CN111576864A - Method for pouring horizontal tie beam of building wall - Google Patents

Method for pouring horizontal tie beam of building wall Download PDF

Info

Publication number
CN111576864A
CN111576864A CN202010361733.3A CN202010361733A CN111576864A CN 111576864 A CN111576864 A CN 111576864A CN 202010361733 A CN202010361733 A CN 202010361733A CN 111576864 A CN111576864 A CN 111576864A
Authority
CN
China
Prior art keywords
tie beam
sides
side plates
horizontal tie
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010361733.3A
Other languages
Chinese (zh)
Other versions
CN111576864B (en
Inventor
李占先
冯国森
代显奇
王孝波
王伟伟
吕世华
孟祥林
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority to CN202010361733.3A priority Critical patent/CN111576864B/en
Publication of CN111576864A publication Critical patent/CN111576864A/en
Application granted granted Critical
Publication of CN111576864B publication Critical patent/CN111576864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/064Spacers placed on the bottom of the mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the field of section building construction methods, in particular to a method for pouring a horizontal tie beam of a building wall, which can be suitable for walls and building blocks with different thicknesses. A method for pouring horizontal tie beams of a building wall body comprises the steps of arranging a bottom plate and side plates on two sides above the wall body, binding and fixing the side plates, and pouring concrete between the side plates to form the horizontal tie beams. The bottom plate and the side plates are matched to form a template of the horizontal tie beam, and the horizontal tie beam is directly formed in the template in a pouring mode, so that the step of removing the template can be omitted; the connecting piece can play the effect of taut both sides curb plate, makes the curb plate can keep pressing from both sides the state of tight middle concrete, improves the fastness of horizontal tie beam. Compared with the mode of using the matching blocks, the side plates and the bottom plate are designed in a split mode, so that the production and transportation are convenient, and the cavity and the building block can adapt to various cavities and building blocks with different specifications.

Description

Method for pouring horizontal tie beam of building wall
Technical Field
The invention relates to the field of section building construction methods, in particular to a method for pouring a horizontal tie beam of a building wall.
Background
In the masonry wall mainly composed of building blocks, a horizontal tie beam is required to be arranged in the middle of the wall, and the horizontal tie beam can be hidden when the height of the wall exceeds a certain standard. The hollow building blocks are usually arranged below the horizontal tie beam, so that the horizontal tie beam is difficult to directly pour and form, and a large number of cavities exist in the hollow building blocks below the horizontal tie beam, so that concrete slurry easily falls down from the cavities, the construction difficulty is improved, and materials are wasted.
In order to solve the problems, the mode of matching blocks is applied to masonry wall construction, the groove-shaped matching blocks are used as covers of the wall, concrete is directly poured into the grooves of the matching blocks, waste of concrete slurry can be effectively prevented, and the process of formwork support and formwork removal during pouring of the beam body is also omitted.
The specifications of the wall building blocks are inconsistent, and in order to match different building blocks, matching blocks with different specifications are required in the construction process of the horizontal tie beam, so that the production cost of the matching blocks is increased, and the transportation of the matching blocks is inconvenient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method for pouring a horizontal tie beam of a building wall, which can be suitable for walls and building blocks with different thicknesses.
The scheme provided by the invention is as follows:
a method for pouring horizontal tie beams of a building wall comprises the following steps:
s01: the top of the building block is covered with a beam-tying bottom plate, and the bottom plate covers the cavity of the building block;
s02: erecting tie beam side plates on two sides of the bottom plate, and enabling the outermost sides of the side plates to be flush with the outermost sides of the building blocks;
s03: the top of the side plates on the two sides is provided with a supporting block, and the two ends of the supporting block respectively support the side plates on the two sides;
s04: the side plates are provided with connecting pieces extending inwards, and the connecting pieces of the side plates on the two sides are bound and connected;
s05: pouring concrete between the side plates on the two sides and tamping;
s06: and curing after the concrete is solidified.
The bottom plate and the side plates are matched to form a template of the horizontal tie beam, and the horizontal tie beam is directly formed in the template in a pouring mode, so that the step of removing the template can be omitted; the connecting piece can play the effect of taut both sides curb plate, makes the curb plate can keep pressing from both sides the state of tight middle concrete, improves the fastness of horizontal tie beam. Compared with the mode of using the matching blocks, the side plates and the bottom plate are designed in a split mode, so that the production and transportation are convenient, and the cavity and the building block can adapt to various cavities and building blocks with different specifications.
Preferably, the bottom of the bottom plate is provided with a downward convex boss, and the boss is matched with the cavity opening of the building block. The boss can be matched with a cavity in the hollow block to play a role in positioning the bottom plate.
Preferably, the width of the bottom plate is larger than the width of the opening of the cavity of the building block and is positioned between the vertical plates at two sides. The bottom plate needs to cover the cavity so as to avoid concrete leakage to the bottom plate below in the pouring process, and the bottom plate plays a supporting and limiting role for the side plates on two sides.
Preferably, the lateral plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, the supporting block comprises a supporting portion and a clamping portion, the length of the supporting portion is matched with the distance between the lateral plates on two sides, the clamping portion is matched with the clamping grooves, and the supporting portion is located between the lateral plates on two sides and supports the lateral plates on two sides when the clamping portion is placed in the clamping grooves. The clamping portion supports the side plate on the upper portion of the side plate and plays a limiting role in the horizontal position of the side plate.
Preferably, the connecting pieces are arranged along the extending direction of the horizontal tie beam, and the connecting pieces of the side plates on two sides are arranged oppositely. The relative setting is convenient for carry out the ligature through the steel wire and fix.
Preferably, the connecting piece is formed by bending a steel wire, two ends of the connecting piece are embedded in the side plates, and the middle part of the connecting piece is bent and extends outwards. The steel wire forms the hook ring after bending, the ligature of the steel wire of being convenient for.
Preferably, the side plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, and the clamping grooves and the connecting pieces are sequentially arranged in a staggered manner. When the clamping grooves and the connecting pieces are arranged in a staggered mode, the supporting blocks in the clamping grooves cannot influence binding of the connecting pieces.
Preferably, reinforcing steel bars are arranged between the side plates on the two sides and are positioned in poured concrete. The reinforcing bars may increase the overall strength of the horizontal tie beam.
Preferably, the reinforcing steel bars are bound and connected with the connecting pieces. Connecting piece and reinforcement are connected, both increased the fastness of curb plate in horizontal tie beam, and the connecting piece has further improved the intensity of horizontal tie beam after on the ligature reinforcing bar simultaneously.
The invention has the following beneficial effects:
1. the bottom plate and the side plates are arranged in a split manner, so that the production, manufacturing and transportation cost is reduced, the side plates can be used as templates, form removal is not needed, and the side plates can adapt to various walls and building blocks with different specifications;
2. the side plates are bound and fixed through the connecting pieces, so that the side plates can be arranged more firmly, the binding of the connecting pieces to the reinforcing steel bars can be reduced, and the strength of the horizontal tie beam is further improved;
3. the bottom plate and the supporting shoe can both play the supporting role to the curb plate, prevent that the curb plate from because the pulling force that receives the connecting piece and the inside skew of position to the supporting shoe sets up with the connecting piece interval, can not cause the interference to the ligature of connecting piece.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a bottom plate block structure;
FIG. 3 is a schematic view of the support block configuration.
In the figure: the steel bar clamping device comprises a base plate 1, side plates 2, supporting blocks 3, connecting pieces 4, steel bars 5, bosses 11, clamping grooves 21, supporting parts 31 and clamping parts 32.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 3, the present embodiment provides a method for pouring a horizontal tie beam of a building wall, including the following steps:
the top of the building block is covered with a beam bottom plate 1, and the bottom plate 1 covers the cavity of the building block. The bottom of the bottom plate 1 is provided with a boss 11 protruding downwards, the boss 11 is matched with the cavity opening of the building block, and the width of the bottom plate 1 is larger than that of the cavity opening of the building block.
And (3) erecting tie beam side plates 2 at two sides of the bottom plate 1, making the outermost sides of the side plates 2 flush with the outermost sides of the building blocks, and clamping the bottom plate 1 between the vertical plates 2 at two sides.
Supporting blocks 3 are installed at the tops of the side plates 2 at the two sides, and the two ends of each supporting block 3 support the side plates 2 at the two sides respectively. Curb plate 2 is provided with draw-in groove 21 along the extending direction interval of horizontal tie beam, and supporting shoe 3 includes supporting part 31 and joint portion 32, and supporting part 31 length and both sides curb plate 2's distance looks adaptation, joint portion 32 and draw-in groove 21 looks adaptation, and joint portion 32 is located between the curb plate 2 of both sides and supports the curb plate 2 of both sides when placing draw-in groove 21.
The side plates 2 are provided with connecting pieces 4 extending towards the inner side, and the connecting pieces 4 of the side plates 2 on the two sides are bound and connected. The connecting pieces 4 are arranged along the extending direction of the horizontal tie beam, and the connecting pieces 4 of the side plates 2 at two sides are arranged oppositely. The connecting piece 4 is formed by bending a steel wire, two ends of the connecting piece 4 are embedded in the side plates 2, and the middle part of the connecting piece is bent and extends outwards. The connecting pieces 4 are arranged alternately with the catching grooves 32 in the extending direction of the horizontal tie beam.
Still set up reinforcing bar 5 between the curb plate 2 of both sides, reinforcing bar 5 is arranged in the concrete of pouring, and reinforcing bar 5 and connecting piece 4 ligature are connected.
Concrete is poured between the side plates 2 on the two sides and tamped;
and curing after the concrete is solidified.
Although the present invention has been described in detail by referring to the drawings in connection with the preferred embodiments, the present invention is not limited thereto. It will be apparent to those skilled in the art that various changes and modifications can be made without departing from the spirit and scope of the invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (9)

1. A method for pouring a horizontal tie beam of a building wall body is characterized by comprising the following steps: the method comprises the following steps:
s01: the top of the building block is covered with a beam-tying bottom plate, and the bottom plate covers the cavity of the building block;
s02: erecting tie beam side plates on two sides of the bottom plate, and enabling the outermost sides of the side plates to be flush with the outermost sides of the building blocks;
s03: the top of the side plates on the two sides is provided with a supporting block, and the two ends of the supporting block respectively support the side plates on the two sides;
s04: the side plates are provided with connecting pieces extending inwards, and the connecting pieces of the side plates on the two sides are bound and connected;
s05: pouring concrete between the side plates on the two sides and tamping;
s06: and curing after the concrete is solidified.
2. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the bottom of the bottom plate is provided with a boss protruding downwards, and the boss is matched with the cavity opening of the building block.
3. The method for casting the horizontal tie beam of the building wall according to claim 2, wherein: the width of the bottom plate is larger than the width of the opening of the cavity of the building block and is positioned between the vertical plates at two sides.
4. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the curb plate is provided with the draw-in groove along the extending direction interval of horizontal tie beam, the supporting shoe includes supporting part and joint portion, the supporting part length and the distance looks adaptation of both sides curb plate, joint portion and draw-in groove looks adaptation, the supporting part is located between the curb plate of both sides and supports the curb plate of both sides when joint portion places the draw-in groove.
5. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the connecting pieces are arranged along the extending direction of the horizontal tie beam, and the connecting pieces of the side plates at two sides are arranged oppositely.
6. The method for casting the horizontal tie beam of the building wall according to claim 5, wherein: the connecting piece is formed by bending a steel wire, two ends of the connecting piece are embedded in the side plates, and the middle part of the connecting piece is bent and extends outwards.
7. The method for casting the horizontal tie beam of the building wall according to claim 5, wherein: the lateral plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, and the clamping grooves and the connecting pieces are sequentially arranged in a staggered mode.
8. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: and reinforcing steel bars are arranged between the side plates at two sides and are positioned in poured concrete.
9. The method for casting the horizontal tie beam of the building wall according to claim 8, wherein: and the steel bars are bound and connected with the connecting pieces.
CN202010361733.3A 2020-04-30 2020-04-30 Method for pouring horizontal tie beam of building wall Active CN111576864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010361733.3A CN111576864B (en) 2020-04-30 2020-04-30 Method for pouring horizontal tie beam of building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010361733.3A CN111576864B (en) 2020-04-30 2020-04-30 Method for pouring horizontal tie beam of building wall

Publications (2)

Publication Number Publication Date
CN111576864A true CN111576864A (en) 2020-08-25
CN111576864B CN111576864B (en) 2022-09-02

Family

ID=72120693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010361733.3A Active CN111576864B (en) 2020-04-30 2020-04-30 Method for pouring horizontal tie beam of building wall

Country Status (1)

Country Link
CN (1) CN111576864B (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2030225U (en) * 1988-04-23 1989-01-04 陆美球 Prefabricated mould jacket for pouring concrete post
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
CN201068619Y (en) * 2007-07-31 2008-06-04 张利萍 Dedicated collar beam, trim joist building blocks with heat-insulating layer
CN201762982U (en) * 2010-04-08 2011-03-16 叶翼翔 Prefabricated spliced concrete formwork
CN201933778U (en) * 2011-01-28 2011-08-17 四川省建筑机械化工程公司 Assembling structure of cast-in-situ concrete beam formwork
CN104674985A (en) * 2015-01-19 2015-06-03 北京振利节能环保科技股份有限公司 Non-dismantling die cast-in-place lightweight thermal insulation wall formboard, thermal insulation wall and construction method thereof
CN105696734A (en) * 2016-03-28 2016-06-22 余德平 Heat-retaining heat-insulating fireproof ratproof assembled composite wall for modern henhouse building
AU2016200245A1 (en) * 2015-01-06 2016-07-21 Pantano Investments Pty Ltd Permanent Formwork System for Building of Columns and Beams
CN106193579A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 Building template assembly
CN106436989A (en) * 2016-10-24 2017-02-22 辽宁金帝建筑设计有限公司 Non-dismantling template for building wall body casting and preparing method thereof
CN206071047U (en) * 2016-08-29 2017-04-05 中国建筑第七工程局有限公司 A kind of beam formwork for building
CN106703288A (en) * 2016-11-18 2017-05-24 湖南大学 Manufacturing method of carbon fiber mesh composite board and concrete continuous beam
KR101745242B1 (en) * 2016-01-22 2017-06-20 삼목에스폼 주식회사 Bariable beam form and construction method thereof
CN106894633A (en) * 2017-03-22 2017-06-27 中冶建工集团有限公司 The cast in situs method of small-size concrete component
CN207017644U (en) * 2017-08-03 2018-02-16 中国十九冶集团有限公司 The special skewed slot of constructional column concrete placings
CN108343234A (en) * 2018-05-02 2018-07-31 天津城建大学 It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry
CN209760801U (en) * 2018-12-26 2019-12-10 河南建鼎工程管理有限公司 Cast-in-place mould of building spandrel girder
KR102095488B1 (en) * 2019-10-01 2020-03-31 구연진 Formwork structure for beam construction

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2030225U (en) * 1988-04-23 1989-01-04 陆美球 Prefabricated mould jacket for pouring concrete post
CN2232953Y (en) * 1995-11-24 1996-08-14 梁育雄 Permanent combination building section mould
CN201068619Y (en) * 2007-07-31 2008-06-04 张利萍 Dedicated collar beam, trim joist building blocks with heat-insulating layer
CN201762982U (en) * 2010-04-08 2011-03-16 叶翼翔 Prefabricated spliced concrete formwork
CN201933778U (en) * 2011-01-28 2011-08-17 四川省建筑机械化工程公司 Assembling structure of cast-in-situ concrete beam formwork
AU2016200245A1 (en) * 2015-01-06 2016-07-21 Pantano Investments Pty Ltd Permanent Formwork System for Building of Columns and Beams
CN104674985A (en) * 2015-01-19 2015-06-03 北京振利节能环保科技股份有限公司 Non-dismantling die cast-in-place lightweight thermal insulation wall formboard, thermal insulation wall and construction method thereof
KR101745242B1 (en) * 2016-01-22 2017-06-20 삼목에스폼 주식회사 Bariable beam form and construction method thereof
CN105696734A (en) * 2016-03-28 2016-06-22 余德平 Heat-retaining heat-insulating fireproof ratproof assembled composite wall for modern henhouse building
CN206071047U (en) * 2016-08-29 2017-04-05 中国建筑第七工程局有限公司 A kind of beam formwork for building
CN106193579A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 Building template assembly
CN106436989A (en) * 2016-10-24 2017-02-22 辽宁金帝建筑设计有限公司 Non-dismantling template for building wall body casting and preparing method thereof
CN106703288A (en) * 2016-11-18 2017-05-24 湖南大学 Manufacturing method of carbon fiber mesh composite board and concrete continuous beam
CN106894633A (en) * 2017-03-22 2017-06-27 中冶建工集团有限公司 The cast in situs method of small-size concrete component
CN207017644U (en) * 2017-08-03 2018-02-16 中国十九冶集团有限公司 The special skewed slot of constructional column concrete placings
CN108343234A (en) * 2018-05-02 2018-07-31 天津城建大学 It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry
CN209760801U (en) * 2018-12-26 2019-12-10 河南建鼎工程管理有限公司 Cast-in-place mould of building spandrel girder
KR102095488B1 (en) * 2019-10-01 2020-03-31 구연진 Formwork structure for beam construction

Also Published As

Publication number Publication date
CN111576864B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN108360550B (en) A kind of steel construction direct-burried foundation bolt construction method
CN111730738A (en) Prefabricated box girder diaphragm plate connecting structure and construction method thereof
CN111576864B (en) Method for pouring horizontal tie beam of building wall
CN212002304U (en) Positioning device for fixing arc-shaped template
CN112049023A (en) Prefabricated T-beam end template and anchor sealing construction process
CN109024842B (en) Inverted trapezoidal open channel construction method
CN101327614A (en) Method for manufacturing pre-fabricated reinforced concrete plate with rib
CN210164241U (en) Prefabricated boundary beam of preset formwork
CN114892811A (en) Construction method for connecting node of core tube and outer frame steel bar truss floor bearing plate
CN212427769U (en) Interlocking building block for mould-disassembly-free constructional column
CN211850266U (en) Laminated floor slab structure
CN212452334U (en) Arch structure for culvert and reinforced concrete arch plate thereof
CN210976322U (en) Bracket superposed beam and forming equipment thereof
CN210421625U (en) Cast-in-place combination beam structure of assembled
CN208717969U (en) A kind of novel alter-pouring strips mould plate installs structure
CN217680006U (en) Simple prefabricated ring beam connecting structure system
CN215331483U (en) Exempt from to tear open form windowsill and press a construction structures
CN220747420U (en) Semi-precast concrete roof pressing
CN217948750U (en) Bridge side flange structure and box girder
CN219671866U (en) Assembled constructional column and embracing frame column structure
CN217580626U (en) Anti-displacement full-cast-in-place concrete outer wall seam pulling plate
CN212001877U (en) Mould disassembly-free module for producing prefabricated part and prefabricated part comprising same
JP3126885B2 (en) Method of manufacturing blocks for stone walls using natural stone
CN218374656U (en) Windowsill coping prefabricated part
CN213654867U (en) One-step casting and forming die frame system for small-section tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant