- foundation pit
- fender
- pile
- gap
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Foundations (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010410587.9A CN111648373B (en) | 2020-05-15 | 2020-05-15 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010410587.9A CN111648373B (en) | 2020-05-15 | 2020-05-15 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111648373A CN111648373A (en) | 2020-09-11 |
CN111648373B true CN111648373B (en) | 2021-11-09 |
Family
ID=72344340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010410587.9A Active CN111648373B (en) | 2020-05-15 | 2020-05-15 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111648373B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118187120A (en) * | 2024-05-17 | 2024-06-14 | 广州建筑股份有限公司 | Pile seam water and sand gushing natural biological material plugging method for support pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205954632U (en) * | 2016-08-18 | 2017-02-15 | 中铁隧道集团二处有限公司 | Pipeline crosses supporting construction of foundation ditch department in rich water sand layer |
CN108442382A (en) * | 2018-03-06 | 2018-08-24 | 中铁十局集团城市轨道工程有限公司 | It crosses the pressure line in-situ conservation of deep basal pit and goes along with sb. to guard him soil-baffling structure and construction method |
CN108570992A (en) * | 2018-04-08 | 2018-09-25 | 中铁五局集团有限公司 | The construction method of form concrete between a kind of foundation pit enclosure stake stake |
CN209179010U (en) * | 2018-08-03 | 2019-07-30 | 中国电建集团华东勘测设计研究院有限公司 | A kind of municipal pipeline crosses the building enclosure of foundation pit |
CN110512613A (en) * | 2019-08-08 | 2019-11-29 | 甘肃建研建设工程有限公司 | A kind of red sand rock stratum water proof combined bolting and shotcrete method and its water barrier device |
CN210529712U (en) * | 2019-06-12 | 2020-05-15 | 中铁十一局集团城市轨道工程有限公司 | Construction structure for foundation pit crossing underground pipeline area |
-
2020
- 2020-05-15 CN CN202010410587.9A patent/CN111648373B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205954632U (en) * | 2016-08-18 | 2017-02-15 | 中铁隧道集团二处有限公司 | Pipeline crosses supporting construction of foundation ditch department in rich water sand layer |
CN108442382A (en) * | 2018-03-06 | 2018-08-24 | 中铁十局集团城市轨道工程有限公司 | It crosses the pressure line in-situ conservation of deep basal pit and goes along with sb. to guard him soil-baffling structure and construction method |
CN108570992A (en) * | 2018-04-08 | 2018-09-25 | 中铁五局集团有限公司 | The construction method of form concrete between a kind of foundation pit enclosure stake stake |
CN209179010U (en) * | 2018-08-03 | 2019-07-30 | 中国电建集团华东勘测设计研究院有限公司 | A kind of municipal pipeline crosses the building enclosure of foundation pit |
CN210529712U (en) * | 2019-06-12 | 2020-05-15 | 中铁十一局集团城市轨道工程有限公司 | Construction structure for foundation pit crossing underground pipeline area |
CN110512613A (en) * | 2019-08-08 | 2019-11-29 | 甘肃建研建设工程有限公司 | A kind of red sand rock stratum water proof combined bolting and shotcrete method and its water barrier device |
Also Published As
Publication number | Publication date |
---|---|
CN111648373A (en) | 2020-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103526770B (en) | A kind of construction method of high antiseepage anti-floating pile raft structure | |
CN109371905B (en) | Dam and construction method | |
CN111576431A (en) | Excavation method for foundation pit of four-layer subway station | |
CN113266392B (en) | Pipe jacking construction method for penetrating through existing anchor cable group | |
CN112746624A (en) | Novel comprehensive water lowering and draining method and device for mudstone subway station | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN203594041U (en) | Piled raft structure with good resistance to seepage and buoyancy | |
CN109723055B (en) | Underground diaphragm wall bottom reinforcing structure and construction method thereof | |
CN111648373B (en) | Excavation supporting construction process for water-rich deep foundation pit fender pile gap | |
CN112127390B (en) | Construction technology for simply plugging reserved sleeve of outer wall in underground structure area | |
CN212641685U (en) | Underground garage drainage open ditch and blind ditch combine antiseep system | |
CN113356229A (en) | Safe and efficient comprehensive construction method for garage under high-speed railway base | |
CN113152518A (en) | Water-rich stratum foundation pit pile plate wall inter-pile gravel reverse-filtration seepage-proofing structure and construction method | |
CN212272234U (en) | High-strength combined template for open groove section of large-section inclined shaft | |
CN110616719B (en) | Quick construction method for U-shaped groove of upper-span existing culvert | |
CN115075289B (en) | Rapid construction method for assembled arc ecological frame retaining wall | |
CN111379273A (en) | Construction method of corrugated steel comprehensive pipe gallery | |
CN114809094A (en) | Pipe jacking working well for complex stratum and construction process thereof | |
CN114855822A (en) | Construction method for deep foundation pit of rain sewage pipeline on highway | |
CN113338340A (en) | Reverse construction method for vertical shaft ensuring normal use of existing pipeline | |
CN113914342A (en) | Basement outer wall fertilizer groove drainage construction method | |
CN113106994A (en) | Wide waterproof plate laying method for cover-excavation top-down subway station | |
CN111577330A (en) | Construction method for open channel section of large-section inclined shaft and high-strength combined template thereof | |
CN216920368U (en) | Large-scale round foundation pit triaxial mixing pile supporting construction | |
CN211472579U (en) | Pipe gallery protection prestressed beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ren Pengpeng Inventor after: Liu Dapeng Inventor after: Liu Baizhong Inventor after: Zhang Yicheng Inventor after: Wen Zhiyang Inventor after: Zhan Youjun Inventor after: Lei Danyang Inventor after: Wang Sai Inventor after: Li Jianming Inventor before: Ren Pengpeng Inventor before: Liu Dapeng Inventor before: Liu Baizhong Inventor before: Zhang Yicheng Inventor before: Wen Zhiyang Inventor before: Zhan Youjun Inventor before: Lei Danyang Inventor before: Wang Sai Inventor before: Li Jianmin |