CN111749277A CN202010564853.3A CN202010564853A CN111749277A CN 111749277 A CN111749277 A CN 111749277A CN 202010564853 A CN202010564853 A CN 202010564853A CN 111749277 A CN111749277 A CN 111749277A
Authority
CN
China
Prior art keywords
layer
prefabricated
pipe
foundation pit
building wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010564853.3A
Other languages
Chinese (zh)
Inventor
邱太岗
师小娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202010564853.3A priority Critical patent/CN111749277A/en
Publication of CN111749277A publication Critical patent/CN111749277A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/025Manhole shafts or other inspection chambers; Snow-filling openings; accessories provided with a liner
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a pipe-jacking building wall structure and a construction method thereof, wherein the pipe-jacking building wall structure comprises a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer. The pipe-jacking building wall structure is simple in structure, easy to construct, good in construction quality, capable of realizing recycling of prefabricated layer components, saving building materials, good in construction effect, capable of realizing environmental protection, capable of shortening construction period and improving working efficiency.

Description

Pipe-jacking building wall structure and construction method thereof
Technical Field
The invention belongs to the technical field of municipal pipeline engineering construction, and particularly relates to a pipe-jacking building wall structure and a construction method thereof.
Background
Along with municipal infrastructure promotes transformation development increase, municipal pipeline push pipe construction technology's application is also more and more extensive. At present, a jack back wall in a top pipe well foundation pit is mostly of a cast-in-place concrete structure, pipe jacking construction can be carried out only after concrete reaches design strength, and the structure is abandoned after the pipe jacking is finished.
Disclosure of Invention
The invention provides a pipe-jacking building wall structure, which solves the technical problems of serious material waste, long construction period and high production cost caused by a cast-in-place concrete structure in the prior art, can realize the recycling of prefabricated layer members, save building materials, have good construction effect, can also realize the environmental protection, can shorten the construction period and improve the working efficiency.
In order to solve the technical problems, the invention adopts the technical scheme that:
a pipe-jacking building wall structure comprises a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer.
Further, the thickness of the filling layer is not less than 50 mm.
Further, keep away from at the prefabricated layer foundation ditch layer one side is equipped with the support body layer, the support body layer includes the steel sheet that a plurality of concatenations set up.
Furthermore, the adjacent steel plates are connected and fixed through bolts.
Furthermore, a plurality of connecting pieces are arranged on the frame body layer, and the connecting pieces sequentially penetrate through the frame body layer and the prefabricated layer.
Furthermore, each connecting piece includes a plurality of bolts, and adjacent bolts are connected through the connector, the bolt evaginate in the frame body layer is kept away from prefabricated layer one side is equipped with rather than the complex nut.
Furthermore, one end of the bolt, which is arranged on the prefabricated layer, is of a bent structure, and the bent structure is of an L shape.
Further, the foundation pit layer is an earthwork structure layer.
Further, the prefabricated layer and the structural layer are both concrete structural layers; the filling layer is a fine aggregate concrete structure layer.
A construction method of a pipe-jacking building wall structure adopts the pipe-jacking building wall structure, and comprises the following steps:
s1: arranging a plurality of the top pipe fender posts at intervals on the same side of the foundation pit layer;
s2: excavating a earthwork pit on the foundation pit layer, wherein the earthwork pit is close to one side of the top pipe fender pile and is arranged along the height direction of the top pipe fender pile from top to bottom to a set depth;
s3: arranging the structural layer at the lower end face of the set depth and vertical to the foundation pit layer;
s4: arranging the prefabricated layer on one side of the foundation pit layer close to the top pipe fender post, wherein the prefabricated layer is perpendicular to the upper end surface of the structural layer;
s5: a frame layer is arranged outside the prefabricated layer, and the frame layer and the prefabricated layer are connected into a whole through the connecting piece;
s6: and pouring fine aggregate concrete between the foundation pit layer and the prefabricated layer to form the filling layer.
Compared with the prior art, the pipe-jacking building wall structure is simple in structure, easy to construct, good in construction quality, capable of realizing recycling of prefabricated layer components, saving building materials, good in construction effect, capable of realizing environmental protection, capable of shortening construction period and improving working efficiency.
Drawings
Fig. 1 is a schematic structural view of a prefabricated assembled background wall according to an embodiment of the present invention;
FIG. 2 is a top view of a prefabricated assembled wall according to one embodiment of the present invention;
fig. 3 is a side view of a prefabricated assembled background wall according to an embodiment of the present invention.
In the figure:
10. foundation pit layer 20, top pipe fender post 30, prefabricated layer
40. Structural layer 50, filling layer 60, and frame layer
70. Bolt 80 and connecting piece
Detailed Description
The invention is described in detail below with reference to the figures and specific embodiments.
The embodiment provides a pipe-jacking building wall structure, as shown in fig. 1-3, which includes a foundation pit layer 10, a prefabricated layer 30 and a structural layer 40, the prefabricated layer 30 and the structural layer 40 are disposed on one side of the foundation pit layer 10, a plurality of pipe-jacking fender posts 20 are disposed at intervals on one side of the foundation pit layer 10, the pipe-jacking fender posts 20 are vertically disposed on the inner side thereof for placing jacking pipes, the pipe-jacking fender posts 20 can be disposed at intervals according to actual conditions, the foundation pit layer 10 is an earthwork structural layer, and earthwork is filled between adjacent pipe-jacking fender posts 20. The prefabricated layer 30 is arranged on one side, close to the top pipe fender post 20, of the foundation pit layer 10 and is arranged at a distance from the foundation pit layer 10, the prefabricated layer 30 and the foundation pit layer 10 are arranged side by side, and the lower end face of the prefabricated layer 30 is connected with the upper end face of the structural layer 40; structural layer 40 is perpendicular to foundation pit layer 10 and is located directly below precast layer 30. A filling layer 50 is further arranged between the foundation pit layer 10 and the prefabricated layer 30, and the thickness of the filling layer 50 is not less than 50 mm.
Further, be equipped with shelf body layer 60 in the one side of prefabricated layer 30 keeping away from foundation ditch layer 10, shelf body layer 60 includes the steel sheet that a plurality of concatenations set up, connects fixedly by bolt 70 between the adjacent steel sheet. The steel plate structures can be the same or different, the bolts 70 are mainly arranged at the splicing seams between the adjacent steel plates, the number of the bolts 70 can be determined according to the actual situation, and the number is not particularly limited.
Further, a plurality of connecting members 80 are disposed on the shelf body layer 60, and the connecting members 80 sequentially penetrate through the shelf body layer 60 and the prefabricated layer 30. Connecting piece 80's setting is mainly set up in the outward flange department and the junction on support body layer 60, and every connecting piece 80 includes a plurality of bolts, connects through the connector between the adjacent bolt, and the bolt majority is pre-buried in prefabricated layer 30, is equipped with the bolt of part evagination in one side of prefabricated layer 30 of support body layer 60 principle, and the bolt is kept away from one side and the nut cooperation on prefabricated layer 30 at support body layer 60. Further, the one end that the bolt is pre-buried at prefabricated layer 30 is the bending structure, and preferably, the bending structure of bolt at prefabricated layer 30 one end is the L type, increases the intensity that prefabricated layer 30 and support body layer 60 are connected, improves the holistic steadiness of push pipe building wall structure.
In this embodiment, the foundation pit layer 10 is an earth structure layer; both the prefabricated layer 30 and the structural layer 40 are concrete structural layers; the filling layer 40 is a fine-grained concrete structure layer.
A construction method of a pipe-jacking building wall structure adopts the pipe-jacking building wall structure, and comprises the following steps:
s1: and arranging a plurality of jacking pipe fender piles 20 arranged at intervals on the same side of the foundation pit layer 10, namely constructing the foundation pit layer 10 in a working well around the jacking pipe fender piles 20.
S2: and excavating square pits layer by layer from top to bottom to a set depth on one side of the foundation pit layer 10 close to the top pipe fender pile 20 along the height direction of the top pipe fender pile 20.
S3: after the excavation is carried out to the set depth, a concrete structure is poured on the lower end face of the earthwork pit perpendicular to one side of the foundation pit layer 10 as soon as possible to form a structural layer 60.
S4: and then, cleaning soil on the surface of one side of the foundation pit layer 10 close to the top pipe fender post 20, arranging a prefabricated layer 30 on one side of the cleaned foundation pit layer 10, and arranging the prefabricated layer 30 to be vertical to the upper end surface of the structural layer 60. Checking the control line during installation; the prefabricated layer 30 is hoisted and installed in a blocking mode, the prefabricated layer 30 and the foundation pit layer 10 are arranged side by side, and the gap between the prefabricated layer 30 and the foundation pit layer 10 is not smaller than 50 mm; the position, perpendicularity and splice gap of the precast layer 30 are checked during installation.
S5: a shelf layer 60 is disposed outside the precast layer 30, and the shelf layer 60 and the precast layer 30 are connected to each other by a connection member 80.
S6: and pouring fine aggregate concrete between the foundation pit layer 10 and the prefabricated layer 30 to form a filling layer 50, wherein the fine aggregate concrete of the filling layer 50 reaches the preset strength and then can be jacked into the pipeline.
Compared with the prior art, the pipe-jacking building wall structure is simple in structure, easy to construct, good in construction quality, capable of realizing recycling of prefabricated layer components, saving building materials, good in construction effect, capable of realizing environmental protection, capable of shortening construction period and improving working efficiency.
The embodiments of the present invention have been described in detail, and the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All equivalent changes and modifications made within the scope of the present invention shall fall within the scope of the present invention.

Claims (10)

1. A pipe-jacking building wall structure is characterized by comprising a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer.
2. A push bench building wall structure as claimed in claim 1, wherein the filler layer is no less than 50mm thick.
3. A pipe-jacking building wall structure as claimed in claim 1 or 2, wherein a frame body layer is provided on the side of the prefabricated layer away from the foundation pit layer, the frame body layer comprising a plurality of spliced steel plates.
4. The pipe-jacking building wall structure according to claim 3, wherein adjacent steel plates are fixed by bolt connection.
5. A push pipe building wall structure as claimed in claim 4, wherein said frame layer is provided with a plurality of connectors, said connectors being sequentially disposed through said frame layer and said prefabricated layer.
6. A push pipe building wall structure as claimed in claim 5, wherein each of said connectors includes a plurality of bolts, adjacent bolts are connected by connectors, and said bolts are provided with nuts engaging with said bolts protruding from said frame layer on a side thereof remote from said prefabricated layer.
7. The pipe-jacking building wall structure according to claim 6, wherein the bolt is arranged at one end of the prefabricated layer and is of a bent structure, and the bent structure is L-shaped.
8. The pipe-jacking building wall structure according to any one of claims 1-2 and 4-7, wherein the foundation pit layer is an earth structure layer.
9. A push pipe building wall structure as claimed in claim 8, wherein said prefabricated layer and said structural layer are both concrete structural layers; the filling layer is a fine aggregate concrete structure layer.
10. A construction method of a pipe-jacking building wall structure is characterized in that the pipe-jacking building wall structure according to any one of 1-9 is adopted, and the steps are as follows:
s1: arranging a plurality of the top pipe fender posts at intervals on the same side of the foundation pit layer;
s2: excavating a earthwork pit on the foundation pit layer, wherein the earthwork pit is close to one side of the top pipe fender pile and is arranged along the height direction of the top pipe fender pile from top to bottom to a set depth;
s3: arranging the structural layer at the lower end face of the set depth and vertical to the foundation pit layer;
s4: arranging the prefabricated layer on one side of the foundation pit layer close to the top pipe fender post, wherein the prefabricated layer is perpendicular to the upper end surface of the structural layer;
s5: arranging the frame layer outside the prefabricated layer, and connecting the frame layer and the prefabricated layer into a whole through the connecting piece;
s6: and pouring fine aggregate concrete between the foundation pit layer and the prefabricated layer to form the filling layer.
CN202010564853.3A 2020-06-19 2020-06-19 Pipe-jacking building wall structure and construction method thereof Pending CN111749277A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010564853.3A CN111749277A (en) 2020-06-19 2020-06-19 Pipe-jacking building wall structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010564853.3A CN111749277A (en) 2020-06-19 2020-06-19 Pipe-jacking building wall structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN111749277A true CN111749277A (en) 2020-10-09

Family

ID=72674776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010564853.3A Pending CN111749277A (en) 2020-06-19 2020-06-19 Pipe-jacking building wall structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN111749277A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323809A (en) * 2020-10-13 2021-02-05 中铁第四勘察设计院集团有限公司 Rear precast pile-wall superposed structure and construction method thereof
CN114857356A (en) * 2022-05-28 2022-08-05 广州工程总承包集团有限公司 Pipe jacking back structure and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323809A (en) * 2020-10-13 2021-02-05 中铁第四勘察设计院集团有限公司 Rear precast pile-wall superposed structure and construction method thereof
CN114857356A (en) * 2022-05-28 2022-08-05 广州工程总承包集团有限公司 Pipe jacking back structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN104652443A (en) Construction method for temporary horizontal supports serving as permanent structural beams simultaneously of deep foundation pit
CN111749277A (en) Pipe-jacking building wall structure and construction method thereof
CN104878776A (en) Full-automatic parking garage body structure at shallow underground layer
CN111779025A (en) In-situ protection structure crossing foundation pit municipal pipe network box culvert and construction method
CN112177012A (en) Precast concrete non-primary support system with lattice columns for foundation pit engineering and construction method
CN112779914A (en) Inclined strut structure and construction method for combined support in foundation pit
CN111188355B (en) Super-gravity type anchorage shallow-buried foundation and construction method
CN111236952A (en) Full-recovery assembly type rectangular pipe-jacking working well steel structure supporting device and construction method of working well
CN110158602B (en) Soft soil geological deep foundation pit supporting excavation construction structure and construction method
CN105064711A (en) Method for constructing underground garage between residential buildings
CN108978680B (en) Mucky soil elevator foundation pit supporting construction device and method
CN212801564U (en) Foundation ditch steel sheet pile supporting construction
CN116856932B (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN212428824U (en) Steel structure supporting device of full-recovery assembly type rectangular pipe-jacking working well
CN212477825U (en) Pipe jacking building wall structure
CN213572357U (en) Basement board reinforcing structure under one-column one-pile working condition of top-down construction method
CN212452765U (en) Two-in-one underground pipe gallery structure
CN114319410A (en) Wind power generation grid-connected power equipment assembly type foundation structure and installation construction process
CN111206592B (en) Construction method of prefabricated steel-concrete combined support foundation pit supporting structure
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
CN113006085A (en) Supporting-first-excavating foundation pit supporting system for inclined prefabricated steel piles and construction method of supporting-second-excavating foundation pit supporting system
CN111962522A (en) Combined supporting structure of inclined wedge-shaped pile and vertical pipe pile and construction method thereof
CN218521839U (en) Assembled floor column retaining wall
CN111005405A (en) Component for preventing uneven settlement of comprehensive pipe gallery and manufacturing method thereof
CN210263110U (en) Prefabricated template device of basement cushion cap and grade beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination