CN111847289B - Intelligent installation construction equipment and process for water conservancy construction pipe pile - Google Patents

Intelligent installation construction equipment and process for water conservancy construction pipe pile Download PDF

Info

Publication number
CN111847289B
CN111847289B CN202010685238.8A CN202010685238A CN111847289B CN 111847289 B CN111847289 B CN 111847289B CN 202010685238 A CN202010685238 A CN 202010685238A CN 111847289 B CN111847289 B CN 111847289B
Authority
CN
China
Prior art keywords
clamping
hoisting
lifting
water conservancy
tubular pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010685238.8A
Other languages
Chinese (zh)
Other versions
CN111847289A (en
Inventor
曹银花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiangong Fangyuan Construction Group Co ltd
Original Assignee
Tiangong Fangyuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiangong Fangyuan Construction Group Co ltd filed Critical Tiangong Fangyuan Construction Group Co ltd
Priority to CN202010685238.8A priority Critical patent/CN111847289B/en
Publication of CN111847289A publication Critical patent/CN111847289A/en
Application granted granted Critical
Publication of CN111847289B publication Critical patent/CN111847289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C25/00Cranes not provided for in groups B66C17/00 - B66C23/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/445Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/445Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated
    • B66C1/447Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated by hydraulic or pneumatic motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • B66C1/54Internally-expanding grippers for handling hollow articles
    • B66C1/56Internally-expanding grippers for handling hollow articles for handling tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to water conservancy construction pipe pile intelligent installation construction equipment and an installation construction process. The clamping device can solve the problems that when the tubular pile is installed, the tubular pile is mostly fixed by manually pulling a rope, the stability of the tubular pile during installation cannot be guaranteed, time and labor are wasted, the clamping device needs to be disassembled by manual high-altitude operation after the tubular pile is installed, the automation intelligence degree of the equipment is low, the manual construction difficulty is high, the efficiency is low, and great potential safety hazards exist.

