CN111725814B - 特高压换流站调相机与变电站无功设备的无功置换方法 - Google Patents

特高压换流站调相机与变电站无功设备的无功置换方法 Download PDF

Info

Publication number
CN111725814B
CN111725814B CN202010669831.3A CN202010669831A CN111725814B CN 111725814 B CN111725814 B CN 111725814B CN 202010669831 A CN202010669831 A CN 202010669831A CN 111725814 B CN111725814 B CN 111725814B
Authority
CN
China
Prior art keywords
extra
high voltage
converter station
reactive
voltage converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010669831.3A
Other languages
English (en)
Other versions
CN111725814A (zh
Inventor
宋朋飞
王衡
汤磊
樊国伟
李小江
张锋
张波
亢朋朋
杨桂兴
王鹏
印欣
郭小龙
段青熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
State Grid Xinjiang Electric Power Co Ltd
Beijing King Star Hi Tech System Control Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
State Grid Xinjiang Electric Power Co Ltd
Beijing King Star Hi Tech System Control Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, State Grid Xinjiang Electric Power Co Ltd, Beijing King Star Hi Tech System Control Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN202010669831.3A priority Critical patent/CN111725814B/zh
Publication of CN111725814A publication Critical patent/CN111725814A/zh
Application granted granted Critical
Publication of CN111725814B publication Critical patent/CN111725814B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • H02J3/1821Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators
    • H02J3/1835Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators with stepless control
    • H02J3/1864Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators with stepless control wherein the stepless control of reactive power is obtained by at least one reactive element connected in series with a semiconductor switch
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

本发明涉及一种特高压换流站调相机与变电站无功设备的无功置换方法,属于电网调度技术领域。本发明方法,根据特高压换流站调相机AVC功能投入的电压条件和在特高压换流站调相机所在的高压直流换流站及近区电网建立二级电压控制区域,对该区域实行特高压换流站调相机与其他变电站无功设备协调控制,为特高压换流站调相机预留足够的无功裕度,提高了电网的静态电压稳定裕度,因而提高了电网暂态电压稳定水平。

