CN111719543A - Welding type steel sheet pile corner water stop construction method - Google Patents
Welding type steel sheet pile corner water stop construction method Download PDFInfo
- Publication number
- CN111719543A CN111719543A CN202010550519.2A CN202010550519A CN111719543A CN 111719543 A CN111719543 A CN 111719543A CN 202010550519 A CN202010550519 A CN 202010550519A CN 111719543 A CN111719543 A CN 111719543A
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- corner
- construction
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/08—Locking forms; Edge joints; Pile crossings; Branch pieces
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Composite Materials (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
A welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps: a. b, connecting two adjacent steel sheet piles with locking notches according to conventional operation on one side of a steel sheet pile corner, c, fixedly welding the linear connecting end part of the prefabricated half steel sheet pile and the linear connecting part of the steel sheet pile on one side to form the steel sheet pile, and connecting the locking notches of the steel sheet piles with the adjacent steel sheet piles according to conventional operation to directly convert the steel sheet piles into horizontal sections for construction. The construction method for the corner water stop of the welded steel sheet pile has the advantages that the device is simple in structure and convenient to manufacture, the condition that the corner of a construction foundation pit cannot be locked to form a right-angle corner is changed, a half steel sheet pile is vertically welded and directly converted into a horizontal section for construction, the construction of a curve section is avoided, the design is reasonable, the operation is easy, and the waterproof effect is good.
Description
Technical Field
The invention relates to a steel sheet pile connection mode, in particular to a welding type steel sheet pile corner water stop construction method.
Background
The steel sheet pile is used as a building enclosure and is used as a soil retaining wall, a water retaining wall and a sand retaining wall during foundation pit excavation, bridge cofferdam construction, large-scale pipeline laying and temporary ditch excavation. The steel sheet pile is high-strength steel with locking mouth, and is engaged with locking mouth to form closed steel sheet pile wall, and can be used for retaining soil and partial water-retaining engineering, and is suitable for preventing seepage in water and under the ground water level. Fig. 1 is a schematic view of a conventional steel sheet pile corner connection structure. Because the lock openings are tightly jointed, the problem that the joint parts are easy to be split when the supporting impervious wall is constructed by other methods is solved, and the large seepage of underground water can be prevented. However, when the steel sheet pile is used for constructing four corner positions of a foundation pit, the locking notch cannot be a right-angle corner, and the transition needs to be slowly carried out according to a curve, so that the locking notch is occluded with a gap, tightness is not achieved, and water leakage and water seepage are easy to occur. In addition, the maximum difficulty of the locking notch engagement is caused by the accumulated error of the new and old degree and the construction gradient of the steel sheet pile, and water leakage caused by the inaccurate locking notch engagement is also easily caused.
Chinese patent CN108130956A discloses a waterproof node structure of a corner wall of an underground prefabricated laminated wall panel and a construction method thereof in 2018, 6.8.8.a bottom plate, a first double-sided prefabricated wall panel and a second double-sided prefabricated wall panel are perpendicular to each other, and an end of the first double-sided prefabricated wall panel is correspondingly connected with a side of the second double-sided prefabricated wall panel. However, the assembled industrialized underground building formed by the double-sided laminated wall boards has the difficulty of wasting labor and materials, is only suitable for the outer walls of structures such as basements, semi-basements, underground garages and the like which adopt the double-sided laminated wall boards, and has no wide application value.
Therefore, the known steel sheet pile corner water stopping method has various inconveniences and problems.
Disclosure of Invention
The invention aims to provide a safe and reliable construction method for sealing water at the corner of a welded steel sheet pile.
In order to achieve the purpose, the technical solution of the invention is as follows:
a welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps:
a. manufacturing a plurality of half steel sheet piles, namely longitudinally cutting a U-shaped steel sheet pile along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation;
c. at the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile at one side are fixedly welded in a way that the steel sheet piles are mutually vertical, the locking ends of the steel sheet piles are still mutually connected in a locking way according to the conventional operation, the steel sheet piles are directly converted into a horizontal section for construction, and the construction of a curve section is avoided.
The method for constructing the welded steel sheet pile corner water stop can be further realized by adopting the following technical measures.
In the method, when the steel sheet piles are vertically welded, full, firm and reliable welding seams need to be ensured.
After the technical scheme is adopted, the welding type steel sheet pile corner water stop construction method has the following advantages:
1. the device has simple structure and convenient manufacture;
2. the situation that the locking notch cannot form a right-angle corner when the steel sheet pile is arranged at four corner positions of the construction foundation pit is changed, half steel sheet piles are vertically welded and directly converted into horizontal section construction, and construction of a curve section is avoided;
3. reasonable design, easy operation and good waterproof effect.
Drawings
FIG. 1 is a schematic view of a conventional steel sheet pile corner connection structure;
fig. 2 is a schematic diagram of a steel sheet pile corner connection manner according to an embodiment of the present invention.
In the figure: 1U-shaped steel sheet pile, 2 half steel sheet piles and 3 welding seams.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a welded steel sheet pile corner water stop construction method, wherein a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the steel sheet pile is U-shaped, and the middle of the U-shaped is a linear connecting part, and the method is characterized by comprising the following steps of:
a. manufacturing a plurality of half steel sheet piles 2, namely longitudinally cutting a U-shaped steel sheet pile 1 along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation; fig. 2 is a schematic diagram of a steel sheet pile corner connection manner according to an embodiment of the present invention.
c. On the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile on one side are in mutually vertical fixed welding of the steel sheet piles, the locking ends of the steel sheet piles are still connected with each other through locking notches according to conventional operation, and the steel sheet piles are directly converted into horizontal sections for construction, so that construction of curved sections is avoided, and when the steel sheet piles are mutually vertical fixed welding, full, firm and reliable welding seams 3 need to be guaranteed.
The invention has substantive characteristics and obvious technical progress, and the welding type steel sheet pile corner water stop construction method of the invention replaces the original closing mode of mutual occlusion through locking notches by a welding mode, so that the steel sheet pile combination mode at the corner is simple and reliable, and water seepage and leakage are avoided.
The method for constructing the welded steel sheet pile corner water stop is applied in engineering practice, is easy to operate, ensures the quality, has obvious effect, is accepted by supervision units and construction units, is popular with operators, and obtains good economic benefit and social influence.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.
Claims (2)
1. A welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps:
a. manufacturing a plurality of half steel sheet piles, namely longitudinally cutting a U-shaped steel sheet pile along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation;
c. at the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile at one side are fixedly welded in a way that the steel sheet piles are mutually vertical, the locking ends of the steel sheet piles are still mutually connected in a locking way according to the conventional operation, the steel sheet piles are directly converted into a horizontal section for construction, and the construction of a curve section is avoided.
2. The method for constructing the corner water stop of the welded steel sheet pile as claimed in claim 1, wherein when the steel sheet piles are vertically welded, the full, firm and reliable welding seam is ensured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010550519.2A CN111719543A (en) | 2020-06-16 | 2020-06-16 | Welding type steel sheet pile corner water stop construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010550519.2A CN111719543A (en) | 2020-06-16 | 2020-06-16 | Welding type steel sheet pile corner water stop construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111719543A true CN111719543A (en) | 2020-09-29 |
Family
ID=72567004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010550519.2A Pending CN111719543A (en) | 2020-06-16 | 2020-06-16 | Welding type steel sheet pile corner water stop construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111719543A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837167A (en) * | 2022-05-23 | 2022-08-02 | 中国建筑土木建设有限公司 | Steel sheet pile cofferdam corner stagnant water connection structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203200744U (en) * | 2013-03-22 | 2013-09-18 | 武汉二航路桥特种工程有限责任公司 | Steel sheet pile corner structure |
CN203346871U (en) * | 2013-07-17 | 2013-12-18 | 深圳市兴班建筑工程有限公司 | Steel sheet pile |
CN106638560A (en) * | 2017-01-10 | 2017-05-10 | 中铁城建集团第三工程有限公司 | Corner steel sheet pile |
CN208792294U (en) * | 2018-08-28 | 2019-04-26 | 云南省建设投资控股集团有限公司 | Underground pipe gallery corner steel plate pilework |
CN209260694U (en) * | 2018-08-31 | 2019-08-16 | 云南省建设投资控股集团有限公司 | Pipe gallery T-type corner steel sheet pile |
-
2020
- 2020-06-16 CN CN202010550519.2A patent/CN111719543A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203200744U (en) * | 2013-03-22 | 2013-09-18 | 武汉二航路桥特种工程有限责任公司 | Steel sheet pile corner structure |
CN203346871U (en) * | 2013-07-17 | 2013-12-18 | 深圳市兴班建筑工程有限公司 | Steel sheet pile |
CN106638560A (en) * | 2017-01-10 | 2017-05-10 | 中铁城建集团第三工程有限公司 | Corner steel sheet pile |
CN208792294U (en) * | 2018-08-28 | 2019-04-26 | 云南省建设投资控股集团有限公司 | Underground pipe gallery corner steel plate pilework |
CN209260694U (en) * | 2018-08-31 | 2019-08-16 | 云南省建设投资控股集团有限公司 | Pipe gallery T-type corner steel sheet pile |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837167A (en) * | 2022-05-23 | 2022-08-02 | 中国建筑土木建设有限公司 | Steel sheet pile cofferdam corner stagnant water connection structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109518696B (en) | Assembled short-limb underground continuous wall | |
CN108086328A (en) | A kind of dynamic sealing, assembled building enclosure and its construction method from recharge | |
CN111778994A (en) | Pipe-jacking working well supporting device for municipal pipeline engineering and construction method | |
CN102839691B (en) | Quick sealing method and device for sandless cement pipe deep well dewatering wellhead | |
KR200452946Y1 (en) | Welded H type steel sheet pile and integrated composite order wall | |
CN111719543A (en) | Welding type steel sheet pile corner water stop construction method | |
CN107326896A (en) | One kind combination steel construction support pile and construction method | |
CN212641468U (en) | Pit-in-pit rapid construction structure | |
CN203475439U (en) | Special precast underground wall in precast underground wall based foundation pit support structure construction method | |
CN210562127U (en) | Fold and water formula underground continuous wall | |
CN112523233A (en) | Construction method of water-through type river-blocking cofferdam | |
CN208472703U (en) | Water-stop curtain interlocking pile | |
CN214169118U (en) | Support deep basal pit cofferdam structure in large-scale combination hasp pile | |
CN216275617U (en) | U-shaped steel sheet pile of vortex structure padlock | |
CN105113513A (en) | Anti-seepage foundation pit supporting structure and construction method | |
CN212801593U (en) | Locking notch structure of steel pipe pile cofferdam | |
CN105625299B (en) | A kind of wall board type Novel underground diaphragm wall and its construction method | |
KR20230001446U (en) | cofferdam locking mechanism | |
CN210395386U (en) | Water-bed tunnel strong-permeable sandy soil layer anti-permeation damage structure | |
CN210288421U (en) | Pressure irrigation type underground continuous wall supporting structure | |
CN211873023U (en) | Foundation pit supporting device | |
CN113216229A (en) | Novel cofferdam and construction method thereof | |
CN111206594A (en) | Foundation pit supporting construction method | |
CN105442528A (en) | Cement grouting sheet pile with sealing ring | |
CN111119200A (en) | Foundation pit supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200929 |