CN111827282A - Municipal works are with pile device - Google Patents

Municipal works are with pile device Download PDF

Info

Publication number
CN111827282A
CN111827282A CN202010765037.9A CN202010765037A CN111827282A CN 111827282 A CN111827282 A CN 111827282A CN 202010765037 A CN202010765037 A CN 202010765037A CN 111827282 A CN111827282 A CN 111827282A
Authority
CN
China
Prior art keywords
gear
rack
adjusting screw
pile
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010765037.9A
Other languages
Chinese (zh)
Inventor
张有志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010765037.9A priority Critical patent/CN111827282A/en
Publication of CN111827282A publication Critical patent/CN111827282A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a piling device for municipal engineering, relates to the technical field of municipal engineering equipment, and mainly solves the problems that pile bodies are easy to incline and the piling quality is low in the piling process of the existing municipal engineering piling equipment; the device includes the mounting bracket, the bottom edge of mounting bracket is provided with the fixed block, fixed block and ground contact, install the spud pile between fixed block and the ground, be provided with adjusting screw on the mounting bracket, adjusting screw rotates with the mounting bracket and links to each other, the last carousel that is provided with of adjusting screw, be provided with the handle on the carousel, adjusting screw links to each other with the thread bush, be provided with the fixed plate on the thread bush, fixed plate and pile body contact installation, the top of pile body is provided with the mounting disc, be provided with on the mounting disc and strike the piece, strike the piece and link to each other with the rack, rack and second gear intermeshing, the second gear is connected with power device.

Description

Municipal works are with pile device
Technical Field
The invention relates to the technical field of municipal engineering equipment, in particular to a piling device for municipal engineering.
Background
Piling operation is required for a long time in the municipal engineering construction process, the piling method is used for fixing other devices or building foundations, and pile bodies are driven into a foundation in a manual or motorized mode, and common piling methods include a hammering method, a vibration method, a water jetting valve, a pile pressing method and the like.
When piling, the pile driving point is not fixed, and pile body inclination is easily caused in the pile driving process in the existing municipal engineering, so that subsequent influence is large, the pile driving is ineffective probably seriously, and the pile driving operation needs to be carried out again.
Disclosure of Invention
An object of an embodiment of the present invention is to provide a piling device for municipal engineering to solve the problems in the background art.
In order to achieve the above purpose, the embodiments of the present invention provide the following technical solutions:
the utility model provides a municipal works are with pile device, includes the mounting bracket, the bottom edge of mounting bracket is provided with the fixed block, fixed block and ground contact, install the spud pile between fixed block and the ground, be provided with adjusting screw on the mounting bracket, adjusting screw rotates with the mounting bracket and links to each other, the last carousel that is provided with of adjusting screw, be provided with the handle on the carousel, adjusting screw links to each other with the screw sleeve, be provided with the fixed plate on the screw sleeve, fixed plate and pile body contact installation, the top of pile body is provided with knocking device, knocking device includes the mounting disc, be provided with the piece of knocking on the mounting disc, it links to each other with the rack to knock the piece, rack and second gear intermeshing, the second gear is connected with power device.
As a further scheme of the embodiment of the invention: the rack is a double-sided rack, one side of the rack is meshed with the first gear, the first gear is connected with the mounting frame through the first support frame, and the other side of the rack is meshed with the second gear.
As a further scheme of the embodiment of the invention: the second gear is an incomplete gear.
As a further scheme of the embodiment of the invention: the installation disc is fixedly connected with the upper side of the pile body, a piston cylinder is arranged on the installation disc, a piston is arranged in the piston cylinder, a connecting rope is arranged on the piston, the side edge of the knocking block is arranged on the connecting block, and the connecting rope is connected with the connecting block.
As a further scheme of the embodiment of the invention: and a second pulley is arranged on the piston cylinder, and the connecting rope is arranged on the second pulley.
As a further scheme of the embodiment of the invention: the adjusting screw rods are provided with three groups and are rotationally connected with the mounting rack through bearings.
As a further scheme of the embodiment of the invention: the fixed block is provided with three groups.
Compared with the prior art, the embodiment of the invention has the beneficial effects that:
the mounting frame is arranged on the ground, and the mounting frame is fixed by combining the fixing block and the fixing pile on the mounting frame; the top of the pile body is connected with the mounting disc, the pile body is knocked by combining the knocking device arranged on the mounting disc, the rack is arranged on the mounting frame and is a double-sided rack, the rack is driven to move by a second gear and a power device connected with the second gear, the second gear is an incomplete gear, the rack moves up and down under the action of the incomplete gear, and therefore repeated knocking action of a knocking block is achieved; through the arrangement of the double-sided rack, the stable installation of the rack is realized by means of the mutual supporting operation of the first gear and the second gear; the pile body is fixedly supported by the adjusting screw rods in a matching way with the fixing plate and the first pulley, so that the inclination of the pile body in the knocking process is avoided, and three groups of adjusting screw rods are arranged to ensure the accuracy and effectiveness of the support; through set up a piston section of thick bamboo on the mounting disc, cooperation piston and connecting rope link to each other with knocking the piece for the rack can not upwards beat because of inertia at the in-process that removes, leads to power transmission process deviation to appear, influences and strikes efficiency.
Drawings
Fig. 1 is a schematic structural diagram of a piling device for municipal engineering.
Fig. 2 is a structural schematic diagram of a mounting plate in the piling device for municipal engineering.
Fig. 3 is a structural schematic diagram of a knocking block in the piling device for municipal engineering.
In the figure: the device comprises a mounting frame, 2 fixing blocks, 3 fixing piles, 4 adjusting screws, 5 rotating discs, 6 handles, 7 threaded sleeves, 8 fixing plates, 9 first pulleys, 10 pile bodies, 11 mounting discs, 12 knocking blocks, 13 racks, 14 first gears, 15 first supporting frames, 16 second gears, 17 second supporting frames, 18 connecting blocks, 19 connecting ropes, 20 piston cylinders, 21 pistons and 22 second pulleys.
Detailed Description
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Example 1:
as shown in fig. 1-3, a municipal works pile driving device comprises a mounting frame 1, a fixed block 2 is arranged at the bottom edge of the mounting frame 1, the fixed block 2 is in contact with the ground, a fixed pile 3 is installed between the fixed block 2 and the ground, an adjusting screw 4 is arranged on the mounting frame 1, the adjusting screw 4 is rotatably connected with the mounting frame 1, a rotary disc 5 is arranged on the adjusting screw 4, a handle 6 is arranged on the rotary disc 5, the adjusting screw 4 is connected with a threaded sleeve 7, a fixed plate 8 is arranged on the threaded sleeve 7, the fixed plate 8 is installed in contact with a pile body 10, a knocking device is arranged at the top of the pile body 10, the knocking device comprises a mounting disc 11, a knocking block 12 is arranged on the mounting disc 11, the knocking block 12 is connected with a rack 13, the rack 13 is meshed with a second gear 16, the second gear 16 is connected to the power unit.
Specifically, through setting up fixed block 2 in the bottom of mounting bracket 1, carry out fixed operation to mounting bracket 1 with the help of spud pile 3, through set up adjusting screw 4 on mounting bracket 1, cooperation screw sleeve 7 carries out position adjustment to fixed plate 8 for paste tightly between fixed plate 8 and the pile body 10, thereby guarantee that pile body 10 can not take place the slope at the in-process of strikeing.
More specifically, in order to reduce the impact of the fixing plate 8 on the pile 10, a first pulley 9 is arranged between the fixing plate 8 and the pile 10 and connected with the pile 10 through the first pulley 9, so that the impact of the resistance of the fixing plate 8 during the impact process of the pile 10 is as small as possible.
More specifically, the vertical movement control operation of the knocking block 12 is realized by the mutual engagement of the rack 13 and the second gear 16, so that the mounting plate 11 is knocked, and further, the pile body 10 is knocked to perform the piling operation.
Further, the rack 13 is a double-sided rack 13, one side of the rack 13 is engaged with a first gear 14, the first gear 14 is connected with the mounting rack 1 through a first support frame 15, and the other side of the rack 13 is engaged with a second gear 16.
Specifically, in order to reduce the frictional resistance between the rack 13 and the mount 1, the rack 13 is provided as a double-sided rack 13, and the first gear 14 and the second gear 16 are provided on both sides of the rack 13, so that one side of the rack 13 is fixed by the first gear 14, thereby causing the rack 13 to move with resistance.
Further, the second gear 16 is an incomplete gear.
Specifically, the second gear 16 is set to be an incomplete gear, so that the power device connected with the second gear 16 can be a motor rotating in a single direction, a forward and reverse rotating motor is avoided, and the equipment cost is reduced.
Further, the mounting disc 11 is fixedly connected with the upper side of the pile body 10, a piston cylinder 20 is arranged on the mounting disc 11, a piston 21 is arranged in the piston cylinder 20, a connecting rope 19 is arranged on the piston 21, the side edge of the knocking block 12 is arranged on the connecting block 18, and the connecting rope 19 is connected with the connecting block 18.
Furthermore, adjusting screw 4 is provided with three groups, adjusting screw 4 rotates with mounting bracket 1 through the bearing and links to each other.
Specifically, three groups of fixing plates 8 realize fixing the pile body 10 in the circumferential direction, and effectively ensure that the pile body 10 cannot incline in the knocking process.
Further, three groups of fixing blocks 2 are arranged.
Specifically, set up three fixed block 2 of group and can guarantee to the fixed operation of mounting bracket 1, guarantee to strike the safe of operation and go on.
Example 2:
this embodiment is a further improvement and a limitation of embodiment 1 on the basis of embodiment 1.
A piling device for municipal engineering, comprising all the components of embodiment 1, and further comprising:
specifically, rack 13 is under the drive of incomplete gear, reciprocate, the in-process of rebound is the process of carrying out the energy storage, strike the operation to mounting disc 11 with the help of the piece 12 of strikeing from eminence free fall, thereby strike the operation to pile body 10, but rack 13 is at the in-process of power device rebound, because inertial effect, when breaking away from second gear 16, can continue rebound, consequently, in order to guarantee to strike the effect, rack 13 falls in time, through set up piston cylinder 20 on mounting disc 11, utilize the connecting rope 19 that sets up between piston 21 and the connecting block 18 to restrict the position of rack 13, guarantee rack 13 and fall back in time.
Further, a second pulley 22 is disposed on the piston cylinder 20, and the connecting rope 19 is mounted on the second pulley 22.
Specifically, in order to reduce the wear of the connection rope 19 and prolong the service life, the second pulley 22 is provided on the upper side of the piston cylinder 20, and the connection rope 19 is slidably connected with the second pulley 22, so that the wear is reduced.
The working principle of the embodiment of the invention is as follows:
as shown in fig. 1-3, the pile 10 is installed, and the pile 10 is supported by the handle 6, the turntable 5 and the fixing plate 8, so that the subsequent pile 10 is not inclined in the knocking process.
And then, starting a power device connected with the second gear 16 to drive the second gear 16 to rotate, and driving the rack 13 to move up and down by the rotating second gear 16, so that the mounting disc 11 is knocked, and the pile body 10 is knocked downwards until the piling is finished.
It should be noted that: the mounting frame is arranged on the ground, and the mounting frame is fixed by combining the fixing block and the fixing pile on the mounting frame; the top of the pile body is connected with the mounting disc, the pile body is knocked by combining the knocking device arranged on the mounting disc, the rack is arranged on the mounting frame and is a double-sided rack, the rack is driven to move by a second gear and a power device connected with the second gear, the second gear is an incomplete gear, the rack moves up and down under the action of the incomplete gear, and therefore repeated knocking action of a knocking block is achieved; through the arrangement of the double-sided rack, the stable installation of the rack is realized by means of the mutual supporting operation of the first gear and the second gear; the pile body is fixedly supported by the adjusting screw rods in a matching way with the fixing plate and the first pulley, so that the inclination of the pile body in the knocking process is avoided, and three groups of adjusting screw rods are arranged to ensure the accuracy and effectiveness of the support; the piston cylinder is arranged on the mounting disc, and the piston and the connecting rope are matched to be connected with the knocking block, so that the rack cannot jump upwards due to inertia in the moving process, deviation occurs in the power transmission process, and knocking efficiency is influenced.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a municipal works are with device of driving a pile, includes mounting bracket (1), its characterized in that, the bottom edge of mounting bracket (1) is provided with fixed block (2), fixed block (2) and ground contact, install spud pile (3) between fixed block (2) and the ground, be provided with adjusting screw (4) on mounting bracket (1), adjusting screw (4) rotate with mounting bracket (1) and link to each other, be provided with carousel (5) on adjusting screw (4), be provided with handle (6) on carousel (5), adjusting screw (4) link to each other with screw sleeve (7), be provided with fixed plate (8) on screw sleeve (7), fixed plate (8) and pile body (10) contact installation, the top of pile body (10) is provided with the knocking device, the knocking device includes mounting disc (11), the mounting disc (11) is provided with a knocking block (12), the knocking block (12) is connected with a rack (13), the rack (13) is meshed with a second gear (16), and the second gear (16) is connected with a power device.
2. Piling device for municipal engineering according to claim 1, wherein the rack (13) is a double sided rack (13), one side of the rack (13) being intermeshed with a first gear (14), the first gear (14) being connected to the mounting frame (1) via a first support frame (15), the other side of the rack (13) being intermeshed with a second gear (16).
3. Piling device for civil engineering according to claim 2, characterised in that said second gear (16) is a partial gear.
4. The piling device for the municipal engineering according to claim 1, wherein the mounting plate (11) is fixedly connected with the upper side of the pile body (10), a piston cylinder (20) is arranged on the mounting plate (11), a piston (21) is arranged in the piston cylinder (20), a connecting rope (19) is arranged on the piston (21), the side edge of the knocking block (12) is arranged on the connecting block (18), and the connecting rope (19) is connected with the connecting block (18).
5. Piling device for civil engineering according to claim 4, characterised in that the piston cylinder (20) is provided with a second pulley (22), the connecting rope (19) being mounted on the second pulley (22).
6. Piling device for municipal engineering according to claim 1, wherein three sets of adjusting screws (4) are provided, and wherein the adjusting screws (4) are rotatably connected to the mounting frame (1) by bearings.
7. Piling device for civil engineering according to claim 1, characterised in that said fixed blocks (2) are provided in three groups.
CN202010765037.9A 2020-08-03 2020-08-03 Municipal works are with pile device Withdrawn CN111827282A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010765037.9A CN111827282A (en) 2020-08-03 2020-08-03 Municipal works are with pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010765037.9A CN111827282A (en) 2020-08-03 2020-08-03 Municipal works are with pile device

Publications (1)

Publication Number Publication Date
CN111827282A true CN111827282A (en) 2020-10-27

Family

ID=72919316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010765037.9A Withdrawn CN111827282A (en) 2020-08-03 2020-08-03 Municipal works are with pile device

Country Status (1)

Country Link
CN (1) CN111827282A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232626A (en) * 2022-01-21 2022-03-25 江西宏巍建筑工程有限公司 Municipal works are with pile device
CN115012411A (en) * 2022-07-01 2022-09-06 崔远谷 Piling device for municipal engineering and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232626A (en) * 2022-01-21 2022-03-25 江西宏巍建筑工程有限公司 Municipal works are with pile device
CN114232626B (en) * 2022-01-21 2023-09-15 广东国大建工集团有限公司 Pile driving device for municipal engineering
CN115012411A (en) * 2022-07-01 2022-09-06 崔远谷 Piling device for municipal engineering and using method thereof

Similar Documents

Publication Publication Date Title
CN107604910B (en) Rotary adjustable building pile driver
CN111827282A (en) Municipal works are with pile device
CN217587233U (en) Concrete workability check out test set
CN214201029U (en) Testing machine for impact test of steel pipe for building
CN212270928U (en) Piling device for building construction
CN100335735C (en) Impact force generator
CN210459207U (en) Pile driver for civil engineering
CN210684687U (en) Pile driver for bridge construction
CN107675599A (en) A kind of building concrete road surface quick crashing device
CN215210966U (en) Ramming device for highway construction
CN214328863U (en) Combined pile machine for stiff composite pile
CN112921964B (en) Engineering building pile driving device and construction method
CN212742524U (en) Civil engineering is with pile equipment
CN213390125U (en) High-strength prestressed pipe pile construction equipment
CN204959752U (en) Novel piling machine
CN210177551U (en) Drop hammer height adjusting device for pile foundation high strain detection
CN219218956U (en) Energy-saving soft soil foundation treatment device
CN216108486U (en) Piling equipment for ocean engineering
CN217231760U (en) Combined bearing plate for composite foundation load test
CN221249124U (en) Drilling device for processing extruded sheet
CN214940116U (en) Can adjust novel pile driver of dynamics of striking
CN216194893U (en) Adjustable support for construction elevator foundation on basement top plate
CN221183706U (en) Automatic sand screening machine for building construction
CN218813693U (en) Hydraulic engineering pile device
CN221118578U (en) Bored concrete pile concrete superfilling height detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20201027