Description

Intelligent installation construction equipment and process for water conservancy construction pipe pile
Technical Field
The invention relates to the technical field of water conservancy construction, in particular to intelligent installation and construction equipment and an intelligent installation and construction process for a water conservancy construction pipe pile.
Background
A water conservancy construction tubular pile (PHC tubular pile), namely a prestressed high-strength hollow cylindrical concrete tubular pile. In the process of rapid development of economy in China, hydraulic engineering construction is also developed very rapidly, and the hydraulic engineering construction has great influence on national economy development and social progress in China, so that the hydraulic engineering construction also has great influence in the process of economic development and social progress in China, the hydraulic engineering has great influence on agricultural development in China, and the influence on the hydraulic engineering in the agricultural development process is very important. The quality of whole hydraulic engineering is directly influenced, also can influence the construction benefit of water conservancy construction unit simultaneously.
At present, to current water conservancy tubular pile erection equipment, there is following defect: 1. when the existing water conservancy tubular pile installation equipment is used for installing a tubular pile, the tubular pile is mostly fixed by manually pulling a rope, the stability of the tubular pile during installation cannot be guaranteed, the time and the labor are consumed, manual high-altitude operation is needed for disassembling a clamping device after the installation is finished, the automation intelligence degree of the equipment is low, the manual construction difficulty is high, the efficiency is low, and great potential safety hazards exist; 2. current water conservancy tubular pile erection equipment adopts single outside centre gripping mostly, and is fixed with the water conservancy tubular pile centre gripping from the outside, can not be fixed water conservancy tubular pile through the cooperation of inside centre gripping and outside centre gripping, and installation stability is poor, influences the installation accuracy.
Disclosure of Invention
Technical problem to be solved
The invention can solve the problems that the existing water conservancy tubular pile installation equipment mostly adopts a manual pulling rope to fix the tubular pile when the tubular pile is installed, the stability of the tubular pile during installation cannot be ensured, the time and the labor are wasted, manual high-altitude operation is needed to disassemble a clamping device after the tubular pile is installed, the automation intelligence degree of the equipment is low, the manual construction difficulty is high, the efficiency is low, and the potential safety hazard is very large.
(II) technical scheme
In order to achieve the purpose, the invention adopts the following technical scheme that the intelligent installation and construction equipment for the water conservancy construction tubular pile comprises a supporting device, a clamping device and a hoisting device, wherein the clamping device is installed in the middle of the supporting device in a sliding fit mode, the hoisting device is installed on the upper portion of the supporting device, and the hoisting device is located above the clamping device.
Strutting arrangement include bottom plate, round hole, ball, support column, Contraband type spout and roof, the bottom plate cross-section be circular structure, the round hole has been seted up at the bottom plate middle part, evenly be provided with the ball along its circumference on the round hole inside wall, evenly be provided with the support column along its circumference on the bottom plate up end, support column quantity is four, has seted up Contraband type spout on the support column, installs the roof on the support column up end.
Clamping device include spacing seat, driving motor, spacing commentaries on classics roller, spacing wire rope, outer fixture and locking mechanism, the bottom plate up end on the symmetry install spacing seat, spacing seat is the ascending U type structure of opening, install spacing commentaries on classics roller through the bearing on the spacing seat, driving motor passes through the motor cabinet and installs on the bottom plate, driving motor's output shaft passes through the shaft coupling and is connected with spacing commentaries on classics roller, the winding has spacing wire rope on the spacing commentaries on classics roller, spacing wire rope is connected with outer fixture, be connected with locking mechanism on the outer fixture, locking mechanism installs in Contraband type spout on the support column through sliding fit's mode.
Hoisting device include rotating electrical machines, hoist and mount pole, interior fixture, the case that lifts by crane, gallows and hoisting machine construct, rotating electrical machines pass through the motor cabinet and install at roof up end middle part, set up the lewis hole that is used for hoist and mount on the roof, there is the hoist and mount pole through splined connection on rotating electrical machines's the output shaft, the hoist and mount pole is the cylinder structure, the terminal surface all is equipped with the opening about the hoist and mount pole, hoist and mount pole middle part is equipped with logical groove, fixture is installed in installing through sliding fit's mode on the hoist and mount pole, terminal surface mid-mounting has the case that lifts by crane under the roof, the case that lifts by crane is equipped with open-ended rectangle structure for the below, the gallows has been installed to the incasement, hoisting machine constructs through the bearing on the gallows.
As a preferred technical scheme of the invention: outer clamping mechanism include grip ring, ear seat, through-hole, rubber pad, chucking dish, screw hole, locking bolt, bolt cap and connecting rod, grip ring lateral surface middle part be provided with the ear seat, offer the through-hole that is used for the spacing wire rope of bolt system on the ear seat, be provided with the rubber pad on the grip ring medial surface, the chucking dish is installed to the last symmetry of grip ring, screw hole is seted up at chucking dish middle part, the locking bolt is installed through screw-thread fit's mode in the screw hole, the last bolt cap that is connected with of locking bolt through screw-thread fit's mode.
As a preferred technical scheme of the invention: the locking mechanism comprises a sliding plate, a pulley, an Contraband type frame, an electric push rod, an electric rotating rod and a nut sleeve, the sliding plate is installed in a Contraband type sliding groove in a supporting column in a sliding fit mode, the pulley is installed on the end face of the sliding plate in a sliding fit mode, a Contraband type frame is installed on the other end face of the sliding plate, the bottom end of the electric push rod is installed on the Contraband type frame, the movable end of the electric push rod is connected with the electric rotating rod through a bearing, and the nut sleeve is installed on the electric rotating rod.
As a preferred technical scheme of the invention: the inner clamping mechanism comprises a cam, a clamping seat, a T-shaped groove, a T-shaped plate, a buffer spring, an air cylinder, a clamping plate, an arc plate and a rubber layer, the cam is installed on the hoisting rod in a sliding fit mode, the clamping seat is connected onto the cam, the T-shaped groove is formed in the clamping seat, the T-shaped plate is installed in the T-shaped groove, the buffer spring is arranged between the T-shaped plate and the clamping seat, the air cylinder is installed in the middle of the T-shaped plate through the air cylinder seat, the output end of the air cylinder is connected with the clamping plate through a flange, the arc plate is installed on the clamping plate, and the rubber layer is arranged on the arc plate.
As a preferred technical scheme of the invention: hoisting machine construct including hoist and mount motor, driving gear, rack bar, driven gear, hoist and mount roller, axle sleeve and lifting rope, the hoist and mount motor pass through the motor cabinet and install in the lifting box, the output shaft of hoist and mount motor passes through spline and driving gear connection, the driving gear passes through gear engagement's mode and is connected with the rack meshing, the meshing has driven gear on the rack bar, driven gear passes through the spline and installs at hoist and mount roller both ends, the hoist and mount roller passes through the bearing and installs on the gallows, the hoist and mount roller both ends are close to driven gear and install the axle sleeve, the winding has the lifting rope in the middle part of the hoist and mount roller, the lifting rope other end is connected with interior clamping mechanism.
As a preferred technical scheme of the invention: the clamping ring cross-section be C type structure, clamping ring quantity is four, and clamping ring bilateral symmetry connects through the connecting rod between the upper and lower clamping ring.
(III) advantageous effects
1. The intelligent installation and construction equipment for the water conservancy construction tubular pile provided by the invention can solve the problems that the existing equipment is time-consuming and labor-consuming because the tubular pile is fixed by manually pulling a rope when the tubular pile is installed, the stability of the tubular pile during installation cannot be ensured, the clamping device needs to be disassembled by manual high-altitude operation after the tubular pile is installed, the automation intelligence degree of the equipment is low, the manual construction difficulty is high, the efficiency is low, a great potential safety hazard exists, the water conservancy tubular pile cannot be fixed by matching of internal clamping and external clamping, the installation stability is poor, and the installation precision is influenced.
2. According to the intelligent installation and construction equipment for the water conservancy construction tubular pile, the clamping device and the hoisting mechanism are matched with each other, so that the water conservancy tubular pile can be automatically fixed transversely and longitudinally, the improvement of the installation stability of the tubular pile is facilitated, the reduction of labor consumption is facilitated, the labor cost is saved, the automatic locking and dismounting of the clamping device can be realized through the locking mechanism, the automation degree of the equipment is facilitated to be improved, the safety coefficient in the installation of the water conservancy tubular pile is facilitated to be improved, and the installation efficiency is facilitated to be improved.
3. According to the intelligent installation and construction equipment for the water conservancy construction tubular pile, the outer clamping mechanism and the inner clamping mechanism are matched with each other, the water conservancy tubular pile can be clamped and fixed from the outside and the inside, double clamping is adopted, the stability of installation of the water conservancy tubular pile is improved, the installation precision is improved, and the intelligent level of the equipment is improved.
Drawings
The invention is further illustrated by the following examples in conjunction with the drawings.
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic longitudinal sectional view of the present invention;
FIG. 3 is a schematic perspective view of the outer clamping mechanism and the locking mechanism of the present invention;
FIG. 4 is a schematic cross-sectional view of the present invention;
FIG. 5 is an enlarged schematic view of the invention at A in FIG. 2;
fig. 6 is an enlarged view of the structure of fig. 4 at B according to the present invention.
Detailed Description
Embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways as defined and covered by the claims.
As shown in fig. 1-6, a water conservancy construction tubular pile intelligence installation construction equipment, including strutting arrangement 1, clamping device 2 and hoist device 3, strutting arrangement 1 middle part install clamping device 2 through sliding fit's mode, hoist device 3 is installed on strutting arrangement 1 upper portion, hoist device 3 is located clamping device 2 tops.
Strutting arrangement 1 include bottom plate 11, round hole 12, ball 13, support column 14, Contraband type spout 15 and roof 16, 11 cross-sections of bottom plate be circular structure, round hole 12 has been seted up at bottom plate 11 middle part, evenly be provided with ball 13 along its circumference on the 12 inside walls of round hole, evenly be provided with support column 14 along its circumference on the 11 up end of bottom plate, 14 quantity of support column is four, Contraband type spout 15 has been seted up on the support column 14, install roof 16 on the 14 up end of support column, when concrete work, round hole 12 is used for the installation of water conservancy tubular pile, evenly be provided with ball 13 along its circumference on the 12 inside walls of round hole and be convenient for water conservancy tubular pile and ground contact, prevent that subaerial earth from collapsing, earth falls in the water conservancy tubular pile mounting groove, Contraband type spout 15 is used for locking mechanism 26 to slide in Contraband type spout 15.
The clamping device 2 comprises a limiting seat 21, a driving motor 22, a limiting rotary roller 23, a limiting steel wire rope 24, an outer clamping mechanism 25 and a locking mechanism 26, the limiting seat 21 is symmetrically installed on the upper end surface of the bottom plate 11, the limiting seat 21 is of a U-shaped structure with an upward opening, the limiting rotary roller 23 is installed on the limiting seat 21 through a bearing, the driving motor 22 is installed on the bottom plate 11 through a motor seat, an output shaft of the driving motor 22 is connected with the limiting rotary roller 23 through a coupler, the limiting rotary roller 23 is wound with the limiting steel wire rope 24, the limiting steel wire rope 24 is connected with the outer clamping mechanism 25, the outer clamping mechanism 25 is connected with the locking mechanism 26, the locking mechanism 26 is installed in an Contraband-shaped sliding groove 15 on the supporting column 14 in a sliding fit manner, during specific work, the limiting rotary roller 23 is driven to rotate through the driving motor 22, so that the limiting steel wire rope 24 is tightened, the tubular pile is limited from two sides, prevent that water conservancy tubular pile from the right-and-left rocking when the installation, influence the installation accuracy of water conservancy tubular pile, it is spacing to avoid artifical pulling from both sides simultaneously, the potential safety hazard appears, reduce the labour loss, improve equipment degree of automation, outer fixture 25 can press from both sides tightly water conservancy tubular pile from the outside, locking mechanism 26 can outer fixture 25 locking, prevent that outer fixture 25 from droing when the installation of water conservancy tubular pile.
The outer clamping mechanism 25 comprises a clamping ring 251, an ear seat 252, a through hole 253, a rubber pad 254, a clamping disc 255, a threaded hole 256, a locking bolt 257, a bolt cap 258 and a connecting rod 259, the ear seat 252 is arranged in the middle of the outer side surface of the clamping ring 251, the through hole 253 for tying the limiting steel wire rope 24 is formed in the ear seat 252, the rubber pad 254 is arranged on the inner side surface of the clamping ring 251, the clamping disc 255 is symmetrically arranged on the clamping ring 251, the threaded hole 256 is formed in the middle of the clamping disc 255, the locking bolt 257 is arranged in the threaded hole 256 in a threaded fit mode, the bolt cap 258 is connected to the locking bolt 257 in a threaded fit mode, during specific work, the ear seat 252 is used for tying the limiting steel wire rope 24, the rubber pad 254 can protect the outer surface of the water conservancy tubular pile from left and right, the damage to the water conservancy tubular pile caused by the clamping ring 251 is prevented in the clamping and the outer surface of the water conservancy tubular pile is deformed, the normal operation of the installation work of the water conservancy pipe pile is influenced, the clamping disc 255 is locked through the matching of the locking bolt 257 and the bolt cap 258, and therefore the purpose of clamping and locking the water conservancy pipe pile from the outside can be achieved.
Grip ring 251 cross-section be C type structure, grip ring 251 quantity is four, and grip ring 251 bilateral symmetry, connect through connecting rod 258 between the upper and lower grip ring 251, concrete during operation, the grip ring 251 bilateral symmetry makes things convenient for locking mechanism 26 to lock grip ring 251, carry out the centre gripping to the water conservancy tubular pile through two sets of grip rings 251, can increase the grip area to the water conservancy tubular pile, make the centre gripping more stable, be difficult for droing, be favorable to the hoist and mount of water conservancy tubular pile, connect through connecting rod 258 between the upper and lower grip ring 251, can make two sets of grip rings 251 close as an organic wholely, be convenient for simultaneous movement.
The locking mechanism 26 comprises a sliding plate 261, a pulley 262, an Contraband-shaped frame 263, an electric push rod 264, an electric rotating rod 265 and a nut sleeve 266, the sliding plate 261 is installed in a Contraband-shaped sliding groove 15 on a supporting column 14 in a sliding fit mode, the pulley 262 is installed on the end surface of the sliding plate 261 in a sliding fit mode, the Contraband-shaped frame 263 is installed on the other end surface of the sliding plate 261, the bottom end of the electric push rod 264 is installed on the Contraband-shaped frame 263, the movable end of the electric push rod 264 is connected with the electric rotating rod 265 through a bearing, the nut sleeve 266 is installed on the electric rotating rod 265, during specific work, the nut sleeve 266 is connected with a locking bolt 257 and a bolt cap 258 in a threaded fit mode, when the electric rotating rod 265 rotates, the purpose of locking the clamping disk 255 can be achieved, the electric push rod 264 can adjust the horizontal position of the electric rotating rod 265, and thus the outer clamping mechanism 25 can be automatically locked, the water conservancy tubular pile is avoided being very high in reality, the purpose of locking the outer clamping mechanism 25 is achieved through manual high-altitude operation, manual labor force is reduced, potential safety hazards are avoided, and the automation intelligence degree of equipment is improved.
The hoisting device 3 comprises a rotating motor 31, a hoisting rod 32, an inner clamping mechanism 33, a hoisting box 34, a hoisting frame 35 and a hoisting mechanism 36, wherein the rotating motor 31 is installed in the middle of the upper end surface of the top plate 16 through a motor base, a hoisting hole for hoisting is formed in the top plate 16, the hoisting rod 32 is connected to an output shaft of the rotating motor 31 through a spline, the hoisting rod 32 is of a cylindrical structure, openings are formed in the upper end surface and the lower end surface of the hoisting rod 32, a through groove is formed in the middle of the hoisting rod 32, the inner clamping mechanism 33 is installed on the hoisting rod 32 in a sliding fit manner, the hoisting box 34 is installed in the middle of the lower end surface of the top plate 16, the hoisting box 34 is of a rectangular structure with an opening formed in the lower part, the hoisting frame 35 is installed in the hoisting box 34, the hoisting mechanism 36 is installed on the hoisting frame 35 through a bearing, during the concrete work, the rotating motor 31 can drive the hoisting rod 32 to rotate, and further enable the inner clamping mechanism 33 to clamp and fix the water conservancy pipe pile from the inside, interior fixture 33 and outer fixture 25 mutually support and can carry out the centre gripping simultaneously from the water conservancy tubular pile inside and outside, make the centre gripping more stable, be favorable to the normal clear of water conservancy tubular pile installation work, gallows 35 and hoisting machine construct 36 mutually support and can control the water conservancy tubular pile and rise and descend, hoisting machine constructs the position that can adjust interior fixture 33 simultaneously, when outer fixture 25 and interior fixture 33 reachd the water conservancy tubular pile top, infer by lever principle this moment, the water conservancy tubular pile atress is minimum, the centre gripping is most stable, do benefit to the installation of water conservancy tubular pile.
The inner clamping mechanism 33 comprises a cam 331, a clamping seat 332, a T-shaped groove 333, a T-shaped plate 334, a buffer spring 335, an air cylinder 336, a clamping plate 337, an arc-shaped plate 338 and a rubber layer 339, the lifting rod 32 is provided with the cam 331 in a sliding fit manner, the cam 331 is connected with the clamping seat 332, the clamping seat 332 is provided with the T-shaped groove 333, the T-shaped plate 334 is arranged in the T-shaped groove 333, the buffer spring 335 is arranged between the T-shaped plate 334 and the clamping seat 332, the air cylinder 336 is arranged in the middle of the T-shaped plate 334 through an air cylinder seat, the output end of the air cylinder 336 is connected with the clamping plate 337 through a flange, the arc-shaped plate 338 is arranged on the clamping plate 337, the rubber layer 339 is arranged on the arc-shaped plate 338, during specific work, the cam 331 rotates under the rotation of the rotating motor 31, and further enables the clamping seat 332 connected with the cam 331 to diffuse from inside to outside, so that the arc-shaped plate 338 is more attached to the inner wall of the water conservancy pipe pile, under the promotion of cylinder 336, arc 338 thoroughly hugs closely with water conservancy tubular pile inner wall to the realization is from inside to the fixed purpose of water conservancy tubular pile centre gripping, and rubber layer 339 plays the effect to water conservancy tubular pile inner wall protection, prevents under the effect of cylinder 336 impetus, and arc 338 causes the damage to water conservancy tubular pile inner wall.
The hoisting mechanism 36 comprises a hoisting motor 361, a driving gear 362, a gear strip 363, a driven gear 364, hoisting rollers 365, shaft sleeves 366 and a hoisting rope 367, the hoisting motor 361 is installed in the hoisting box 34 through a motor base, an output shaft of the hoisting motor 361 is connected with the driving gear 362 through a spline, the driving gear 362 is meshed with the gear strip 363 through a gear meshing mode, the driven gear 364 is meshed with the gear strip 363, the driven gear 364 is installed at two ends of the hoisting rollers 365 through a spline, the hoisting rollers 365 are installed on the hoisting frame 35 through bearings, the shaft sleeves 366 are installed at two ends of the hoisting rollers 365 close to the driven gear 364, the hoisting rope 365 is wound in the middle of the hoisting rollers 365, the other ends of the hoisting rope 367 are connected with the inner clamping mechanism 33, when the hoisting motor 361 rotates during specific work, the hoisting rollers 365 are driven to rotate through the principle of gear meshing, the length of the hoisting rope 367 on the hoisting rollers 365 is controlled, the purpose of controlling the height of the water conservancy tubular pile and the height of the inner clamping mechanism 33 is achieved.
In addition, the invention also provides an intelligent installation and construction process of the water conservancy construction tubular pile, which is mainly completed by matching the intelligent installation and construction equipment of the water conservancy construction tubular pile, and comprises the following steps:
s1 external clamping and fixing: the driving motor 22 drives the limiting rotary roller 23 to rotate, so that the limiting steel wire rope 24 is tightened, the water conservancy tubular pile is limited from two sides, the water conservancy tubular pile is prevented from shaking left and right during installation to influence the installation precision of the water conservancy tubular pile, meanwhile, the situation that the limiting is pulled from two sides manually to cause potential safety hazards can be avoided, the labor loss is reduced, the automation degree of equipment is improved, and the clamping disc 255 is locked through the matching of the locking bolt 257 and the bolt cap 258, so that the purpose of clamping the water conservancy tubular pile from the outside can be achieved;
s2: external locking: when the two groups of outer clamping mechanisms 25 clamp and fix the water conservancy tubular pile from the outside through the clamping rings 251, the nut sleeves 266 are connected with the locking bolts 257 and the bolt caps 258 in a threaded fit manner, when the electric rotating rod 265 rotates, the purpose of locking the clamping disc 255 can be realized, and the electric push rod 264 can adjust the horizontal position of the electric rotating rod 265, so that the outer clamping mechanisms 25 can be automatically locked, the problem that the water conservancy tubular pile is high in reality and needs manual high-altitude operation to realize the purpose of locking the outer clamping mechanisms 25 is solved, the manual labor force is reduced, the potential safety hazard is avoided, and the automation intelligence degree of equipment is improved;
s3: the internal clamping is fixed: the cam 331 rotates under the rotation of the rotating motor 31, so that the clamping seat 332 connected with the cam 331 is diffused from inside to outside, the arc-shaped plate 338 is more attached to the inner wall of the water conservancy tubular pile, the arc-shaped plate 338 is completely attached to the inner wall of the water conservancy tubular pile under the pushing of the cylinder 336, the purpose of clamping and fixing the water conservancy tubular pile from the inside is achieved, the rubber layer 339 plays a role in protecting the inner wall of the water conservancy tubular pile, and the arc-shaped plate 338 is prevented from damaging the inner wall of the water conservancy tubular pile under the pushing force of the cylinder 336;
s4: hoisting and installing: when the external clamping and locking of the water conservancy pipe pile are realized, when the internal clamping work is completed, the external clamping mechanism 25 and the internal clamping mechanism 33 reach the top of the water conservancy pipe pile, the water conservancy pipe pile is minimum in stress and most stable in clamping, the water conservancy pipe pile is convenient to install, the hoisting motor 361 rotates, the hoisting roller 365 is driven to rotate through the gear meshing principle, the length of the hoisting rope 367 on the hoisting roller 365 is controlled to be tightened, the purpose of controlling the height of the water conservancy pipe pile and the height of the internal clamping mechanism 33 is achieved, and the stable installation of the water conservancy pipe pile is realized.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The utility model provides a water conservancy construction tubular pile intelligence installation construction equipment, includes strutting arrangement (1), clamping device (2) and hoist device (3), its characterized in that: the middle part of the supporting device (1) is provided with a clamping device (2) in a sliding fit manner, the upper part of the supporting device (1) is provided with a hoisting device (3), and the hoisting device (3) is positioned above the clamping device (2); wherein:
the supporting device (1) comprises a bottom plate (11), round holes (12), balls (13), supporting columns (14), Contraband-type sliding grooves (15) and a top plate (16), wherein the cross section of the bottom plate (11) is of a round structure, the round holes (12) are formed in the middle of the bottom plate (11), the balls (13) are uniformly arranged on the inner side walls of the round holes (12) along the circumferential direction of the round holes, the supporting columns (14) are uniformly arranged on the upper end surface of the bottom plate (11) along the circumferential direction of the bottom plate, the number of the supporting columns (14) is four, the Contraband-type sliding grooves (15) are formed in the supporting columns (14), and the top plate (16) is installed on the upper end surface of the supporting columns (14);
the clamping device (2) comprises a limiting seat (21), a driving motor (22), a limiting rotary roller (23), a limiting steel wire rope (24), an outer clamping mechanism (25) and a locking mechanism (26), the upper end surface of the bottom plate (11) is symmetrically provided with limiting seats (21), the limiting seats (21) are of U-shaped structures with upward openings, limiting rotary rollers (23) are arranged on the limiting seats (21) through bearings, a driving motor (22) is arranged on the bottom plate (11) through a motor seat, an output shaft of the driving motor (22) is connected with the limiting rotary rollers (23) through a coupler, limiting steel wire ropes (24) are wound on the limiting rotary rollers (23), the limiting steel wire ropes (24) are connected with outer clamping mechanisms (25), the outer clamping mechanisms (25) are connected with locking mechanisms (26), and the locking mechanisms (26) are arranged in Contraband-shaped sliding grooves (15) in the supporting columns (14) in a sliding fit mode;
the hoisting device (3) comprises a rotating motor (31), a hoisting rod (32), an inner clamping mechanism (33), a hoisting box (34), a hoisting frame (35) and a hoisting mechanism (36), the lifting device is characterized in that the rotating motor (31) is installed in the middle of the upper end face of the top plate (16) through a motor base, a lifting hole for lifting is formed in the top plate (16), a lifting rod (32) is connected to an output shaft of the rotating motor (31) through a spline, the lifting rod (32) is of a cylindrical structure, openings are formed in the upper end face and the lower end face of the lifting rod (32), a through groove is formed in the middle of the lifting rod (32), an inner clamping mechanism (33) is installed on the lifting rod (32) in a sliding fit mode, a lifting box (34) is installed in the middle of the lower end face of the top plate (16), the lifting box (34) is of a rectangular structure with an opening formed in the lower portion, a lifting frame (35) is installed in the lifting box (34), and a lifting mechanism (36) is installed on the lifting frame (35) through a bearing;
the outer clamping mechanism (25) comprises a clamping ring (251), an ear seat (252), a through hole (253), a rubber pad (254), a clamping disc (255), a threaded hole (256), a locking bolt (257), a bolt cap (258) and a connecting rod (259), the ear seat (252) is arranged in the middle of the outer side face of the clamping ring (251), the through hole (253) for tying the limiting steel wire rope (24) is formed in the ear seat (252), the rubber pad (254) is arranged on the inner side face of the clamping ring (251), the clamping disc (255) is symmetrically arranged on the clamping ring (251), the threaded hole (256) is formed in the middle of the clamping disc (255), the locking bolt (257) is arranged in the threaded hole (256) in a thread fit mode, and the locking bolt (257) is connected with the bolt cap (258) in a thread fit mode;
the locking mechanism (26) comprises a sliding plate (261), pulleys (262), an Contraband-shaped frame (263), an electric push rod (264), an electric rotating rod (265) and a nut sleeve (266), wherein the sliding plate (261) is installed in a Contraband-shaped sliding groove (15) on a supporting column (14) in a sliding fit mode, the pulleys (262) are installed on the end face of the sliding plate (261) in a sliding fit mode, the Contraband-shaped frame (263) is installed on the other end face of the sliding plate (261), the bottom end of the electric push rod (264) is installed on the Contraband-shaped frame (263), the movable end of the electric push rod (264) is connected with the electric rotating rod (265) through a bearing, and the nut sleeve (266) is installed on the electric rotating rod (265);
the hoisting mechanism (36) comprises a hoisting motor (361), a driving gear (362), a gear strip (363), a driven gear (364), a hoisting roller (365), a shaft sleeve (366) and a hoisting rope (367), hoist motor (361) install in lifting by crane case (34) through the motor cabinet, the output shaft of hoist motor (361) passes through the spline and is connected with driving gear (362), driving gear (362) are connected with gear rack (363) meshing through gear engagement's mode, the meshing has driven gear (364) on gear rack (363), driven gear (364) are installed at hoist roller (365) both ends through the spline, hoist roller (365) are installed on gallows (35) through the bearing, hoist roller (365) both ends are close to driven gear (364) and install axle sleeve (366), hoist roller (365) middle part winding has lifting rope (367), the lifting rope (367) other end is connected with interior fixture (33).
2. The water conservancy construction tubular pile intelligence installation and construction equipment of claim 1, characterized in that: interior fixture (33) include cam (331), cassette (332), T type groove (333), T type board (334), buffer spring (335), cylinder (336), grip block (337), arc (338), rubber layer (339), hoist and mount pole (32) on install cam (331) through sliding fit's mode, be connected with cassette (332) on cam (331), T type groove (333) have been seted up on cassette (332), install T type board (334) in T type groove (333), be provided with buffer spring (335) between T type board (334) and cassette (332), install at T type board (334) middle part through the cylinder block cylinder (336), the output of cylinder (336) passes through the flange and is connected with grip block (337), install arc (338) on grip block (337), be provided with rubber layer (339) on arc (338).
3. The water conservancy construction tubular pile intelligence installation and construction equipment of claim 1, characterized in that: the cross section of the clamping ring (251) is of a C-shaped structure, the number of the clamping rings (251) is four, the clamping rings (251) are symmetrical left and right, and the upper clamping ring (251) and the lower clamping ring (251) are connected through a connecting rod (258).
CN202010685238.8A 2020-07-16 2020-07-16 Intelligent installation construction equipment and process for water conservancy construction pipe pile Active CN111847289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010685238.8A CN111847289B (en) 2020-07-16 2020-07-16 Intelligent installation construction equipment and process for water conservancy construction pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010685238.8A CN111847289B (en) 2020-07-16 2020-07-16 Intelligent installation construction equipment and process for water conservancy construction pipe pile

Publications (2)

Publication Number Publication Date
CN111847289A CN111847289A (en) 2020-10-30
CN111847289B true CN111847289B (en) 2022-07-26

Family

ID=72984620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010685238.8A Active CN111847289B (en) 2020-07-16 2020-07-16 Intelligent installation construction equipment and process for water conservancy construction pipe pile

Country Status (1)

Country Link
CN (1) CN111847289B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000506B (en) * 2021-11-27 2023-07-04 金匠建设集团有限公司 Pile feeding and lifting method and lifting tool for pile pressing machine
CN114164829B (en) * 2021-12-14 2023-03-03 深圳中铁二局工程有限公司 Process and device for rapidly pulling out underground precast pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207760859U (en) * 2017-12-29 2018-08-24 盐城欣昌新型建材有限公司 Pile pile lifts by crane collet
CN108978674A (en) * 2018-07-28 2018-12-11 江苏地基工程有限公司 PCMW engineering method locating rack
CN109577333A (en) * 2019-01-28 2019-04-05 福州聚敏科技信息咨询有限公司 A kind of the posture correcting device and its antidote of tubular pole
CN109761142A (en) * 2019-03-15 2019-05-17 费海宇 A kind of hydraulic engineering hanging device and application method
CN110528521A (en) * 2019-09-05 2019-12-03 宁波青缇工业设计有限公司 A kind of construction site tubular pole piling equipment
CN111335317A (en) * 2020-04-08 2020-06-26 中交一公局集团有限公司 Tubular pile perpendicularity adjusting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9598833B2 (en) * 2011-08-26 2017-03-21 American Piledriving Equipment, Inc. Apparatus and methods for pipe piling placement with continuous grouting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207760859U (en) * 2017-12-29 2018-08-24 盐城欣昌新型建材有限公司 Pile pile lifts by crane collet
CN108978674A (en) * 2018-07-28 2018-12-11 江苏地基工程有限公司 PCMW engineering method locating rack
CN109577333A (en) * 2019-01-28 2019-04-05 福州聚敏科技信息咨询有限公司 A kind of the posture correcting device and its antidote of tubular pole
CN109761142A (en) * 2019-03-15 2019-05-17 费海宇 A kind of hydraulic engineering hanging device and application method
CN110528521A (en) * 2019-09-05 2019-12-03 宁波青缇工业设计有限公司 A kind of construction site tubular pole piling equipment
CN111335317A (en) * 2020-04-08 2020-06-26 中交一公局集团有限公司 Tubular pile perpendicularity adjusting device

Also Published As

Publication number Publication date
CN111847289A (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN111847289B (en) Intelligent installation construction equipment and process for water conservancy construction pipe pile
CN101761071B (en) Manufacturing method of reinforcement cage of pouring pile with large diameter
CN109110616B (en) Overhead telescopic construction elevator roof beam for elevator shaft traction and installation and use method thereof
CN219341474U (en) Hoisting machine for column top walking
CN110867774B (en) Electric power installation tensioner bullwheel
CN111710496A (en) Supporting and lifting device of transformer
CN113023600B (en) Prefabricated post location guider of assembled building concrete
CN113351806A (en) Pier steel reinforcement cage coiling device
CN112832579A (en) Suspension derrick type inverted lifting system and application method thereof
CN109083426B (en) Board wall installation device for construction
CN215757521U (en) Quenching device for production of slewing bearing
CN215439498U (en) Synchronous jacking platform convenient to it is fixed
CN214456355U (en) Convenient lifter for substation small equipment
CN214653048U (en) Special tool for indoor hoisting of elevator steel structure hoistway
CN214576154U (en) Suspension derrick type inverted lifting system
CN110759255B (en) Lifting frame convenient to disassemble and assemble for building construction
CN112173531A (en) Simple pipeline transportation device and construction method thereof
CN219384441U (en) Simple hoisting mechanism for equipment installation
CN217808392U (en) Hoisting assembly device for prefabricated parts of prefabricated building
CN220264684U (en) Building electric cable conveying device
CN220766342U (en) Winch slewing mechanism
CN216129116U (en) Horizontal pay-off rack
CN220122480U (en) Overhead line crossing wiring device
CN219384559U (en) Detachable portal frame
CN219567099U (en) Cable paying-off device for construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220701

Address after: 338000 Room 101, 201, 301, 401, building 1, suidu building, No. 1039, Xianlai West Avenue, Yushui District, Xinyu City, Jiangxi Province

Applicant after: TIANGONG FANGYUAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 242200 Tianshou Road, Taozhou Town, Guangde County, Xuancheng City, Anhui Province

Applicant before: Cao Yinhua

GR01 Patent grant
GR01 Patent grant