CN111501535A - 一种装配式道路桥梁墩柱结构 - Google Patents

一种装配式道路桥梁墩柱结构 Download PDF

Info

Publication number
CN111501535A
CN111501535A CN202010434868.8A CN202010434868A CN111501535A CN 111501535 A CN111501535 A CN 111501535A CN 202010434868 A CN202010434868 A CN 202010434868A CN 111501535 A CN111501535 A CN 111501535A
Authority
CN
China
Prior art keywords
seat
integrally formed
butt joint
limiting groove
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010434868.8A
Other languages
English (en)
Other versions
CN111501535B (zh
Inventor
汪友仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Urban Construction Planning And Design Institute Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010434868.8A priority Critical patent/CN111501535B/zh
Publication of CN111501535A publication Critical patent/CN111501535A/zh
Application granted granted Critical
Publication of CN111501535B publication Critical patent/CN111501535B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及道路桥梁工程技术领域,具体为一种装配式道路桥梁墩柱结构,包括底座,底座的下方一体成型有埋入地面的埋入桩,且埋入桩的上端开设有第二限位槽,底座的上方设置有对接安装座,且对接安装座的下方设置有***第二限位槽内的中心柱,底座上一体成型有配合卡勾,且对接安装座上一体成型有与配合卡勾对应卡接的对接卡勾。有益效果为:本发明所设计的桥梁墩柱能够在工厂内将主要零部件进行快速的生产,然后利用车辆统一运输至施工位置后进行快速的组装,并且组装方式简单,能够快速的建成所需的桥梁墩柱,从而能够有效的提高桥梁铺设的速度,尤其适合对车流量较大的桥梁进行快速抢修。

Description

一种装配式道路桥梁墩柱结构
技术领域
本发明涉及道路桥梁工程技术领域,具体为一种装配式道路桥梁墩柱结构。
背景技术
我国高铁和高速公路主要采用架设桥梁的方式进行建造,因此对桥梁铺设的需求很高,现有铺设桥梁时所采用的桥梁墩柱一般是直接的在所需位置进行浇注形成,但是浇注成型的桥梁需要很长时间进行固化,这就导致桥梁建设的工期会很长,不适合缩短建设工期,也不适合在桥梁发生故障后进行快速的抢修,而且随着我国装配式桥梁的逐步普及,对桥梁墩柱采用装配式组装也必然成为新的发展方向。
如果发明一种能够在工厂中进行加工,然后在施工位置在进行装配的新型桥梁墩柱就能够有效的解决此类问题,为此我们提供了一种装配式道路桥梁墩柱结构。
发明内容
本发明的目的在于提供一种装配式道路桥梁墩柱结构,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种装配式道路桥梁墩柱结构,包括底座,所述底座的下方一体成型有埋入地面的埋入桩,且埋入桩的上端开设有第二限位槽,所述底座的上方设置有对接安装座,且对接安装座的下方设置有***第二限位槽内的中心柱,所述底座上一体成型有配合卡勾,且对接安装座上一体成型有与配合卡勾对应卡接的对接卡勾,所述底座和对接安装座的四角处通过定位固定杆插接安装;
所述对接安装座的上方一体成型有配合支撑座,且配合支撑座的内部开设有第三限位槽,所述配合支撑座的上方串联安装有至少一个单元连接桩,且单元连接桩的底部一体成型有与第三限位槽插接安装的对接柱,所述单元连接桩的上端一体成型有与对接柱对应配合的第一限位槽,且位于最高处的单元连接桩的上方设置有减震调隙装置;
所述减震调隙装置包括下连接座,且下连接座的底部通过配合定心柱与第一限位槽插接安装,所述下连接座的上端一体成型有对接座,且对接座的中心处设置有第四限位槽,所述第四限位槽内插接安装有导向柱,且导向柱的顶部一体成型有上连接座,所述上连接座和对接座之间安装有至少一个套接在导向柱上的减震调隙块,且上连接座的上端一体成型有用于支撑桥梁的顶部支撑柱;
所述对接柱和配合定心柱上均开设有限位孔,且配合支撑座和单元连接桩上均安装有与限位孔对应限位的固定装置,所述固定装置包括与配合支撑座或者单元连接桩通过螺栓固定安装的安装板,且安装板的内侧社会中右与限位孔插接安装的限位杆。
优选的,所述上连接座和下连接座之间插接安装有连接杆,且连接杆的末端通过螺接或者焊接安装有配合固定块。
优选的,所述安装板上一体成型有便于搬运的提手,且安装板的外侧一体成型有便于分散外部锤压设备冲击力的锤压配合块。
优选的,所述减震调隙块为环形橡胶块,且定位固定杆为金属柱。
优选的,所述单元连接桩的外侧一体成型有方便外部悬吊设备进行吊装的悬吊座,且悬吊座采用浇注在单元连接桩内的钢圈构成。
与现有技术相比,本发明的有益效果是:本发明所设计的桥梁墩柱能够在工厂内将主要零部件进行快速的生产,然后利用车辆统一运输至施工位置后进行快速的组装,并且组装方式简单,能够快速的建成所需的桥梁墩柱,从而能够有效的提高桥梁铺设的速度,尤其适合对车流量较大的桥梁进行快速抢修,具有很高的实用价值。
附图说明
图1为本发明结构示意图;
图2为本发明结构的剖视图;
图3为本发明单元连接桩的结构示意图;
图4为本发明对接安装座的结构示意图。
图中:1、底座;2、配合卡勾;3、固定装置;301、限位杆;302、安装板;303、锤压配合块;304、提手;4、减震调隙装置;401、上连接座;402、连接杆;403、减震调隙块;404、对接座;405、配合固定块;406、下连接座;5、限位孔;6、第一限位槽;7、悬吊座;8、对接柱;9、单元连接桩;10、对接安装座;11、第二限位槽;12、配合支撑座;13、第三限位槽;14、对接卡勾;15、定位固定杆;16、中心柱;17、埋入桩;18、顶部支撑桩;19、配合定心柱;20、第四限位槽;21、导向柱。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的技术方案,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1至图4,本发明提供一种技术方案:一种装配式道路桥梁墩柱结构,包括底座1,底座1的下方一体成型有埋入地面的埋入桩17,且埋入桩17的上端开设有第二限位槽11,底座1的上方设置有对接安装座10,且对接安装座10的下方设置有***第二限位槽11内的中心柱16,底座1上一体成型有配合卡勾2,且对接安装座10上一体成型有与配合卡勾2对应卡接的对接卡勾14,底座1和对接安装座10的四角处通过定位固定杆15插接安装;
对接安装座10的上方一体成型有配合支撑座12,且配合支撑座12的内部开设有第三限位槽13,配合支撑座12的上方串联安装有至少一个单元连接桩9,且单元连接桩9的底部一体成型有与第三限位槽13插接安装的对接柱8,单元连接桩9的上端一体成型有与对接柱8对应配合的第一限位槽6,且位于最高处的单元连接桩9的上方设置有减震调隙装置4;
减震调隙装置4包括下连接座406,且下连接座406的底部通过配合定心柱19与第一限位槽6插接安装,下连接座406的上端一体成型有对接座404,且对接座404的中心处设置有第四限位槽20,第四限位槽20内插接安装有导向柱21,且导向柱21的顶部一体成型有上连接座401,上连接座401和对接座404之间安装有至少一个套接在导向柱21上的减震调隙块403,且上连接座401的上端一体成型有用于支撑桥梁的顶部支撑柱18;
对接柱8和配合定心柱19上均开设有限位孔5,且配合支撑座12和单元连接桩9上均安装有与限位孔5对应限位的固定装置3,固定装置3包括与配合支撑座12或者单元连接桩9通过螺栓固定安装的安装板302,且安装板302的内侧社会中右与限位孔5插接安装的限位杆301;
上连接座401和下连接座406之间插接安装有连接杆402,且连接杆402的末端通过螺接或者焊接安装有配合固定块405,安装板302上一体成型有便于搬运的提手304,且安装板302的外侧一体成型有便于分散外部锤压设备冲击力的锤压配合块303,减震调隙块403为环形橡胶块,且定位固定杆15为金属柱,单元连接桩9的外侧一体成型有方便外部悬吊设备进行吊装的悬吊座7,且悬吊座7采用浇注在单元连接桩9内的钢圈构成。
工作原理:该装置使用时,各部位可以单独在工厂内浇注成型,然后分开运输至施工现场后进行组装。组装时,首先将底座1安装在所需的桩位上,然后将对接安装座10以交错的方式***底座1的上方使得第二限位槽11和中心柱16能够有效的对接,然后旋转对接安装座10从而使得配合卡勾2和对接卡勾14能够正确的卡紧在一起,随后将定位固定桩15***相应的位置处用来避免对接安装座10再次发生转动,随后根据所需安装桩位所对应的桥梁高度,在对接安装座10的上方串联安装上相应数量的单元连接桩9,并且位于最上层的单元连接桩9的顶部用于安装减震调隙装置4,所述减震调隙装置4内通过串联不同数量的减振调隙块403来实现对该桩体高度的最后调隙以便于顶部支撑桩18能够更好的与桥梁接触,而连接杆402则能够有效的将减震调隙装置4内部固定成为一个整体,同时固定装置3也能够使得对接安装座10、单元连接桩9和减震调隙装置4之间固定成为一个整体,从而有效的避免桩体安装成型有发生倾斜,同时也提供了良好的防撞能力,而且装配式桥梁墩柱能够有效的提高桥梁铺设的速度,尤其适合对车流量较大的桥梁进行快速抢修,因此能够有效的满足现有的施工使用需要,具有很高的实用价值。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (5)

1.一种装配式道路桥梁墩柱结构,其特征在于:包括底座(1),所述底座(1)的下方一体成型有埋入地面的埋入桩(17),且埋入桩(17)的上端开设有第二限位槽(11),所述底座(1)的上方设置有对接安装座(10),且对接安装座(10)的下方设置有***第二限位槽(11)内的中心柱(16),所述底座(1)上一体成型有配合卡勾(2),且对接安装座(10)上一体成型有与配合卡勾(2)对应卡接的对接卡勾(14),所述底座(1)和对接安装座(10)的四角处通过定位固定杆(15)插接安装;
所述对接安装座(10)的上方一体成型有配合支撑座(12),且配合支撑座(12)的内部开设有第三限位槽(13),所述配合支撑座(12)的上方串联安装有至少一个单元连接桩(9),且单元连接桩(9)的底部一体成型有与第三限位槽(13)插接安装的对接柱(8),所述单元连接桩(9)的上端一体成型有与对接柱(8)对应配合的第一限位槽(6),且位于最高处的单元连接桩(9)的上方设置有减震调隙装置(4);
所述减震调隙装置(4)包括下连接座(406),且下连接座(406)的底部通过配合定心柱(19)与第一限位槽(6)插接安装,所述下连接座(406)的上端一体成型有对接座(404),且对接座(404)的中心处设置有第四限位槽(20),所述第四限位槽(20)内插接安装有导向柱(21),且导向柱(21)的顶部一体成型有上连接座(401),所述上连接座(401)和对接座(404)之间安装有至少一个套接在导向柱(21)上的减震调隙块(403),且上连接座(401)的上端一体成型有用于支撑桥梁的顶部支撑柱(18);
所述对接柱(8)和配合定心柱(19)上均开设有限位孔(5),且配合支撑座(12)和单元连接桩(9)上均安装有与限位孔(5)对应限位的固定装置(3),所述固定装置(3)包括与配合支撑座(12)或者单元连接桩(9)通过螺栓固定安装的安装板(302),且安装板(302)的内侧社会中右与限位孔(5)插接安装的限位杆(301)。
2.根据权利要求1所述的一种装配式道路桥梁墩柱结构,其特征在于:所述上连接座(401)和下连接座(406)之间插接安装有连接杆(402),且连接杆(402)的末端通过螺接或者焊接安装有配合固定块(405)。
3.根据权利要求1所述的一种装配式道路桥梁墩柱结构,其特征在于:所述安装板(302)上一体成型有便于搬运的提手(304),且安装板(302)的外侧一体成型有便于分散外部锤压设备冲击力的锤压配合块(303)。
4.根据权利要求1所述的一种装配式道路桥梁墩柱结构,其特征在于:所述减震调隙块(403)为环形橡胶块,且定位固定杆(15)为金属柱。
5.根据权利要求1所述的一种装配式道路桥梁墩柱结构,其特征在于:所述单元连接桩(9)的外侧一体成型有方便外部悬吊设备进行吊装的悬吊座(7),且悬吊座(7)采用浇注在单元连接桩(9)内的钢圈构成。
CN202010434868.8A 2020-05-21 2020-05-21 一种装配式道路桥梁墩柱结构 Active CN111501535B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010434868.8A CN111501535B (zh) 2020-05-21 2020-05-21 一种装配式道路桥梁墩柱结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010434868.8A CN111501535B (zh) 2020-05-21 2020-05-21 一种装配式道路桥梁墩柱结构

Publications (2)

Publication Number Publication Date
CN111501535A true CN111501535A (zh) 2020-08-07
CN111501535B CN111501535B (zh) 2022-04-19

Family

ID=71870214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010434868.8A Active CN111501535B (zh) 2020-05-21 2020-05-21 一种装配式道路桥梁墩柱结构

Country Status (1)

Country Link
CN (1) CN111501535B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211090A (zh) * 2020-09-29 2021-01-12 西安建筑科技大学 一种均摊耗能式装配式桥墩

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001027283A (ja) * 1999-07-12 2001-01-30 Bridgestone Corp 積層ゴム支承体
KR100704737B1 (ko) * 2005-10-27 2007-04-06 김태균 프리캐스트 수중조립식 교각구조물
KR100736378B1 (ko) * 2006-07-15 2007-07-06 한 선 유 다층 건물의 바닥구조
CN201003563Y (zh) * 2006-12-15 2008-01-09 机械工业第四设计研究院 大荷载高阻尼橡胶隔振器
KR20100005830A (ko) * 2008-07-08 2010-01-18 고려대학교 산학협력단 내부구속 중공 콘크리트 충전유닛을 사용한 조립식 교각 및그 시공방법
CN102720127A (zh) * 2012-06-28 2012-10-10 中铁十三局集团第一工程有限公司 箱梁高度调整结构
CN203714183U (zh) * 2014-02-14 2014-07-16 中安(天津)航空设备有限公司 一种多功能组合式橡胶垫块
CN104032673A (zh) * 2014-06-17 2014-09-10 同济大学 细密高强钢丝网结合钢纤维加劲的叠层橡胶支座
CN205347966U (zh) * 2016-02-19 2016-06-29 贺长霞 一种减震桥梁墩柱
CN105735112A (zh) * 2016-04-14 2016-07-06 北京工业大学 基于螺栓连接的快速拼装预制矩形钢管混凝土桥墩
CN206143607U (zh) * 2016-10-27 2017-05-03 浙江海洋大学 一种减震缓冲桥梁
CN107905092A (zh) * 2017-11-02 2018-04-13 东南大学 一种预制装配式桥墩及其拼装施工方法
KR20180072968A (ko) * 2016-12-22 2018-07-02 정만식 교각 구조물용 영구거푸집 및 이를 이용한 교각 시공방법
CN207619823U (zh) * 2017-11-27 2018-07-17 深圳市交运工程集团有限公司 一种装配式桥梁的连接结构
CN207685678U (zh) * 2017-11-24 2018-08-03 江苏中铁山桥重工有限公司 一种桥梁大节段拼装用对拼式可调楔块
CN108643031A (zh) * 2018-05-24 2018-10-12 西南交通大学 一种预制节段拼装桥墩钢混连接接头
CN109898404A (zh) * 2019-04-18 2019-06-18 重庆锦森腾建筑工程咨询有限公司 一种装配式桥梁结构
CN209482127U (zh) * 2018-11-09 2019-10-11 龙德建设有限公司 一种拼装式桥墩
CN110396917A (zh) * 2019-07-13 2019-11-01 济邦建设集团有限公司 一种立交桥拼接式墩柱
CN110424255A (zh) * 2019-08-26 2019-11-08 沈阳建筑大学 一种桥墩柱上的抗震装置
CN209686219U (zh) * 2019-03-07 2019-11-26 周海平 装配式道路桥梁墩柱结构

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001027283A (ja) * 1999-07-12 2001-01-30 Bridgestone Corp 積層ゴム支承体
KR100704737B1 (ko) * 2005-10-27 2007-04-06 김태균 프리캐스트 수중조립식 교각구조물
KR100736378B1 (ko) * 2006-07-15 2007-07-06 한 선 유 다층 건물의 바닥구조
CN201003563Y (zh) * 2006-12-15 2008-01-09 机械工业第四设计研究院 大荷载高阻尼橡胶隔振器
KR20100005830A (ko) * 2008-07-08 2010-01-18 고려대학교 산학협력단 내부구속 중공 콘크리트 충전유닛을 사용한 조립식 교각 및그 시공방법
CN102720127A (zh) * 2012-06-28 2012-10-10 中铁十三局集团第一工程有限公司 箱梁高度调整结构
CN203714183U (zh) * 2014-02-14 2014-07-16 中安(天津)航空设备有限公司 一种多功能组合式橡胶垫块
CN104032673A (zh) * 2014-06-17 2014-09-10 同济大学 细密高强钢丝网结合钢纤维加劲的叠层橡胶支座
CN205347966U (zh) * 2016-02-19 2016-06-29 贺长霞 一种减震桥梁墩柱
CN105735112A (zh) * 2016-04-14 2016-07-06 北京工业大学 基于螺栓连接的快速拼装预制矩形钢管混凝土桥墩
CN206143607U (zh) * 2016-10-27 2017-05-03 浙江海洋大学 一种减震缓冲桥梁
KR20180072968A (ko) * 2016-12-22 2018-07-02 정만식 교각 구조물용 영구거푸집 및 이를 이용한 교각 시공방법
CN107905092A (zh) * 2017-11-02 2018-04-13 东南大学 一种预制装配式桥墩及其拼装施工方法
CN207685678U (zh) * 2017-11-24 2018-08-03 江苏中铁山桥重工有限公司 一种桥梁大节段拼装用对拼式可调楔块
CN207619823U (zh) * 2017-11-27 2018-07-17 深圳市交运工程集团有限公司 一种装配式桥梁的连接结构
CN108643031A (zh) * 2018-05-24 2018-10-12 西南交通大学 一种预制节段拼装桥墩钢混连接接头
CN209482127U (zh) * 2018-11-09 2019-10-11 龙德建设有限公司 一种拼装式桥墩
CN209686219U (zh) * 2019-03-07 2019-11-26 周海平 装配式道路桥梁墩柱结构
CN109898404A (zh) * 2019-04-18 2019-06-18 重庆锦森腾建筑工程咨询有限公司 一种装配式桥梁结构
CN110396917A (zh) * 2019-07-13 2019-11-01 济邦建设集团有限公司 一种立交桥拼接式墩柱
CN110424255A (zh) * 2019-08-26 2019-11-08 沈阳建筑大学 一种桥墩柱上的抗震装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211090A (zh) * 2020-09-29 2021-01-12 西安建筑科技大学 一种均摊耗能式装配式桥墩
CN112211090B (zh) * 2020-09-29 2021-11-30 西安建筑科技大学 一种均摊耗能式装配式桥墩

Also Published As

Publication number Publication date
CN111501535B (zh) 2022-04-19

Similar Documents

Publication Publication Date Title
CN107289198B (zh) 一种消解混凝土地泵输送动能的装置
CN105421260A (zh) 公路用防撞限高架
CN109403213B (zh) 桥梁预制墩身安装定位导向装置及其施工方法
CN111501535B (zh) 一种装配式道路桥梁墩柱结构
CN211340386U (zh) 一种新型预制节段拼装桥墩的连接结构
CN206768675U (zh) 一种公路三波梁钢护栏增高型防阻块
CN109702387B (zh) 一种斜拉桥塔柱内衬钢结构制作方法
CN219731647U (zh) 一种具有缓冲功能的可拆卸混凝土护栏结构
CN210031489U (zh) 一种板凳式牛腿盖梁支架
CN111441349A (zh) 一种城市桥梁与地铁共建桩基础钢管柱精确定位的施工方法
CN111021235A (zh) 一种增强独柱式桥墩抗倾覆性能的装置及安装方法
CN214656443U (zh) 一种预应力盖梁支撑用抱箍定位结构
CN105625177A (zh) 钢桁架悬挑支架施工方法
CN210767913U (zh) 一种临时支撑预制混凝土外墙的结构
CN210369024U (zh) 一种装配式塔吊承台基础节标高控制装置
CN110616742B (zh) 一种大型预制构件预应力施工减阻水槽及使用方法
CN203174511U (zh) 钢桁架悬挑支架
CN218263872U (zh) 一种多功能基坑盖件
CN214245333U (zh) 一种预制桥墩与承台的连接结构
CN220486262U (zh) 一种用于桥梁拓宽的新建混凝土桥梁结构
CN111576197B (zh) 一种能缓解桥头跳车问题的装配式桥台及其施工方法
CN220394305U (zh) 一种桥墩墩顶围栏安装设备
CN217897385U (zh) 一种混凝土支撑柱加固结构
CN218814395U (zh) 一种逆作法施工桩柱与钢结构连接结构
CN217517383U (zh) 道路桥梁施工用桥墩柱加固装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220329

Address after: Room 601, 776 Dongfeng East Road, Yuexiu District, Guangzhou City, Guangdong 510000

Applicant after: Guangzhou urban construction planning and Design Institute Co.,Ltd.

Address before: 321000 Zhejiang Jinhua Shangpin Construction Engineering Co., Ltd., Room 501, block B, innovation building, No. 1118, Liyu Road, Wucheng District, Jinhua City, Zhejiang Province

Applicant before: Wang Youxian

GR01 Patent grant
GR01 Patent grant