CN111809634A - Steel guide wall for hole forming construction of secant pile - Google Patents

Steel guide wall for hole forming construction of secant pile Download PDF

Info

Publication number
CN111809634A
CN111809634A CN202010839777.2A CN202010839777A CN111809634A CN 111809634 A CN111809634 A CN 111809634A CN 202010839777 A CN202010839777 A CN 202010839777A CN 111809634 A CN111809634 A CN 111809634A
Authority
CN
China
Prior art keywords
steel
guide wall
pile
longitudinal beams
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010839777.2A
Other languages
Chinese (zh)
Inventor
李骏
文果
习树信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202010839777.2A priority Critical patent/CN111809634A/en
Publication of CN111809634A publication Critical patent/CN111809634A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a steel guide wall for hole forming construction of an occlusive pile, wherein at least four positioning hole groups are arranged on two longitudinal beams which are oppositely arranged at equal intervals, each positioning hole group comprises at least three positioning holes, at least four limiting cross beams are connected between the two longitudinal beams corresponding to the positioning hole groups to form at least three square holes in a surrounding manner, and the limiting cross beams are connected to the longitudinal beams through the positioning holes by fasteners; the anchor piles are fixedly arranged on the outer sides of the two longitudinal beams, so that when the secant pile pore-forming construction is carried out, the steel guide wall is fixed on the operation ground only by utilizing the anchor piles, then first secant pile holes are formed at intervals by utilizing square holes, and then second secant pile holes between the adjacent first secant pile holes are formed by adjusting the limiting cross beams and fastening and connecting different positioning holes in the positioning hole group, so that the purposes of positioning the secant pile holes and mutual secant are achieved.

