the upper inner mold (27) and the two inner side molds (26) form a rectangular cylinder, the corners of the rectangular cylinder are fixed through the connecting angle steel (28), the support angle steel (14) is connected to the lower inner mold (16), two support angle steel (14) are arranged, and the support angle steel (14) and the connecting angle steel (28) at the edges of the upper inner mold (27) are connected through the inner supports (29).
4. The cantilever bridge side span formwork system construction method according to claim 1, wherein two embedded steel plates (5) are arranged at the top of the side span buttress (23), the support frame is composed of two support longitudinal beams (4) and three upper, middle and lower support cross beams (2) arranged between the support longitudinal beams (4), the bottom of each support longitudinal beam (4) is arranged on the embedded steel plates (5), two support frames are arranged, and the two support frames are connected through the reinforcing support (1).
5. The cantilever bridge side span formwork system construction method according to claim 1, wherein the top of the side span buttress (23) is divided into two installation positions by a support frame, and an inner temporary support (6), a permanent support (7) and an outer temporary support (8) are sequentially arranged from the support frame to the edge of the top surface of the side span buttress (23) on each installation position.
6. The cantilever bridge side-span formwork system construction method according to claim 1, wherein the top of the bottom formwork (10) and the top of the permanent support (7) are equal in height.
7. The cantilever bridge side-span formwork system construction method according to claim 1, wherein the front cross beam (17) and the rear lower cross beam (22) are at the same level.
8. The cantilever bridge side-span formwork system construction method according to claim 1, characterized in that an end formwork (3) is installed on the side surface of the supporting frame.
9. A cantilever bridge side span formwork system is characterized by being built through the steps.
CN202010920835.4A 2020-09-04 2020-09-04 Cantilever bridge side span formwork system and construction method thereof Active CN111851318B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010920835.4A CN111851318B (en) 2020-09-04 2020-09-04 Cantilever bridge side span formwork system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010920835.4A CN111851318B (en) 2020-09-04 2020-09-04 Cantilever bridge side span formwork system and construction method thereof

Publications (2)

Publication Number Publication Date
CN111851318A true CN111851318A (en) 2020-10-30
CN111851318B CN111851318B (en) 2021-09-07

Family

ID=72967819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010920835.4A Active CN111851318B (en) 2020-09-04 2020-09-04 Cantilever bridge side span formwork system and construction method thereof

Country Status (1)

Country Link
CN (1) CN111851318B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627060A (en) * 2020-12-30 2021-04-09 中国建筑土木建设有限公司 Side-span cast-in-place section cantilever bearing system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009108635A (en) * 2007-10-31 2009-05-21 Sumitomo Mitsui Construction Co Ltd Bridge construction method
CN202658536U (en) * 2012-04-11 2013-01-09 中铁三局集团有限公司 Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof
CN106522102A (en) * 2016-11-22 2017-03-22 中交公局海威工程建设有限公司 Side span construction support, rigid frame bridge side span and rigid frame bridge
CN107724244A (en) * 2017-10-26 2018-02-23 中铁第四勘察设计院集团有限公司 Temporary T structure and its construction method without bearing continuous rigid frame end bay beam section composition
CN111395181A (en) * 2020-03-27 2020-07-10 中交二公局东萌工程有限公司 Self-anchoring construction method for side-span cast-in-place section and closure section of continuous rigid frame bridge
CN211171632U (en) * 2019-08-14 2020-08-04 中交二公局东萌工程有限公司 Continuous rigid frame bridge side-span cast-in-place section and closure section are pour and are used gallows

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009108635A (en) * 2007-10-31 2009-05-21 Sumitomo Mitsui Construction Co Ltd Bridge construction method
CN202658536U (en) * 2012-04-11 2013-01-09 中铁三局集团有限公司 Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof
CN106522102A (en) * 2016-11-22 2017-03-22 中交公局海威工程建设有限公司 Side span construction support, rigid frame bridge side span and rigid frame bridge
CN107724244A (en) * 2017-10-26 2018-02-23 中铁第四勘察设计院集团有限公司 Temporary T structure and its construction method without bearing continuous rigid frame end bay beam section composition
CN211171632U (en) * 2019-08-14 2020-08-04 中交二公局东萌工程有限公司 Continuous rigid frame bridge side-span cast-in-place section and closure section are pour and are used gallows
CN111395181A (en) * 2020-03-27 2020-07-10 中交二公局东萌工程有限公司 Self-anchoring construction method for side-span cast-in-place section and closure section of continuous rigid frame bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627060A (en) * 2020-12-30 2021-04-09 中国建筑土木建设有限公司 Side-span cast-in-place section cantilever bearing system and construction method thereof

Also Published As

Publication number Publication date
CN111851318B (en) 2021-09-07

Similar Documents

Publication Publication Date Title
CN103981803A (en) Prefabricated assembled combination type door-shaped pillar and construction method thereof
CN111335181A (en) Mounting support frame and mounting method for cast-in-place concrete structure template of steel-concrete composite beam flange plate
CN216765936U (en) Cast-in-place concrete frame beam regularization template structure
CN111851318B (en) Cantilever bridge side span formwork system and construction method thereof
KR20100003791A (en) A precast type pre-stress box girder bridge excution method
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN113027021A (en) Support-free prefabricated floor slab with bracket
CN219671054U (en) Steel-concrete combined small box girder prefabricated by integral hoisting
CN210421568U (en) Assembled beam and plate structure
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN112663507A (en) Tower beam synchronous construction method for short-tower cable-stayed bridge
CN109610707A (en) A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush
CN213389745U (en) Cantilever bridge side span formwork system
CN214459548U (en) Assembled steel and concrete combined rigid frame bridge
CN212025941U (en) Cast-in-place concrete structure formwork mounting support frame for steel-concrete composite beam flange plate
CN212926589U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN211285212U (en) Small box girder structure suitable for medium and small span simply supported girder bridge
CN211947965U (en) Cast-in-situ continuous box girder internal mold
CN113073541A (en) Combined capping beam suitable for continuous bridge deck construction, bridge and construction process
CN113059685A (en) Precast beam construction system and construction method
CN112323647A (en) Rigid frame bridge hanging basket suspension casting system and construction method thereof
CN220450689U (en) Distributing machine suspension bracket for concrete pouring construction of upper beam of cable tower
CN219260729U (en) Opposite-pulling bracket without damaging bridge pier
CN117127483B (en) Modularized construction bridge structure and construction process
CN217710298U (en) Steel shell concrete bent cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20201030

Assignee: Anhui Xingtai Financial Leasing Co.,Ltd.

Assignor: ANHUI GOURGEN TRAFFIC CONSTRUCTION CO.,LTD.

Contract record no.: X2023980034901

Denomination of invention: Side span formwork system of cantilever bridge and its construction method

Granted publication date: 20210907

License type: Exclusive License

Record date: 20230423

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Side span formwork system of cantilever bridge and its construction method

Effective date of registration: 20230426

Granted publication date: 20210907

Pledgee: Anhui Xingtai Financial Leasing Co.,Ltd.

Pledgor: ANHUI GOURGEN TRAFFIC CONSTRUCTION CO.,LTD.

Registration number: Y2023980039310