CN111576864A - Method for pouring horizontal tie beam of building wall - Google Patents
Method for pouring horizontal tie beam of building wall Download PDFInfo
- Publication number
- CN111576864A CN111576864A CN202010361733.3A CN202010361733A CN111576864A CN 111576864 A CN111576864 A CN 111576864A CN 202010361733 A CN202010361733 A CN 202010361733A CN 111576864 A CN111576864 A CN 111576864A
- Authority
- CN
- China
- Prior art keywords
- tie beam
- sides
- side plates
- horizontal tie
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/001—Corner fastening or connecting means for forming or stiffening elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/064—Spacers placed on the bottom of the mould
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention relates to the field of section building construction methods, in particular to a method for pouring a horizontal tie beam of a building wall, which can be suitable for walls and building blocks with different thicknesses. A method for pouring horizontal tie beams of a building wall body comprises the steps of arranging a bottom plate and side plates on two sides above the wall body, binding and fixing the side plates, and pouring concrete between the side plates to form the horizontal tie beams. The bottom plate and the side plates are matched to form a template of the horizontal tie beam, and the horizontal tie beam is directly formed in the template in a pouring mode, so that the step of removing the template can be omitted; the connecting piece can play the effect of taut both sides curb plate, makes the curb plate can keep pressing from both sides the state of tight middle concrete, improves the fastness of horizontal tie beam. Compared with the mode of using the matching blocks, the side plates and the bottom plate are designed in a split mode, so that the production and transportation are convenient, and the cavity and the building block can adapt to various cavities and building blocks with different specifications.
Description
Technical Field
The invention relates to the field of section building construction methods, in particular to a method for pouring a horizontal tie beam of a building wall.
Background
In the masonry wall mainly composed of building blocks, a horizontal tie beam is required to be arranged in the middle of the wall, and the horizontal tie beam can be hidden when the height of the wall exceeds a certain standard. The hollow building blocks are usually arranged below the horizontal tie beam, so that the horizontal tie beam is difficult to directly pour and form, and a large number of cavities exist in the hollow building blocks below the horizontal tie beam, so that concrete slurry easily falls down from the cavities, the construction difficulty is improved, and materials are wasted.
In order to solve the problems, the mode of matching blocks is applied to masonry wall construction, the groove-shaped matching blocks are used as covers of the wall, concrete is directly poured into the grooves of the matching blocks, waste of concrete slurry can be effectively prevented, and the process of formwork support and formwork removal during pouring of the beam body is also omitted.
The specifications of the wall building blocks are inconsistent, and in order to match different building blocks, matching blocks with different specifications are required in the construction process of the horizontal tie beam, so that the production cost of the matching blocks is increased, and the transportation of the matching blocks is inconvenient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method for pouring a horizontal tie beam of a building wall, which can be suitable for walls and building blocks with different thicknesses.
The scheme provided by the invention is as follows:
a method for pouring horizontal tie beams of a building wall comprises the following steps:
s01: the top of the building block is covered with a beam-tying bottom plate, and the bottom plate covers the cavity of the building block;
s02: erecting tie beam side plates on two sides of the bottom plate, and enabling the outermost sides of the side plates to be flush with the outermost sides of the building blocks;
s03: the top of the side plates on the two sides is provided with a supporting block, and the two ends of the supporting block respectively support the side plates on the two sides;
s04: the side plates are provided with connecting pieces extending inwards, and the connecting pieces of the side plates on the two sides are bound and connected;
s05: pouring concrete between the side plates on the two sides and tamping;
s06: and curing after the concrete is solidified.
The bottom plate and the side plates are matched to form a template of the horizontal tie beam, and the horizontal tie beam is directly formed in the template in a pouring mode, so that the step of removing the template can be omitted; the connecting piece can play the effect of taut both sides curb plate, makes the curb plate can keep pressing from both sides the state of tight middle concrete, improves the fastness of horizontal tie beam. Compared with the mode of using the matching blocks, the side plates and the bottom plate are designed in a split mode, so that the production and transportation are convenient, and the cavity and the building block can adapt to various cavities and building blocks with different specifications.
Preferably, the bottom of the bottom plate is provided with a downward convex boss, and the boss is matched with the cavity opening of the building block. The boss can be matched with a cavity in the hollow block to play a role in positioning the bottom plate.
Preferably, the width of the bottom plate is larger than the width of the opening of the cavity of the building block and is positioned between the vertical plates at two sides. The bottom plate needs to cover the cavity so as to avoid concrete leakage to the bottom plate below in the pouring process, and the bottom plate plays a supporting and limiting role for the side plates on two sides.
Preferably, the lateral plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, the supporting block comprises a supporting portion and a clamping portion, the length of the supporting portion is matched with the distance between the lateral plates on two sides, the clamping portion is matched with the clamping grooves, and the supporting portion is located between the lateral plates on two sides and supports the lateral plates on two sides when the clamping portion is placed in the clamping grooves. The clamping portion supports the side plate on the upper portion of the side plate and plays a limiting role in the horizontal position of the side plate.
Preferably, the connecting pieces are arranged along the extending direction of the horizontal tie beam, and the connecting pieces of the side plates on two sides are arranged oppositely. The relative setting is convenient for carry out the ligature through the steel wire and fix.
Preferably, the connecting piece is formed by bending a steel wire, two ends of the connecting piece are embedded in the side plates, and the middle part of the connecting piece is bent and extends outwards. The steel wire forms the hook ring after bending, the ligature of the steel wire of being convenient for.
Preferably, the side plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, and the clamping grooves and the connecting pieces are sequentially arranged in a staggered manner. When the clamping grooves and the connecting pieces are arranged in a staggered mode, the supporting blocks in the clamping grooves cannot influence binding of the connecting pieces.
Preferably, reinforcing steel bars are arranged between the side plates on the two sides and are positioned in poured concrete. The reinforcing bars may increase the overall strength of the horizontal tie beam.
Preferably, the reinforcing steel bars are bound and connected with the connecting pieces. Connecting piece and reinforcement are connected, both increased the fastness of curb plate in horizontal tie beam, and the connecting piece has further improved the intensity of horizontal tie beam after on the ligature reinforcing bar simultaneously.
The invention has the following beneficial effects:
1. the bottom plate and the side plates are arranged in a split manner, so that the production, manufacturing and transportation cost is reduced, the side plates can be used as templates, form removal is not needed, and the side plates can adapt to various walls and building blocks with different specifications;
2. the side plates are bound and fixed through the connecting pieces, so that the side plates can be arranged more firmly, the binding of the connecting pieces to the reinforcing steel bars can be reduced, and the strength of the horizontal tie beam is further improved;
3. the bottom plate and the supporting shoe can both play the supporting role to the curb plate, prevent that the curb plate from because the pulling force that receives the connecting piece and the inside skew of position to the supporting shoe sets up with the connecting piece interval, can not cause the interference to the ligature of connecting piece.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a bottom plate block structure;
FIG. 3 is a schematic view of the support block configuration.
In the figure: the steel bar clamping device comprises a base plate 1, side plates 2, supporting blocks 3, connecting pieces 4, steel bars 5, bosses 11, clamping grooves 21, supporting parts 31 and clamping parts 32.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 3, the present embodiment provides a method for pouring a horizontal tie beam of a building wall, including the following steps:
the top of the building block is covered with a beam bottom plate 1, and the bottom plate 1 covers the cavity of the building block. The bottom of the bottom plate 1 is provided with a boss 11 protruding downwards, the boss 11 is matched with the cavity opening of the building block, and the width of the bottom plate 1 is larger than that of the cavity opening of the building block.
And (3) erecting tie beam side plates 2 at two sides of the bottom plate 1, making the outermost sides of the side plates 2 flush with the outermost sides of the building blocks, and clamping the bottom plate 1 between the vertical plates 2 at two sides.
Supporting blocks 3 are installed at the tops of the side plates 2 at the two sides, and the two ends of each supporting block 3 support the side plates 2 at the two sides respectively. Curb plate 2 is provided with draw-in groove 21 along the extending direction interval of horizontal tie beam, and supporting shoe 3 includes supporting part 31 and joint portion 32, and supporting part 31 length and both sides curb plate 2's distance looks adaptation, joint portion 32 and draw-in groove 21 looks adaptation, and joint portion 32 is located between the curb plate 2 of both sides and supports the curb plate 2 of both sides when placing draw-in groove 21.
The side plates 2 are provided with connecting pieces 4 extending towards the inner side, and the connecting pieces 4 of the side plates 2 on the two sides are bound and connected. The connecting pieces 4 are arranged along the extending direction of the horizontal tie beam, and the connecting pieces 4 of the side plates 2 at two sides are arranged oppositely. The connecting piece 4 is formed by bending a steel wire, two ends of the connecting piece 4 are embedded in the side plates 2, and the middle part of the connecting piece is bent and extends outwards. The connecting pieces 4 are arranged alternately with the catching grooves 32 in the extending direction of the horizontal tie beam.
Still set up reinforcing bar 5 between the curb plate 2 of both sides, reinforcing bar 5 is arranged in the concrete of pouring, and reinforcing bar 5 and connecting piece 4 ligature are connected.
Concrete is poured between the side plates 2 on the two sides and tamped;
and curing after the concrete is solidified.
Although the present invention has been described in detail by referring to the drawings in connection with the preferred embodiments, the present invention is not limited thereto. It will be apparent to those skilled in the art that various changes and modifications can be made without departing from the spirit and scope of the invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (9)
1. A method for pouring a horizontal tie beam of a building wall body is characterized by comprising the following steps: the method comprises the following steps:
s01: the top of the building block is covered with a beam-tying bottom plate, and the bottom plate covers the cavity of the building block;
s02: erecting tie beam side plates on two sides of the bottom plate, and enabling the outermost sides of the side plates to be flush with the outermost sides of the building blocks;
s03: the top of the side plates on the two sides is provided with a supporting block, and the two ends of the supporting block respectively support the side plates on the two sides;
s04: the side plates are provided with connecting pieces extending inwards, and the connecting pieces of the side plates on the two sides are bound and connected;
s05: pouring concrete between the side plates on the two sides and tamping;
s06: and curing after the concrete is solidified.
2. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the bottom of the bottom plate is provided with a boss protruding downwards, and the boss is matched with the cavity opening of the building block.
3. The method for casting the horizontal tie beam of the building wall according to claim 2, wherein: the width of the bottom plate is larger than the width of the opening of the cavity of the building block and is positioned between the vertical plates at two sides.
4. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the curb plate is provided with the draw-in groove along the extending direction interval of horizontal tie beam, the supporting shoe includes supporting part and joint portion, the supporting part length and the distance looks adaptation of both sides curb plate, joint portion and draw-in groove looks adaptation, the supporting part is located between the curb plate of both sides and supports the curb plate of both sides when joint portion places the draw-in groove.
5. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: the connecting pieces are arranged along the extending direction of the horizontal tie beam, and the connecting pieces of the side plates at two sides are arranged oppositely.
6. The method for casting the horizontal tie beam of the building wall according to claim 5, wherein: the connecting piece is formed by bending a steel wire, two ends of the connecting piece are embedded in the side plates, and the middle part of the connecting piece is bent and extends outwards.
7. The method for casting the horizontal tie beam of the building wall according to claim 5, wherein: the lateral plates are provided with clamping grooves at intervals along the extending direction of the horizontal tie beam, and the clamping grooves and the connecting pieces are sequentially arranged in a staggered mode.
8. The method for casting the horizontal tie beam of the building wall according to claim 1, wherein the method comprises the following steps: and reinforcing steel bars are arranged between the side plates at two sides and are positioned in poured concrete.
9. The method for casting the horizontal tie beam of the building wall according to claim 8, wherein: and the steel bars are bound and connected with the connecting pieces.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010361733.3A CN111576864B (en) | 2020-04-30 | 2020-04-30 | Method for pouring horizontal tie beam of building wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010361733.3A CN111576864B (en) | 2020-04-30 | 2020-04-30 | Method for pouring horizontal tie beam of building wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111576864A true CN111576864A (en) | 2020-08-25 |
CN111576864B CN111576864B (en) | 2022-09-02 |
Family
ID=72120693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010361733.3A Active CN111576864B (en) | 2020-04-30 | 2020-04-30 | Method for pouring horizontal tie beam of building wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111576864B (en) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2030225U (en) * | 1988-04-23 | 1989-01-04 | 陆美球 | Prefabricated mould jacket for pouring concrete post |
CN2232953Y (en) * | 1995-11-24 | 1996-08-14 | 梁育雄 | Permanent combination building section mould |
CN201068619Y (en) * | 2007-07-31 | 2008-06-04 | 张利萍 | Dedicated collar beam, trim joist building blocks with heat-insulating layer |
CN201762982U (en) * | 2010-04-08 | 2011-03-16 | 叶翼翔 | Prefabricated spliced concrete formwork |
CN201933778U (en) * | 2011-01-28 | 2011-08-17 | 四川省建筑机械化工程公司 | Assembling structure of cast-in-situ concrete beam formwork |
CN104674985A (en) * | 2015-01-19 | 2015-06-03 | 北京振利节能环保科技股份有限公司 | Non-dismantling die cast-in-place lightweight thermal insulation wall formboard, thermal insulation wall and construction method thereof |
CN105696734A (en) * | 2016-03-28 | 2016-06-22 | 余德平 | Heat-retaining heat-insulating fireproof ratproof assembled composite wall for modern henhouse building |
AU2016200245A1 (en) * | 2015-01-06 | 2016-07-21 | Pantano Investments Pty Ltd | Permanent Formwork System for Building of Columns and Beams |
CN106193579A (en) * | 2016-08-31 | 2016-12-07 | 广州市轻能建材有限公司 | Building template assembly |
CN106436989A (en) * | 2016-10-24 | 2017-02-22 | 辽宁金帝建筑设计有限公司 | Non-dismantling template for building wall body casting and preparing method thereof |
CN206071047U (en) * | 2016-08-29 | 2017-04-05 | 中国建筑第七工程局有限公司 | A kind of beam formwork for building |
CN106703288A (en) * | 2016-11-18 | 2017-05-24 | 湖南大学 | Manufacturing method of carbon fiber mesh composite board and concrete continuous beam |
KR101745242B1 (en) * | 2016-01-22 | 2017-06-20 | 삼목에스폼 주식회사 | Bariable beam form and construction method thereof |
CN106894633A (en) * | 2017-03-22 | 2017-06-27 | 中冶建工集团有限公司 | The cast in situs method of small-size concrete component |
CN207017644U (en) * | 2017-08-03 | 2018-02-16 | 中国十九冶集团有限公司 | The special skewed slot of constructional column concrete placings |
CN108343234A (en) * | 2018-05-02 | 2018-07-31 | 天津城建大学 | It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry |
CN209760801U (en) * | 2018-12-26 | 2019-12-10 | 河南建鼎工程管理有限公司 | Cast-in-place mould of building spandrel girder |
KR102095488B1 (en) * | 2019-10-01 | 2020-03-31 | 구연진 | Formwork structure for beam construction |
-
2020
- 2020-04-30 CN CN202010361733.3A patent/CN111576864B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2030225U (en) * | 1988-04-23 | 1989-01-04 | 陆美球 | Prefabricated mould jacket for pouring concrete post |
CN2232953Y (en) * | 1995-11-24 | 1996-08-14 | 梁育雄 | Permanent combination building section mould |
CN201068619Y (en) * | 2007-07-31 | 2008-06-04 | 张利萍 | Dedicated collar beam, trim joist building blocks with heat-insulating layer |
CN201762982U (en) * | 2010-04-08 | 2011-03-16 | 叶翼翔 | Prefabricated spliced concrete formwork |
CN201933778U (en) * | 2011-01-28 | 2011-08-17 | 四川省建筑机械化工程公司 | Assembling structure of cast-in-situ concrete beam formwork |
AU2016200245A1 (en) * | 2015-01-06 | 2016-07-21 | Pantano Investments Pty Ltd | Permanent Formwork System for Building of Columns and Beams |
CN104674985A (en) * | 2015-01-19 | 2015-06-03 | 北京振利节能环保科技股份有限公司 | Non-dismantling die cast-in-place lightweight thermal insulation wall formboard, thermal insulation wall and construction method thereof |
KR101745242B1 (en) * | 2016-01-22 | 2017-06-20 | 삼목에스폼 주식회사 | Bariable beam form and construction method thereof |
CN105696734A (en) * | 2016-03-28 | 2016-06-22 | 余德平 | Heat-retaining heat-insulating fireproof ratproof assembled composite wall for modern henhouse building |
CN206071047U (en) * | 2016-08-29 | 2017-04-05 | 中国建筑第七工程局有限公司 | A kind of beam formwork for building |
CN106193579A (en) * | 2016-08-31 | 2016-12-07 | 广州市轻能建材有限公司 | Building template assembly |
CN106436989A (en) * | 2016-10-24 | 2017-02-22 | 辽宁金帝建筑设计有限公司 | Non-dismantling template for building wall body casting and preparing method thereof |
CN106703288A (en) * | 2016-11-18 | 2017-05-24 | 湖南大学 | Manufacturing method of carbon fiber mesh composite board and concrete continuous beam |
CN106894633A (en) * | 2017-03-22 | 2017-06-27 | 中冶建工集团有限公司 | The cast in situs method of small-size concrete component |
CN207017644U (en) * | 2017-08-03 | 2018-02-16 | 中国十九冶集团有限公司 | The special skewed slot of constructional column concrete placings |
CN108343234A (en) * | 2018-05-02 | 2018-07-31 | 天津城建大学 | It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry |
CN209760801U (en) * | 2018-12-26 | 2019-12-10 | 河南建鼎工程管理有限公司 | Cast-in-place mould of building spandrel girder |
KR102095488B1 (en) * | 2019-10-01 | 2020-03-31 | 구연진 | Formwork structure for beam construction |
Also Published As
Publication number | Publication date |
---|---|
CN111576864B (en) | 2022-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108360550B (en) | A kind of steel construction direct-burried foundation bolt construction method | |
CN111730738A (en) | Prefabricated box girder diaphragm plate connecting structure and construction method thereof | |
CN111576864B (en) | Method for pouring horizontal tie beam of building wall | |
CN212002304U (en) | Positioning device for fixing arc-shaped template | |
CN112049023A (en) | Prefabricated T-beam end template and anchor sealing construction process | |
CN109024842B (en) | Inverted trapezoidal open channel construction method | |
CN101327614A (en) | Method for manufacturing pre-fabricated reinforced concrete plate with rib | |
CN210164241U (en) | Prefabricated boundary beam of preset formwork | |
CN114892811A (en) | Construction method for connecting node of core tube and outer frame steel bar truss floor bearing plate | |
CN212427769U (en) | Interlocking building block for mould-disassembly-free constructional column | |
CN211850266U (en) | Laminated floor slab structure | |
CN212452334U (en) | Arch structure for culvert and reinforced concrete arch plate thereof | |
CN210976322U (en) | Bracket superposed beam and forming equipment thereof | |
CN210421625U (en) | Cast-in-place combination beam structure of assembled | |
CN208717969U (en) | A kind of novel alter-pouring strips mould plate installs structure | |
CN217680006U (en) | Simple prefabricated ring beam connecting structure system | |
CN215331483U (en) | Exempt from to tear open form windowsill and press a construction structures | |
CN220747420U (en) | Semi-precast concrete roof pressing | |
CN217948750U (en) | Bridge side flange structure and box girder | |
CN219671866U (en) | Assembled constructional column and embracing frame column structure | |
CN217580626U (en) | Anti-displacement full-cast-in-place concrete outer wall seam pulling plate | |
CN212001877U (en) | Mould disassembly-free module for producing prefabricated part and prefabricated part comprising same | |
JP3126885B2 (en) | Method of manufacturing blocks for stone walls using natural stone | |
CN218374656U (en) | Windowsill coping prefabricated part | |
CN213654867U (en) | One-step casting and forming die frame system for small-section tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |