CN111705629A - Integrally prefabricated assembled combined bent cap and construction method thereof - Google Patents

Integrally prefabricated assembled combined bent cap and construction method thereof Download PDF

Info

Publication number
CN111705629A
CN111705629A CN202010482691.9A CN202010482691A CN111705629A CN 111705629 A CN111705629 A CN 111705629A CN 202010482691 A CN202010482691 A CN 202010482691A CN 111705629 A CN111705629 A CN 111705629A
Authority
CN
China
Prior art keywords
bent cap
connecting section
bridge pier
beam body
shear key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010482691.9A
Other languages
Chinese (zh)
Inventor
张涛
闫兴非
周良
方志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN202010482691.9A priority Critical patent/CN111705629A/en
Publication of CN111705629A publication Critical patent/CN111705629A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an integrally prefabricated assembled composite capping beam and a construction method thereof, wherein the integrally prefabricated assembled composite capping beam comprises a plate body, a beam body, a capping beam pier connecting section, a shear key and a grouting sleeve; the construction method comprises the following steps: completing the manufacture of the beam body, and welding a shear key on the beam body; step two: arranging a grouting sleeve and installing the beam body in place, and pouring a plate body and a bent cap bridge pier connecting section; step three: transporting the plate body, the beam body, the bent cap bridge pier connecting section, the shear key and the grouting sleeve to a construction site, and completing site hoisting in place; and (5) grouting the grouting material in the grouting sleeve to complete the field assembly. The connecting section of the slab body and the bent cap bridge pier prefabricated by concrete has the characteristic of good compression performance, the conventional concrete bent cap and prestressed concrete bent cap structures are improved, the steel beam and the concrete slab are connected into a whole through the shear key, the weight is far smaller than that of the solid concrete bent cap with the same external dimension, and the construction operation on site is facilitated.

Description

Integrally prefabricated assembled combined bent cap and construction method thereof
Technical Field
The invention relates to the technical field of bent cap construction, in particular to an integrally prefabricated assembled combined bent cap and a construction method thereof.
Background
In the existing capping beam construction, due to the limitation of hoisting and transportation capacity in a construction site, a large-size capping beam is difficult to construct by adopting a prefabrication and assembly process. In order to expand the application range of the large-size bent cap, a large-tonnage crane is usually adopted to carry out construction and assembly operation on site or a sectional prefabrication mode is adopted.
The construction and assembly operation carried out by adopting a large-tonnage crane can bring higher crane platform shift cost, and the working procedure is more complicated by adopting a sectional prefabrication mode.
The person skilled in the art is dedicated to solving the above technical drawbacks.
Disclosure of Invention
In view of the above-mentioned drawbacks of the prior art, a technical object of the present invention is to solve the problems mentioned in the above-mentioned background art.
In order to realize the technical purpose, the invention provides an integrally prefabricated assembled combined capping beam which at least comprises a plate body, a beam body, a capping beam pier connecting section, a shear key and a grouting sleeve; the plate body and the bent cap bridge pier connecting section are connected into a whole through the shear key, the beam body and the bent cap bridge pier connecting section are connected into a whole through the shear key, and the grouting sleeve is arranged in the bent cap bridge pier connecting section.
Preferably, the plate body and the bent cap bridge pier connecting section are both made of concrete.
Preferably, the beam body is made of steel.
Preferably, the shear key is made of perforated steel plates or shear nails.
Preferably, the external part of the structure of the integral prefabricated assembled combined bent cap is provided with prestressed steel bundles.
The invention also provides an integrally prefabricated assembled combined bent cap and a construction method thereof, wherein the integrally prefabricated assembled combined bent cap comprises the following steps:
the method comprises the following steps: the beam body is manufactured in a steel structure processing plant, and the shear strength is welded on the beam body;
step two: after the grouting sleeve is arranged and the beam body is installed in place, the connecting section of the plate body and the bent cap bridge pier is poured;
step three: transporting the plate body, the beam body, the bent cap bridge pier connecting section, the shear key and the grouting sleeve to a construction site, and completing site hoisting and positioning by using a hoisting tool; and (5) grouting the grouting material in the grouting sleeve to complete the field assembly.
The invention has the beneficial effects that:
according to the invention, due to the structural design, the construction method is good, the connecting section of the pier of the bent cap beam and the plate body prefabricated by concrete has the characteristic of good compression performance, the conventional concrete bent cap beam and prestressed concrete bent cap beam structure at present is improved, the steel beam and the concrete slab are connected into a whole through the shear key, the weight is far smaller than that of the solid concrete bent cap beam with the same external dimension, and the construction operation on site is convenient to carry out.
Drawings
FIG. 1 is a schematic view of the bending moment of the bent cap beam under a constant load according to the present invention;
FIG. 2 is a schematic structural view of the present invention as a whole;
FIG. 3 is a schematic structural view of the cross-section A-A in FIG. 2;
FIG. 4 is a schematic structural view of a cross-section B-B in FIG. 2;
FIG. 5 is a schematic view showing a state of a first step of the construction method of the present invention;
FIG. 6 is a schematic view showing a state of a first step of the construction method of the present invention;
FIG. 7 is a schematic view showing a state of a third step of the construction method of the present invention.
In the figure: 1 concrete slab, 2 steel beams, 3 bent cap pier connecting sections, 4 shear keys and 5 grouting sleeves.
Detailed Description
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings to fully understand the objects, the features and the effects of the present invention.
Example (b):
as shown in fig. 1, the bending moment diagram shows that the upper edge of the bent cap structure is pulled and the lower edge is compressed under the action of constant live load, and in consideration of the characteristics of good tensile property of a steel structure and good compression property of a concrete structure, a concrete slab 1 is arranged at the lower edge of the bent cap structure, and a steel beam 2 is arranged at the upper edge.
As shown in fig. 2, the integrally precast and assembled capping beam is structurally designed according to the analysis result of fig. 1, and includes a concrete slab 1, a steel beam 2, a capping beam pier connection section 3, a shear key 4, and a grouting sleeve 5.
As shown in fig. 3, the concrete slab 1 and the steel beam 2 are connected into a whole through the shear key 4, and the shear key 4 can transmit shear force, so that the two can bear force together.
As shown in fig. 4, the steel beam 2 and the bent cap pier connecting section 3 are connected into a whole through a shear key 4, so that the two can bear force together; the concrete slab 1 and the bent cap bridge pier connecting section 3 are both of reinforced concrete structures and are integrally poured during factory manufacture, so that force can be transmitted between the concrete slab 1 and the bent cap bridge pier connecting section; thus, the concrete slab 1, the steel beam 2 and the bent cap bridge pier connecting section 3 form an integrated bent cap structure capable of transmitting force; the grout sleeve 5 is arranged in the capping beam pier connecting section 3, so that the capping beam can be connected with the precast concrete pier like other concrete capping beams arranged with the grout sleeve 5.
The principle of the invention is as follows: by utilizing the characteristics of good tensile property of a steel structure and good compression property of a concrete structure, the steel beam 2, the concrete slab 1 and the capping beam pier connecting section 3 are connected into a whole by utilizing the shear force key 4, the weight of the capping beam is reduced, and the requirement of reducing the weight of the structure by transportation and hoisting in construction can be met.
In some embodiments, external prestressing steel strands may be added to apply additional bending moments in the cap beam structure, increasing the bending resistance load carrying capacity of the cap beam structure.
In some embodiments, UHPC material may be used to form the concrete slab 1, which improves the compression resistance of the concrete slab 1 and further improves the bending resistance and load-bearing capacity of the bent structure.
In some embodiments, the steel beams 2 may be made of a weathering steel, further improving the durability of the capping beam structure.
As shown in fig. 5-7, the invention also provides a construction method of the integrally prefabricated assembled composite bent cap, which comprises the following steps:
the method comprises the following steps: the steel beam 2 is manufactured in a steel structure processing factory, and the shear key 4 is welded on the steel beam;
step two: after arranging the grouting sleeve 5 and installing the steel beam 2 in place, pouring the concrete slab 1 and the bent cap pier connecting section 3;
step three: transporting the concrete slab 1, the steel beam 2, the bent cap pier connecting section 3, the shear key 4 and the grouting sleeve 5 to a construction site, and completing site hoisting and positioning by using a crane; grouting material is poured into the grouting sleeve 5 to complete the field assembly of the bent cap.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.

Claims (5)

1. The utility model provides an integral prefabrication assembles combination bent cap which characterized in that: the composite slab at least comprises a slab body, a beam body, a bent cap bridge pier connecting section, a shear key and a grouting sleeve; the plate body and the bent cap bridge pier connecting section are connected into a whole through the shear key, the beam body and the bent cap bridge pier connecting section are connected into a whole through the shear key, and the grouting sleeve is arranged in the bent cap bridge pier connecting section.
2. The integrally prefabricated assembled composite bent cap of claim 1, wherein: the plate body and the bent cap bridge pier connecting section are made of concrete.
3. The integrally prefabricated assembled composite bent cap of claim 1, wherein: the beam body is made of steel.
4. The integrally prefabricated assembled composite bent cap of claim 1, wherein: and prestressed steel bundles are arranged outside the structure of the integral prefabricated assembled composite bent cap.
5. A construction method for integrally prefabricating, assembling and combining a bent cap comprises the following steps:
the method comprises the following steps: the beam body is manufactured in a steel structure processing plant, and the shear strength is welded on the beam body;
step two: after the grouting sleeve is arranged and the beam body is installed in place, the connecting section of the plate body and the bent cap bridge pier is poured;
step three: transporting the plate body, the beam body, the bent cap bridge pier connecting section, the shear key and the grouting sleeve to a construction site, and completing site hoisting and positioning by using a hoisting tool; and (5) grouting the grouting material in the grouting sleeve to complete the field assembly.
CN202010482691.9A 2020-06-01 2020-06-01 Integrally prefabricated assembled combined bent cap and construction method thereof Pending CN111705629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010482691.9A CN111705629A (en) 2020-06-01 2020-06-01 Integrally prefabricated assembled combined bent cap and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010482691.9A CN111705629A (en) 2020-06-01 2020-06-01 Integrally prefabricated assembled combined bent cap and construction method thereof

Publications (1)

Publication Number Publication Date
CN111705629A true CN111705629A (en) 2020-09-25

Family

ID=72537336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010482691.9A Pending CN111705629A (en) 2020-06-01 2020-06-01 Integrally prefabricated assembled combined bent cap and construction method thereof

Country Status (1)

Country Link
CN (1) CN111705629A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635349A (en) * 2021-12-06 2022-06-17 中交第二公路勘察设计研究院有限公司 Light-duty assembled pier suitable for non-violent earthquake district

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635349A (en) * 2021-12-06 2022-06-17 中交第二公路勘察设计研究院有限公司 Light-duty assembled pier suitable for non-violent earthquake district

Similar Documents

Publication Publication Date Title
US6915615B2 (en) Prestressed composite truss girder and construction method of the same
CN113481826B (en) Prefabricated assembled corrugated steel web plate combined box girder
CN109653350B (en) Mixed reinforcement embedded low-prestress dry beam column node and method
CN110004822A (en) The wet seam of precast concrete beam connects design
CN110847021A (en) High-performance light connecting structure of assembled bent cap-pier
CN107842132B (en) Connecting device and connecting method for bending shear resistant precast reinforced concrete shear wall
CN210916962U (en) Segmental precast beam of cantilever assembly bridge and splicing structure thereof
CN111705629A (en) Integrally prefabricated assembled combined bent cap and construction method thereof
KR100274141B1 (en) Manufacturing method of preplex composite beem by divisional method
CN212294321U (en) Integral prefabricated assembled combined bent cap
CN217869978U (en) Steel-concrete combined bridge deck and wet seam structure thereof
CN113026555A (en) Combined beam structure of prefabricated steel plate beam and combined bridge deck
CN218116110U (en) Prefabricated assembled double-layer concrete-filled steel tube combined pier structure
CN218813186U (en) Cast-in-situ connecting structure of steel-concrete composite beam
CN115772848A (en) Single-layer reinforcement hollow prefabricated pier with built-in metal corrugated pipe
CN115928882A (en) Assembled composite structure hybrid connection node suitable for coastal region
CN213625221U (en) Wet seam structure of prefabricated decking
CN211689866U (en) High-performance light connecting structure of assembled bent cap-pier
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN213390771U (en) Welding-free laminated plate
CN212742169U (en) Steel stand and concrete cushion cap connection structure
CN108643350A (en) A kind of prefabricated assembled concrete continuous beam is bolted dry type node
CN212103635U (en) Pier structure is assembled in prefabrication based on UHPC seam
CN210767210U (en) Fabricated building structure system
CN211256620U (en) Assembled combination case roof beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination