CN111719543A - Welding type steel sheet pile corner water stop construction method - Google Patents

Welding type steel sheet pile corner water stop construction method Download PDF

Info

Publication number
CN111719543A
CN111719543A CN202010550519.2A CN202010550519A CN111719543A CN 111719543 A CN111719543 A CN 111719543A CN 202010550519 A CN202010550519 A CN 202010550519A CN 111719543 A CN111719543 A CN 111719543A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
corner
construction
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010550519.2A
Other languages
Chinese (zh)
Inventor
尚宁洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202010550519.2A priority Critical patent/CN111719543A/en
Publication of CN111719543A publication Critical patent/CN111719543A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Composite Materials (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps: a. b, connecting two adjacent steel sheet piles with locking notches according to conventional operation on one side of a steel sheet pile corner, c, fixedly welding the linear connecting end part of the prefabricated half steel sheet pile and the linear connecting part of the steel sheet pile on one side to form the steel sheet pile, and connecting the locking notches of the steel sheet piles with the adjacent steel sheet piles according to conventional operation to directly convert the steel sheet piles into horizontal sections for construction. The construction method for the corner water stop of the welded steel sheet pile has the advantages that the device is simple in structure and convenient to manufacture, the condition that the corner of a construction foundation pit cannot be locked to form a right-angle corner is changed, a half steel sheet pile is vertically welded and directly converted into a horizontal section for construction, the construction of a curve section is avoided, the design is reasonable, the operation is easy, and the waterproof effect is good.

Description

Welding type steel sheet pile corner water stop construction method
Technical Field
The invention relates to a steel sheet pile connection mode, in particular to a welding type steel sheet pile corner water stop construction method.
Background
The steel sheet pile is used as a building enclosure and is used as a soil retaining wall, a water retaining wall and a sand retaining wall during foundation pit excavation, bridge cofferdam construction, large-scale pipeline laying and temporary ditch excavation. The steel sheet pile is high-strength steel with locking mouth, and is engaged with locking mouth to form closed steel sheet pile wall, and can be used for retaining soil and partial water-retaining engineering, and is suitable for preventing seepage in water and under the ground water level. Fig. 1 is a schematic view of a conventional steel sheet pile corner connection structure. Because the lock openings are tightly jointed, the problem that the joint parts are easy to be split when the supporting impervious wall is constructed by other methods is solved, and the large seepage of underground water can be prevented. However, when the steel sheet pile is used for constructing four corner positions of a foundation pit, the locking notch cannot be a right-angle corner, and the transition needs to be slowly carried out according to a curve, so that the locking notch is occluded with a gap, tightness is not achieved, and water leakage and water seepage are easy to occur. In addition, the maximum difficulty of the locking notch engagement is caused by the accumulated error of the new and old degree and the construction gradient of the steel sheet pile, and water leakage caused by the inaccurate locking notch engagement is also easily caused.
Chinese patent CN108130956A discloses a waterproof node structure of a corner wall of an underground prefabricated laminated wall panel and a construction method thereof in 2018, 6.8.8.a bottom plate, a first double-sided prefabricated wall panel and a second double-sided prefabricated wall panel are perpendicular to each other, and an end of the first double-sided prefabricated wall panel is correspondingly connected with a side of the second double-sided prefabricated wall panel. However, the assembled industrialized underground building formed by the double-sided laminated wall boards has the difficulty of wasting labor and materials, is only suitable for the outer walls of structures such as basements, semi-basements, underground garages and the like which adopt the double-sided laminated wall boards, and has no wide application value.
Therefore, the known steel sheet pile corner water stopping method has various inconveniences and problems.
Disclosure of Invention
The invention aims to provide a safe and reliable construction method for sealing water at the corner of a welded steel sheet pile.
In order to achieve the purpose, the technical solution of the invention is as follows:
a welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps:
a. manufacturing a plurality of half steel sheet piles, namely longitudinally cutting a U-shaped steel sheet pile along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation;
c. at the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile at one side are fixedly welded in a way that the steel sheet piles are mutually vertical, the locking ends of the steel sheet piles are still mutually connected in a locking way according to the conventional operation, the steel sheet piles are directly converted into a horizontal section for construction, and the construction of a curve section is avoided.
The method for constructing the welded steel sheet pile corner water stop can be further realized by adopting the following technical measures.
In the method, when the steel sheet piles are vertically welded, full, firm and reliable welding seams need to be ensured.
After the technical scheme is adopted, the welding type steel sheet pile corner water stop construction method has the following advantages:
1. the device has simple structure and convenient manufacture;
2. the situation that the locking notch cannot form a right-angle corner when the steel sheet pile is arranged at four corner positions of the construction foundation pit is changed, half steel sheet piles are vertically welded and directly converted into horizontal section construction, and construction of a curve section is avoided;
3. reasonable design, easy operation and good waterproof effect.
Drawings
FIG. 1 is a schematic view of a conventional steel sheet pile corner connection structure;
fig. 2 is a schematic diagram of a steel sheet pile corner connection manner according to an embodiment of the present invention.
In the figure: 1U-shaped steel sheet pile, 2 half steel sheet piles and 3 welding seams.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a welded steel sheet pile corner water stop construction method, wherein a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the steel sheet pile is U-shaped, and the middle of the U-shaped is a linear connecting part, and the method is characterized by comprising the following steps of:
a. manufacturing a plurality of half steel sheet piles 2, namely longitudinally cutting a U-shaped steel sheet pile 1 along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation; fig. 2 is a schematic diagram of a steel sheet pile corner connection manner according to an embodiment of the present invention.
c. On the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile on one side are in mutually vertical fixed welding of the steel sheet piles, the locking ends of the steel sheet piles are still connected with each other through locking notches according to conventional operation, and the steel sheet piles are directly converted into horizontal sections for construction, so that construction of curved sections is avoided, and when the steel sheet piles are mutually vertical fixed welding, full, firm and reliable welding seams 3 need to be guaranteed.
The invention has substantive characteristics and obvious technical progress, and the welding type steel sheet pile corner water stop construction method of the invention replaces the original closing mode of mutual occlusion through locking notches by a welding mode, so that the steel sheet pile combination mode at the corner is simple and reliable, and water seepage and leakage are avoided.
The method for constructing the welded steel sheet pile corner water stop is applied in engineering practice, is easy to operate, ensures the quality, has obvious effect, is accepted by supervision units and construction units, is popular with operators, and obtains good economic benefit and social influence.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (2)

1. A welded steel sheet pile corner water stop construction method is characterized in that a steel sheet pile is a profiled steel sheet pile with locking notches at two ends, the cross section of the profiled steel sheet pile is U-shaped, and a linear connecting part is arranged in the middle of the U-shaped, and the method comprises the following steps:
a. manufacturing a plurality of half steel sheet piles, namely longitudinally cutting a U-shaped steel sheet pile along a linear connecting part to divide the U-shaped steel sheet pile into half steel sheet piles, wherein one end of each half steel sheet pile is provided with a locking notch, and the other end of each half steel sheet pile is provided with a linear connecting end part;
b. two adjacent steel sheet piles are connected with each other by a locking notch at one side of the corner of the steel sheet pile according to conventional operation;
c. at the other side of the steel sheet pile corner, the straight-line-shaped connecting end part of the prefabricated half steel sheet pile and the straight-line-shaped connecting part of the steel sheet pile at one side are fixedly welded in a way that the steel sheet piles are mutually vertical, the locking ends of the steel sheet piles are still mutually connected in a locking way according to the conventional operation, the steel sheet piles are directly converted into a horizontal section for construction, and the construction of a curve section is avoided.
2. The method for constructing the corner water stop of the welded steel sheet pile as claimed in claim 1, wherein when the steel sheet piles are vertically welded, the full, firm and reliable welding seam is ensured.
CN202010550519.2A 2020-06-16 2020-06-16 Welding type steel sheet pile corner water stop construction method Pending CN111719543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010550519.2A CN111719543A (en) 2020-06-16 2020-06-16 Welding type steel sheet pile corner water stop construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010550519.2A CN111719543A (en) 2020-06-16 2020-06-16 Welding type steel sheet pile corner water stop construction method

Publications (1)

Publication Number Publication Date
CN111719543A true CN111719543A (en) 2020-09-29

Family

ID=72567004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010550519.2A Pending CN111719543A (en) 2020-06-16 2020-06-16 Welding type steel sheet pile corner water stop construction method

Country Status (1)

Country Link
CN (1) CN111719543A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837167A (en) * 2022-05-23 2022-08-02 中国建筑土木建设有限公司 Steel sheet pile cofferdam corner stagnant water connection structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203200744U (en) * 2013-03-22 2013-09-18 武汉二航路桥特种工程有限责任公司 Steel sheet pile corner structure
CN203346871U (en) * 2013-07-17 2013-12-18 深圳市兴班建筑工程有限公司 Steel sheet pile
CN106638560A (en) * 2017-01-10 2017-05-10 中铁城建集团第三工程有限公司 Corner steel sheet pile
CN208792294U (en) * 2018-08-28 2019-04-26 云南省建设投资控股集团有限公司 Underground pipe gallery corner steel plate pilework
CN209260694U (en) * 2018-08-31 2019-08-16 云南省建设投资控股集团有限公司 Pipe gallery T-type corner steel sheet pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203200744U (en) * 2013-03-22 2013-09-18 武汉二航路桥特种工程有限责任公司 Steel sheet pile corner structure
CN203346871U (en) * 2013-07-17 2013-12-18 深圳市兴班建筑工程有限公司 Steel sheet pile
CN106638560A (en) * 2017-01-10 2017-05-10 中铁城建集团第三工程有限公司 Corner steel sheet pile
CN208792294U (en) * 2018-08-28 2019-04-26 云南省建设投资控股集团有限公司 Underground pipe gallery corner steel plate pilework
CN209260694U (en) * 2018-08-31 2019-08-16 云南省建设投资控股集团有限公司 Pipe gallery T-type corner steel sheet pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837167A (en) * 2022-05-23 2022-08-02 中国建筑土木建设有限公司 Steel sheet pile cofferdam corner stagnant water connection structure

Similar Documents

Publication Publication Date Title
CN109518696B (en) Assembled short-limb underground continuous wall
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN111778994A (en) Pipe-jacking working well supporting device for municipal pipeline engineering and construction method
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
KR200452946Y1 (en) Welded H type steel sheet pile and integrated composite order wall
CN111719543A (en) Welding type steel sheet pile corner water stop construction method
CN107326896A (en) One kind combination steel construction support pile and construction method
CN212641468U (en) Pit-in-pit rapid construction structure
CN203475439U (en) Special precast underground wall in precast underground wall based foundation pit support structure construction method
CN210562127U (en) Fold and water formula underground continuous wall
CN112523233A (en) Construction method of water-through type river-blocking cofferdam
CN208472703U (en) Water-stop curtain interlocking pile
CN214169118U (en) Support deep basal pit cofferdam structure in large-scale combination hasp pile
CN216275617U (en) U-shaped steel sheet pile of vortex structure padlock
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN212801593U (en) Locking notch structure of steel pipe pile cofferdam
CN105625299B (en) A kind of wall board type Novel underground diaphragm wall and its construction method
KR20230001446U (en) cofferdam locking mechanism
CN210395386U (en) Water-bed tunnel strong-permeable sandy soil layer anti-permeation damage structure
CN210288421U (en) Pressure irrigation type underground continuous wall supporting structure
CN211873023U (en) Foundation pit supporting device
CN113216229A (en) Novel cofferdam and construction method thereof
CN111206594A (en) Foundation pit supporting construction method
CN105442528A (en) Cement grouting sheet pile with sealing ring
CN111119200A (en) Foundation pit supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200929