CN111502233A - Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane - Google Patents

Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane Download PDF

Info

Publication number
CN111502233A
CN111502233A CN202010321602.2A CN202010321602A CN111502233A CN 111502233 A CN111502233 A CN 111502233A CN 202010321602 A CN202010321602 A CN 202010321602A CN 111502233 A CN111502233 A CN 111502233A
Authority
CN
China
Prior art keywords
scaffold
tower crane
attached
folding
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010321602.2A
Other languages
Chinese (zh)
Inventor
徐卫星
孙季超
何志刚
朱兆国
韩尚
季小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Anheng Intelligent Technology Development Co ltd
Original Assignee
Nantong Anheng Intelligent Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Anheng Intelligent Technology Development Co ltd filed Critical Nantong Anheng Intelligent Technology Development Co ltd
Priority to CN202010321602.2A priority Critical patent/CN111502233A/en
Publication of CN111502233A publication Critical patent/CN111502233A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment position of a tower crane, which has the technical scheme that: the method specifically comprises the following steps: s1, installing an attached lifting scaffold: installing the attached lifting scaffold at the position of the tower crane attachment arm by adopting a special vertical standard frame, and connecting one end of the folding scaffold board with the special vertical standard frame during installation; s2, lifting and attaching a lifting scaffold; s3, fixing the attached lifting scaffold again: when the attached lifting scaffold passes through a tower crane attachment rod after being lifted, the steel wire rope is loosened to enable the folding scaffold board to be restored to a horizontal state, and then a pin shaft is inserted for fixing; the utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane can reduce the workload of disassembly and assembly, improve the working efficiency and precision of workers and guarantee the construction period of a project.

Description

Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane
Technical Field
The invention relates to a building construction method, in particular to a method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment of a tower crane.
Background
At present, super high-rise buildings are more and more, and the attached lifting scaffold is used more and more widely in super high-rise building construction, but how to handle the scaffold board through the tower crane attachment when the attached lifting scaffold is rising and falling is always the safety of the scaffold itself and the tower crane attachment arm when the key difficulty in construction passes through the tower crane attachment, and the passing time is reduced, otherwise, the construction period is influenced. Traditional scaffold boards attached to lifting scaffolds are attached to the place through a tower crane, and the dismounting is complex and inconvenient.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment part of a tower crane, so as to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment position of a tower crane specifically comprises the following steps:
s1, installing an attached lifting scaffold: the method comprises the following steps that an attached lifting scaffold is installed at the position of an attached arm of a tower crane by adopting a special vertical standard frame, one end of a folding scaffold board is connected with the special vertical standard frame during installation, the folding scaffold board can rotate around the connection position of the folding scaffold board and the special vertical standard frame, and the other end of the folding scaffold board is connected with the special vertical standard frame in a pulling mode through a steel wire rope;
s2, lifting and attaching the lifting scaffold: when the folding type scaffold board meets the tower crane attachment rod in the lifting process, the pin shaft is firstly opened, the steel wire rope is pulled to fold the folding type scaffold board, and the attachment lifting scaffold passes through the tower crane attachment rod in the lifting process;
s3, fixing the attached lifting scaffold again: when the attached lifting scaffold is lifted through the tower crane attachment rod, the steel wire rope is loosened to enable the folding scaffold board to recover to a horizontal state, and then the pin shaft is inserted for fixing.
Further, when the attached lifting scaffold is installed in S1, connection anchoring portions for connecting folding scaffold boards are arranged at both ends of the adopted special vertical standard frame.
Further, when the attached lifting scaffold is installed in S1, one end of the folding scaffold board is connected to the special vertical standard frame through a bolt, and the other end of the folding scaffold board is connected to the special vertical standard frame through a steel wire rope, wherein the folding scaffold board is connected to the folding scaffold board through a plug.
Furthermore, two protruding connecting ribs are symmetrically fixed on the folding scaffold board, two pulling rope sleeves are respectively fixed on the two protruding connecting ribs, a steel hook is fixed at the pulling end of the steel wire rope, and the steel hook is fixed in an opening of the pulling rope sleeve in a closed mode.
Furthermore, the position of the attached scaffold except the tower crane is fixed on the wall surface through an attached wall support.
Further, the distance between two adjacent wall-attached supports in the vertical position is equal to the building distance.
Further, it adheres to the pole district to be formed with the tower crane in tower crane adhesion department to adhere to the lifting foot hand frame the tower crane adheres to pole district and reserves the tower crane and adheres to the pole entrance to a cave, foldable scaffold board is located the tower crane adheres to pole entrance to a cave top the tower crane adheres to pole entrance to a cave department and is provided with horizontal tower crane and adheres to the pole.
Furthermore, the two ends of the tower crane attachment rod are respectively arranged on the attachment type scaffold.
Further, tower crane adheres to in the pole district tower crane adheres to pole entrance to a cave width degree and is twice tower crane width at least.
Further, the foldable scaffold board is customized according to the size of the tower crane attachment rod hole, and the length of the foldable scaffold board is the same as the width of the tower crane attachment rod hole.
In summary, the invention mainly has the following beneficial effects:
the utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane can reduce the workload of disassembly and assembly, improve the working efficiency and precision of workers and guarantee the construction period of a project.
Drawings
FIG. 1 is a schematic structural diagram for showing the positional relationship between an attached scaffold and a tower crane according to the present invention;
FIG. 2 is a schematic view of the foldable scaffold board of the present invention;
fig. 3 is a schematic structural view for showing a connection structure of a special vertical standard frame and a steel wire rope.
In the figure: 1. a tower crane attachment rod area; 2. a folding scaffold board; 3. a tower crane attachment rod hole; 4. a tower crane attachment rod; 5. a special vertical standard frame; 6. a wire rope; 7. and (7) a pin shaft.
Detailed Description
The present invention is described in further detail below with reference to figures 1-3.
Example 1
A method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment position of a tower crane specifically comprises the following steps:
s1, installing an attached lifting scaffold: the attachment lifting scaffold is installed at the position of an attachment arm of a tower crane by adopting a special vertical standard frame, one end of a folding scaffold board 2 is connected with the special vertical standard frame when the attachment lifting scaffold is installed, the folding scaffold board 2 can rotate around the connection position of the folding scaffold board 2 and the special vertical standard frame 5, and the other end of the folding scaffold board 2 is connected with the special vertical standard frame 5 in a pulling mode through a steel wire rope 6;
s2, lifting and attaching the lifting scaffold: when the folding type scaffold board 2 meets the tower crane attachment rod 4 in the lifting process of the attachment lifting scaffold, the pin shaft 7 is firstly opened, the steel wire rope 6 is pulled to fold the folding type scaffold board 2, and the attachment lifting scaffold passes through the tower crane attachment rod 4 in the lifting process;
s3, fixing the attached lifting scaffold again: when the attached lifting scaffold is lifted and passes through the tower crane attachment rod 4, the steel wire rope 6 is loosened to enable the folding scaffold board 2 to be restored to a horizontal state, and then the pin shaft 7 is inserted for fixing.
When the attached lifting scaffold is installed in the S1, connection anchoring parts for connecting the folding scaffold boards 2 are arranged at two ends of the adopted special vertical standard frame 5.
When the attached lifting scaffold is installed in the S1, one end of the folding scaffold board 2 is connected with the special vertical standard frame 5 through a bolt, the other end of the folding scaffold board is connected with the special vertical standard frame 5 through a steel wire rope 6 in a pulling mode, and the folding scaffold board 2 is connected with the folding scaffold board 2 through a bolt.
Wherein, two protruding connecting ribs are symmetrically fixed on the folding scaffold board 2, a traction rope sleeve is respectively fixed on the two protruding connecting ribs, a steel hook is fixed at the traction end of the steel wire rope 6, and the steel hook is fixed in an opening of the traction rope sleeve.
Wherein, the position of the attached scaffold except the tower crane is fixed on the wall surface through the attached wall support.
Wherein, the distance between two adjacent wall-attached supports at the vertical position is equal to the distance between the floors.
Wherein, it adheres to lifting foot rest and is formed with tower crane adhesion rod district 1 in tower crane adhesion department, adheres to 1 reservation in tower crane adhesion rod districts and has tower crane adhesion rod entrance to a cave 3, and foldable scaffold board 2 is located tower crane adhesion rod entrance to a cave 3 tops, adheres to 3 departments of pole and is provided with horizontal tower crane adhesion rod 4 at the tower crane.
Wherein, the both ends of tower crane attachment rod 4 are installed respectively on the attached scaffold.
Wherein, the tower crane adheres to 3 width in the pole entrance to a cave of pole in the tower crane adheres to pole district 1 and is two times tower crane width at least.
Wherein, foldable scaffold board 2 is customized according to the size that the pole entrance to a cave 3 is adhered to the tower crane, and foldable scaffold board 2 length is the same with the width that the pole entrance to a cave 3 is adhered to the tower crane.
The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane can reduce the workload of disassembly and assembly, improve the working efficiency and precision of workers and guarantee the construction period of a project.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (10)

1. The utility model provides a method for utilizing a folding scaffold board attached to a lifting scaffold at the attachment part of a tower crane, which is characterized in that: the method specifically comprises the following steps:
s1, installing an attached lifting scaffold: the method comprises the following steps that an attached lifting scaffold is installed at the position of an attached arm of a tower crane by adopting a special vertical standard frame (5), one end of a folding type scaffold board (2) is connected with the special vertical standard frame (5) during installation, the folding type scaffold board (2) can rotate around the connection position of the folding type scaffold board (2) and the special vertical standard frame (5), and the other end of the folding type scaffold board (2) is connected with the special vertical standard frame (5) in a pulling mode through a steel wire rope (6);
s2, lifting and attaching the lifting scaffold: when the folding type scaffold board (2) meets a tower crane attachment rod (4) in the lifting process of the attached lifting scaffold, the pin shaft (7) is firstly opened, the steel wire rope (6) is pulled to fold the folding type scaffold board (2), and the attached lifting scaffold passes through the tower crane attachment rod (4) in the lifting process;
s3, fixing the attached lifting scaffold again: when the attached lifting scaffold is lifted and passes through the tower crane attachment rod (4), the steel wire rope (6) is loosened to enable the folding scaffold board (2) to recover to a horizontal state, and then the pin shaft (7) is inserted for fixing.
2. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: when the attached lifting scaffold is installed in the S1, the two ends of the adopted special vertical standard frame (5) are respectively provided with a connecting and anchoring part for connecting the folding scaffold boards (2).
3. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: when the attached lifting scaffold is installed in the S1, one end of the folding scaffold board (2) is connected with the special vertical standard frame (5) through a bolt, the other end of the folding scaffold board is connected with the special vertical standard frame (5) through a steel wire rope (6) in a pulling mode, and the folding scaffold board (2) is connected with the folding scaffold board (2) through a bolt.
4. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: two protruding connecting ribs are symmetrically fixed on the folding scaffold board (2), two pulling rope sleeves are respectively fixed on the protruding connecting ribs, a steel hook is fixed at the pulling end of the steel wire rope (6), and the steel hook is fixed in an opening of the pulling rope sleeve in a hooking mode.
5. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: the position of the attached scaffold except the tower crane is fixed on the wall surface through an attached wall support.
6. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 5, wherein the method comprises the following steps: the distance between two adjacent wall-attached supports in the vertical position is equal to the floor distance.
7. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: adhere to the lifting foot hand frame and be formed with tower crane adhesion rod district (1) in tower crane adhesion rod district (1) is reserved there is tower crane adhesion rod entrance to a cave (3), foldable scaffold board (2) are located tower crane adhesion rod entrance to a cave (3) top the tower crane adhesion rod entrance to a cave (3) department is provided with horizontal tower crane adhesion rod (4).
8. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 7, wherein the method comprises the following steps: and two ends of the tower crane attachment rod (4) are respectively installed on the attachment type scaffold.
9. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 7, wherein the method comprises the following steps: the width of the tower crane attachment rod hole (3) in the tower crane attachment rod area (1) is at least twice of the width of a tower crane.
10. The utilization method of the folding scaffold board attached to the lifting scaffold at the attachment position of the tower crane according to claim 1, wherein the method comprises the following steps: the foldable scaffold board (2) is customized according to the size of the tower crane attachment rod hole (3), and the length of the foldable scaffold board (2) is the same as the width of the tower crane attachment rod hole (3).
CN202010321602.2A 2020-04-22 2020-04-22 Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane Pending CN111502233A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010321602.2A CN111502233A (en) 2020-04-22 2020-04-22 Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010321602.2A CN111502233A (en) 2020-04-22 2020-04-22 Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane

Publications (1)

Publication Number Publication Date
CN111502233A true CN111502233A (en) 2020-08-07

Family

ID=71870015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010321602.2A Pending CN111502233A (en) 2020-04-22 2020-04-22 Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane

Country Status (1)

Country Link
CN (1) CN111502233A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854550A (en) * 1972-12-21 1974-12-17 Cyclops Corp Mobile outrigger for scaffolds
JP3996708B2 (en) * 1998-09-18 2007-10-24 セイコー機器株式会社 Temporary construction method for work scaffolds such as pedestrian bridges and overhead beam
CN201891253U (en) * 2010-09-03 2011-07-06 姚康华 Light type cable-stayed scaffold
CN205088933U (en) * 2015-10-29 2016-03-16 保定市裕升建筑安装股份有限公司 Tower crane inserted lift scaffold's operation protection platform
CN107939035A (en) * 2017-11-20 2018-04-20 北京崇建工程有限公司 The method that attached lifting scaffold and attached lifting scaffold pass through tower crane attachment
CN209817397U (en) * 2019-04-09 2019-12-20 湖南省第三工程有限公司 Foldable scaffold board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854550A (en) * 1972-12-21 1974-12-17 Cyclops Corp Mobile outrigger for scaffolds
JP3996708B2 (en) * 1998-09-18 2007-10-24 セイコー機器株式会社 Temporary construction method for work scaffolds such as pedestrian bridges and overhead beam
CN201891253U (en) * 2010-09-03 2011-07-06 姚康华 Light type cable-stayed scaffold
CN205088933U (en) * 2015-10-29 2016-03-16 保定市裕升建筑安装股份有限公司 Tower crane inserted lift scaffold's operation protection platform
CN107939035A (en) * 2017-11-20 2018-04-20 北京崇建工程有限公司 The method that attached lifting scaffold and attached lifting scaffold pass through tower crane attachment
CN209817397U (en) * 2019-04-09 2019-12-20 湖南省第三工程有限公司 Foldable scaffold board

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江正荣: "《建筑施工工程师手册》", 31 October 1992, 北京:中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN201040922Y (en) Anti-slip hook for fixing and suspending scaffold
CN102561669B (en) Cantilever scaffold and construction method thereof
CN102168484B (en) External hanging scaffold and application method thereof
CN212403268U (en) Wall assembly is hung to outer tower of building structure
CN206273948U (en) Truss operating platform
CN201614731U (en) Novel electric lifting scaffold
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN201221194Y (en) Postposition pre-embedded type wall connecting components
CN111502233A (en) Method for utilizing folding scaffold board attached to lifting scaffold at attachment position of tower crane
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN206034875U (en) Auxiliary mounting movable arm type tower crane tool beam hanging basket device
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN206607903U (en) A kind of pre-assembled elevator hard protection pipe support
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN201502170U (en) Horizontal supporting device of building external frame
CN201474283U (en) Composite outer hanger bracket for construction
CN201362948Y (en) Steel hanger installer
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN106812331B (en) Manufacturing method of pre-assembled elevator shaft hard protection and protective pipe frame
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN205709351U (en) Building hoist remote installing type attachment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200807