Description

特高压换流站调相机与变电站无功设备的无功置换方法
技术领域
本发明涉及一种特高压换流站调相机与变电站无功设备的无功置换方法,属于电网调度技术领域。
背景技术
自动电压控制(以下简称AVC,Automatic Voltage Control)***是实现输电网安全(提高电压稳定裕度)、经济(降低网络损耗)、优质(提高电压合格率)运行的重要手段。AVC***架构在电网能量管理***(EMS)之上,能够利用输电网实时运行数据,从输电网全局优化的角度科学决策出最佳的无功电压调整方案,自动下发给电厂、变电站以及下级电网调度机构执行。孙宏斌、张伯明、郭庆来在《基于软分区的全局电压优化控制***设计》(电力***自动化,2003年,第27卷第8期,16-20页)中说明了大电网自动电压控制的体系结构。
AVC***的主站部分是在电力***控制中心基于软件实现的,其对输电网的电压控制策略主要有对电厂各发电机无功控制策略以及对变电站的无功设备控制策略2类。其中对电厂各发电机的无功控制策略,目前采用的主要方式是:调度中心的AVC主站***通过无功优化计算得到电厂各发电机组的无功调节量后,通过数据通信通道向电厂的AVC子站***发送,电厂的AVC子站接收到发电机无功调整量后,根据当前电厂内各台发电机的运行状态,采用步进方式调整发电机发出的无功功率,直到达到AVC主站下发的调整量。对变电站的无功设备控制策略为对无功补偿设备的投切指令,无功设备主要包括电容器和电抗器,当投入电容器或切除电抗器时,母线电压升高;当切除电容器或投入电抗器时,母线电压降低。AVC主站下发投入或切除无功设备的指令,变电站内的自动化监控***根据接收的指令,找到无功设备所连接的断路器并合上或断开断路器,以完成无功设备的投入或切除。
特高压换流站调相机具有良好的次暂态特性,故障发生瞬间可使电势不发生变化,并瞬时发出或吸收无功。将特高压换流站调相机安装在直流受端后,能发出无功,为电网电压提供支撑,特别是多直流馈入电网,能提高同时换相成功率,从而保证电网安全特高压换流站调相机具有良好的次暂态特性,故障发生瞬间可使电势不发生变化,并瞬时发出或吸收无功。将特高压换流站调相机安装在直流受端后,能发出无功,为电网电压提供支撑,特别是多直流馈入电网,能提高同时换相成功率,从而保证电网安全将特高压换流站调相机安装在直流送端后,能吸收无功,对暂态过电压予以限制,特别是新能源外送的直流送端,能对新能源的脱网予以有效抑制,使其输送比例符合要求。特高压换流站调相机具有良好的暂态特性,也就是强励特性,能在较短的时间内发出不少于额定功率两倍的无功。将特高压换流站调相机安装在直流受端后,如果***产生故障使电压明显跌落,则特高压换流站调相机将开始强励,保证***稳定,为直流功率与电压的恢复创造良好条件,起到避免电压崩溃的作用。
随着特高压直流建设的发展,我国已步入区域电网大容量特高压交直流互联新时代,电网“强直弱交”特性突出。华东电网作为世界上直流输电***馈入最多的受端电网,直流***带来的电压稳定等问题十分突出。直流换相失败及恢复过程中,会从***吸收大量无功,若换相失败导致直流闭锁,将对电网稳定产生冲击。通过与其他无功设备对比,新一代特高压换流站调相机可以通过强励提供动态电压支撑,降低直流***发生换相失败的风险,利用特高压换流站调相机次暂态特性抑制电压波动,***电压迅速恢复,通过分析表明,特高压换流站调相机可以提高***的静态电压稳定裕度,提高***暂态电压稳定水平,解决受端电网各种类型的电压稳定问题。稳态运行时,特高压换流站调相机还可以维持电压稳定,作为区域电压调节手段。2015年底,国网公司决定在各区域电网内配置一定数量的特高压换流站调相机。华东电网的特高压换流站调相机配置在8个换流站:金华换流站、奉贤换流站、苏州换流站、政平换流站、淮安换流站、绍兴换流站、泰州换流站、古泉换流站,共计配置18台300Mvar特高压换流站调相机。特高压换流站调相机组采用特高压换流站调相机-变压器单元接线,接入500kV换流站母线,或接入500kV滤波器母线。电网应通过AVC控制保证受端电网保留足够的动态无功储备,动态无功补偿装置如何定位其角色是一个新问题。
发明内容
本发明的目的是提出一种特高压换流站调相机与变电站无功设备的无功置换方法,实行特高压换流站调相机与区域内其它变电站无功设备协调控制,为特高压换流站调相机预留足够的无功裕度,提高电网的静态电压稳定裕度,提高电网暂态电压稳定水平。
本发明提出的1、一种特高压换流站调相机与变电站无功设备的无功置换方法,包括以下步骤:
(1)设定自动电压控制周期为Tc
(2)从电网调度***获取电网网络结构数据,构造一个与特高压换流站500kV母线协调控制的区域电网模型,记为
其中,表示特高压换流站和近区参与协调控制500kV变电站,总计N座,/>表示特高压换流站和近区参与协调控制500kV变电站内参与协调控制的500kV母线,500kV
母线总计有K条;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制***中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度***中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制***中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度***中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQs|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V′m,V′m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V′m进行判断,若满足Vm-min<V′m<Vm-max,则进入步骤(10),若满足V′m≤Vm-min或者V′m≥Vm-max,则进入步骤(9);
(9)从电网自动电压控制***中读取特高压换流站和近区500kV变电站内参与协调控制的500kV母线的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示/>母线的编号,j∈K,csens-j-m表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V′m≤Vm-min则进入步骤(9-1),若V′m≥Vm-max进入步骤(9-2);
(9-1)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站站内的无功资源,计算生成变电站/>协助提升特高压换流站母线m的电压的增无功策略,具体过程如下:
(9-1-1)从电网调度***中读取变电站中主变压器低压侧无功量测Qj和可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j>0,则进入步骤(9-1-2),若Qadd-j≤0,则进入步骤(9-1-3);
(9-1-2)对Qj进行判断,若Qj<0,则切除变电站中的低压侧电抗器,若Qj≥0,则投入变电站/>中的低压侧电容器,返回步骤(3);
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站内的无功资源,计算生成变电站/>协助降低特高压换流站内母线m的电压的减无功策略,包括以下步骤:
(9-2-1)从电网调度***中读取变电站内主变压器低压侧无功量测Qj和可减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j>0,则进入步骤(9-2-2),若Qdec-j≤0,则进入步骤(9-2-3);
(9-2-2)对Qj进行判断,若Qj>0,则切除变电站中的低压则电容器,若Qj≤0则投入变电站/>中的低压侧电抗器,返回步骤(3);
(9-2-3)使j=j+1返回步骤(9-2);
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现特高压换流站调相机与变电站无功设备的无功置换。
本发明提出的特高压换流站调相机与变电站无功设备的无功置换方法,其优点是:
本发明提出的特高压换流站调相机与变电站无功设备无功置换的方法,根据特高压换流站调相机AVC功能投入的电压条件和在特高压换流站调相机所在的高压直流换流站及近区电网建立二级电压控制区域,对该区域实行特高压换流站调相机与其他无功设备协调控制,为特高压换流站调相机预留足够的无功裕度,提高了电网的静态电压稳定裕度,因而提高了电网暂态电压稳定水平。
附图说明
图1是本发明方法的流程框图。
具体实施方式
本发明提出的特高压换流站调相机与变电站无功设备的无功置换方法,其流程框图如图1所示,该方法包括以下步骤:
(1)设定自动电压控制周期为Tc
(2)从电网调度***获取电网网络结构数据,构造一个与特高压换流站500kV母线协调控制的区域电网模型,记为
其中,表示特高压换流站和近区参与协调控制500kV变电站,总计N座,/>表示特高压换流站和近区参与协调控制500kV变电站内参与协调控制的500kV母线,500kV
母线总计有K条;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制***中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度***中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制***中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度***中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQs|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V′m,V′m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V′m进行判断,若满足Vm-min<V′m<Vm-max,则进入步骤(10),若满足V′m≤Vm-min或者V′m≥Vm-max,则进入步骤(9);
(9)上述步骤(8)中计算的结果,需要特高压换流站的近区变电站的低压侧无功设备参与协调,从电网自动电压控制***中读取特高压换流站和近区500kV变电站内参与协调控制的500kV母线/>的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示/>母线的编号,j∈K,csens-j-m表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V′m≤Vm-min则进入步骤(9-1),若V′m≥Vm-max进入步骤(9-2);
(9-1)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站站内的无功资源,计算生成变电站/>协助提升特高压换流站母线m的电压的增无功策略,具体过程如下:
(9-1-1)从电网调度***中读取变电站中主变压器低压侧无功量测Qj和可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j>0,则进入步骤(9-1-2),若Qadd-j≤0,则进入步骤(9-1-3);
(9-1-2)对Qj进行判断,若Qj<0,则切除变电站中的低压侧电抗器,若Qj≥0,则投入变电站/>中的低压侧电容器,返回步骤(3);
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站内的无功资源,计算生成变电站/>协助降低特高压换流站内母线m的电压的减无功策略,包括以下步骤:
(9-2-1)从电网调度***中读取变电站内主变压器低压侧无功量测Qj和可减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j>0,则进入步骤(9-2-2),若Qdec-j≤0,则进入步骤(9-2-3);
(9-2-2)对Qj进行判断,若Qj>0,则切除变电站中的低压则电容器,若Qj≤0则投入变电站/>中的低压侧电抗器,返回步骤(3);
(9-2-3)使j=j+1返回步骤(9-2);
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现特高压换流站调相机与变电站无功设备的无功置换。

Claims (1)

1.一种特高压换流站调相机与变电站无功设备的无功置换方法,其特征在于,该方法包括以下步骤:
(1)设定自动电压控制周期为Tc
(2)从电网调度***获取电网网络结构数据,构造一个与特高压换流站500kV母线协调控制的区域电网模型,记为
其中,表示特高压换流站和近区参与协调控制500kV变电站,总计N座,/>表示特高压换流站和近区参与协调控制500kV变电站内参与协调控制的500kV母线,500kV母线总计有K条;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制***中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度***中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制***中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度***中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQs|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V’m,V’m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V’m进行判断,若满足Vm-min<V’m<Vm-max,则进入步骤(10),若满足V’m≤Vm-min或者V’m≥Vm-max,则进入步骤(9);
(9)从电网自动电压控制***中读取特高压换流站和近区500kV变电站内参与协调控制的500kV母线的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示/>母线的编号,/>表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V’m≤Vm-min则进入步骤(9-1),若V’m≥Vm-max进入步骤(9-2);
(9-1)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站站内的无功资源,计算生成变电站/>协助提升特高压换流站母线m的电压的增无功策略,具体过程如下:
(9-1-1)从电网调度***中读取变电站中主变压器低压侧无功量测Qj和可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j>0,则进入步骤(9-1-2),若Qadd-j≤0,则进入步骤(9-1-3);
(9-1-2)对Qj进行判断,若Qj<0,则切除变电站中的低压侧电抗器,若Qj≥0,则投入变电站/>中的低压侧电容器,返回步骤(3);
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2)选择与编号为j的母线相对应的近区参与协调控制的500kV变电站内的无功资源,计算生成变电站/>协助降低特高压换流站内母线m的电压的减无功策略,包括以下步骤:
(9-2-1)从电网调度***中读取变电站内主变压器低压侧无功量测Qj和可减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j>0,则进入步骤(9-2-2),若Qdec-j≤0,则进入步骤(9-2-3);
(9-2-2)对Qj进行判断,若Qj>0,则切除变电站中的低压则电容器,若Qj≤0则投入变电站/>中的低压侧电抗器,返回步骤(3);
(9-2-3)使j=j+1返回步骤(9-2);
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现特高压换流站调相机与变电站无功设备的无功置换。
CN202010669831.3A 2020-07-13 2020-07-13 特高压换流站调相机与变电站无功设备的无功置换方法 Active CN111725814B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010669831.3A CN111725814B (zh) 2020-07-13 2020-07-13 特高压换流站调相机与变电站无功设备的无功置换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010669831.3A CN111725814B (zh) 2020-07-13 2020-07-13 特高压换流站调相机与变电站无功设备的无功置换方法

Publications (2)

Publication Number Publication Date
CN111725814A CN111725814A (zh) 2020-09-29
CN111725814B true CN111725814B (zh) 2024-04-09

Family

ID=72573970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010669831.3A Active CN111725814B (zh) 2020-07-13 2020-07-13 特高压换流站调相机与变电站无功设备的无功置换方法

Country Status (1)

Country Link
CN (1) CN111725814B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094591A (zh) * 2021-11-18 2022-02-25 广东电网有限责任公司 一种自动电压控制方法、装置、计算机设备和存储介质

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012155494A1 (zh) * 2011-05-16 2012-11-22 河北省电力研究院 自动电压控制***全网最优控制参数校验方法
CN107834567A (zh) * 2017-11-30 2018-03-23 国家电网公司西北分部 特高压直流换流站与近区发电厂的无功电压协调控制方法
CN109742769A (zh) * 2019-01-24 2019-05-10 国家电网有限公司 一种直流受端区域调相机无功置换方法和***

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9450409B2 (en) * 2013-06-20 2016-09-20 Abb Research Ltd. Converter station power set point analysis system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012155494A1 (zh) * 2011-05-16 2012-11-22 河北省电力研究院 自动电压控制***全网最优控制参数校验方法
CN107834567A (zh) * 2017-11-30 2018-03-23 国家电网公司西北分部 特高压直流换流站与近区发电厂的无功电压协调控制方法
CN109742769A (zh) * 2019-01-24 2019-05-10 国家电网有限公司 一种直流受端区域调相机无功置换方法和***

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
特高压交流电网的无功电压控制;张勇军;李钦豪;刘轩;;电力***自动化;20170310(第05期);全文 *

Also Published As

Publication number Publication date
CN111725814A (zh) 2020-09-29

Similar Documents

Publication Publication Date Title
CN107834567B (zh) 特高压直流换流站与近区发电厂的无功电压协调控制方法
CN102354992B (zh) 风电场无功功率控制方法
CN109378830B (zh) 一种基于远距离输电的同步调相机选址方法
CN104659780A (zh) 适用于消纳大规模分布式电源的能源互联网的实现方法
CN112467753B (zh) 一种无功置换方法及装置
Assis et al. Impact of multi-terminal HVDC grids on enhancing dynamic power transfer capability
CN107404119B (zh) 一种电动汽车负荷转供***的控制方法
CN110994626B (zh) 基于电压趋势预测的500-220kV区域电网自动电压控制方法
CN112491092B (zh) 一种柔性台区的安全调度方法
CN110198030B (zh) 考虑光伏发电功率快速调控的直流紧急协调控制方法
CN105720585A (zh) 风电场集群的无功功率控制方法及***
CN103647304B (zh) 一种有外部支援的电网黑启动子***并列方法
CN111725814B (zh) 特高压换流站调相机与变电站无功设备的无功置换方法
CN110336296B (zh) 一种基于分区无功平衡指标的电网无功设备配置方法
CN108631293B (zh) 一种直流配网用dc/dc变换器运行模式及控制方法
CN110994624B (zh) 避免特高压直流换流站故障引起电压越限的电压控制方法
CN113097995A (zh) 一种考虑多时间尺度的交直流混合配电网优化运行方法
CN106058916B (zh) 一种基于单三相多微网的被动并网转离网切换控制方法
CN109936142B (zh) 输配一体化电网电压自动控制方法和装置
CN114513009B (zh) 一种基于低压配电台区的柔直控制方法、装置及***
Zhang et al. Adaptive Voltage Reference Based Controls of Converter Power Sharing and Pilot Voltage in HVDC System for Large-Scale Offshore Wind
CN111799811B (zh) 电网中特高压换流站调相机与近区电厂的无功置换方法
CN107785921A (zh) 基于柔性直流输电技术的城市电网分区互联运行调度方法
CN110458314B (zh) 一种用于电网日前潮流预报的负荷预测数据分解方法
CN115459293A (zh) 基于统一模型的网省协同控制方法及***

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant