Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010556750.2A
Other languages
Chinese (zh)
Inventor
李积贤
张九海
杜领会
李小平
宿康宁
谢新普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Orient Tantalum Industry Co Ltd
Original Assignee
Ningxia Orient Tantalum Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Orient Tantalum Industry Co Ltd filed Critical Ningxia Orient Tantalum Industry Co Ltd
Priority to CN202010556750.2A priority Critical patent/CN111744984A/en
Publication of CN111744984A publication Critical patent/CN111744984A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C27/00Alloys based on rhenium or a refractory metal not mentioned in groups C22C14/00 or C22C16/00
    • C22C27/02Alloys based on vanadium, niobium, or tantalum

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Forging (AREA)

Abstract

The application provides a preparation method of a tantalum alloy and niobium alloy tube blank, which comprises the following steps: processing a through hole with the diameter of phi 40-phi 120mm in the center of a tantalum alloy or niobium alloy ingot to obtain a hollow round ingot; carrying out room-temperature forging or heating forging on the hollow round ingot to obtain a thick tube blank with the diameter phi of 90-phi 150 mm; and (3) carrying out surface acid washing, heat treatment, machining and material repairing on the rough pipe blank to obtain a finished product of the tantalum alloy or niobium alloy pipe blank. In the method, the forging process can adopt a room temperature or heating forging mode, so that the surface quality of the forged pipe blank is good, the post-treatment is simple, and the yield is high; meanwhile, forging can realize the preparation of a material pipe blank with high strength and poor plasticity in part. The preparation method of the tantalum alloy tube blank and the niobium alloy tube blank can obtain the tube blank surface with few surface defects and tail shrinkage defects, can effectively control the generation of the defects, and improves the material utilization rate.

Description

Preparation method of tantalum alloy and niobium alloy tube blank
Technical Field
The application relates to the technical field of alloy pipe blank processing, in particular to a preparation method of a tantalum alloy and niobium alloy pipe blank.
Background
The tantalum, niobium and alloys thereof have good high-temperature corrosion resistance and good thermal expansion coefficient. Tantalum, niobium and their alloy pipes are used as main materials for chemical corrosion prevention, aerospace, semiconductors, electric light sources and the like, and have been widely applied to the manufacture of acid guns, acid liquor conveying equipment, high-pressure sodium lamps and missiles.
At present, the production process of tube blanks for tantalum-niobium and tantalum-niobium alloy tubes is mainly an extrusion method, namely a mode of pushing an ingot into a mold with a hole through extrusion equipment and performing plastic deformation to obtain a blank with a smaller size. However, the extrusion method needs heating, so that the energy consumption is high, the material is greatly deformed due to insufficient lubrication, the produced tube blank has the defects of wrinkles and peeling on the surface, the material consumption in post-treatment is high, and the yield is low; and the extrusion method is difficult to realize the preparation of the tube blank for materials with high part strength and poor plasticity.
Disclosure of Invention
The application provides a preparation method of a tantalum alloy and niobium alloy tube blank, which aims to solve the problems of high energy consumption, wrinkle and peeling defects on the surface of the produced tube blank and the like of the traditional extrusion method adopted by the tube blank for the alloy tube.
The technical scheme adopted by the application for solving the technical problems is as follows:
a preparation method of tantalum alloy and niobium alloy tube blanks comprises the following steps:
processing a through hole with the diameter of phi 40-phi 120mm in the center of a tantalum alloy or niobium alloy ingot to obtain a hollow round ingot;
carrying out room-temperature forging or heating forging on the hollow round ingot to obtain a thick tube blank with the diameter phi of 90-phi 150 mm;
and carrying out surface pickling, heat treatment, machining and material repairing on the rough tube blank to obtain a finished product of the tantalum alloy or niobium alloy tube blank.
Optionally, the step of machining a through hole with the diameter phi of 40-120 mm in the center of the tantalum alloy or niobium alloy ingot comprises the step of drilling a hole in the center of the tantalum alloy or niobium alloy ingot in a linear cutting or machining mode.
Optionally, before the hollow round ingot is forged at room temperature or heated to obtain a rough tube blank with the diameter of phi 90-phi 150mm, the method further comprises the step of performing heat treatment on the hollow round ingot, wherein the heat treatment condition is that the temperature is 1450 ℃ at 800-phi for 30-150 min.
Optionally, before performing room-temperature forging or heating forging on the hollow round ingot after heat treatment, the method includes selecting room-temperature forging or heating forging according to the plasticity of the hollow round ingot material, forging pure metal at room temperature, and heating and forging alloy.
Optionally, the heating forging comprises:
and (3) loading the steel bar into the through hole, reserving a gap of not less than 1mm between the steel bar and the through hole, forging at the temperature of 350-1300 ℃ for 10-150min, and taking out the steel bar after forging.
Optionally, the acid solution in the acid washing is an acidic mixed solution with a volume ratio of nitric acid to hydrofluoric acid of 40: 1-3.
Optionally, the tantalum alloy consists of the following components in percentage by mass:
0.001 to 42 percent of niobium, 0.001 to 13.5 percent of tungsten, 0.001 to 1.2 percent of zirconium, 0.001 to 1.1 percent of hafnium, and the balance of tantalum and impurity components.
Optionally, the impurity component includes metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum, and gas elements of carbon, nitrogen, oxygen and hydrogen.
Optionally, the niobium alloy consists of the following components in percentage by mass:
0.001-58% of tantalum, 0.001-5.5% of tungsten, 0.001-1.2% of zirconium, 0.001-2.3% of molybdenum, and the balance of niobium and impurity elements.
Optionally, the impurity elements include metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum, and gas elements of carbon, nitrogen, oxygen and hydrogen.
The technical scheme provided by the application comprises the following beneficial technical effects:
the application provides a preparation method of a tantalum alloy and niobium alloy tube blank, which comprises the following steps: processing a through hole with the diameter of phi 40-phi 120mm in the center of a tantalum alloy or niobium alloy ingot to obtain a hollow round ingot; carrying out room-temperature forging or heating forging on the hollow round ingot to obtain a thick tube blank with the diameter phi of 90-phi 150 mm; and (3) carrying out surface acid washing, heat treatment, machining and material repairing on the rough pipe blank to obtain a finished product of the tantalum alloy or niobium alloy pipe blank. In the method, the forging process can adopt a room temperature or heating forging mode, so that the surface quality of the forged pipe blank is good, the post-treatment is simple, and the yield is high; meanwhile, forging can realize the preparation of a material pipe blank with high strength and poor plasticity in part. The preparation method of the tantalum alloy tube blank and the niobium alloy tube blank can obtain the tube blank surface with few surface defects and tail shrinkage defects, can effectively control the generation of the defects, and improves the material utilization rate.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
Fig. 1 is a flowchart of a method for manufacturing a tantalum alloy tube blank and a niobium alloy tube blank according to an embodiment of the present application.
Detailed Description
In order to make the technical solutions in the present application better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application; it is to be understood that the embodiments described are only a few embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Referring to fig. 1, fig. 1 is a flowchart of a method for manufacturing a tantalum alloy and niobium alloy tube blank according to an embodiment of the present disclosure, and as shown in the drawing, the method for manufacturing a tantalum alloy and niobium alloy tube blank according to the embodiment includes the following steps:
s1: and processing a through hole with the diameter of phi 40-phi 120mm in the center of the tantalum alloy or niobium alloy ingot to obtain a hollow round ingot.
S2: and carrying out room-temperature forging or heating forging on the hollow round ingot to obtain a rough pipe blank with the diameter phi of 90-phi 150 mm.
S3: and carrying out surface pickling, heat treatment, machining and material repairing on the rough tube blank to obtain a finished product of the tantalum alloy or niobium alloy tube blank.
According to the traditional extrusion method for producing the tube blank, a large amount of grooves and peeling defects are generated on the inner surface and the outer surface of the tube blank in the extrusion mode, and tail shrinkage defects are generated and need to be removed later, so that the material utilization rate is reduced. The technical scheme in the application can obtain good surface, and surface defect, tail-shrinking defect are few, can effectively control the production of defect, improve material utilization. In the method, the forging process can adopt a room temperature or heating forging mode, so that the surface quality of the forged pipe blank is good, the post-treatment is simple, and the yield is high; meanwhile, forging can realize the preparation of a material pipe blank with high strength and poor plasticity in part. The preparation method of the tantalum alloy tube blank and the niobium alloy tube blank can obtain the tube blank surface with few surface defects and tail shrinkage defects, can effectively control the generation of the defects, and improves the material utilization rate.
As an embodiment, the step of machining the through hole with the diameter of phi 40-phi 120mm in the center of the tantalum alloy or niobium alloy ingot comprises the step of drilling the center of the tantalum alloy or niobium alloy ingot by adopting a linear cutting or machining mode.
In the embodiment of the application, before the hollow round ingot is forged at room temperature or heated to obtain a thick tube blank with the diameter of phi 90-phi 150mm, the heat treatment is carried out on the hollow round ingot. After the hollow round ingot is subjected to heat treatment, the cast structure can be optimized, the hardness of the material is reduced, the subsequent forging resistance is reduced, and the plasticity of the material is improved. The heat treatment condition is that the temperature is 800-1450 ℃, and the time is 30-150 min.
As an embodiment, before the room-temperature forging or the heating forging is performed on the hollow round ingot after the heat treatment, the room-temperature forging or the heating forging is selected according to the plasticity of the hollow round ingot, the forging is performed under the condition of pure metal room temperature, and the alloy heating forging is performed.
If the steel bar is heated and forged, the operation mode is that a steel bar is arranged in the through hole, a gap with the diameter not less than 1mm is reserved between the steel bar and the through hole, the inner diameter size and the inner surface quality are ensured, the steel bar is forged under the conditions that the temperature is 350-1300 ℃ and the heat preservation time is 10-150min, and the steel bar is taken out after the forging is finished.
And after the forging is finished, carrying out surface acid washing, heat treatment, machining and material repairing on the rough tube blank to obtain a finished product of the tantalum alloy or niobium alloy tube blank. The acid liquid in the acid cleaning adopts an acid mixed liquid with the volume ratio of nitric acid to hydrofluoric acid being 40:1-3, and oil stains and foreign matters on the surface are removed. The acid-washed rough pipe blank is subjected to heat treatment and machining to remove the surface defects of the inner hole and the outer hole, and the acid-washed rough pipe blank is used for producing tantalum-niobium and alloy pipes thereof after partial defects are removed.
As an embodiment, the tantalum alloy comprises the following components in percentage by mass:
0.001-42% of niobium, 0.001-13.5% of tungsten, 0.001-1.2% of zirconium, 0.001-1.1% of hafnium and the balance of tantalum and impurity components, wherein the impurity components comprise metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum and gas elements of carbon, nitrogen, oxygen and hydrogen.
As an embodiment, the niobium alloy comprises the following components in percentage by mass:
0.001-58% of tantalum, 0.001-5.5% of tungsten, 0.001-1.2% of zirconium, 0.001-2.3% of molybdenum, and the balance of niobium and impurity elements, wherein the impurity elements comprise metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum and body elements of carbon, nitrogen, oxygen and hydrogen.
In the embodiment, the production of the tantalum-niobium and alloy pipe blanks thereof is realized by adopting a forging method, and the tantalum-niobium and alloy pipe blanks thereof with the outer circle diameter phi of 90-phi 150mm and the inner hole diameter phi of 40-phi 120mm can be processed on the premise of simple process and no need of manufacturing and heating. The method adopts a forging method to process the outer diameter phi of 90-phi 150mm and the inner hole diameter phi of 40-phi 120mm, and controls the effective deformation of the material in the forging process by controlling the forging reduction and the striking speed, thereby reducing the generation of surface defects; the inner diameter of the tube blank is ensured to keep the required size by lining the steel rod, and the quality of the inner surface can also be ensured.
The ingot for tantalum alloy or niobium alloy raw tube in the present example has a large diameter of 150mm or more, preferably 150mm to 285 mm.
In order to make the technical solution in the present application more clear to those skilled in the art, this embodiment also provides a specific operation mode, whether it is tantalum alloy or niobium alloy, which is implemented by the following steps:
s10: drilling holes on the tantalum-niobium and alloy cast ingots with the aperture of
Figure BDA0002544587340000031
Obtaining the hollow cast ingot.
S11: and (4) carrying out homogenization heat treatment on the hollow ingot obtained in the step S10: carrying out heat treatment on the cast ingot with the prepared holes, wherein the heat treatment temperature is different according to different alloys, the temperature range is 700-; such as: tantalum 2.5 tungsten alloy, the homogenization heat treatment system is as follows: 1250-; the niobium-zirconium alloy comprises the following homogenized heat treatment system: the temperature is kept at 1100-1200 ℃ for 60-150 min.
S12: and (4) preheating the hollow cast ingot obtained in the step (S11), wherein preheating treatment is performed on a part of materials with high strength and poor plasticity, such as tantalum alloy or niobium alloy, before forging, the preheating can be performed by adopting a box-type resistance furnace or a medium-frequency induction furnace, the preheating temperature is 350-800 ℃, the heat preservation time is 10-150min, the tantalum is 10 tungsten, the preheating temperature is 800 ℃, and the heat preservation time is 60-150 min. And (3) carrying out heat preservation on the niobium-zirconium alloy for 60-150min at the preheating temperature of 410 ℃. The material with low strength and good plasticity, such as pure tantalum metal or niobium metal, can be directly forged.
S13: and (5) penetrating the hollow ingot obtained in the step (S12) into a steel bar which is coated with a lubricant in advance, wherein the diameter of the steel bar is smaller than that of the inner hole of the ingot. Repeatedly striking the outer circular die or directly striking the outer surface of the cast ingot, and timely rotating the outer circular die or the cast ingot to ensure that the shape of the forging material is nearly circular or round all the time. Eventually reaching the desired outer diameter dimension. And after the forging is finished, removing the steel bar.
S14: the pipe blank obtained in step S13 is pickled and heat-treated. Removing grease and impurities by acid washing, and eliminating processing stress by heat treatment.
S15: and (4) machining and repairing the tube blank obtained in the step (S14). The defects of the outer surface of the tube blank are removed through a handheld grinder, and the defects of the inner surface of the tube blank are removed through boring and turning.
S16: and (5) transferring the tube blank obtained in the step S15 to tube rolling production.
It is noted that relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that an article or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above description is merely exemplary of the present application and is presented to enable those skilled in the art to understand and practice the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
It will be understood that the present application is not limited to what has been described above and shown in the accompanying drawings, and that various modifications and changes can be made without departing from the scope thereof. The scope of the application is limited only by the appended claims.

Claims (10)

1. A preparation method of a tantalum alloy and niobium alloy tube blank is characterized by comprising the following steps:
processing a through hole with the diameter of phi 40-phi 120mm in the center of a tantalum alloy or niobium alloy ingot to obtain a hollow round ingot;
carrying out room-temperature forging or heating forging on the hollow round ingot to obtain a thick tube blank with the diameter phi of 90-phi 150 mm;
and carrying out surface pickling, heat treatment, machining and material repairing on the rough tube blank to obtain a finished product of the tantalum alloy or niobium alloy tube blank.
2. A method for preparing a tantalum alloy and niobium alloy tube blank according to claim 1, wherein the step of machining a through hole with the diameter phi of 40-120 mm in the center of the tantalum alloy or niobium alloy ingot comprises the step of drilling a hole in the center of the tantalum alloy or niobium alloy ingot by adopting a linear cutting or machining mode.
3. A method for preparing a tantalum alloy tube blank and a niobium alloy tube blank as claimed in claim 1, wherein the method comprises the step of performing heat treatment on the hollow round ingot at 800-.
4. A method for preparing a tantalum alloy and niobium alloy tube blank according to claim 1, wherein before the heat-treated hollow round ingot is subjected to room temperature forging or heating forging, the method comprises the steps of selecting room temperature forging or heating forging according to the plasticity of the hollow round ingot material, forging pure metal at room temperature and heating forging alloy.
5. A method for producing a tantalum alloy and niobium alloy tube blank according to claim 4, wherein said heating forging comprises:
and (3) loading the steel bar into the through hole, reserving a gap of not less than 1mm between the steel bar and the through hole, forging at the temperature of 350-1300 ℃ for 10-150min, and taking out the steel bar after forging.
6. A method for preparing a tantalum alloy and niobium alloy tube blank according to claim 1, wherein the acid solution in the acid pickling is an acidic mixed solution with a volume ratio of nitric acid to hydrofluoric acid of 40: 1-3.
7. A method for preparing a tantalum alloy and niobium alloy tube blank according to claim 1, wherein the tantalum alloy comprises the following components in percentage by mass:
0.001 to 42 percent of niobium, 0.001 to 13.5 percent of tungsten, 0.001 to 1.2 percent of zirconium, 0.001 to 1.1 percent of hafnium, and the balance of tantalum and impurity components.
8. A method for manufacturing a tube blank of tantalum alloy and niobium alloy according to claim 7, wherein the impurity components comprise metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum and gas elements of carbon, nitrogen, oxygen and hydrogen.
9. A method for preparing a tantalum alloy and niobium alloy tube blank according to claim 1, wherein the niobium alloy comprises the following components in percentage by mass:
0.001-58% of tantalum, 0.001-5.5% of tungsten, 0.001-1.2% of zirconium, 0.001-2.3% of molybdenum, and the balance of niobium and impurity elements.
10. A method for manufacturing a tube blank of tantalum alloy and niobium alloy according to claim 9, wherein the impurity elements comprise metal elements of iron, silicon, titanium, molybdenum, nickel and aluminum and gas elements of carbon, nitrogen, oxygen and hydrogen.
CN202010556750.2A 2020-06-18 2020-06-18 Preparation method of tantalum alloy and niobium alloy tube blank Pending CN111744984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010556750.2A CN111744984A (en) 2020-06-18 2020-06-18 Preparation method of tantalum alloy and niobium alloy tube blank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010556750.2A CN111744984A (en) 2020-06-18 2020-06-18 Preparation method of tantalum alloy and niobium alloy tube blank

Publications (1)

Publication Number Publication Date
CN111744984A true CN111744984A (en) 2020-10-09

Family

ID=72676234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010556750.2A Pending CN111744984A (en) 2020-06-18 2020-06-18 Preparation method of tantalum alloy and niobium alloy tube blank

Country Status (1)

Country Link
CN (1) CN111744984A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359257A (en) * 2020-08-18 2021-02-12 长沙南方钽铌有限责任公司 Tantalum alloy, tantalum alloy seamless tube preparation method and tantalum alloy seamless tube

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005052178B4 (en) * 2004-10-25 2008-06-19 V&M Deutschland Gmbh Method for producing a seamless hot-worked steel tube
CN102489951A (en) * 2011-12-03 2012-06-13 西北有色金属研究院 Preparation method of niobium tubular target materials for sputtering
CN103358100A (en) * 2013-07-26 2013-10-23 江南工业集团有限公司 Forging and molding process method for titanium alloy tubular piece
CN103668028A (en) * 2013-12-27 2014-03-26 张斌 Preparation method of titanium and titanium alloy seamless tube blank
CN103849803A (en) * 2014-03-26 2014-06-11 宁夏东方钽业股份有限公司 Tantalum alloy and method for preparing tantalum alloy tube
CN104550312A (en) * 2014-12-10 2015-04-29 宁夏东方钽业股份有限公司 Processing method of large seamless tantalum or tantalum alloy pipe
CN104651787A (en) * 2013-11-21 2015-05-27 安泰科技股份有限公司 Manufacturing method for niobium tube target material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005052178B4 (en) * 2004-10-25 2008-06-19 V&M Deutschland Gmbh Method for producing a seamless hot-worked steel tube
CN102489951A (en) * 2011-12-03 2012-06-13 西北有色金属研究院 Preparation method of niobium tubular target materials for sputtering
CN103358100A (en) * 2013-07-26 2013-10-23 江南工业集团有限公司 Forging and molding process method for titanium alloy tubular piece
CN104651787A (en) * 2013-11-21 2015-05-27 安泰科技股份有限公司 Manufacturing method for niobium tube target material
CN103668028A (en) * 2013-12-27 2014-03-26 张斌 Preparation method of titanium and titanium alloy seamless tube blank
CN103849803A (en) * 2014-03-26 2014-06-11 宁夏东方钽业股份有限公司 Tantalum alloy and method for preparing tantalum alloy tube
CN104550312A (en) * 2014-12-10 2015-04-29 宁夏东方钽业股份有限公司 Processing method of large seamless tantalum or tantalum alloy pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张春基 胡国林: "Nb521铌钨合金组织性能及其应用研究", 《宇航材料工艺》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359257A (en) * 2020-08-18 2021-02-12 长沙南方钽铌有限责任公司 Tantalum alloy, tantalum alloy seamless tube preparation method and tantalum alloy seamless tube

Similar Documents

Publication Publication Date Title
US5141566A (en) Process for manufacturing corrosion-resistant seamless titanium alloy tubes and pipes
CN114749508B (en) Large-caliber austenitic stainless steel seamless pipe and manufacturing method and application thereof
WO2021046928A1 (en) Large pipe-diameter ni-v rotary target material containing trace elements and preparation method therefor
CN111644462A (en) Preparation method of Gr23 titanium alloy wire for powder making
CN110252843A (en) A kind of preparation method of the A100 super-high strength steel silk material for increasing material manufacturing
CN112756909A (en) Preparation method of large-caliber Ti35 titanium alloy pipe
CN111299572B (en) Production method of titanium and titanium alloy seamless tube
CN112718910A (en) Manufacturing method of large-caliber TC4 titanium alloy thick-wall pipe
JPS62149859A (en) Production of beta type titanium alloy wire
CN110976512A (en) Cold rolling method for TC4 titanium alloy wire
CN111744984A (en) Preparation method of tantalum alloy and niobium alloy tube blank
CN111438318B (en) Thin-wall high-strength titanium alloy pipe and preparation method thereof
CN114107834A (en) High-strength iron-nickel-molybdenum alloy wire and low-cost preparation method thereof
CN111687235B (en) Method for improving yield of titanium alloy wire
CN111809080A (en) Preparation method of TC2 alloy thin-wall extruded section
CN114850219B (en) Preparation method of high-precision thin-diameter thin-wall nickel-titanium alloy pipe
CN111014314A (en) Titanium tube production and processing method
CN115890137A (en) High-strength lightweight titanium alloy pipe and processing technology thereof
CN110369546B (en) Method for producing large-diameter titanium alloy hot-rolled seamless pipe
CN112359256A (en) Tantalum alloy, tantalum alloy seamless tube preparation method and tantalum alloy seamless tube
KR20220023763A (en) Manufacturing method of zirconium alloy pipe
CN112719199B (en) Preparation method of large-caliber titanium alloy thick-wall pipe
CN113290178B (en) Cogging forging method for high-Nb-content Ti-Nb alloy ingot
CN114273429B (en) Preparation method of metal pipe difficult to deform
CN113695417B (en) Preparation method of large-caliber high-performance titanium alloy pipe and product thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201009