CN111756514A - Power control method, device, electronic equipment and storage medium - Google Patents

Power control method, device, electronic equipment and storage medium Download PDF

Info

Publication number
CN111756514A
CN111756514A CN201911025890.0A CN201911025890A CN111756514A CN 111756514 A CN111756514 A CN 111756514A CN 201911025890 A CN201911025890 A CN 201911025890A CN 111756514 A CN111756514 A CN 111756514A
Authority
CN
China
Prior art keywords
pusch
transmitting
priority data
determining
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911025890.0A
Other languages
Chinese (zh)
Inventor
付景兴
喻斌
王轶
孙霏菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Samsung Telecom R&D Center
Beijing Samsung Telecommunications Technology Research Co Ltd
Samsung Electronics Co Ltd
Original Assignee
Beijing Samsung Telecommunications Technology Research Co Ltd
Samsung Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Samsung Telecommunications Technology Research Co Ltd, Samsung Electronics Co Ltd filed Critical Beijing Samsung Telecommunications Technology Research Co Ltd
Priority to PCT/KR2020/004233 priority Critical patent/WO2020197331A1/en
Priority to US17/310,811 priority patent/US11832292B2/en
Publication of CN111756514A publication Critical patent/CN111756514A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/24TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0473Wireless resource allocation based on the type of the allocated resource the resource being transmission power
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The application provides a power control method, a power control device, electronic equipment and a storage medium. The method comprises the following steps: receiving resource occupation indication information, wherein the resource occupation indication information is used for indicating the resource occupation condition of second priority data on a PUSCH (physical uplink shared channel) used for transmitting first priority data; determining the resource occupation condition of a Physical Uplink Shared Channel (PUSCH) for transmitting the first priority data according to the resource occupation indication information; the power of the PUSCH for transmitting the first priority data is determined according to the resource occupation condition of the PUSCH for transmitting the first priority data, whether the resource occupation condition of the PUSCH for transmitting the high priority data is idle or low priority data is transmitted can be determined through the indication of the resource occupation indication information, and then the power of the PUSCH for transmitting the high priority data is determined according to the determined source occupation condition, so that the power of the PUSCH is controlled, the reliability of the transmission of the high priority data can be ensured, and the power can not be wasted.

Description

Power control method, device, electronic equipment and storage medium
Technical Field
The present application relates to the field of wireless communication technologies, and in particular, to a power control method, apparatus, electronic device, and storage medium.
Background
In order to make full use of resources for transmission of two or more types of data with different priorities, for example, when Enhanced Mobile Broadband (eMBB) data already occupies all transmission resources and Ultra-reliable Low Latency Communication (URLLC) data needs to be transmitted, power for URLLC data transmission may be increased, so that the data may be transmitted on the resources already occupied by the eMBB. That is, two or more sets of power control parameter sets are configured for the PUSCH of URLLC data transmission, and are used when URLLC data is transmitted on idle resources or on resources occupied by the eMBB, respectively.
In order to meet the requirement of low-delay characteristic for transmitting high-priority data, a Physical Uplink Shared Channel (PUSCH) of a non-scheduled (GF, grant-free, PUSCH also referred to as a configured PUSCH, that is, a PUSCH not scheduled to be transmitted by DCI) is used for transmission of Uplink data. However, high priority data is not required to be transmitted at every time of the grant-free PUSCH, and in actual applications, there are times when data is transmitted and there are times when no data is transmitted for the grant-free PUSCH, as shown in fig. 1. At the time of no data transmission, the User Equipment (UE) does not transmit PUSCH, and PUSCH resources of grant-free are idle. In order to make full use of resources, it is preferable to transmit data of low priority when there is no data of high priority to be transmitted, so that the data can be transmitted by making full use of the resources.
When the PUSCH for transmitting high-priority data is transmitted on idle resources, the interference on the PUSCH is small, and the performance is easily ensured, at this time, the power control for PUSCH transmission may employ a power control parameter set P-set 1. When the PUSCH for transmitting high-priority data is transmitted on the PUSCH for transmitting low-priority data, the PUSCH is subjected to additional interference, which is relatively large, and performance is not easily guaranteed. To achieve the same performance as when not interfered by PUSCH transmitting low priority data, the additional interference experienced may be cancelled by increasing the transmit power of PUSCH transmitting high priority data, at which time the power control of the PUSCH transmission may employ the power control parameter set P-set 2. The transmission power of the PUSCH calculated using the power control parameter set P-set2 is greater than the transmission power of the PUSCH calculated using the power control parameter set P-set1, as shown in FIG. 2.
When high-priority data is transmitted through grant-free PUSCH, which is not scheduled through Downlink Control Information (DCI), a solution is needed how a UE knows that the PUSCH is idle or has transmitted low-priority data when the UE intends to transmit high-priority data through grant-free PUSCH.
Disclosure of Invention
In order to overcome the above technical problems or at least partially solve the above technical problems, the following technical solutions are proposed:
in a first aspect, the present application provides a power control method, including:
receiving resource occupation indication information, wherein the resource occupation indication information is used for indicating the resource occupation condition of second priority data on a PUSCH (physical uplink shared channel) used for transmitting first priority data;
determining the resource occupation condition of a PUSCH (physical uplink shared channel) for transmitting the first priority data according to the resource occupation indication information;
determining the power of a PUSCH (physical uplink shared channel) for transmitting the first priority data according to the resource occupation condition of the PUSCH for transmitting the first priority data;
wherein the priority of the first priority data is higher than the priority of the second priority data.
In one possible implementation, the method further includes:
when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data overlap, and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, determining a PUSCH for determining PHR from the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data;
and determining the PHR based on the determined power control parameter of the PUSCH for determining the PHR, and transmitting the determined PHR.
In another possible implementation manner, determining a PUSCH for determining a PHR from PUSCHs transmitting a first priority and PUSCHs transmitting second priority data includes any one of:
determining a PUSCH for determining PHR according to the data transmission time of each PUSCH;
determining a PUSCH for determining PHR according to the scheduled time of each PUSCH;
if each PUSCH comprises a DCI scheduled PUSCH and a configured PUSCH, determining the PUSCH for transmitting the first priority data or the PUSCH for transmitting the second priority data as a PUSCH for determining the PHR;
and determining the PUSCH for determining the PHR according to the relation between the PHR driven by the timer and each PUSCH.
In another possible implementation manner, determining the PUSCH for determining the PHR according to the time of transmitting data of each PUSCH includes any one of:
determining a PUSCH for transmitting data first in time among a PUSCH for transmitting first priority data and a PUSCH for transmitting second priority data as a PUSCH for determining a PHR;
if any PUSCH in the PUSCHs for transmitting the first priority data and the PUSCHs for transmitting the second priority data meets the delay requirement, determining the PUSCHs meeting the delay requirement as the PUSCHs for determining the PHR;
and if the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data both meet the delay requirement, determining the PUSCH for transmitting the first transmission data in time from the PUSCHs for transmitting the first priority data and the PUSCHs for transmitting the second priority data as the PUSCHs for determining the PHR.
In another possible implementation manner, determining the PUSCH for determining the PHR according to the scheduled time of each PUSCH includes:
and determining the PUSCH of the first scheduled transmission data in time from the PUSCH transmitting the data of the first priority and the PUSCH transmitting the data of the second priority as the PUSCH for determining the PHR.
In another possible implementation manner, determining the PUSCH for determining the PHR according to the relationship between the PHR driven by the timer and each PUSCH includes:
if the PHR driven by the timer corresponds to the PUSCH for transmitting the first priority data, determining the PUSCH for transmitting the first priority data as the PUSCH for determining the PHR;
and if the PHR driven by the timer corresponds to the PUSCH for transmitting the second priority data, determining the PUSCH for transmitting the second priority data as the PUSCH for determining the PHR.
In a second aspect, the present application provides a power control apparatus, comprising:
a receiving module, configured to receive resource occupation indication information, where the resource occupation indication information is used to indicate a resource occupation situation of second priority data on a PUSCH for transmitting first priority data;
a first determining module, configured to determine, according to the resource occupation indication information, a resource occupation situation of a PUSCH for transmitting the first priority data;
a second determining module, configured to determine, according to a resource occupation situation of a PUSCH for transmitting first priority data, power of the PUSCH for transmitting the first priority data;
wherein the priority of the first priority data is higher than the priority of the second priority data.
In a third aspect, the present application provides an electronic device comprising: a processor and a memory storing at least one instruction, at least one program, set of codes, or set of instructions, which is loaded and executed by the processor to implement the method as set forth in the first aspect of the application.
In a fourth aspect, the present application provides a computer readable storage medium for storing a computer instruction, program, set of codes or set of instructions which, when run on a computer, causes the computer to perform the method as set forth in the first aspect of the present application.
According to the power control method, the power control device, the electronic equipment and the storage medium, through the indication of the resource occupation indication information, whether the resource occupation condition of the PUSCH used for transmitting the high-priority data is idle or low-priority data is transmitted can be determined, and then the power of the PUSCH used for transmitting the high-priority data is determined according to the determined source occupation condition, so that the power of the PUSCH is controlled, the reliability of high-priority data transmission can be guaranteed, and the power can not be wasted.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings used in the description of the embodiments of the present application will be briefly described below.
Fig. 1 is a schematic diagram of a transmission time of an unscheduled PUSCH according to an embodiment of the present application;
fig. 2 is a schematic diagram of calculating transmission power of a PUSCH according to an embodiment of the present application;
fig. 3 is a schematic flowchart of a power control method according to an embodiment of the present disclosure;
FIG. 4 is a schematic diagram of a timing relationship provided by an embodiment of the present application;
fig. 5 is a schematic diagram of a resource occupation situation that is not indicated according to an embodiment of the present application;
fig. 6 is a schematic diagram of an occupation situation of multiplexing resources according to an embodiment of the present application;
fig. 7 is a schematic diagram of a resource occupation situation according to an embodiment of the present application;
fig. 8 is a schematic diagram of PUSCH overlap provided in an embodiment of the present application;
fig. 9 is a schematic diagram of meeting a delay requirement according to an embodiment of the present application;
fig. 10 is a schematic diagram of a determination mode 2 for satisfying a delay requirement according to an embodiment of the present application;
fig. 11 is a schematic diagram of a determination mode 3 for satisfying a delay requirement according to an embodiment of the present application;
fig. 12 is a schematic diagram of a PUSCH for determining a PHR in a first manner provided in the embodiment of the present application;
fig. 13 is a schematic diagram of a PUSCH for determining a PHR in a second mode provided in the embodiment of the present application;
fig. 14 is a schematic structural diagram of a power control apparatus according to an embodiment of the present application.
Detailed Description
Reference will now be made in detail to embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
As used herein, the singular forms "a", "an", "the" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. It will be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element or intervening elements may also be present. Further, "connected" or "coupled" as used herein may include wirelessly connected or wirelessly coupled. As used herein, the term "and/or" includes all or any element and all combinations of one or more of the associated listed items.
To make the objects, technical solutions and advantages of the present application more clear, embodiments of the present application will be described in further detail below with reference to the accompanying drawings.
An embodiment of the present application provides a power control method, as shown in fig. 3, the method includes:
step S301: receiving resource occupation indication information, wherein the resource occupation indication information is used for indicating the resource occupation condition of second priority data on a PUSCH (physical uplink shared channel) used for transmitting first priority data;
step S302: determining the resource occupation condition of a PUSCH (physical uplink shared channel) for transmitting the first priority data according to the resource occupation indication information;
step S303: determining the power of a PUSCH (physical uplink shared channel) for transmitting the first priority data according to the resource occupation condition of the PUSCH for transmitting the first priority data;
wherein the priority of the first priority data is higher than the priority of the second priority data.
The execution main body of the method may be a UE or a functional module of the UE, and the following embodiments take the UE as an example for description.
In step S301 in this embodiment of the present application, the UE receives resource occupation indication information. In step S302, according to the resource occupation indication information, determining the resource occupation of the PUSCH for transmitting the first priority data, and determining whether the resource of the PUSCH for transmitting the first priority data is an idle resource or a PUSCH resource which has transmitted the second priority data.
In one possible implementation, the resource occupancy indication information may indicate which resources are PUSCH resources on which the second priority data has been transmitted. That is, the UE determines which resources have transmitted the second priority data through the received resource occupation indication information.
In another possible implementation, the resource occupation indication information may indicate which resources are idle resources. That is, the UE may determine which resources do not transmit the second priority data through the received resource occupancy indication information.
Then, in step S303, the UE may determine the power of the PUSCH for transmitting the first priority data according to whether the determined resource of the PUSCH for transmitting the first priority data is an idle resource or a PUSCH resource which has transmitted the second priority data, for example, determine an adopted power control parameter set, and determine the corresponding power according to the determined power control parameter set, so as to perform power control on the PUSCH for transmitting the first priority data according to the determined power.
According to the power control method provided by the embodiment of the application, through the indication of the resource occupation indication information, whether the resource occupation condition of the PUSCH used for transmitting the high-priority data is idle or the low-priority data is transmitted can be determined, and then the power of the PUSCH used for transmitting the high-priority data is determined according to the determined source occupation condition, so that the power control is performed on the PUSCH, the reliability of the high-priority data transmission can be ensured, and the power can not be wasted.
The present inventors further realized that after receiving the resource occupation indication information, the UE still needs to solve the problem of how to determine which time unit the resource occupation indication information indicates, and a feasible solution is provided below.
In the embodiment of the application, through a timing relationship, the UE receiving the resource occupation indication information can know which time unit the resource occupation indication information corresponds to. As an example, the time unit occupied by the transmission of the resource occupation indication information (the time unit may be one slot or one or more OFDM symbols) is n-k, that is, the resource occupation indication information is transmitted in the n-k time unit, the resource occupation indication information describes the resource occupation condition of the PUSCH of the time unit n, and determining the timing relationship is determining the k value (also referred to as a time interval).
Specifically, step S302 may include the steps of:
step Sa: and determining a timing relation between a first time unit and a second time unit, wherein the first time unit is a time unit occupied by transmission resource occupation indication information, and the second time unit is a time unit occupied by PUSCH resources corresponding to the resource occupation condition indicated by the resource occupation indication information.
And Sb: and determining the resource occupation condition of the PUSCH for transmitting the first priority data according to the timing relation and the resource occupation indication information.
Each time unit may be one time slot, or multiple time slots, or one OFDM (Orthogonal Frequency Division Multiplexing) symbol, or multiple OFDM symbols.
In the embodiment of the present application, the resource occupation indication information may be transmitted through DCI, or may be transmitted through one sequence. The following description will take the resource occupation indication information through DCI transmission as an example. In practical applications, one DCI may provide transmission resource occupation indication information for a plurality of UEs, and the resource occupation indication information is transmitted through a UE group-common DCI.
In step Sa, the first time unit is a time unit occupied by transmitting the resource occupation indication information, and may also be considered as a time unit for transmitting DCI of the UE group-common resource occupation indication information;
the second time unit is a time unit occupied by the PUSCH resource corresponding to the resource occupation condition indicated by the resource occupation indication information, that is, the resource occupation indication information needs to indicate whether the resource occupation condition is idle or the PUSCH occupied by which the second priority data has been transmitted.
Wherein the first time unit and the second time unit only represent the distinction of the time units of the two resources and are not to be understood as the definition of the time unit order or value.
According to the determined timing relationship between the first time unit and the second time unit, after receiving the DCI for transmitting the UE group-common resource occupation indication information, the UE can know which time unit is described by the resource occupation indication information for transmitting the PUSCH of the first priority data, so that the resource occupation situation of the PUSCH for transmitting the first priority data can be determined by the resource occupation indication information, so as to subsequently determine and adjust the transmission power of the PUSCH, as shown in fig. 4.
In this case, how the UE obtains the timing relationship between the first time unit and the second time unit is described below.
In an embodiment of the present application, a method for determining a timing relationship between a first time unit and a second time unit includes: directly obtaining a timing relation according to the received signaling; or, a preset timing relationship is directly obtained.
Specifically, in the first method, the UE may obtain the timing relationship according to the received explicit signaling and/or implicit signaling, or obtain the timing relationship preset by the protocol.
The explicit signaling includes, but is not limited to, system information, higher layer signaling, medium access layer signaling, or physical layer signaling.
In an example of the first method, the UE obtains the timing relationship between the first time unit and the second time unit by receiving an explicit signaling (e.g., signaling with slow change such as system information, higher layer signaling, media access layer signaling, etc.) sent by the base station, that is, the UE obtains a value k by receiving the explicit signaling sent by the base station, where k is an integer greater than or equal to 0. When the value k is configured through high-layer signaling, the value k can be configured through common high-layer signaling or through UE-specific high-layer signaling. The k value may be the same for different UEs in a group, which may allow for more convenient transmission in TDD (Time Division Duplexing) situations.
In another example of the first method, the UE determines the k value in a manner preset by a protocol, and the k value is the same for different UEs.
In another example of the first method, the UE obtains the timing relationship between the first time unit and the second time unit by receiving an implicit signaling sent by the base station, that is, the UE obtains a value k by receiving the implicit signaling sent by the base station, where k is an integer greater than or equal to 0. In one possible implementation, assuming that the UE has configured a set of timing relationships k2 between DCI scheduling a PUSCH and the DCI scheduled PUSCH, the value of the timing relationship k between the first time unit and the second time unit is one of the set of timing relationships k2 (e.g., the minimum value or the maximum value, etc.). For example, if the set of timing relationships k2 for a UE is {1,2,3,4}, and the minimum value in the set of timing relationships k2 is 1, the value of the timing relationship k between the first time unit and the second time unit for the UE is 1.
The method is easy to implement and requires relatively low signaling overhead. In consideration of the situation that the PUSCH for transmitting the first priority data includes the PUSCH which cannot determine the resource occupation situation according to the resource occupation indication information in some cases, that is, some uplink time units cannot perform the resource occupation situation indication. For example, in the case of an asymmetric spectrum, when the number of uplink time units and downlink time units is not equal, for example, there are 2 downlink time units and 8 uplink time units in 10 time units, and k is equal to 4, the resource occupation status of some uplink time units cannot be indicated, as shown in fig. 5.
In the embodiment of the present application, the method that can be adopted for this is: and determining the resource occupation condition of the specific PUSCH as the resource occupation condition of the PUSCH which cannot determine the resource occupation condition according to the resource occupation indication information. In short, the resource occupation situation of the PUSCH of the uplink time unit without the resource occupation indication information may be considered to be the same as the resource occupation situation of the PUSCH of the specific uplink time unit. In a feasible implementation manner, the resource occupation situation of the PUSCH of the uplink time unit without the resource occupation indication information may be considered to be the same as the resource occupation situation of the PUSCH of the uplink time unit with the latest previous resource occupation indication. In the above example, in the case of an asymmetric spectrum, when the number of uplink time units is not equal to that of downlink time units, if there are 2 downlink time units, 8 uplink time units, and k is equal to 4 in 10 time units, the resource occupancy indication information of the downlink time unit 0 indicates the resource occupancy of the PUSCH of the uplink time unit 4, and the resource occupancy indication information of the downlink time unit 5 indicates the resource occupancy of the PUSCH of the uplink time unit 9. At this time, the resource occupancy of the PUSCH of the uplink time unit 1,2,3 may be determined to be the same as the resource occupancy of the PUSCH of the indicated uplink time unit that is the latest before the uplink time unit 1, and the resource occupancy of the PUSCH of the uplink time unit 6,7,8 may be determined to be the same as the resource occupancy of the PUSCH of the indicated uplink time unit 4 that is the latest before the uplink time unit 6, as shown in fig. 6.
In the embodiment of the present application, in order to determine the timing relationship more flexibly, the timing relationship is obtained in a dynamic manner by the second method.
Specifically, in the second method, the UE obtains a timing relationship set and timing relationship indication information according to the received signaling; and obtaining the timing relationship according to the timing relationship set and the timing relationship indication information.
Wherein the received signaling is explicit signaling and/or implicit signaling. Explicit signaling includes, but is not limited to, system information, higher layer signaling, medium access layer signaling, or physical layer signaling, etc.
In this embodiment of the present application, the received signaling includes a first sub signaling and a second sub signaling, for example, the first sub signaling is explicit signaling (for example, system information or higher layer signaling), the second sub signaling is another explicit signaling (for example, physical layer signaling), or the first sub signaling is implicit signaling, and the second sub signaling is explicit signaling. Those skilled in the art can appropriately expand the scope of the present application based on these examples.
Specifically, a timing relationship set is obtained according to a received first sub-signaling; and obtaining a timing relation according to the received second sub-instruction corresponding to the resource occupation indication information.
By way of example, through explicit signaling (or implicit signaling) and physical layerThe value of k is obtained by means of signaling combination, and k is an integer greater than or equal to 0. Taking the explicit signaling as an example, the UE obtains a timing relationship set (which may also be referred to as a resource occupation indication information timing relationship set, and the same parts are not described in detail below) through the explicit signaling (e.g., system information, higher layer signaling). For example, the set of timing relationships is k0,k1,k2,k3}. A specific time interval value (i.e., k value) in the set is then indicated by physical layer signaling. Illustratively, the timing relation indication information is a timing relation indication value which is related to the timing relation kiThe correspondence of (a) is shown in table 1.
Timing relationship indicator value Timing relationship ki
00 k0
01 k1
10 k2
11 k3
TABLE 1
The following describes the manner of determining the timing relationship set and indicating a specific time interval value (timing relationship) in the set through physical layer signaling in several second methods.
In a feasible implementation, the UE passes through the displayThe timing relationship set is obtained by formula signaling (e.g., system information, higher layer signaling configuration, where the higher layer signaling configuration may be UE-specific higher layer signaling configuration or UE common higher layer signaling configuration), where the timing relationship sets corresponding to the resource occupation indication information transmitted in the DCI transmitting the same UE group-common resource occupation indication information are the same. For example, the set of timing relationships is k0,k1,k2,k3}. In addition to transmitting the resource occupation indication information in the DCI transmitting the UE group-common resource occupation indication information, one timing relationship indication information (e.g., a timing relationship indication value) may be transmitted to indicate one value in a timing relationship set as a timing relationship k between a first time unit and a second time uniti. For example, the information in the DCI transmitting the UE group-common resource occupancy indication information is { resource occupancy indication information, timing relationship indication value }, where an information field of the timing relationship indication value includes L bits (e.g., L is 2), and a timing relationship k between the first time unit and the second time unitiThe correspondence of (a) is shown in table 1.
In another possible implementation manner, the UE obtains the timing relationship set through implicit signaling (for example, the timing relationship set may be a timing relationship set k2 between DCI for scheduling a PUSCH configured by UE common higher layer signaling and a PUSCH scheduled by the DCI), where the timing relationship sets corresponding to resource occupancy indication information transmitted in the DCI for transmitting the same UE group-common resource occupancy indication information are the same. For example, k2 has a set of timing relationships { k2 }0,k21,k22,k23}. In addition to transmitting the ue group-common resource occupancy indication information, a specific timing relationship indication information (e.g., timing relationship indication value) is transmitted to indicate one of the sets of timing relationships k2 as the timing relationship k between the first time unit and the second time uniti. For example, the information in the DCI transmitting the UE group-common resource occupancy indication information is { resource occupancy indication information, timing relationship indication value }, where an information field of the timing relationship indication value includes L bits (e.g., L is 2), and the first information field includes L bitsTiming relationship k between a time unit and a second time unitiThe correspondence of (2) is shown in Table 2.
Timing relationship indicator value Timing relationship k2i
00 k20
01 k21
10 k2 2
11 k23
TABLE 2
Alternatively, the timing relation set obtained by implicit signaling is a set composed of a part of elements in the timing relation set k2, for example, the timing relation set k2 includes 4 elements, k2 is { k20,k21,k22,k23The set of timing relationships obtained by implicit signaling is a set consisting of the first two elements in the k2 set, and is { k2 }0,k21}。
In the embodiment of the application, the determination mode of the timing relationship can be obtained according to default configuration or received high-level signaling; and determining the timing relation based on the obtained determination mode. The determination mode of the timing relationship comprises the first method and the second method.
That is, the method for determining the timing relationship between the first time unit and the second time unit may be configured by a higher layer signaling according to the first method or the second method. If the UE does not receive the configuration of the higher layer signaling by using the first method or the second method, the UE may determine the timing relationship between the first time unit and the second time unit by using a default method of the first method and the second method, for example, the first method is a default method.
In this embodiment of the present application, step S303 may specifically include the following implementation manners:
if all resources of the PUSCH used for transmitting the first priority data are idle resources, determining the first power as the power of the PUSCH used for transmitting the first priority data;
if all resources of the PUSCH used for transmitting the first priority data are occupied resources of the PUSCH used for transmitting the second priority data, determining the second power as the power of the PUSCH used for transmitting the first priority data;
and if a part of the resources of the PUSCH used for transmitting the first priority data are occupied resources of the PUSCH used for transmitting the second priority data, and the other part of the resources are idle resources, determining the power of the PUSCH used for transmitting the first priority data according to a preset mode.
Wherein the first power is less than the second power.
As an example, the first power is a transmission power of PUSCH calculated with the power control parameter set P-set1, and the second power is a transmission power of PUSCH calculated with the power control parameter set P-set 2.
For the case that a part of the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data, and another part of the resources are idle resources, as shown in fig. 7, the embodiments of the present application provide the following power control methods.
The method comprises the following steps: the second power is determined as a power of all resources of the PUSCH for transmitting the first priority data.
If the resource of the PUSCH for transmitting the first priority data is an idle resource, the power of the PUSCH should be relatively small, denoted as P1, and if the resource of the PUSCH for transmitting the first priority data is an occupied resource of the PUSCH for transmitting the second priority data, the power of the PUSCH should be relatively large, denoted as P2.
If a part of the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data, and another part of the resources are idle resources, at this time, the resources of the PUSCH for transmitting the first priority data may all use the relatively large power P2, that is, it is assumed that all the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data when determining the power, so that the resource powers of the PUSCHs are equal, and the reliability of the transmission of the first priority data can be ensured.
And determining the third power as the power of all resources of the PUSCH for transmitting the first priority data, wherein the third power is determined according to at least one of the first power, the second power, the PUSCH resource corresponding to the first power and the PUSCH resource corresponding to the second power.
If the resource of the PUSCH for transmitting the first priority data is an idle resource, the power of the PUSCH should be relatively small, denoted as P1, and if the resource of the PUSCH for transmitting the first priority data is an occupied resource of the PUSCH for transmitting the second priority data, the power of the PUSCH should be relatively large, denoted as P2.
If a part of the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data, and the other part of the resources are idle resources, at this time, the power of the PUSCH is calculated according to whether the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data or the idle resources, respectively. That is, when the resource of the PUSCH for transmitting the first priority data is the occupied resource of the PUSCH for transmitting the second priority data, the power of the partial resource is P2, and when the resource of the PUSCH for transmitting the first priority data is the idle resource, the power of the partial resource is P1, and then the occupied resource part, that is, the idle resource part, of the PUSCH for corresponding to P1 and P2 to the second priority data is averaged to obtain the power of the entire resource of the PUSCH for transmitting the first priority data. For example, the PUSCH for transmitting the first priority data includes 20 Physical Resource Blocks (PRBs), where resources of 10 PRBs are occupied resources of the PUSCH for the second priority data, the calculated power of each PRB is P2, the resources of 10 PRBs are idle resources, the calculated power of each PRB is P1, and the average method is: (10 × P1+10 × P2)/20 ═ P1+ P2)/2, and all PRBs use power, (P1+ P2)/2.
And thirdly, determining the power of all resources of the PUSCH for transmitting the first priority data according to the proportion of occupied resources and idle resources of the second priority PUSCH transmission in the resources of the PUSCH for transmitting the first priority data.
If the resource of the PUSCH for transmitting the first priority data is an idle resource, the power of the PUSCH should be relatively small, denoted as P1, and if the resource of the PUSCH for transmitting the first priority data is an occupied resource of the PUSCH for transmitting the second priority data, the power of the PUSCH should be relatively large, denoted as P2.
If a part of the resources of the PUSCH for transmitting the first priority data are occupied resources for transmitting the PUSCH of the second priority data, and another part of the resources are idle resources, at this time, the power of all the resources of the PUSCH for transmitting the first priority data may be determined according to the ratio of occupied resources to idle resources for transmitting the PUSCH of the second priority in the resources of the PUSCH for transmitting the first priority data, for example, if the ratio of occupied resources to idle resources for transmitting the PUSCH of the second priority in the resources of the PUSCH for transmitting the first priority data is greater than a threshold (denoted as th1), the second power is determined as the power of all the resources of the PUSCH for transmitting the first priority data, that is, all the resources of the PUSCH for transmitting the first priority data adopt a relatively large power P2. Otherwise, the first power is determined as the power of all resources of the PUSCH for transmitting the first priority data, that is, if the ratio of occupied resources of the PUSCH for second priority transmission to idle resources in the resources of the PUSCH for transmitting the first priority data is less than or equal to the threshold (denoted as th1), all resources of the PUSCH for transmitting the first priority data use a relatively small power P1.
The inventors of the present application found that, in order to satisfy the low latency characteristic of transmission of first priority data, when there is an overlap between the PUSCH for transmitting first priority data and the PUSCH for transmitting second priority data, the PUSCH for transmitting first priority data may replace the PUSCH for transmitting second priority data, as shown in fig. 8, the DCI for slot n-4 schedules PUSCH-1 for transmission in slot n, the DCI for slot n-2 schedules PUSCH-2 for transmission in slot n, PUSCH-2 and PUSCH-1 have an overlap, and PUSCH-2 has a higher priority than PUSCH-1, and thus PUSCH-2 is transmitted in slot n and PUSCH-1 is not transmitted in slot n, and then, in this case, that is, when there is an overlap between the PUSCH for transmitting first priority data and the PUSCH for transmitting second priority data, and the PUSCH for transmitting first priority data replaces the PUSCH for transmitting second priority data, a Power Headroom Report (PHR) may be determined according to a first Power control parameter of a PUSCH for transmitting first priority data that satisfies a delay requirement, and the determined PHR may be transmitted.
In general, the PHR may be determined according to one of a first power control parameter of a PUSCH for transmitting first priority data, a second power control parameter of a PUSCH for transmitting second priority data, and a default power control parameter, and the determined PHR may be transmitted.
Specifically, when the PUSCH for transmitting the first priority data satisfies the delay requirement (in this case, regardless of whether the PUSCH for transmitting the second priority data satisfies the delay requirement), the PHR is determined according to the first power control parameter;
when the PUSCH for transmitting the first priority data does not meet the time delay requirement and the PUSCH for transmitting the second priority data meets the time delay requirement, determining a PHR according to a second power control parameter;
and when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data do not meet the time delay requirement, determining the PHR according to the default power control parameter.
It should be noted that, meeting the latency requirement means that a certain time is required before transmitting the PHR in the PUSCH to calculate the PHR according to the PUSCH power control parameter, that is, a preparation time is required, for example, when the PUSCH for transmitting the PHR starts at the mth OFDM symbol of the slot n and the processing latency is L OFDM symbols, the UE needs to know the PUSCH power control parameter for calculating the PHR before L OFDM symbols before the mth OFDM symbol of the slot n of the PUSCH for transmitting the PHR, so that the PHR can be calculated. If the UE knows the PUSCH power control parameter for calculating the PHR before L OFDM symbols before the mth OFDM symbol of the slot n of the PUSCH for transmitting the PHR, it is able to calculate the PHR according to the PUSCH power control parameter, which means that the PUSCH corresponding to the PUSCH power control parameter for calculating the PHR satisfies the latency requirement, and if the UE cannot know the PUSCH power control parameter for calculating the PHR before L OFDM symbols before the mth OFDM symbol of the slot n of the PUSCH for transmitting the PHR, it is unable to calculate the PHR according to the PUSCH power control parameter, which means that the PUSCH corresponding to the PUSCH power control parameter for calculating the PHR does not satisfy the latency requirement, as shown in fig. 9.
In the embodiment of the present application, whether the PUSCH for transmitting data meets the delay requirement includes at least one of the following determination manners:
determining a mode 1, if the PUSCH for transmitting data is configured, the PUSCH for transmitting data meets a delay requirement;
determining a mode 2, when the PUSCH for transmitting the PHR is configured and the PUSCH for transmitting the data is scheduled by the DCI, if the number of OFDM symbols spaced between the last orthogonal frequency division multiplexing OFDM symbol of the PDCCH which schedules the DCI for transmitting the data for the PUSCH and the PUSCH starting OFDM symbol for transmitting the PHR is not less than a predetermined value L, the PUSCH for transmitting the data satisfies a delay requirement, otherwise, the PUSCH for transmitting the data does not satisfy the delay requirement;
wherein the predetermined value L may be equal to Tproc,2, and the value L may be preset by the protocol.
Illustratively, the PUSCH for transmitting data is said to satisfy the latency requirement if the last OFDM symbol of the PDCCH scheduling DCI for PUSCH for transmitting data is 2 OFDM symbols earlier than the PUSCH start OFDM symbol Tproc for transmitting PHR, and the PUSCH for calculating PHR is said to not satisfy the latency requirement if the number of OFDM symbols of the PDCCH scheduling DCI for PUSCH for transmitting data is less than Tproc 2 OFDM symbols earlier than the PUSCH start OFDM symbol for transmitting PHR, as shown in fig. 10.
Determining a mode 3, when both the PUSCH for transmitting the PHR and the PUSCH for transmitting data are scheduled by DCI, if the end position of the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the data of the PUSCH is before the end position of the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the PHR, the PUSCH for transmitting the data satisfies a delay requirement, otherwise, the PUSCH for transmitting the data does not satisfy the delay requirement;
specifically, when both the PUSCH for transmitting the PHR and the PUSCH for transmitting data are scheduled by the DCI, the end position of the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the PUSCH for transmitting data is earlier than the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the PUSCH for PHR, the PUSCH for transmitting data satisfies the latency requirement, and the end position of the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the PUSCH for data is not earlier than the last OFDM symbol of the PDCCH scheduling the DCI for transmitting the PUSCH for PHR, the PUSCH for transmitting data does not satisfy the latency requirement, as shown in fig. 11.
It is to be understood that the above-mentioned PUSCH for transmitting data includes PUSCH for transmitting first priority data and/or PUSCH for transmitting second priority data.
The following describes whether the PUSCH for transmitting data satisfies the requirement of latency requirement in various situations, and a corresponding PHR calculation manner.
Case 1.1: the PUSCH for transmitting the PHR is configured (i.e., configured PUSCH), and the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data are scheduled by DCI.
In this case, it can be determined whether the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement by the determination method 2.
Optionally, it may be determined whether the PUSCH for transmitting the first priority data meets the delay condition first, if the PUSCH for transmitting the first priority data meets the delay requirement, the PHR is determined directly according to the first power control parameter, if the PUSCH for transmitting the first priority data does not meet the delay requirement, it is determined whether the PUSCH for transmitting the second priority data meets the delay condition, if the PUSCH for transmitting the second priority data meets the delay requirement, the PHR is determined according to the second power control parameter, and if the PUSCH for transmitting the second priority data does not meet the delay requirement, the PHR is determined according to the default power control parameter.
Optionally, it may be determined whether the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement at the same time, and then if both the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement, the PHR is determined according to the first power control parameter; if the PUSCH for transmitting the first priority data does not meet the delay requirement and the PUSCH for transmitting the second priority data meets the delay requirement, determining the PHR according to the second power control parameter; if the PUSCH for transmitting the first priority data meets the time delay requirement and the PUSCH for transmitting the second priority data does not meet the time delay requirement, determining a PHR according to the first power control parameter; and if the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data do not meet the time delay requirement, determining the PHR according to the default power control parameter.
Case 1.2: the PUSCH for transmitting PHR is configured, the PUSCH for transmitting first priority data is scheduled by DCI, and the PUSCH for transmitting second priority data is configured.
As can be seen from the determination method 1, since the PUSCH for transmitting the second priority data is configured, it can be considered that the delay requirement is always satisfied. In this case, it may be determined whether the PUSCH for transmitting the first priority data satisfies the delay requirement by the determination method 2.
If the PUSCH for transmitting the first priority data is determined to meet the time delay requirement, determining a PHR according to the first power control parameter; and if the PUSCH for transmitting the first priority data is determined not to meet the delay requirement, determining the PHR according to the second power control parameter.
Case 1.3: the PUSCH for transmitting PHR is configured, the PUSCH for transmitting first priority data is configured, and the PUSCH for transmitting second priority data is scheduled by DCI.
As can be seen from the determination method 1, since the PUSCH for transmitting the first priority data is configured, it can be considered that the delay requirement is always satisfied, and in this case, the PHR may be determined according to the first power control parameter.
Case 1.4: the PUSCH for transmitting PHR is configured, and the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data are both configured.
Similarly, as can be seen from the determination method 1, since the PUSCH for transmitting the first priority data is configured, it can be considered that the delay requirement is always satisfied, and in this case, the PHR may be determined according to the first power control parameter.
Case 2.1: the PUSCH for transmitting PHR, the PUSCH for transmitting first priority data, and the PUSCH for transmitting second priority data are all scheduled by DCI.
In this case, it can be determined whether the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement by the determination method 3 described above.
Optionally, it may be determined whether the PUSCH for transmitting the first priority data meets the delay condition first, if the PUSCH for transmitting the first priority data meets the delay requirement, the PHR is determined directly according to the first power control parameter, if the PUSCH for transmitting the first priority data does not meet the delay requirement, it is determined whether the PUSCH for transmitting the second priority data meets the delay condition, if the PUSCH for transmitting the second priority data meets the delay requirement, the PHR is determined according to the second power control parameter, and if the PUSCH for transmitting the second priority data does not meet the delay requirement, the PHR is determined according to the default power control parameter.
Optionally, it may be determined whether the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement at the same time, and then if both the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data satisfy the latency requirement, the PHR is determined according to the first power control parameter; if the PUSCH for transmitting the first priority data does not meet the delay requirement and the PUSCH for transmitting the second priority data meets the delay requirement, determining the PHR according to the second power control parameter; if the PUSCH for transmitting the first priority data meets the time delay requirement and the PUSCH for transmitting the second priority data does not meet the time delay requirement, determining a PHR according to the first power control parameter; and if the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data do not meet the time delay requirement, determining the PHR according to the default power control parameter.
Case 2.2: the PUSCH for transmitting PHR is scheduled by DCI, the PUSCH for transmitting first priority data is scheduled by DCI, and the PUSCH for transmitting second priority data is configured.
As can be seen from the determination method 1, since the PUSCH for transmitting the second priority data is configured, it can be considered that the delay requirement is always satisfied. In this case, it may be determined whether the PUSCH for transmitting the first priority data satisfies the delay requirement by the determination method 3 described above.
If the PUSCH for transmitting the first priority data is determined to meet the time delay requirement, determining a PHR according to the first power control parameter; and if the PUSCH for transmitting the first priority data is determined not to meet the delay requirement, determining the PHR according to the second power control parameter.
Case 2.3: the PUSCH for transmitting PHR is scheduled by DCI, the PUSCH for transmitting first priority data is configured, and the PUSCH for transmitting second priority data is scheduled by DCI.
As can be seen from the determination method 1, since the PUSCH for transmitting the first priority data is configured, it can be considered that the delay requirement is always satisfied, and in this case, the PHR may be determined according to the first power control parameter.
Case 2.4: the PUSCH for transmitting PHR is scheduled by DCI, and the PUSCH for transmitting first priority data and the PUSCH for transmitting second priority data are both configured.
Similarly, as can be seen from the determination method 1, since the PUSCH for transmitting the first priority data is configured, it can be considered that the delay requirement is always satisfied, and in this case, the PHR may be determined according to the first power control parameter.
By the PHR reporting mode under each condition, the PHR reporting can more accurately reflect the power use condition of the actual data to be transmitted, and the power can be more fully utilized.
Further, in order to satisfy the low latency characteristic of the transmission of the first priority data, when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data overlap, the PUSCH for transmitting the first priority data may replace the PUSCH for transmitting the second priority data, for example, as shown in fig. 8, the DCI for slot n-4 schedules the PUSCH-1 for transmission in slot n, the DCI for slot n-2 schedules the PUSCH-2 for transmission in slot n, the PUSCH-2 and the PUSCH-1 overlap, and the PUSCH-2 has a higher priority than the PUSCH-1, so that the PUSCH-2 is transmitted in slot n and the PUSCH-1 is not transmitted in slot n, and then in this case, that is, when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data overlap, and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, determining a PUSCH for determining a PHR from among a PUSCH transmitting first priority data and a PUSCH transmitting second priority data; and determining the PHR based on the determined power control parameter of the PUSCH for determining the PHR, and transmitting the determined PHR.
As can be seen from the above description, in determining the PHR using the power control parameter, an important point is to determine whether the power control parameter used in determining the PHR is the PUSCH for transmitting the first priority data or the PUSCH for transmitting the second priority data, and therefore, determining the PUSCH for determining the PHR from among the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data includes any one of the following first, second, third, and fourth modes:
the first method is as follows: and determining the PUSCH for determining the PHR according to the data transmission time of each PUSCH.
That is, as can be seen from the first embodiment, in the first embodiment, the PUSCH for determining the PHR may be determined according to the time when the PUSCH transmission data of the first priority data is transmitted and the time when the PUSCH transmission data of the second priority data is transmitted.
Specifically, for one possible implementation of the first mode: determining the PUSCHs for determining the PHR according to the time for transmitting data of each PUSCH, comprising: determining a PUSCH on which data is transmitted first in time among PUSCHs on which first priority data is transmitted and PUSCHs on which second priority data is transmitted as PUSCHs for determining PHR.
Specifically, the PUSCH for transmitting data first in time is determined as the PUSCH for determining the PHR, and the PHR (Power Headroom Report) is determined according to the Power control parameter of the PUSCH for transmitting data first in time, and the determined PHR is transmitted, for example, as shown in fig. 12, PUSCH-2 is earlier in time than PUSCH-1, so PUSCH-2 may be determined as the PUSCH for determining the PHR, and the PHR is determined according to the Power control parameter of PUSCH-2, and the determined PHR is transmitted.
In the foregoing implementation manner, only the order of the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data in data transmission time needs to be considered to determine the PUSCH for determining the PHR, in the following embodiments, whether the two PUSCHs meet the delay requirement needs to be considered first, and then the PUSCH for determining the PHR is determined, which is specifically shown as follows:
according to another possible implementation manner of the first manner, determining the PUSCH for determining the PHR according to the time for transmitting data of each PUSCH includes: if any PUSCH in the PUSCHs for transmitting the first priority data and the PUSCHs for transmitting the second priority data meets the delay requirement, determining the PUSCHs meeting the delay requirement as the PUSCHs for determining the PHR; or if the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data both meet the delay requirement, determining the PUSCH for transmitting the first transmission data in time from the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data as the PUSCH for determining the PHR.
In the embodiment of the application, whether each PUSCH of a PUSCH for transmitting first priority data and a PUSCH for transmitting second priority data meets a delay requirement or not may be determined first, if both the PUSCH of the first priority data and the PUSCH of the second priority data are met, the PUSCH of the first transmission data in time is determined as the PUSCH for determining the PHR, the PHR is determined according to a power control parameter of the PUSCH of the first transmission data in time, and the determined PHR is sent; if only one of the PUSCHs for transmitting the first priority data and the PUSCHs for transmitting the second priority data meets the delay requirement, determining the PUSCHs meeting the delay requirement as the PUSCHs for determining the PHR, determining the PHR according to the power control parameters of the PUSCHs meeting the delay requirement, and sending the determined PHR; if the time delay requirements are not met, determining the PHR according to the default power control parameters, and sending the determined PHR.
The manner for determining whether each PUSCH in the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data meets the delay requirement is detailed in the above embodiments, and details are not repeated here.
And the second mode is that the PUSCH used for determining the PHR is determined according to the scheduled time of each PUSCH.
In the second mode, according to the scheduled time of each PUSCH in the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data, the PUSCH for determining the PHR is determined, the PHR is determined based on the determined power control parameter of the PUSCH, and the determined PHR is further transmitted.
Specifically, determining the PUSCH for determining the PHR according to the scheduled time of each PUSCH includes: and determining the PUSCH of the first scheduled transmission data in time from the PUSCH transmitting the data of the first priority and the PUSCH transmitting the data of the second priority as the PUSCH for determining the PHR. I.e. the PUSCH of the transmission data scheduled earliest in time is determined as the PUSCH for determining the PHR.
Further, a PHR is determined according to a control parameter of a PUSCH for transmitting data that is scheduled earliest in time, and the determined PHR is transmitted, as shown in fig. 13, if the PUSCH that is scheduled earliest in time is PUSCH-1, the PHR is determined according to the control parameter of PUSCH-1, and the determined PHR is transmitted.
Further, in addition to determining the PUSCH for determining the PHR according to the time at which the PUSCH transmits data and the scheduled time of the PUSCH, the PUSCH for determining the PHR may be determined according to the type of the PUSCH (the type of each of the PUSCH transmitting the first priority data and the PUSCH transmitting the second priority data), the PHR is determined according to the determined power control parameter of the PUSCH, and the determined PHR is further transmitted.
In one possible example, the category of PUSCH includes: DCI for scheduled PUSCH and configured PUSCH, and therefore, in this case, the PUSCH for determining PHR is determined in the third embodiment.
And determining the PUSCH transmitting the first priority data or the PUSCH transmitting the second priority data as the PUSCH for determining the PHR if each PUSCH comprises the DCI scheduled PUSCH and the configured PUSCH.
Specifically, if the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data include the DCI scheduled PUSCH and the configured PUSCH, the DCI scheduled PUSCH may be selected as the PUSCH for determining the PHR, the PHR is determined according to the determined power control parameter of the PUSCH, and the determined PHR is sent; of course, the configured PUSCH may also be selected as the PUSCH for determining the PHR, and the PHR is determined according to the determined power control parameter of the PUSCH, and then the determined PHR is transmitted.
Further, in the third mode, the PUSCH for determining the PHR is determined according to the type of the PUSCH, and another possible implementation may also determine the PUSCH for determining the PHR according to a relationship between the PHR driven by a Timer (Timer) and each PUSCH, which is specifically as follows:
and determining the PUSCHs for determining the PHR according to the relation between the PHR driven by the timer and each PUSCH.
The relationship between the timer-driven PHR and each PSCH may include: the timer-driven PHR is a PHR for a PUSCH transmitting first priority data, and the timer-driven PHR is a PHR for a PUSCH transmitting second priority data. In the embodiment of the present application, the PHR for the PUSCH transmitting the first priority data may be referred to as a first priority PHR, and the PHR for the PUSCH transmitting the second priority data may be referred to as a second priority PHR. That is, the first priority PHR and the second priority PHR are driven by different timers.
Therefore, on the basis of the above embodiments, determining the PUSCH for determining the PHR according to the relationship between the PHR driven by the timer and each PUSCH includes: if the PHR driven by the timer corresponds to the PUSCH for transmitting the first priority data, determining the PUSCH for transmitting the first priority data as the PUSCH for determining the PHR; and if the PHR driven by the timer corresponds to the PUSCH for transmitting the second priority data, determining the PUSCH for transmitting the second priority data as the PUSCH for determining the PHR.
Further, after determining the PUSCH for determining the PHR, determining the PHR according to the determined power control parameter of the PUSCH, and then transmitting the determined PHR.
For a possible example of the fourth mode, as shown in fig. 8, the DCI in the slot n-4 schedules the PUSCH-1 to transmit in the slot n (or in the time unit n), and the DCI in the slot n-2 schedules the PUSCH-2 to transmit in the slot n (or in the time unit n), that is, when the PUSCH for transmitting the first priority data overlaps with the PUSCH for transmitting the second priority data and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, if the PHR timer drives the first priority PHR on the time unit n, the PUSCH for transmitting the first priority data is determined to be the PUSCH for determining the PHR, and the PHR is determined according to the power control parameter of the PUSCH for transmitting the first priority data, and then the determined PHR is transmitted;
for another possible example of the fourth mode, if the PUSCH for transmitting the first priority data overlaps with the PUSCH for transmitting the second priority data in time unit n + k, and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, if the PHR timer drives the second priority PHR in time unit n + k, the PUSCH for transmitting the second priority data is determined to be the PUSCH for determining the PHR, the PHR is determined according to the power control parameter of the PUSCH for transmitting the second priority data, and the determined PHR is further transmitted.
An embodiment of the present application further provides a power control apparatus, as shown in fig. 14, the power control apparatus 120 may include: a receiving module 1201, a first determining module 1202 and a second determining module 1203, wherein
A receiving module, configured to receive resource occupation indication information, where the resource occupation indication information is used to indicate a resource occupation situation of second priority data on a physical uplink shared channel PUSCH used for transmitting first priority data;
a first determining module, configured to determine, according to the resource occupation indication information, a resource occupation situation of a PUSCH for transmitting the first priority data;
a second determining module, configured to determine, according to a resource occupation situation of a PUSCH for transmitting first priority data, power of the PUSCH for transmitting the first priority data;
wherein the priority of the first priority data is higher than the priority of the second priority data.
The first determining module 1202 is configured to determine, according to the resource occupation indication information, a resource occupation situation of a physical uplink shared channel PUSCH for transmitting the first priority data;
the second determining module 1203 is configured to determine power of a PUSCH for transmitting the first priority data according to a resource occupation situation of the PUSCH for transmitting the first priority data.
In an alternative implementation, the first determining module 1202 is specifically configured to:
determining a timing relation between a first time unit and a second time unit, wherein the first time unit is a time unit occupied by transmission resource occupation indication information, and the second time unit is a time unit occupied by PUSCH resources corresponding to the resource occupation condition indicated by the resource occupation indication information;
and determining the resource occupation condition of the PUSCH for transmitting the first priority data according to the timing relation and the resource occupation indication information.
In an alternative implementation, the first determining module 1202 is specifically configured to:
obtaining a timing relation according to the received signaling; alternatively, the first and second electrodes may be,
and acquiring a preset timing relation.
In an alternative implementation, the first determining module 1202 is specifically configured to:
obtaining a timing relation set and timing relation indication information according to the received signaling;
obtaining a timing relation according to the timing relation set and the timing relation indication information;
in an optional implementation manner, the received signaling includes a first sub signaling and a second sub signaling, and the first determining module 1202 is specifically configured to:
obtaining a timing relation set according to the received first sub-signaling;
and obtaining a timing relation according to the received second sub-instruction corresponding to the resource occupation indication information.
In an alternative implementation, the received signaling is explicit signaling and/or implicit signaling.
In an alternative implementation, the first determining module 1202 is specifically configured to:
obtaining a determining mode of a timing relation according to default configuration or received high-level signaling;
and determining the timing relation based on the obtained determination mode.
In an alternative implementation, the first determining module 1202 is further configured to:
and determining the resource occupation condition of the specific PUSCH as the resource occupation condition of the PUSCH which cannot determine the resource occupation condition according to the resource occupation indication information.
In an alternative implementation, the second determining module 1203 is specifically configured to:
if all resources of the PUSCH used for transmitting the first priority data are idle resources, determining the first power as the power of the PUSCH used for transmitting the first priority data;
if all resources of the PUSCH used for transmitting the first priority data are occupied resources of the PUSCH used for transmitting the second priority data, determining the second power as the power of the PUSCH used for transmitting the first priority data;
and if a part of the resources of the PUSCH used for transmitting the first priority data are occupied resources of the PUSCH used for transmitting the second priority data, and the other part of the resources are idle resources, determining the power of the PUSCH used for transmitting the first priority data according to a preset mode.
Wherein the first power is less than the second power.
In an alternative implementation, the second determining module 1203 is specifically configured to:
determining the second power as a power of all resources of a PUSCH for transmitting the first priority data;
determining a third power as the power of all resources of the PUSCH for transmitting the first priority data, wherein the third power is determined according to the first power, the second power and at least one of the PUSCH resources corresponding to the first power and the PUSCH resources corresponding to the second power;
and determining the power of all resources of the PUSCH for transmitting the first priority data according to the ratio of occupied resources of second priority PUSCH transmission to idle resources in the resources of the PUSCH for transmitting the first priority data.
In an alternative implementation, the power control apparatus 120 further includes a first determining and transmitting module, wherein,
the first determining and sending module is configured to determine a PHR according to one of a first power control parameter of a PUSCH for transmitting first priority data, a second power control parameter of a PUSCH for transmitting second priority data, and a default power control parameter when a PUSCH for transmitting first priority data and a PUSCH for transmitting second priority data overlap and the PUSCH for transmitting first priority data replaces a PUSCH for transmitting second priority data, and send the determined PHR.
In an optional implementation manner, the first determining and sending module is specifically configured to:
when the PUSCH for transmitting the first priority data meets the time delay requirement, determining a PHR according to a first power control parameter;
when the PUSCH for transmitting the first priority data does not meet the time delay requirement and the PUSCH for transmitting the second priority data meets the time delay requirement, determining a PHR according to a second power control parameter;
and when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data do not meet the time delay requirement, determining the PHR according to the default power control parameter.
In an optional implementation manner, the PUSCH for transmitting data satisfies the delay requirement, and includes at least one of the following situations:
if the PUSCH for transmitting data is configured, the PUSCH for transmitting data meets the delay requirement;
when the PUSCH for transmitting the PHR is configured and the PUSCH for transmitting the data is scheduled by the DCI, if the number of the OFDM symbols spaced between the last Orthogonal Frequency Division Multiplexing (OFDM) symbol of the Physical Downlink Control Channel (PDCCH) of the DCI for scheduling the PUSCH for transmitting the data and the PUSCH starting OFDM symbol for transmitting the PHR is not less than a preset value, the PUSCH for transmitting the data meets the delay requirement, otherwise, the PUSCH for transmitting the data does not meet the delay requirement;
when both the PUSCH for transmitting the PHR and the PUSCH for transmitting the data are scheduled by the DCI, if the end position of the last OFDM symbol of the PDCCH for scheduling the DCI of the PUSCH for transmitting the data is before the end position of the last OFDM symbol of the PDCCH for scheduling the DCI of the PUSCH for transmitting the PHR, the PUSCH for transmitting the data meets the delay requirement, otherwise, the PUSCH for transmitting the data does not meet the delay requirement;
the PUSCH used for transmitting the data comprises a PUSCH transmitting first priority data and/or a PUSCH transmitting second priority data.
In an optional implementation manner, when there is an overlap between the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data, and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, the power control apparatus 120 may further include: a third determining module and a second determining and transmitting module, wherein,
a third determining module, configured to determine a PUSCH for determining the PHR from a PUSCH for transmitting the first priority data and a PUSCH for transmitting the second priority data;
and the second determining and transmitting module is used for determining the PHR based on the determined power control parameter of the PUSCH for determining the PHR and transmitting the determined PHR.
In an optional implementation manner, the third determining module is specifically configured to any one of:
determining a PUSCH for determining PHR according to the data transmission time of each PUSCH;
determining a PUSCH for determining PHR according to the scheduled time of each PUSCH;
when each PUSCH comprises a DCI scheduled PUSCH and a configured PUSCH, determining the PUSCH for transmitting the first priority data or the PUSCH for transmitting the second priority data as the PUSCH for determining the PHR;
and determining the PUSCH for determining the PHR according to the relation between the PHR driven by the timer and each PUSCH.
In an optional implementation manner, the third determining module determines, at a time when data is transmitted according to each PUSCH, a PUSCH used for determining the PHR, and is specifically used for any one of the following:
determining a PUSCH for transmitting data first in time among a PUSCH for transmitting first priority data and a PUSCH for transmitting second priority data as a PUSCH for determining a PHR;
when any PUSCH in the PUSCHs for transmitting the first priority data and the PUSCHs for transmitting the second priority data meets the delay requirement, determining the PUSCHs meeting the delay requirement as the PUSCHs for determining the PHR;
and when the PUSCH transmitting the first priority data and the PUSCH transmitting the second priority data both meet the delay requirement, determining the PUSCH transmitting the first transmission data in time from the PUSCH transmitting the first priority data and the PUSCH transmitting the second priority data as the PUSCH used for determining the PHR.
In an optional implementation manner, when determining the PUSCH for determining the PHR according to the scheduled time of each PUSCH, the third determining module is specifically configured to: and determining the PUSCH of the first scheduled transmission data in time from the PUSCH transmitting the data of the first priority and the PUSCH transmitting the data of the second priority as the PUSCH for determining the PHR.
In an optional implementation manner, when determining the PUSCH for determining the PHR according to the relationship between the PHR driven by the timer and each PUSCH, the third determining module is specifically configured to: when the PHR driven by the timer corresponds to the PUSCH for transmitting the first priority data, determining the PUSCH for transmitting the first priority data as the PUSCH for determining the PHR; and when the PHR driven by the timer corresponds to the PUSCH for transmitting the second priority data, determining the PUSCH for transmitting the second priority data as the PUSCH for determining the PHR.
Further, the first determining module 1202, the second determining module 1203, and the third determining module in the above embodiments may be the same determining module, or all of them may be different determining modules, or any combination thereof may be the same determining module. The embodiments of the present application are not limited. The first determining and sending module and the second determining and sending module in the foregoing embodiments may be the same module or different modules, and are not limited in this embodiment of the application.
It can be clearly understood by those skilled in the art that the power control apparatus provided in the embodiment of the present application has the same implementation principle and the same technical effect as those of the foregoing method embodiment, and for convenience and brevity of description, corresponding contents in the foregoing method embodiment may be referred to for parts of this embodiment, and are not repeated herein.
An embodiment of the present application further provides an electronic device (for example, a terminal device), including: a processor and a memory, the memory storing at least one instruction, at least one program, set of codes or set of instructions, which is loaded and executed by the processor to implement the respective content of the aforementioned method embodiments.
Optionally, the electronic device may further comprise a transceiver. The processor is coupled to the transceiver, such as via a bus. It should be noted that the transceiver in practical application is not limited to one, and the structure of the electronic device does not constitute a limitation to the embodiments of the present application.
The processor may be a CPU, general purpose processor, DSP, ASIC, FPGA or other programmable logic device, transistor logic device, hardware component, or any combination thereof. Which may implement or perform the various illustrative logical blocks, modules, and circuits described in connection with the disclosure. A processor may also be a combination of computing functions, e.g., comprising one or more microprocessors, a DSP and a microprocessor, or the like.
A bus may include a path that transfers information between the above components. The bus may be a PCI bus or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The memory may be, but is not limited to, a ROM or other type of static storage device that can store static information and instructions, a RAM or other type of dynamic storage device that can store information and instructions, an EEPROM, a CD-ROM or other optical disk storage, optical disk storage (including compact disk, laser disk, optical disk, digital versatile disk, blu-ray disk, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium that can be used to carry or store desired program code in the form of instructions or data structures and that can be accessed by a computer.
The embodiment of the present application also provides a computer-readable storage medium for storing computer instructions, which when run on a computer, enable the computer to execute the corresponding content in the foregoing method embodiments.
It should be understood that, although the steps in the flowcharts of the figures are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps are not performed in the exact order shown and may be performed in other orders unless explicitly stated herein. Moreover, at least a portion of the steps in the flow chart of the figure may include multiple sub-steps or multiple stages, which are not necessarily performed at the same time, but may be performed at different times, which are not necessarily performed in sequence, but may be performed alternately or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
The foregoing is only a partial embodiment of the present application, and it should be noted that, for those skilled in the art, several modifications and decorations can be made without departing from the principle of the present application, and these modifications and decorations should also be regarded as the protection scope of the present application.

Claims (15)

1. A method of power control, comprising:
receiving resource occupation indication information, wherein the resource occupation indication information is used for indicating the resource occupation condition of second priority data on a Physical Uplink Shared Channel (PUSCH) used for transmitting first priority data;
determining the resource occupation condition of the PUSCH for transmitting the first priority data according to the resource occupation indication information;
determining the power of a PUSCH (physical uplink shared channel) for transmitting the first priority data according to the resource occupation condition of the PUSCH for transmitting the first priority data;
wherein the first priority data has a higher priority than the second priority data.
2. The power control method according to claim 1, wherein the determining the resource occupation status of the PUSCH for transmitting the first priority data according to the resource occupation indication information comprises:
determining a timing relationship between a first time unit and a second time unit, wherein the first time unit is a time unit occupied by transmitting the resource occupation indication information, and the second time unit is a time unit occupied by a PUSCH resource corresponding to the resource occupation condition indicated by the resource occupation indication information;
and determining the resource occupation condition of the PUSCH for transmitting the first priority data according to the timing relation and the resource occupation indication information.
3. The power control method of claim 2, wherein determining the timing relationship between the first time unit and the second time unit comprises:
obtaining the timing relation according to the received signaling; alternatively, the first and second electrodes may be,
and acquiring the preset timing relation.
4. The power control method of claim 3, wherein obtaining the timing relationship according to the received signaling comprises:
obtaining a timing relation set and timing relation indication information according to the received signaling;
and obtaining the timing relationship according to the timing relationship set and the timing relationship indication information.
5. The power control method according to claim 4, wherein the received signaling comprises a first sub signaling and a second sub signaling, and the obtaining the timing relationship set and the timing relationship indication information according to the received signaling comprises:
obtaining a timing relation set according to the received first sub-signaling;
and obtaining the timing relation according to the received second sub-instruction corresponding to the resource occupation indication information.
6. The power control method of any of claims 3-5, wherein determining the timing relationship between the first time unit and the second time unit comprises:
obtaining a determining mode of the timing relation according to default configuration or received high-level signaling;
and determining the timing relationship based on the obtained determination mode.
7. The power control method according to claim 3, wherein if the PUSCHs for transmitting the first priority data include PUSCHs for which the resource occupation status cannot be determined according to the resource occupation indication information, the method further comprises:
and determining the resource occupation condition of the specific PUSCH as the resource occupation condition of the PUSCH of which the resource occupation condition can not be determined according to the resource occupation indication information.
8. The power control method according to any one of claims 1-7, wherein determining the power of the PUSCH for transmitting the high priority data according to the resource occupancy of the PUSCH for transmitting the first priority data comprises:
if all resources of the PUSCH used for transmitting the first priority data are idle resources, determining the first power as the power of the PUSCH used for transmitting the first priority data;
if all resources of the PUSCH used for transmitting the first priority data are occupied resources of the PUSCH used for transmitting the second priority data, determining the second power as the power of the PUSCH used for transmitting the second priority data;
if a part of resources in the resources of the PUSCH for transmitting the first priority data are occupied resources of the PUSCH for transmitting the second priority data, and the other part of resources are idle resources, determining the power of the PUSCH for transmitting the first priority data according to a preset mode;
wherein the first power is less than the second power.
9. The power control method according to claim 8, wherein the determining the power of the PUSCH transmitting the first priority data according to a predetermined manner comprises any one of:
determining the second power as a power of all resources of a PUSCH used for transmitting first priority data;
determining a third power as the power of all resources of a PUSCH used for transmitting first priority data, wherein the third power is determined according to at least one of the first power, the second power, a PUSCH resource corresponding to the first power and a PUSCH resource corresponding to the second power;
and determining the power of all resources of the PUSCH for transmitting the first priority data according to the ratio of occupied resources of second priority PUSCH transmission to idle resources in the resources of the PUSCH for transmitting the first priority data.
10. The power control method according to any one of claims 1-9, further comprising:
when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data are overlapped and the PUSCH for transmitting the first priority data replaces the PUSCH for transmitting the second priority data, determining a Power Headroom Report (PHR) according to one of a first power control parameter of the PUSCH for transmitting the first priority data, a second power control parameter of the PUSCH for transmitting the second priority data and a default power control parameter, and transmitting the determined PHR.
11. The power control method of claim 10, wherein determining the PHR according to one of a first power control parameter of the PUSCH for transmitting first priority data, a second power control parameter of the PUSCH for transmitting second priority data, and a default power control parameter comprises:
when the PUSCH for transmitting the first priority data meets the time delay requirement, determining a PHR according to the first power control parameter;
when the PUSCH for transmitting the first priority data does not meet the time delay requirement and the PUSCH for transmitting the second priority data meets the time delay requirement, determining a PHR according to the second power control parameter;
and when the PUSCH for transmitting the first priority data and the PUSCH for transmitting the second priority data do not meet the time delay requirement, determining the PHR according to the default power control parameter.
12. The power control method of claim 11, wherein the PUSCH for transmitting data satisfies latency requirements, including at least one of:
if the PUSCH for transmitting data is configured, the PUSCH for transmitting data meets the delay requirement;
when the PUSCH for transmitting the PHR is configured and the PUSCH for transmitting the data is scheduled by the downlink control information DCI, if the number of the OFDM symbols spaced between the last orthogonal frequency division multiplexing OFDM symbol of the physical downlink control channel PDCCH for scheduling the DCI for transmitting the data and the PUSCH starting OFDM symbol for transmitting the PHR is not less than a preset value, the PUSCH for transmitting the data meets the delay requirement, otherwise, the PUSCH for transmitting the data does not meet the delay requirement;
when both the PUSCH for transmitting the PHR and the PUSCH for transmitting the data are scheduled by the DCI, if the end position of the last OFDM symbol of the PDCCH for scheduling the DCI of the PUSCH for transmitting the data is before the end position of the last OFDM symbol of the PDCCH for scheduling the DCI of the PUSCH for transmitting the PHR, the PUSCH for transmitting the data meets the delay requirement, otherwise, the PUSCH for transmitting the data does not meet the delay requirement;
the PUSCH used for transmitting the data comprises a PUSCH transmitting first priority data and/or a PUSCH transmitting second priority data.
13. A power control apparatus, comprising:
a receiving module, configured to receive resource occupation indication information, where the resource occupation indication information is used to indicate a resource occupation situation of second priority data on a physical uplink shared channel PUSCH used for transmitting first priority data;
a first determining module, configured to determine, according to the resource occupation indication information, a resource occupation situation of a PUSCH for transmitting first priority data;
a second determining module, configured to determine, according to a resource occupation situation of a PUSCH for transmitting first priority data, power of the PUSCH for transmitting the first priority data;
wherein the first priority data has a higher priority than the second priority data.
14. An electronic device, comprising: a processor and a memory, wherein the processor is capable of processing a plurality of data,
the memory stores at least one instruction, at least one program, set of codes, or set of instructions that is loaded and executed by the processor to implement the method of any of claims 1-12.
15. A computer-readable storage medium for storing a computer instruction, a program, a set of codes, or a set of instructions that, when executed on a computer, causes the computer to perform the method of any one of claims 1-12.
CN201911025890.0A 2019-03-28 2019-10-25 Power control method, device, electronic equipment and storage medium Pending CN111756514A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/KR2020/004233 WO2020197331A1 (en) 2019-03-28 2020-03-27 Method and apparatus for power control in v2x communication in wireless communication system
US17/310,811 US11832292B2 (en) 2019-03-28 2020-03-27 Method and apparatus for power control in V2X communication in wireless communication system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2019102452294 2019-03-28
CN201910245229 2019-03-28

Publications (1)

Publication Number Publication Date
CN111756514A true CN111756514A (en) 2020-10-09

Family

ID=72672967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911025890.0A Pending CN111756514A (en) 2019-03-28 2019-10-25 Power control method, device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN111756514A (en)

Similar Documents

Publication Publication Date Title
JP7119100B2 (en) Communication methods and devices
KR102424179B1 (en) Method and apparatus for transmitting different power headroom reports based on different transmission time interval lengths
KR102307935B1 (en) Method and apparatus for transmitting scheduling requests with reduced latency
KR102431721B1 (en) Method and apparatus for uplink power control when uplink transmissions overlap in time for at least one symbol duration
KR102354911B1 (en) Method and apparatus for scheduling uplink transmissions with reduced latency
CN108886798B (en) Method and apparatus for scheduling buffer status reports with reduced delay
KR102354273B1 (en) Method and apparatus for scheduling user equipment uplink transmissions on an unlicensed carrier
US10172156B2 (en) Method and apparatus for scheduling uplink transmissions with reduced latency
KR20170118150A (en) Method and apparatus for scheduling user equipment uplink transmissions on unauthorized carriers
KR20170118820A (en) Method and apparatus for scheduling user equipment uplink transmissions on unauthorized carriers
KR102309328B1 (en) Method and apparatus for scheduling uplink transmissions with reduced latency
CN111756514A (en) Power control method, device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination