CN111778794A - Construction structure and construction method for roadbed earthwork engineering in rainy season - Google Patents

Construction structure and construction method for roadbed earthwork engineering in rainy season Download PDF

Info

Publication number
CN111778794A
CN111778794A CN202010623088.8A CN202010623088A CN111778794A CN 111778794 A CN111778794 A CN 111778794A CN 202010623088 A CN202010623088 A CN 202010623088A CN 111778794 A CN111778794 A CN 111778794A
Authority
CN
China
Prior art keywords
drainage
construction
rainwater
roadbed
filter box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010623088.8A
Other languages
Chinese (zh)
Inventor
蒋武维
黄春凤
甘文兴
朱兴源
刘期学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Aerospace Construction Engineering Co ltd
Original Assignee
Sichuan Aerospace Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Aerospace Construction Engineering Co ltd filed Critical Sichuan Aerospace Construction Engineering Co ltd
Priority to CN202010623088.8A priority Critical patent/CN111778794A/en
Publication of CN111778794A publication Critical patent/CN111778794A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • E03F1/003Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells via underground elongated vaulted elements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The application relates to a construction structure and a construction method of roadbed earthwork engineering in rainy season, relating to the technical field of road construction; including setting up the drainage subassembly in subsiding the well, the drainage subassembly includes drain pipe and hollow rose box, drain pipe and rose box intercommunication, a plurality of filtration pores have been seted up to the lateral wall of rose box. When in use, the drainage assembly is arranged in the excavated settling well, and the drainage pipe is communicated with the municipal pipeline; in the rainy period, rainwater is discharged into the settling well, a large amount of silt in the rainwater settles to the bottom of the settling well, then the rainwater enters the filter box through the filter holes, and finally the rainwater is discharged into a municipal pipeline through the drain pipe; effectively preventing rainwater from being directly poured into the foundation pit to influence construction; the filtration hole plays the effect of filtering the rainwater simultaneously, prevents rubbish such as a large amount of silt or leaves from entering into the municipal administration pipeline, guarantees that the municipal administration pipeline drainage is unobstructed, reduces the possibility of ponding, guarantees to construct as early as possible normally behind the rain.

Description

Construction structure and construction method for roadbed earthwork engineering in rainy season
Technical Field
The application relates to the technical field of road construction, in particular to a construction structure of roadbed earthwork engineering in rainy season and a construction method thereof.
Background
The earthwork engineering comprises site leveling, roadbed excavation, civil air defense engineering excavation, terrace filling, roadbed filling and foundation pit backfilling. The roadbed earthwork project needs a long construction period, and some long road sections only need to dig earthwork, so that the construction period is from six months to eight months.
In the meantime, a rainy period is often encountered, the roadbed deviation is easily caused by directly excavating earth in the rainy period, and the roadbed is required to be filled after the rainy period is over, so that the construction progress is influenced.
Disclosure of Invention
In order to reduce the influence on the construction progress, the application provides a roadbed earthwork construction structure in rainy season and a construction method thereof.
First aspect, the application provides a road bed earthwork engineering construction structures in rainy season adopts following technical scheme:
the utility model provides a road bed earthwork engineering construction structures in rainy season, is including setting up the drainage subassembly in subsiding the well, the drainage subassembly includes drain pipe and hollow rose box, drain pipe and rose box intercommunication, a plurality of filtration pores have been seted up to the lateral wall of rose box.
By adopting the technical scheme, when in use, the drainage assembly is arranged in the excavated settling well, and the drainage pipe is communicated with the municipal pipeline; in the rainy period, rainwater is discharged into the settling well, a large amount of silt in the rainwater settles to the bottom of the settling well, then the rainwater enters the filter box through the filter holes, and finally the rainwater is discharged into a municipal pipeline through the drain pipe; effectively preventing rainwater from being directly poured into the foundation pit to influence construction; the filtration hole plays the effect of filtering the rainwater simultaneously, prevents rubbish such as a large amount of silt or leaves from entering into the municipal administration pipeline, guarantees that the municipal administration pipeline drainage is unobstructed, reduces the possibility of ponding, guarantees to construct as early as possible normally behind the rain.
Preferably, the cross section of the filter box is circular, a rotating shaft which is collinear with the central axis of the filter box is rotatably arranged on the filter box, and a cleaning piece for cleaning the filter holes is arranged on the rotating shaft; and a driving piece for driving the rotating shaft to rotate is arranged in the filter box.
Through adopting above-mentioned technical scheme, during the use, driving piece drive clearance piece is made circular motion along the lateral wall of rose box, and then realizes ordering about the purpose that clearance piece cleared up the filtration pore, prevents effectively that the filtration pore from being blockked up by silt, guarantees the filter effect.
Preferably, the pivot stretches into in the rose box, the driving piece includes the impeller, the impeller is fixed to be set up in the pivot stretches into the one end in the rose box, clearance piece and pivot fixed connection.
Through adopting above-mentioned technical scheme, when rainy period, in the rainwater entered into the rose box and discharged into the drain pipe, rivers drive impeller rotation, and the impeller drives the pivot and rotates, and then realizes the purpose of drive clearance piece motion.
Preferably, the cleaning member comprises a brush plate and bristles, the bristles are fixedly arranged on the brush plate, and the bristles are abutted against the side wall of the filter box.
Through adopting above-mentioned technical scheme, the during operation, the brush hair and the lateral wall butt of rose box at pivot pivoted in-process, realize clearing up the mesh of filtration pore.
Preferably, the rotating shaft is fixedly provided with a scraper which is used for being abutted against the side wall of the filter box.
Through adopting above-mentioned technical scheme, impurity such as leaf in the rainwater is adsorbed back on the lateral wall of rose box, and the scraper blade moves along the lateral wall of rose box, plays the purpose that will be stained with the rubbish clearance that attaches, improves the filter effect.
Preferably, the rotating shaft is fixedly provided with an installation rod parallel to the rotating shaft, and the brush plate is detachably arranged on the installation rod.
Through adopting above-mentioned technical scheme, treat that the brush hair wearing and tearing back, be convenient for change new clearance piece guarantees the clearance effect.
Preferably, the mounting groove has been seted up along the length direction of mounting bar to the lateral wall that the installation pole is close to the rose box, and the mounting groove runs through the diapire of installation pole, the brush board slides and sets up in the mounting groove, be provided with the mounting that is used for injecing the brush board position on the installation pole.
By adopting the technical scheme, after the bristles are worn, the limit of the fixing piece on the brush plate is firstly removed, and then the brush plate is drawn out along the mounting groove, so that the operation is simple and convenient.
In a second aspect, the application provides a method for constructing roadbed earthwork in rainy season, which adopts the following technical scheme:
a construction method of roadbed earthwork engineering in rainy season comprises the following steps:
s1, paying off before construction, and determining the boundary of the roadbed;
s2, excavating drainage ditches at two sides of the roadbed, and arranging soil retaining weirs;
s3, excavating a settling well, wherein the settling well is communicated with a drainage ditch, the drainage assembly is arranged in the settling well, and the drainage pipe is communicated with a municipal pipeline;
s4, excavating a foundation pit;
and S5, filling concrete, and filling the foundation pit through the concrete.
By adopting the technical scheme, when in construction and use, the drainage assembly is arranged in the excavated settling well, and the drainage pipe is communicated with the municipal pipeline; in the rainy period, rainwater is discharged into the settling well, a large amount of silt in the rainwater settles to the bottom of the settling well, then the rainwater enters the filter box through the filter holes, and finally the rainwater is discharged into a municipal pipeline through the drain pipe; effectively preventing rainwater from being directly poured into the foundation pit to influence construction.
Preferably, a weather shelter is erected before the concrete is filled, so that the pouring is performed in the weather shelter.
Through adopting above-mentioned technical scheme, because of concrete in the process of pouring or pour the back and finally congeal before rain, will lead to the surface to receive destruction, and the setting of weather enclosure, the effectual effect of preventing that the rainwater from influencing the concrete placement that prevents.
In summary, the present application includes at least one of the following beneficial technical effects:
in the rainy period, rainwater is discharged into the settling well, a large amount of silt in the rainwater settles to the bottom of the settling well, then the rainwater enters the filter box through the filter holes, and finally the rainwater is discharged into a municipal pipeline through the drain pipe; effectively preventing rainwater from being directly poured into the foundation pit to influence construction; meanwhile, the filtering holes play a role in filtering rainwater, so that a large amount of garbage such as silt or leaves is prevented from entering the municipal pipeline, smooth drainage of the municipal pipeline is ensured, the possibility of water accumulation is reduced, and normal construction after rain can be ensured;
when the filter box works, the bristles are abutted against the side wall of the filter box, and the purpose of cleaning the filter holes is achieved in the rotating process of the rotating shaft;
after the bristles are worn, the limit of the fixing piece on the brush plate is firstly removed, and then the brush plate is pulled out along the mounting groove, so that the operation is simple and convenient.
Drawings
FIG. 1 is a schematic overall structure of the present application;
FIG. 2 is a cross-sectional view of a filtration tank of the present application;
FIG. 3 is a schematic structural view of a cleaning member of the present application;
fig. 4 is an enlarged view of a portion a in fig. 3 of the present application.
Description of reference numerals: 1. a settling well; 11. an overflow port; 2. a drainage assembly; 21. a drain pipe; 22. a filter box; 221. a filtration pore; 222. a frame body; 223. a flare tube; 3. a rotating shaft; 31. an impeller; 32. a squeegee; 33. a support; 4. cleaning the workpiece; 41. brushing the board; 42. brushing; 5. mounting a rod; 51. mounting grooves; 52. mounting holes; 53. and (5) fixing the bolt.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses road bed earthwork engineering construction structure in rainy season.
Referring to fig. 1, the construction structure of roadbed earthwork engineering in rainy season comprises a drainage assembly 2 arranged in a settling well 1, wherein the drainage assembly 2 comprises a drainage pipe 21 and a hollow filter box 22, and the filter box 22 is vertically and fixedly arranged in the settling well 1.
Referring to fig. 1, an overflow port 11 is provided at a wellhead of a settling well 1. If too much rainwater is discharged from the overflow port 11, the flood discharge pressure of the municipal pipeline is reduced.
As shown in fig. 2, the side wall of the filter box 22 is provided with a plurality of filter holes 221. The cross section of the filter box 22 is circular, wherein the whole filter box 22 may be cylindrical, truncated cone or conical, and in this embodiment the whole filter box 22 is cylindrical.
As shown in fig. 1, a frame body 222 is fixedly arranged on the filter box 22, and the frame body 222 is inserted into the side wall of the settling well 1 to fix the position of the filter box 22. The filter box 22 is arranged at the position 15-20cm away from the wellhead of the settling well 1.
In the rainy period, the settling well 1 is filled with rainwater, and a large amount of floating leaves and other impurities exist on the surface of accumulated water in the settling well 1; the filter box 22 is arranged at the position 15-20cm away from the wellhead of the settling well 1, so that the blockage of the filter holes 221 by leaves is reduced.
As shown in fig. 1 and 2, one end of the drain pipe 21 is communicated with the filter box 22, and the other end is communicated with the municipal pipeline. The vertical intercommunication of the diapire of rose box 22 has the flare 223, and flare 223 is the round platform shape, and its internal diameter reduces gradually from top to bottom. The drain pipe 21 communicates with an end of the bell pipe 223 remote from the filter tank 22.
As shown in fig. 2, the filter box 22 is rotatably provided with a rotating shaft 3 which is collinear with the central axis of the filter box 22, and one end of the rotating shaft 3 extends into the joint of the flare 223 and the filter box 22. A driving part for driving the rotating shaft 3 to rotate is arranged in the filter box 22 and comprises an impeller 31, and the impeller 31 is fixedly arranged at one end of the rotating shaft 3 extending into the filter box 22.
As shown in fig. 2, a bracket 33 is horizontally and fixedly arranged at one end of the rotating shaft 3 extending out of the top wall of the filter box 22. The rotating shaft 3 is provided with a cleaning piece 4 for cleaning the filter hole 221.
As shown in fig. 3 and 4, the cleaning member 4 includes a brush plate 41 and bristles 42, the bristles 42 are fixedly disposed on the brush plate 41, and the bristles 42 abut against the side wall of the filter box 22. The support 33 is fixedly provided with an installation rod 5 parallel to the rotating shaft 3, the brush plate 41 is detachably arranged on the installation rod 5, and after the bristles 42 are worn, the cleaning piece 4 is convenient to replace, so that the cleaning effect is ensured.
As shown in fig. 3 and 4, the side wall of the installation rod 5 close to the filter box 22 is provided with an installation groove 51 along the length direction of the installation rod 5, the installation groove 51 is a dovetail groove, the installation groove 51 penetrates through the bottom wall of the installation rod 5, the brush plate 41 is slidably arranged in the installation groove 51, and the brush plate 41 is matched with the dovetail groove. The mounting rod 5 is provided with a fixing piece for limiting the position of the brush plate 41, the side wall of the mounting rod 5 far away from the brush plate 41 is provided with a mounting hole 52 penetrating through the mounting groove 51, the fixing piece is a fixing bolt 53 penetrating through the mounting hole 52 for rotation, the side wall of the brush plate 41 far away from the filter box 22 is provided with a threaded hole, and the fixing bolt 53 is in threaded connection with the threaded hole.
As shown in fig. 2 and 3, the bracket 33 is fixedly provided with a scraper 32 for abutting against the side wall of the filter box 22, and the scraper 32 and the mounting rod 5 are symmetrically arranged along the rotation shaft 3. The angle between the scraper 32 and the generatrix of the side wall of the filter box 22 is acute.
When rainy day, in the rainwater enters into rose box 22 and discharges into drain pipe 21, rivers drive impeller 31 rotates, and impeller 31 drives pivot 3 and rotates, and then realizes that the drive clearance makes circular motion along the lateral wall of rose box 22, and then realizes ordering about the purpose that clearance 4 cleared up filtration pore 221, prevents effectively that filtration pore 221 from being blockked up by silt, guarantees the filter effect.
The implementation principle is as follows: when in use, the drainage assembly 2 is arranged in the excavated settling well 1, and the drainage pipe 21 is communicated with municipal pipelines; in the rainy period, rainwater is discharged into the settling well 1, a large amount of silt in the rainwater settles to the bottom of the settling well 1, then the rainwater enters the filter box 22 through the filter hole 221, and finally is discharged into a municipal pipeline through the drain pipe 21; effectively preventing rainwater from being directly poured into the foundation pit to influence construction; meanwhile, the filtering holes 221 play a role in filtering rainwater, so that a large amount of silt or leaves and other garbage are prevented from entering the municipal pipeline, smooth drainage of the municipal pipeline is guaranteed, the possibility of water accumulation is reduced, and normal construction after rain can be guaranteed.
The embodiment of the application also discloses a construction method of the roadbed earthwork engineering in rainy season.
A construction method of roadbed earthwork engineering in rainy season comprises the following steps:
and S1, setting lines before construction, and determining the boundary of the roadbed.
And C, carefully organizing related personnel to analyze the construction production plan in the rainy season before construction in the rainy season, and compiling construction measures in the rainy season according to construction projects in the rainy season, wherein required materials are prepared before construction in the rainy season.
Arranging a specially-assigned person to listen to weather forecast and strong wind alarm of a local weather station, recording the weather forecast, reporting to a project flood prevention leader group in time when rainstorm weather is found, enabling the project leader to be on duty personally, organizing each construction team to arrange the specially-assigned person on duty, performing flood prevention preparation according to construction technical measures in rainy season, and checking the implementation condition of each preparation work.
And establishing a flood prevention group, making a flood prevention plan and emergency plan measures, dispatching people to frequently check a ground drainage system, and timely processing if blockage occurs.
And S2, digging drainage ditches at two sides of the roadbed, and arranging soil retaining weirs. Planning drainage subareas to ensure that rainwater cannot be poured into the foundation pit when heavy rain comes. And a submersible pump is configured to pump water in rainy seasons.
S3, excavating the settling well 1, wherein the settling well 1 is communicated with a drainage ditch, arranging the drainage assembly 2 in the settling well 1, and communicating the drainage pipe 21 with a municipal pipeline.
S4, excavating a foundation pit; and after rain, rainwater and sludge of the foundation pit are completely removed, and then the next procedure construction is carried out.
And S5, filling concrete, and filling the foundation pit through the concrete.
Before concrete is filled, a rain-proof shed is erected so as to enable the concrete to be poured in the rain-proof shed. If the concrete is in rain during pouring, the concrete should be covered by plastic cloth in time to prevent rain.
If the surface of the concrete is damaged due to rain during the pouring process or before final setting after the pouring, the part of the concrete should be timely smashed to the compact layer and then repaired.
In the rainy period, rainwater is discharged into the settling well 1, a large amount of silt in the rainwater settles to the bottom of the settling well 1, then the rainwater enters the filter box 22 through the filter hole 221, and finally is discharged into a municipal pipeline through the drain pipe 21; effectively preventing rainwater from being directly poured into the foundation pit to influence construction.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a rainy season road bed earthwork engineering construction structure which characterized in that: including setting up drainage subassembly (2) in settling well (1), drainage subassembly (2) are including drain pipe (21) and hollow rose box (22), drain pipe (21) and rose box (22) intercommunication, a plurality of filtration pore (221) of crossing have been seted up to the lateral wall of rose box (22).
2. The construction structure of the roadbed earthmoving engineering in rainy season according to claim 1, characterized in that: the cross section of the filter box (22) is circular, a rotating shaft (3) which is collinear with the central axis of the filter box (22) is rotatably arranged on the filter box (22), and a cleaning piece (4) for cleaning the filter holes (221) is arranged on the rotating shaft (3); and a driving piece for driving the rotating shaft (3) to rotate is arranged in the filter box (22).
3. The wet land earthwork construction structure according to claim 2, wherein: the utility model discloses a filter box, including pivot (3), driving piece, impeller (31), clearance piece (4) and pivot (3), pivot (3) stretch into in rose box (22), the driving piece includes impeller (31), impeller (31) are fixed to be set up in the one end that pivot (3) stretched into in rose box (22), clearance piece (4) and pivot (3) fixed connection.
4. The construction structure of the roadbed earthmoving engineering in rainy season according to claim 3, characterized in that: the cleaning piece (4) comprises a brush plate (41) and bristles (42), the bristles (42) are fixedly arranged on the brush plate (41), and the bristles (42) are abutted against the side wall of the filter box (22).
5. The construction structure of the roadbed earthmoving engineering in rainy season according to claim 4, characterized in that: and a scraper (32) which is used for being abutted against the side wall of the filter box (22) is fixedly arranged on the rotating shaft (3).
6. The wet land earthwork construction structure according to claim 5, wherein: the brush is characterized in that an installation rod (5) parallel to the rotating shaft (3) is fixedly arranged on the rotating shaft (3), and the brush plate (41) is detachably arranged on the installation rod (5).
7. The wet land earthwork construction structure according to claim 6, wherein: the utility model discloses a brush plate, including installation pole (5), installation pole (5) are close to the lateral wall of rose box (22) and have seted up mounting groove (51) along the length direction of installation pole (5), and the diapire of installation pole (5) is run through in mounting groove (51), brush plate (41) slide to set up in mounting groove (51), be provided with the mounting that is used for injecing brush plate (41) position on installation pole (5).
8. A construction method of roadbed earthwork engineering in rainy season is characterized by comprising the following steps: the method comprises the following steps:
s1, paying off before construction, and determining the boundary of the roadbed;
s2, excavating drainage ditches at two sides of the roadbed, and arranging soil retaining weirs;
s3, excavating a settling well (1), communicating the settling well (1) with a drainage ditch, arranging a drainage assembly (2) in the settling well (1), and communicating a drainage pipe (21) with a municipal pipeline;
s4, excavating a foundation pit;
and S5, filling concrete, and filling the foundation pit through the concrete.
9. The method for constructing a roadbed earth work in rainy season according to claim 8, wherein the method comprises the following steps: before concrete is filled, a rain-proof shed is erected so as to enable the concrete to be poured in the rain-proof shed.
CN202010623088.8A 2020-06-30 2020-06-30 Construction structure and construction method for roadbed earthwork engineering in rainy season Pending CN111778794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010623088.8A CN111778794A (en) 2020-06-30 2020-06-30 Construction structure and construction method for roadbed earthwork engineering in rainy season

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010623088.8A CN111778794A (en) 2020-06-30 2020-06-30 Construction structure and construction method for roadbed earthwork engineering in rainy season

Publications (1)

Publication Number Publication Date
CN111778794A true CN111778794A (en) 2020-10-16

Family

ID=72761621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010623088.8A Pending CN111778794A (en) 2020-06-30 2020-06-30 Construction structure and construction method for roadbed earthwork engineering in rainy season

Country Status (1)

Country Link
CN (1) CN111778794A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813760A (en) * 2021-02-07 2021-05-18 安徽省合通交通工程有限公司 Construction structure and construction method for roadbed earthwork engineering in rainy season
CN112942002A (en) * 2021-02-02 2021-06-11 李士环 Municipal administration road bed
CN115182368A (en) * 2022-06-20 2022-10-14 浙江泛海交通工程有限公司 Earthwork construction method suitable for rainy season

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002059125A (en) * 2000-08-11 2002-02-26 Hideo Kusano Disposal device for garbage
CN206752305U (en) * 2017-05-15 2017-12-15 黄亮亮 A kind of bridge drainage system of double drainage facility
CN208055795U (en) * 2017-11-16 2018-11-06 广州隆盛景观建设有限公司 A kind of town road
CN209040448U (en) * 2018-10-22 2019-06-28 余科 A kind of high-building construction temporary drainage structure
CN209384064U (en) * 2018-12-25 2019-09-13 镇江市规划设计研究院 A kind of pavement receipts water drainage arrangement
CN210458932U (en) * 2019-08-06 2020-05-05 湖南发通路桥集团有限公司 Highway bridge drainage structures

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002059125A (en) * 2000-08-11 2002-02-26 Hideo Kusano Disposal device for garbage
CN206752305U (en) * 2017-05-15 2017-12-15 黄亮亮 A kind of bridge drainage system of double drainage facility
CN208055795U (en) * 2017-11-16 2018-11-06 广州隆盛景观建设有限公司 A kind of town road
CN209040448U (en) * 2018-10-22 2019-06-28 余科 A kind of high-building construction temporary drainage structure
CN209384064U (en) * 2018-12-25 2019-09-13 镇江市规划设计研究院 A kind of pavement receipts water drainage arrangement
CN210458932U (en) * 2019-08-06 2020-05-05 湖南发通路桥集团有限公司 Highway bridge drainage structures

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942002A (en) * 2021-02-02 2021-06-11 李士环 Municipal administration road bed
CN112942002B (en) * 2021-02-02 2022-07-22 辽宁郡兴建设有限公司 Municipal administration road bed
CN112813760A (en) * 2021-02-07 2021-05-18 安徽省合通交通工程有限公司 Construction structure and construction method for roadbed earthwork engineering in rainy season
CN112813760B (en) * 2021-02-07 2022-02-18 安徽省合通建工集团有限公司 Construction structure and construction method for roadbed earthwork engineering in rainy season
CN115182368A (en) * 2022-06-20 2022-10-14 浙江泛海交通工程有限公司 Earthwork construction method suitable for rainy season

Similar Documents

Publication Publication Date Title
CN111778794A (en) Construction structure and construction method for roadbed earthwork engineering in rainy season
CN106759781B (en) Intelligent urban rainwater regulation and storage system and construction method thereof
JP5014835B2 (en) Rainwater infiltration dredging and rainwater infiltration hatching method for existing rainwater dredging
CN106836438A (en) Step for municipal Storm Sewer Network blocks water with water system of regulating and storing
CN114319401A (en) Foundation pit slope drainage system
CN210066791U (en) A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation
CN211395714U (en) Novel building foundation pit drainage structure
CN104499560B (en) Combined rainwater seepage well and construction method
CN112746624A (en) Novel comprehensive water lowering and draining method and device for mudstone subway station
CN113356211A (en) Cast-in-place pile hole dredging device for civil engineering construction
CN211006218U (en) Water accumulation structure is prevented with road to hydraulic design
CN112814126A (en) Municipal road-based rainwater collection device and construction method thereof
CN214940298U (en) Foundation pit drainage structure
CN114319537A (en) Can strengthen sponge system of rainwater purification infiltration function
JP2012219591A (en) Permeation structure, water collecting facility with the same and installation method for the same
CN211057828U (en) Interim drainage structures is dug to earthwork packing
CN213682175U (en) Drainage treatment device for traffic highway engineering construction
KR100964741B1 (en) Intake structure for preventing underground water pollution
JP7222602B2 (en) Surface drainage system and its installation method
CN113914447A (en) Waterlogging drainage pump station and construction method thereof
CN219621808U (en) Bank protection foundation pit drainage structure
CN114319557B (en) Permeable concealed drainage ditch and construction method thereof
CN114855813B (en) Foundation pit upper layer stagnant water precipitation slope support device and construction method
CN217128281U (en) Large-scale deep basal pit engineering drainage system
CN219080334U (en) Foundation pit with be favorable to drainage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201016

RJ01 Rejection of invention patent application after publication