Description

Steel guide wall for hole forming construction of secant pile
Technical Field
The invention relates to the technical field of building construction, in particular to a steel guide wall for hole forming construction of an occlusive pile.
Background
At present, in the construction of an occlusive pile, in order to accurately position and mutually occlude the occlusive pile and control the occlusion depth among piles to meet the construction quality requirement, before the occlusive pile is drilled, a guide wall is constructed according to the designed pile position and axis to control the pile position, the pile axis, the occlusion depth and the like, the common guide wall adopts a C30 plate type reinforced concrete structure with the thickness of 200mm, the guide wall is easy to damage in the construction process, the reinforced concrete structure cannot be reused, the construction cost is high, and the construction is not expected by technical personnel in the field.
Disclosure of Invention
Aiming at the existing problems, the invention discloses a steel guide wall for the hole forming construction of an occlusive pile, wherein the steel guide wall comprises two longitudinal beams which are oppositely arranged;
at least four positioning hole groups are arranged on the two longitudinal beams at equal intervals, each positioning hole group at least comprises three positioning holes, the positioning holes on the two longitudinal beams are arranged in a one-to-one correspondence mode, at least four limiting cross beams are connected between the two longitudinal beams corresponding to the positioning hole groups, and the limiting cross beams are connected to the longitudinal beams through the positioning holes by fasteners;
and anchor piles are fixedly arranged on the outer sides of the two longitudinal beams, and the tops of the anchor piles are fixed on the longitudinal beams through connecting pieces.
Preferably, the fastener is a bolt.
Preferably, the connecting piece is a connecting rib.
Preferably, the connecting rib is an L-shaped reinforcing steel bar, the short side of the L-shaped reinforcing steel bar is welded with the outer side face of the longitudinal beam, and the long side of the L-shaped reinforcing steel bar is welded with the anchor pile.
Preferably, both of the longitudinal beams are H-shaped steel.
Preferably, the limiting cross beam is made of channel steel, and end-blocking steel plates are arranged at two ends of the channel steel.
Preferably, the connection between the end-capped steel plate and the channel steel is full-welded connection.
Preferably, the anchor pile is made of H-shaped steel.
The invention has the following advantages or beneficial effects:
the invention discloses a steel guide wall for hole forming construction of an occlusive pile, wherein at least four positioning hole groups are arranged on two oppositely arranged longitudinal beams at equal intervals, each positioning hole group comprises at least three positioning holes, the positioning holes on the two longitudinal beams are arranged in a one-to-one correspondence manner, at least four limiting cross beams are connected between the two longitudinal beams at positions corresponding to the positioning hole groups to form at least three square holes in a surrounding manner, and the limiting cross beams are connected to the longitudinal beams through positioning holes by fasteners; the outer sides of the two longitudinal beams are fixedly provided with anchor piles, so that when the secant pile hole forming construction is carried out, the steel guide wall is fixed on the operation ground only by using the anchor piles, then first secant pile holes are formed at intervals by using square holes, and then second secant pile holes positioned between adjacent first secant pile holes are formed by adjusting the limit cross beam and fastening and connecting different positioning holes in the positioning hole group, so that the purpose of positioning and mutual secant pile holes is achieved; the steel guide wall is firm and durable, simple in structure, convenient to manufacture, easy to operate and fix, and capable of being repeatedly used for many times, so that the construction efficiency is improved, and the construction cost is reduced.
Drawings
The invention and its features, aspects and advantages will become more apparent from reading the following detailed description of non-limiting embodiments with reference to the accompanying drawings. Like reference symbols in the various drawings indicate like elements. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
Fig. 1 is a schematic structural diagram of a steel guide wall for use in the hole forming construction of a bite pile in the embodiment of the present invention.
Detailed Description
The invention discloses a steel guide wall for hole forming construction of an occlusive pile, which comprises two longitudinal beams arranged oppositely; at least four positioning hole groups are arranged on the two longitudinal beams at equal intervals, each positioning hole group at least comprises three positioning holes, the positioning holes on the two longitudinal beams are arranged in a one-to-one correspondence mode, at least four limiting cross beams are connected between the two longitudinal beams corresponding to the positioning hole groups, and the limiting cross beams are connected to the longitudinal beams through the positioning holes by fasteners; and anchor piles are fixedly arranged on the outer sides of the two longitudinal beams, and the tops of the anchor piles are fixed on the longitudinal beams through connecting pieces.
The present invention will be further described with reference to the following drawings and specific examples, but the present invention is not limited thereto.
As shown in fig. 1, the present embodiment relates to a steel guide wall for use in the hole-forming construction of a secant pile, which comprises a left longitudinal beam 1 and a right longitudinal beam 2 which are oppositely arranged; the left longitudinal beam 1 and the right longitudinal beam 2 are provided with 7 positioning hole groups at equal intervals (namely, the left longitudinal beam 1 is provided with 7 positioning hole groups at equal intervals, the right longitudinal beam 2 is also provided with 7 positioning hole groups at equal intervals), each positioning hole group comprises three positioning holes 7, the positioning holes 7 of the left longitudinal beam 1 and the positioning holes 7 of the right longitudinal beam 2 are arranged in a one-to-one correspondence manner, the corresponding positioning hole groups between the left longitudinal beam 1 and the right longitudinal beam 2 are connected with 7 limiting cross beams 3 to form 6 square holes, and the limiting cross beams 3 are connected on the longitudinal beams through a positioning hole 7 by bolts 5 (specifically, one end of any limiting cross beam 3 is connected on the left longitudinal beam 1 through a positioning hole 7 in the corresponding positioning group on the left longitudinal beam 1 by a bolt 5, the other end is connected on the right longitudinal beam 2 through a positioning hole 7 in the corresponding positioning group on the right longitudinal beam 2 by a bolt 5, namely, 7 limit crossbeams are connected with the left longitudinal beam 1 and the right longitudinal beam 2 into a whole through bolts 5 penetrating through the positioning holes 7 at certain intervals; the outside of this left longeron 1 and right longeron 2 is all fixed and is provided with anchor pile 4, and the top of anchor pile 4 is fixed on left longeron 1/right longeron 2 through splice bar 6 and is fixed on operation ground with left longeron 1, right longeron 2 and the spacing crossbeam 3 of this steel guide wall in order to utilize anchor pile 4 to fix when carrying out the secant pile pore-forming construction, and in this embodiment, the length of this spacing crossbeam 3, interval are calculated according to secant pile footpath and are confirmed.
Specifically, the left longitudinal beam 1 and the right longitudinal beam 2 both adopt 500mm × 300mm H-shaped steel, and the length is preferably 12 m; above-mentioned spacing crossbeam 3 adopts 18# channel-section steel, and this channel-section steel both ends set up by the end capping steel sheet, and the thickness of end capping steel sheet is 8mm, and this end capping steel sheet is full-welded with the channel-section steel junction, and above-mentioned anchor pile 4 adopts 500mm 300mmH shaped steel, length 4000mm, and above-mentioned bolt 5 adopts 6.8 grades of M20 bolts so that this steel leads the wall sturdy and durable more. Above-mentioned splice bar 6 adopts three grade reinforcing bar processing of phi 20mm to become L shaped steel muscle, and L shaped steel muscle's minor face length 100mm, L shaped steel muscle's minor face and left longeron 1, the equal welded connection of 2 lateral surfaces of right longeron, L shaped steel muscle's long limit length 150mm, L shaped steel muscle's long limit and anchor pile 4 welded connection. The distances among the 3 positioning holes 7 of the positioning hole groups positioned at the two ends of any limiting cross beam 3 are equal, the hole diameters of the positioning holes 7 are slightly larger than the diameter of the bolt 5, and the distance and the position between the adjacent positioning holes 7 are determined by calculation according to the pile diameter and the pile distance of the secant pile.
When the steel guide wall for the occlusive pile pore-forming construction is used for the occlusive pile pore-forming construction, firstly, the left longitudinal beam 1, the right longitudinal beam 2 and the limiting cross beam 3 are fixed on the operation ground by using the anchor pile 4, then, square hole positioning (namely, positioning is carried out by the left cross beam, the right cross beam and the limiting cross beam 3) is utilized to form a first occlusive pile hole, and then, the limiting cross beam 3 is adjusted to be fastened and connected with different positioning holes 7 in a positioning hole group to form a second occlusive pile hole positioned between adjacent first occlusive pile holes, so that the aims of positioning and mutual occlusion of the occlusive pile holes are fulfilled; and when a group of occlusive pile holes are required to be formed, the steel guide wall can be spliced.
Those skilled in the art will appreciate that variations may be implemented by those skilled in the art in combination with the prior art and the above-described embodiments, and will not be described herein in detail. Such variations do not affect the essence of the present invention and are not described herein.
The above description is of the preferred embodiment of the invention. It is to be understood that the invention is not limited to the particular embodiments described above, in that devices and structures not described in detail are understood to be implemented in a manner common in the art; those skilled in the art can make many possible variations and modifications to the disclosed embodiments, or modify equivalent embodiments to equivalent variations, without departing from the spirit of the invention, using the methods and techniques disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention are still within the scope of the protection of the technical solution of the present invention, unless the contents of the technical solution of the present invention are departed.

Claims (8)

1. A steel guide wall for hole forming construction of an occlusive pile is characterized by comprising two longitudinal beams which are oppositely arranged;
at least four positioning hole groups are arranged on the two longitudinal beams at equal intervals, each positioning hole group comprises at least three positioning holes, the positioning holes on the two longitudinal beams are arranged in a one-to-one correspondence manner, at least four limiting cross beams are connected between the two longitudinal beams corresponding to the positioning hole groups, and the limiting cross beams are connected to the longitudinal beams through the positioning holes by fasteners;
and anchor piles are fixedly arranged on the outer sides of the two longitudinal beams, and the tops of the anchor piles are fixed on the longitudinal beams through connecting pieces.
2. A steel guide wall for use in the formation of a bore in a spud according to claim 1, wherein the fasteners are bolts.
3. The steel guide wall for use in pile boring according to claim 1, wherein the connecting members are tie bars.
4. The steel guide wall for the hole forming construction of the occlusive pile as claimed in claim 3, wherein the connecting rib is an L-shaped steel bar, the short side of the L-shaped steel bar is welded with the outer side face of the longitudinal beam, and the long side of the L-shaped steel bar is welded with the anchor pile.
5. A steel guide wall for use in the formation of a bore in a spud according to claim 1, wherein both of the stringers are H-section steel.
6. The steel guide wall for the hole forming construction of the occlusive pile as claimed in claim 1, wherein the limiting cross beam is a channel steel, and end-capped steel plates are arranged at two ends of the channel steel.
7. The steel guide wall for use in pile boring according to claim 5, wherein the connection between the capped steel plate and the channel is a full weld connection.
8. A steel guide wall for use in the formation of a bore in a spud according to claim 1, wherein the anchor pile is formed of H-section steel.
CN202010839777.2A 2020-08-19 2020-08-19 Steel guide wall for hole forming construction of secant pile Pending CN111809634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010839777.2A CN111809634A (en) 2020-08-19 2020-08-19 Steel guide wall for hole forming construction of secant pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010839777.2A CN111809634A (en) 2020-08-19 2020-08-19 Steel guide wall for hole forming construction of secant pile

Publications (1)

Publication Number Publication Date
CN111809634A true CN111809634A (en) 2020-10-23

Family

ID=72860470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010839777.2A Pending CN111809634A (en) 2020-08-19 2020-08-19 Steel guide wall for hole forming construction of secant pile

Country Status (1)

Country Link
CN (1) CN111809634A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957879A (en) * 2021-11-16 2022-01-21 青岛海大建科岩土工程有限公司 Assembled type steel-inserted underground continuous wall
CN114250794A (en) * 2021-11-30 2022-03-29 中交路桥建设有限公司 Steel guide wall capable of being used in turnover mode

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110098597A (en) * 2010-02-26 2011-09-01 주식회사 건축사사무소건원엔지니어링 Guide frame for h-steel
CN202227365U (en) * 2011-09-07 2012-05-23 中铁五局集团第一工程有限责任公司 Form traveler for guide wall of underground continuous wall
CN103266600A (en) * 2013-05-17 2013-08-28 浙江省地质矿产工程公司 Occlusion pile of full reinforcement pile and construction method thereof
CN103967050A (en) * 2014-01-29 2014-08-06 广州机施建设集团有限公司 Construction system of subway station
CN104652445A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Pile and column steel latticed column location device for deep foundation pits and construction method for location device
CN204662445U (en) * 2015-04-24 2015-09-23 济南轨道交通集团有限公司 A kind of accurate-location device of piling
CN204703512U (en) * 2015-06-17 2015-10-14 陕西建工集团总公司 The adjustable guide wall form board bracing means of a kind of simple-mounting-dismounting formula
CN205776161U (en) * 2016-06-14 2016-12-07 东通岩土科技(杭州)有限公司 Wall device led by a kind of reusable interlocking pile steel
CN106245664A (en) * 2016-08-28 2016-12-21 东通岩土科技(杭州)有限公司 There is rigid wall retaining design and the construction method thereof of rectangle steel reinforcement cage
CN206646488U (en) * 2017-01-22 2017-11-17 深圳市正兴基础建筑工程有限公司 A kind of guide wall of occlusive pile
CN109914702A (en) * 2019-04-22 2019-06-21 北京城建北方集团有限公司 A kind of use mold that can control wall protective layer outside the room of underground and can have enough to meet the need
CN109914434A (en) * 2019-04-16 2019-06-21 中建一局集团第五建筑有限公司 Foundation pit supporting pile top crown beam construction structure
CN209669890U (en) * 2019-02-28 2019-11-22 广东广强基础工程有限公司 A kind of guide wall of occlusive pile
CN111172969A (en) * 2020-01-09 2020-05-19 中建交通建设集团有限公司 Assembly type guide wall system and construction method thereof
CN111395344A (en) * 2020-03-25 2020-07-10 中国一冶集团有限公司 Reusable secant pile positioning device and construction method
CN217580081U (en) * 2022-05-17 2022-10-14 广东品建基础工程有限公司 Wall structure is led to secant pile

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110098597A (en) * 2010-02-26 2011-09-01 주식회사 건축사사무소건원엔지니어링 Guide frame for h-steel
CN202227365U (en) * 2011-09-07 2012-05-23 中铁五局集团第一工程有限责任公司 Form traveler for guide wall of underground continuous wall
CN103266600A (en) * 2013-05-17 2013-08-28 浙江省地质矿产工程公司 Occlusion pile of full reinforcement pile and construction method thereof
CN104652445A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Pile and column steel latticed column location device for deep foundation pits and construction method for location device
CN103967050A (en) * 2014-01-29 2014-08-06 广州机施建设集团有限公司 Construction system of subway station
CN204662445U (en) * 2015-04-24 2015-09-23 济南轨道交通集团有限公司 A kind of accurate-location device of piling
CN204703512U (en) * 2015-06-17 2015-10-14 陕西建工集团总公司 The adjustable guide wall form board bracing means of a kind of simple-mounting-dismounting formula
CN205776161U (en) * 2016-06-14 2016-12-07 东通岩土科技(杭州)有限公司 Wall device led by a kind of reusable interlocking pile steel
CN106245664A (en) * 2016-08-28 2016-12-21 东通岩土科技(杭州)有限公司 There is rigid wall retaining design and the construction method thereof of rectangle steel reinforcement cage
CN206646488U (en) * 2017-01-22 2017-11-17 深圳市正兴基础建筑工程有限公司 A kind of guide wall of occlusive pile
CN209669890U (en) * 2019-02-28 2019-11-22 广东广强基础工程有限公司 A kind of guide wall of occlusive pile
CN109914434A (en) * 2019-04-16 2019-06-21 中建一局集团第五建筑有限公司 Foundation pit supporting pile top crown beam construction structure
CN109914702A (en) * 2019-04-22 2019-06-21 北京城建北方集团有限公司 A kind of use mold that can control wall protective layer outside the room of underground and can have enough to meet the need
CN111172969A (en) * 2020-01-09 2020-05-19 中建交通建设集团有限公司 Assembly type guide wall system and construction method thereof
CN111395344A (en) * 2020-03-25 2020-07-10 中国一冶集团有限公司 Reusable secant pile positioning device and construction method
CN217580081U (en) * 2022-05-17 2022-10-14 广东品建基础工程有限公司 Wall structure is led to secant pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜乃灿;: "钻孔咬合桩在软土地层基坑支护中的应用", 福建建材, no. 01, 10 February 2010 (2010-02-10), pages 35 *
文果等: "城市地下综合管廊现浇施工技术", 工业建筑, vol. 48, 6 March 2018 (2018-03-06), pages 1232 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957879A (en) * 2021-11-16 2022-01-21 青岛海大建科岩土工程有限公司 Assembled type steel-inserted underground continuous wall
CN114250794A (en) * 2021-11-30 2022-03-29 中交路桥建设有限公司 Steel guide wall capable of being used in turnover mode

Similar Documents

Publication Publication Date Title
CN111809634A (en) Steel guide wall for hole forming construction of secant pile
CN110847169B (en) Construction method of steel pipe pile steel trestle
CN103306214B (en) The bracing means of a kind of reinforced concrete beam and floor
CN111379335B (en) Node connecting device of reinforced concrete column and girder steel
CN214883827U (en) Construction elevator foundation support system device that encorbelments
CN109235273B (en) Assembled prefabricated Liang Zhuangyun interlude car
CN110030005A (en) The light-duty guarantor's circle support system of shield tunnel and its construction method
US8459570B2 (en) Supporting arrangement
CN214301271U (en) Ladder stand device capable of installing embedded part by utilizing hollow pier template
CN211898422U (en) Prefabricated high-strength waist beam with narrow fertilizer groove of foundation pit
CN113668703A (en) Direct-insertion type bolt-free connecting joint of closed cavity column and steel beam with three-layer ring plate structure
CN112227686A (en) Overhanging steel beam system scaffold moving positioning pile and construction method
CN210032595U (en) Dual-purpose column mould hoop device
CN208965580U (en) A kind of non-console mode tower crane
CN205061427U (en) Tower crane cushion cap
CN211368330U (en) Steel trestle for steel pipe pile
KR20210104486A (en) Buckling prevention wheel for steel pipe connection and its installation structure and construction method
CN217174856U (en) Special-shaped cover arch structure for oblique tunnel portal
CN213683154U (en) Cantilever steel beam system scaffold moving positioning pile
CN217318550U (en) Be used for prefabricated case roof beam reinforcement support
CN213447891U (en) A structure for portal crane rail is fixed fast
CN113882285B (en) Temporary supporting device in concrete box girder bridge block dismantling hanging box and construction method
CN216156583U (en) Cap-shaped combined steel sheet pile top crown beam device for foundation pit support
CN215905656U (en) Construction elevator goes out roofing and attaches wall fixing device
CN217735490U (en) Pipe piece circumferential supporting device for small clear distance tunnel between subway shield zones

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination