CN111476385B - Building facility maintenance supervisory systems based on BIM - Google Patents

Building facility maintenance supervisory systems based on BIM Download PDF

Info

Publication number
CN111476385B
CN111476385B CN202010450573.XA CN202010450573A CN111476385B CN 111476385 B CN111476385 B CN 111476385B CN 202010450573 A CN202010450573 A CN 202010450573A CN 111476385 B CN111476385 B CN 111476385B
Authority
CN
China
Prior art keywords
data
facility
module
signal
damage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010450573.XA
Other languages
Chinese (zh)
Other versions
CN111476385A (en
Inventor
刘文玲
欧碧芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Wenling
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010450573.XA priority Critical patent/CN111476385B/en
Publication of CN111476385A publication Critical patent/CN111476385A/en
Application granted granted Critical
Publication of CN111476385B publication Critical patent/CN111476385B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • General Health & Medical Sciences (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Primary Health Care (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a BIM-based building facility maintenance supervision system, which comprises an acquisition module, an analysis module, a monitoring module, a processor, an alarm, a database, a timing unit and intelligent equipment, wherein the acquisition module is used for acquiring facility working information, the facility working information comprises working duration data, fault frequency data, temperature data and power-on and power-off frequency data, the working duration data, the fault frequency data, the temperature data and the power-on and power-off frequency data are transmitted to the analysis module through the processor, the analysis module receives the facility working duration data, the facility fault frequency data, the facility temperature data and the power-on and power-off frequency data, the invention analyzes damage factors of facilities through the arrangement of the acquisition module and the analysis module, calculates the damage degree, the average damage coefficient and the discrete degree of the damage coefficient of the facilities, and a fault judgment module judges the use of the facilities according to the analysis result of the analysis module, and the safety analysis of the facility is increased, so that the safety of the facility is better maintained, and the working efficiency is improved.

Description

Building facility maintenance supervisory systems based on BIM
Technical Field
The invention relates to the technical field of maintenance supervision, in particular to a building facility maintenance supervision system based on BIM.
Background
The building refers to an asset formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and buildings. A house is an engineered building for people to live, work, study, produce, manage, entertain, store goods, and perform other social activities. The building is distinguished from a building, the building refers to engineering buildings except a house, such as an enclosing wall, a road, a dam, a water well, a tunnel, a water tower, a bridge, a chimney and the like, and the facility is a Chinese vocabulary and refers to arrangement; the maintenance refers to the maintenance of a mechanism, an organization, a building and the like which are established for certain needs and protected from external damage. For example, protective facilities are provided around the place where people live, around the stocked livestock, and around other important objects and places to prevent external invasion. Maintenance is also one of the communication terms, and then maintenance of the construction equipment is characterized in that the construction equipment is detected and repaired regularly to avoid damage of the construction equipment.
A notice number is CN109801480A intelligent floor monitoring management system based on BIM, this intelligent floor monitoring management system based on BIM, its intelligent monitoring management system that can with administrator and user interactive, can solve the intelligent analytic system in emergent management, energy optimization, three aspects of floor maintenance, however, this intelligent floor monitoring management system based on BIM, can't realize the maintenance to the building facility, and, can't carry out accurate analysis and calculation to the degree of loss of facility, simultaneously, can't carry out the timing monitoring to the inside temperature condition of facility, more can't set for different time according to different ambient temperature and carry out the timing monitoring, for this reason, we propose a building facility maintenance supervisory systems based on BIM.
Disclosure of Invention
The invention aims to provide a BIM-based building facility maintenance supervision system, which analyzes facility working information acquired by an acquisition module through an analysis module to obtain a damage coefficient of the facility, increases safety analysis on the facility, thereby better maintaining the safety of the facility, saving time and improving working efficiency.
The technical problem to be solved by the invention is as follows:
(1) how to analyze damage factors of the facility through the arrangement of the acquisition module and the analysis module, and calculate the damage degree, the average damage coefficient and the discrete degree of the damage coefficient of the facility, and the fault judgment module judges the use of the facility according to the analysis result of the analysis module so as to solve the problem that the damage degree of the facility is difficult to be accurately analyzed in the prior art;
(2) how to analyze the current, the voltage and the resistance inside the facility through the arrangement of the monitoring module, calculate the amount of heat energy generated inside the facility, calculate the actual storage factor which does not generate heat and the influence factor of the generated heat on the facility, and solve the problem that the accurate calculation of the data inside the facility is difficult in the prior art;
(3) how to accurately calculate the temperature change of the facility during working through the analysis and calculation operation of the analysis module, and adjust the timing monitoring time of the internal temperature of the facility according to the external temperature condition so as to solve the problem that the timing monitoring of the temperature of the facility is difficult to realize in the prior art.
The purpose of the invention can be realized by the following technical scheme: a BIM-based building facility maintenance supervision system comprises an acquisition module, an analysis module, a monitoring module, a fault judgment module, an emergency module, a processor, an alarm, a database, a timing unit and intelligent equipment;
the system comprises an acquisition module, an analysis module and a fault judgment module, wherein the acquisition module is used for acquiring facility working information which comprises working time length data, fault frequency data, temperature data and power on and power off frequency data and transmitting the working time length data, the fault frequency data, the temperature data and the power on and power off frequency data to the analysis module through a processor, and the analysis module is used for analyzing the facility working time length data, the facility fault frequency data, the facility temperature data and the power on and power off frequency data to obtain an average damage coefficient and a discrete degree of the damage coefficient and transmitting the discrete degree to the fault judgment module;
the fault judgment module is used for judging the average damage coefficient and the discrete degree of the damage coefficient to obtain a damage command, a detection command and a sound signal, transmitting the damage command to the alarm and the emergency module, transmitting the detection command to the monitoring module and transmitting the sound signal to the intelligent equipment;
the alarm gives out a damage alarm after receiving a damage command, the emergency module stops the operation of the facility after receiving the damage command, the monitoring module is used for monitoring the internal operation information of the facility, the internal operation information comprises current data, voltage data, resistance data, time data and internal temperature data, monitoring and analyzing operation is carried out according to the internal operation information, actual heat generation storage factors and heat generation influence factors on the facility are obtained, and the actual heat generation storage factors and the heat generation influence factors are transmitted to the analysis module;
the analysis module is also used for carrying out analysis calculation operation on the maximum temperature reaching time of the facility to obtain the actually required time and transmitting the actually required time to the timing unit;
the timing unit is after receiving actual required time, begins to count down promptly to sending the monitoring command to monitoring module when the count down is about to end, monitoring module monitors the facility temperature once more, and compares the data after monitoring with the highest outside temperature, specifically does:
h1: when the difference value between the re-monitored temperature and the highest external temperature is less than or equal to M, respectively sending a replacement signal to the emergency module and the alarm, sending a replacement alarm when the alarm receives the replacement signal, stopping the facility work after the emergency module receives the replacement signal, and replacing the standby facility for re-operation;
h2: when the difference between the re-monitored temperature and the highest external temperature is larger than M, signal maintenance signals are respectively sent to the emergency module and the alarm, the alarm sends out maintenance alarm when receiving the maintenance signals, the emergency module stops the operation of the facilities after receiving the maintenance signals, switches to the standby facilities for re-operation, and carries out maintenance and repair on the stopped facilities.
As a further improvement of the invention: the specific operation process of the analysis operation is as follows:
the method comprises the following steps: acquiring temperature data of each facility in operation in a period of time, and marking the temperature data as Qhi, wherein h is 1,2,3.. n, i is 1,2,3.. m;
step two: acquiring working time length data of each facility in each day in one period, and marking the working time length data as Whi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Whi one by one;
step three: acquiring failure frequency data of each facility in each day in one period, and marking the data as Ehi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Ehi one by one;
step four: acquiring startup and shutdown frequency data of each facility in each day in one period, and marking the data as Rhi, h1, 2,3.. n, i 1,2,3.. m, wherein Qhi, Ehi, Whi and Rhi are in one-to-one correspondence;
step five: setting the influence ratios of the service lives of the facilities corresponding to the first to fourth steps Qhi, Ehi, Whi and Rhi, respectively marked as q, w, e and r, and calculating the damage degree of the facilities by using the influence ratios and Qhi, Ehi, Whi and Rhi, wherein Thi is represented as the damage degree of the facilities, and q + w + e + r is 1;
step six: firstly according to the formula
Figure GDA0003326041570000041
To obtain the average damage coefficient of each facility in each day in a period of time, and then according to the formula
Figure GDA0003326041570000042
To find the discrete degree of damage coefficient of each facility in each day in a period of time.
As a further improvement of the invention: the specific operation process of the judgment operation is as follows:
s1: setting preset values y and u of the average damage coefficient and the dispersion degree of the damage coefficient, and comparing the preset values y and u with Ui and Yi, wherein the preset values y and u are specifically as follows:
s 1: when Ui is more than or equal to u and Yi is more than or equal to y, judging that the intelligent equipment is seriously damaged and needs to be replaced, and generating an intelligent equipment replacement signal;
s 2: when Ui is more than or equal to u and Yi is less than y, judging that the intelligent equipment is damaged and needs to be maintained, and generating an intelligent equipment maintenance signal;
s 3: when Ui is less than u and Yi is more than or equal to y, judging that the intelligent equipment has a fault and needs to be checked, and generating an intelligent equipment checking signal;
s 4: when Ui is less than u and Yi is less than y, judging that the intelligent equipment is slightly damaged without maintenance, and generating a complete signal of the intelligent equipment;
s2: the intelligent equipment replacement signal, the intelligent equipment overhaul signal, the intelligent equipment check signal and the intelligent equipment sound signal in the s1-s4 are obtained and transmitted to the signal identification unit in the fault judgment module, when the identification unit identifies the intelligent equipment replacement signal, the intelligent equipment replacement signal is converted into a replacement command and is transmitted to the alarm and the emergency module respectively, when the identification unit identifies the intelligent equipment overhaul signal and the intelligent equipment check signal, the intelligent equipment replacement signal is converted into a detection command and is transmitted to the monitoring module, and when the identification unit identifies the intelligent equipment sound signal, the intelligent equipment replacement signal, the intelligent equipment overhaul signal, the intelligent equipment check signal and the intelligent equipment sound signal are transmitted to the intelligent equipment.
As a further improvement of the invention: the specific operation process of the monitoring and analyzing operation comprises the following steps:
k1: acquiring current data, voltage data, resistance data, time data and internal temperature data, and sequentially marking the current data, the voltage data, the resistance data, the time data and the internal temperature data as DLo, DYo, DZo, SJo and NWo, wherein o is 1,2,3.... times.v, and DLo, DYo, DZo, SJo and NW correspond to one another one by one;
k2: acquiring current data, voltage data and resistance data, and substituting the current data, the voltage data and the resistance data into a calculation formula Qo-DLo2DYo and DZo, wherein Qo represents the heat generated during current operation;
k3: the time data SJo and the heat Qo generated during the above operation are acquired and brought into the calculation formula
Figure GDA0003326041570000051
Calculating the sum of the generated heat;
k4: acquiring the total and internal temperature data of the generated heat and substituting the data into a calculation formula
Figure GDA0003326041570000061
QGeneral assembly*f=PNWoThereby obtaining
Figure GDA0003326041570000062
Wherein f is represented byGenerating heat actual storage factor, and simultaneously acquiring temperature data Qhi of each facility in the step one during operation, and substituting the temperature data and the total temperature data into a calculation formula PNWog-Qhi, thereby obtaining g-Qhi/PNWoWherein g is expressed as an influence factor of the generated heat on the facility.
As a further improvement of the invention: the specific operation process of the analysis and calculation operation comprises the following steps:
g1: acquiring maximum external temperature data, initial current data, initial voltage data and initial resistance data of a facility, and sequentially marking the data as ZGk, CLk, CYk and CZk, wherein k is 1,2,3.... l;
g2: the maximum external temperature data of the facility, the actual heat generation conservation factor and the influence factor of the generated heat on the facility are brought into the calculation formula
Figure GDA0003326041570000063
Wherein CR is expressed as actual operating heat data;
g3: the initial current data, initial voltage data and initial resistance data are brought into a calculation formula together with actual operation heat data
Figure GDA0003326041570000064
Wherein T isFruit of Chinese wolfberryExpressed as the time actually required for the temperature to rise to the maximum external temperature, and transmitted to the timing unit;
g4: meanwhile, temperature data of the day are collected through the monitoring module, the temperature data are calibrated to be DWD, a temperature preset value range B is set, when the DWD belongs to B, detection is carried out according to time, when the DWD is smaller than B, A1 seconds are added in time for detection, when the DWD is larger than B, A2 seconds are shortened for detection, and A1 and A2 are preset values.
The invention has the beneficial effects that:
(1) the acquisition module acquires the working information of the facility and transmits the working information to the analysis module through the processor, the analysis module is used for analyzing and operating the working time length data of the facility, the failure frequency data of the facility, the temperature data of the facility and the on-off frequency data of the facility to obtain an average damage coefficient and the discrete degree of the damage coefficient, and transmits the average damage coefficient and the discrete degree of the damage coefficient to a fault judgment module which judges the average damage coefficient and the discrete degree of the damage coefficient, the damage factors of the facilities are analyzed, the damage degree, the average damage coefficient and the discrete degree of the damage coefficient of the facilities are calculated, the fault judgment module judges the use of the facilities according to the analysis result of the analysis module, and the safety analysis of the facilities is increased, so that the safety of the facilities is maintained better, the time is saved, and the working efficiency is improved.
(2) The damage command is transmitted to the alarm and the emergency module, the detection command is transmitted to the monitoring module, the sound signal is transmitted to the intelligent device, the alarm gives out a damage alarm after receiving the damage command, the emergency module stops the operation of the facility after receiving the damage command, the monitoring module monitors the internal operation information of the facility, the internal operation information comprises current data, voltage data, resistance data, time data and internal temperature data, monitoring analysis operation is carried out according to the internal operation information, the current, the voltage and the resistance in the facility are analyzed through the setting of the monitoring module, the generated heat energy in the facility is calculated, the actual storage factor without heat generation is calculated, the influence factor of the generated heat on the facility is calculated, and the internal working condition of the facility is accurately analyzed.
(3) The maximum external temperature data, the initial current data, the initial voltage data and the initial resistance data of the facility are stored in the database, the analysis module analyzes and calculates the maximum temperature reaching time of the facility to obtain the actual required time, and the actual required time is transmitted to the timing unit; the timing unit starts to count down after receiving the actually required time, and sends a monitoring command to the monitoring module when the countdown is about to end, the monitoring module monitors the temperature of the facility again, compares the monitored data with the highest external temperature, and performs analysis calculation operation through the analysis module, so that the temperature change of the facility during working is accurately calculated, the timing detection time of the internal temperature of the facility is adjusted according to the external temperature condition, the maintenance effect of the facility is increased, the protection of the facility is increased, the damage of the facility is avoided, and the loss brought to people is avoided.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a system block diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the invention relates to a building facility maintenance and supervision system based on BIM, which comprises an acquisition module, an analysis module, a monitoring module, a fault judgment module, an emergency module, a processor, an alarm, a database, a timing unit and intelligent equipment;
the system comprises a collection module, an analysis module, a processor and an analysis module, wherein the collection module is used for collecting facility working information, the facility working information comprises working duration data, failure frequency data, temperature data and power on and power off frequency data, the working duration data, the failure frequency data, the temperature data and the power on and power off frequency data are transmitted to the analysis module through the processor, the analysis module is used for analyzing the facility working duration data, the facility failure frequency data, the facility temperature data and the power on and power off frequency data of the facility, and the specific operation process of the analysis operation is as follows:
the method comprises the following steps: acquiring temperature data of each facility in operation in a period of time, and marking the temperature data as Qhi, wherein h is 1,2,3.. n, i is 1,2,3.. m;
step two: acquiring working time length data of each facility in each day in one period, and marking the working time length data as Whi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Whi one by one;
step three: acquiring failure frequency data of each facility in each day in one period, and marking the data as Ehi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Ehi one by one;
step four: acquiring startup and shutdown frequency data of each facility in each day in one period, and marking the data as Rhi, h1, 2,3.. n, i 1,2,3.. m, wherein Qhi, Ehi, Whi and Rhi are in one-to-one correspondence;
step five: setting the influence ratios of the service lives of the facilities corresponding to Qhi, Ehi, Whi and Rhi in the first to fourth steps, wherein the influence ratios are respectively marked as q, w, e and r, and calculating the damage degree of the facilities by the aid of the influence ratios and the Qhi, Ehi, Whi and Rhi, wherein Thi is represented as Qhi q + Ehi w + Whi e + Rhi r, and q + w + e + r is 1;
step six: firstly according to the formula
Figure GDA0003326041570000091
To obtain the average damage coefficient of each facility in each day in a period of time, and then according to the formula
Figure GDA0003326041570000092
Obtaining the discrete degree of the damage coefficient of each facility in each day in a period of time;
the analysis module transmits Ui and Yi to a fault judgment module, the fault judgment module is used for judging the average damage coefficient and the dispersion degree of the damage coefficient, and the specific operation process of the judgment operation is as follows:
s1: setting preset values y and u of the average damage coefficient and the dispersion degree of the damage coefficient, and comparing the preset values y and u with Ui and Yi, wherein the preset values y and u are specifically as follows:
s 1: when Ui is more than or equal to u and Yi is more than or equal to y, judging that the intelligent equipment is seriously damaged and needs to be replaced, and generating an intelligent equipment damage signal;
s 2: when Ui is more than or equal to u and Yi is less than y, judging that the intelligent equipment is damaged and needs to be maintained, and generating an intelligent equipment maintenance signal;
s 3: when Ui is less than u and Yi is more than or equal to y, judging that the intelligent equipment has a fault and needs to be checked, and generating an intelligent equipment checking signal;
s 4: when Ui is less than u and Yi is less than y, judging that the intelligent equipment is slightly damaged without maintenance, and generating a complete signal of the intelligent equipment;
s2: acquiring an intelligent equipment damage signal, an intelligent equipment overhaul signal, an intelligent equipment check signal and an intelligent equipment intact signal in the s1-s4, transmitting the signals to a signal identification unit in the fault judgment module, converting the signals into damage commands when the identification unit identifies the intelligent equipment damage signal, transmitting the damage commands to the alarm and the emergency module respectively, converting the signals into detection commands when the identification unit identifies the intelligent equipment overhaul signal and the intelligent equipment check signal, transmitting the detection commands to the monitoring module, and transmitting the detection commands to the intelligent equipment when the identification unit identifies the intelligent equipment intact signal;
the alarm sends out the damage alarm after receiving the damage order, and the operation of facility is stopped after receiving the damage order to emergency module, monitoring module is used for monitoring the inside operation information of facility, inside operation information includes current data, voltage data, resistance data, time data and inside temperature data to monitor the analysis operation according to it, the concrete operation process of monitoring the analysis operation is:
k1: acquiring current data, voltage data, resistance data, time data and internal temperature data, and sequentially marking the current data, the voltage data, the resistance data, the time data and the internal temperature data as DLo, DYo, DZo, SJo and NWo, wherein o is 1,2,3.... times.v, and DLo, DYo, DZo, SJo and NW correspond to one another one by one;
k2: acquiring current data, voltage data and resistance data, and substituting the current data, the voltage data and the resistance data into a calculation formula Qo-DLo2DYo and DZo, wherein Qo represents the heat generated during current operation;
k3: the time data SJo and the heat Qo generated during the above operation are acquired and brought into the calculation formula
Figure GDA0003326041570000101
Calculating the sum of the generated heat;
k4: acquiring the total and internal temperature data of the generated heat and substituting the data into a calculation formula
Figure GDA0003326041570000102
QGeneral assembly*f=PNWoThereby obtaining
Figure GDA0003326041570000103
Wherein f is expressed as a heat generation actual storage factor, and the temperature data Qhi of each facility in the step one during working is obtained and is taken into the calculation formula P together with the total temperature dataNWog-Qhi, thereby obtaining g-Qhi/PNWoWherein g is expressed as an influence factor of the generated heat on the facility, and the generated heat actual storage factor and the influence factor of the generated heat on the facility are transmitted to the analysis module;
the data base stores the highest external temperature data, the initial current data, the initial voltage data and the initial resistance data of the facility, the analysis module is further used for analyzing and calculating the maximum temperature reaching time of the facility, and the specific operation process of the analyzing and calculating operation is as follows:
g1: acquiring maximum external temperature data, initial current data, initial voltage data and initial resistance data of a facility, and sequentially marking the data as ZGk, CLk, CYk and CZk, wherein k is 1,2,3.... l;
g2: the maximum external temperature data of the facility, the actual heat generation conservation factor and the influence factor of the generated heat on the facility are brought into the calculation formula
Figure GDA0003326041570000111
Wherein CR is expressed as actual operating heat data;
g3: the initial current data, initial voltage data and initial resistance data are brought into a calculation formula together with actual operation heat data
Figure GDA0003326041570000112
Wherein T isFruit of Chinese wolfberryExpressed as the time actually required for the temperature to rise to the maximum external temperature, and transmitted to the timing unit;
g4: meanwhile, temperature data of the day are collected through a monitoring module, the temperature data are calibrated to be DWD, a temperature preset value range B is set, when the DWD belongs to B, detection is carried out according to time, when the DWD is smaller than B, detection is carried out by increasing A1 seconds in time, when the DWD is larger than B, detection is carried out by shortening A2 seconds in time, and A1 and A2 are preset values;
the timing unit is after receiving actual required time, begins to count down promptly to sending the monitoring command to monitoring module when the count down is about to end, monitoring module monitors the facility temperature once more, and compares the data after monitoring with the highest outside temperature, specifically does:
h1: when the difference value between the re-monitored temperature and the highest external temperature is less than or equal to M, respectively sending a replacement signal to the emergency module and the alarm, sending a replacement alarm when the alarm receives the replacement signal, stopping the facility work after the emergency module receives the replacement signal, and replacing the standby facility for re-operation;
h2: when the difference between the re-monitored temperature and the highest external temperature is larger than M, signal maintenance signals are respectively sent to the emergency module and the alarm, the alarm sends out maintenance alarm when receiving the maintenance signals, the emergency module stops the operation of the facilities after receiving the maintenance signals, switches to the standby facilities for re-operation, and carries out maintenance and repair on the stopped facilities.
When the invention works, the acquisition module acquires the working information of the facility, and transmits the working information to the analysis module through the processor, the analysis module analyzes the working time length data of the facility, the failure frequency data of the facility, the temperature data of the facility and the on-off frequency data of the facility to obtain an average damage coefficient and the dispersion degree of the damage coefficient and transmits the average damage coefficient and the dispersion degree of the damage coefficient to the failure judgment module, the failure judgment module judges the average damage coefficient and the dispersion degree of the damage coefficient to obtain a damage command, a detection command and a sound signal, transmits the damage command to the alarm and the emergency module, transmits the detection command to the monitoring module, transmits the sound signal to the intelligent equipment, the alarm gives a damage alarm after receiving the damage command, the emergency module stops the operation of the facility after receiving the damage command, and the monitoring module is used for monitoring the internal operation information of the facility, the internal operation information comprises current data, voltage data, resistance data, time data and internal temperature data, monitoring and analyzing operation is carried out according to the internal operation information to obtain an actual heat generation storage factor and an influence factor of the generated heat on the facility, and the actual heat generation storage factor and the influence factor are transmitted to the analysis module; the analysis module is used for analyzing and calculating the maximum temperature reaching time of the facility to obtain the actual required time and transmitting the actual required time to the timing unit; the timing unit starts to count down after receiving the actual required time, and sends a monitoring command to the monitoring module when the countdown is about to end, the monitoring module monitors the temperature of the facility again, compares the monitored data with the highest external temperature, when the difference between the temperature monitored again and the highest external temperature is less than or equal to M, sends a replacing signal to the emergency module and the alarm respectively, when the alarm receives the replacing signal, the alarm sends a replacing alarm, when the emergency module receives the replacing signal, the facility stops working, the standby facility is replaced for running again, when the difference between the temperature monitored again and the highest external temperature is greater than M, the emergency module and the alarm send signal maintenance signals respectively, when the alarm receives the maintenance signals, the alarm sends a maintenance alarm, when the emergency module receives the maintenance signals, and stopping the operation of the facilities, switching to the standby facilities for operation again, and performing overhaul and maintenance on the stopped facilities.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the invention as defined in the following claims.

Claims (4)

1. A BIM-based building facility maintenance supervision system is characterized by comprising an acquisition module, an analysis module, a monitoring module, a fault judgment module, an emergency module, a processor, an alarm, a database, a timing unit and intelligent equipment;
the system comprises an acquisition module, an analysis module and a fault judgment module, wherein the acquisition module is used for acquiring facility working information which comprises working time length data, fault frequency data, temperature data and power on and power off frequency data and transmitting the working time length data, the fault frequency data, the temperature data and the power on and power off frequency data to the analysis module through a processor, and the analysis module is used for analyzing the facility working time length data, the facility fault frequency data, the facility temperature data and the power on and power off frequency data to obtain an average damage coefficient and a discrete degree of the damage coefficient and transmitting the discrete degree to the fault judgment module;
the fault judgment module is used for judging the average damage coefficient and the discrete degree of the damage coefficient to obtain a damage command, a detection command and a sound signal, transmitting the damage command to the alarm and the emergency module, transmitting the detection command to the monitoring module and transmitting the sound signal to the intelligent equipment;
the alarm gives out a damage alarm after receiving a damage command, the emergency module stops the operation of the facility after receiving the damage command, the monitoring module is used for monitoring the internal operation information of the facility, the internal operation information comprises current data, voltage data, resistance data, time data and internal temperature data, monitoring and analyzing operation is carried out according to the internal operation information, actual heat generation storage factors and heat generation influence factors on the facility are obtained, and the actual heat generation storage factors and the heat generation influence factors are transmitted to the analysis module;
the analysis module is also used for carrying out analysis calculation operation on the maximum temperature reaching time of the facility to obtain the actually required time and transmitting the actually required time to the timing unit;
the timing unit is after receiving actual required time, begins to count down promptly to sending the monitoring command to monitoring module when the count down is about to end, monitoring module monitors the facility temperature once more, and compares the data after monitoring with the highest outside temperature, specifically does:
h1: when the difference value between the re-monitored temperature and the highest external temperature is less than or equal to M, respectively sending a replacement signal to the emergency module and the alarm, sending a replacement alarm when the alarm receives the replacement signal, stopping the facility work after the emergency module receives the replacement signal, and replacing the standby facility for re-operation;
h2: when the difference between the re-monitored temperature and the highest external temperature is larger than M, signal maintenance signals are respectively sent to the emergency module and the alarm, the alarm sends out maintenance alarm when receiving the maintenance signals, the emergency module stops the operation of the facilities after receiving the maintenance signals, switches to the standby facilities for re-operation, and carries out maintenance and repair on the stopped facilities.
2. The BIM-based construction facility maintenance supervision system according to claim 1, wherein the specific operation process of the analysis operation is:
the method comprises the following steps: acquiring temperature data of each facility in operation in a period of time, and marking the temperature data as Qhi, wherein h is 1,2,3.. n, i is 1,2,3.. m;
step two: acquiring working time length data of each facility in each day in one period, and marking the working time length data as Whi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Whi one by one;
step three: acquiring failure frequency data of each facility in each day in one period, and marking the data as Ehi, wherein h is 1,2,3.. n, i is 1,2,3.. 10, and Qhi corresponds to Ehi one by one;
step four: acquiring startup and shutdown frequency data of each facility in each day in one period, and marking the data as Rhi, h1, 2,3.. n, i 1,2,3.. m, wherein Qhi, Ehi, Whi and Rhi are in one-to-one correspondence;
step five: setting the influence ratios of the service lives of the facilities corresponding to the first to fourth steps Qhi, Ehi, Whi and Rhi, respectively marked as q, w, e and r, and calculating the damage degree of the facilities by using the influence ratios and Qhi, Ehi, Whi and Rhi, wherein Thi is represented as the damage degree of the facilities, and q + w + e + r is 1;
step six: firstly according to the formula
Figure FDA0003326041560000031
i 1,2,3.. m to obtain the average damage coefficient of each facility in each day in a period of time, and then according to a formula
Figure FDA0003326041560000032
i 1,2,3.. m to find the degree of dispersion of the damage coefficient of each facility in each day in a period of time.
3. The BIM-based construction equipment maintenance supervision system according to claim 1, wherein the specific operation process of the decision operation is:
s1: setting preset values y and u of the average damage coefficient and the dispersion degree of the damage coefficient, and comparing the preset values y and u with Ui and Yi, wherein the preset values y and u are specifically as follows:
s 1: when Ui is more than or equal to u and Yi is more than or equal to y, judging that the intelligent equipment is seriously damaged and needs to be replaced, and generating an intelligent equipment replacement signal;
s 2: when Ui is more than or equal to u and Yi is less than y, judging that the intelligent equipment is damaged and needs to be maintained, and generating an intelligent equipment maintenance signal;
s 3: when Ui is less than u and Yi is more than or equal to y, judging that the intelligent equipment has a fault and needs to be checked, and generating an intelligent equipment checking signal;
s 4: when Ui is less than u and Yi is less than y, judging that the intelligent equipment is slightly damaged without maintenance, and generating a complete signal of the intelligent equipment;
s2: the method comprises the steps of obtaining an intelligent device replacing signal, an intelligent device overhauling signal, an intelligent device checking signal and an intelligent device sound signal in s1-s4, transmitting the intelligent device replacing signal, the intelligent device overhauling signal, the intelligent device checking signal and the intelligent device sound signal to a signal identification unit in a fault judgment module, converting the intelligent device replacing signal into a replacing command when the intelligent device replacing signal is identified by the identification unit, transmitting the replacing command to an alarm and an emergency module respectively, converting the intelligent device overhauling signal and the intelligent device checking signal into a detection command when the intelligent device overhauling signal and the intelligent device checking signal are identified by the identification unit, transmitting the detection command to a monitoring module, and transmitting the intelligent device sound signal to the intelligent device when the intelligent device sound signal is identified by the identification unit.
4. The BIM-based construction equipment maintenance supervision system according to claim 1, wherein the specific operation process of the monitoring and analyzing operation is:
k1: acquiring current data, voltage data, resistance data, time data and internal temperature data, and sequentially marking the current data, the voltage data, the resistance data, the time data and the internal temperature data as DLo, DYo, DZo, SJo and NWo, wherein o is 1,2,3.... times.v, and DLo, DYo, DZo, SJo and NW correspond to one another one by one;
k2: acquiring current data, voltage data and resistance data, and substituting the current data, the voltage data and the resistance data into a calculation formula Qo-DLo2DYo and DZo, wherein Qo represents the heat generated during current operation;
k3: the time data SJo and the heat Qo generated during the above operation are acquired and brought into the calculation formula
Figure FDA0003326041560000041
Calculating the sum of the generated heat;
k4: acquiring the total and internal temperature data of the generated heat and substituting the data into a calculation formula
Figure FDA0003326041560000042
QGeneral assembly*f=PNWoThereby obtaining
Figure FDA0003326041560000043
Wherein f is expressed as a heat generation actual storage factor, and the temperature data Qhi of each facility in the step one during working is obtained and is taken into the calculation formula P together with the total temperature dataNWog-Qhi, thereby obtaining g-Qhi/PNWoWherein g is expressed as an influence factor of the generated heat on the facility.
CN202010450573.XA 2020-05-25 2020-05-25 Building facility maintenance supervisory systems based on BIM Expired - Fee Related CN111476385B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010450573.XA CN111476385B (en) 2020-05-25 2020-05-25 Building facility maintenance supervisory systems based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010450573.XA CN111476385B (en) 2020-05-25 2020-05-25 Building facility maintenance supervisory systems based on BIM

Publications (2)

Publication Number Publication Date
CN111476385A CN111476385A (en) 2020-07-31
CN111476385B true CN111476385B (en) 2022-02-01

Family

ID=71760271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010450573.XA Expired - Fee Related CN111476385B (en) 2020-05-25 2020-05-25 Building facility maintenance supervisory systems based on BIM

Country Status (1)

Country Link
CN (1) CN111476385B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113008591B (en) * 2021-03-10 2021-12-17 山东大学 Equipment full-life-cycle monitoring method and system based on Internet of things
CN114493123A (en) * 2021-12-27 2022-05-13 山东建安物联科技有限公司 Smart construction site cloud platform management method, system and device and storage medium
CN115470557B (en) * 2022-09-16 2023-04-07 盐城工学院 Intelligent building design method and system based on BIM
CN115330002B (en) * 2022-10-14 2023-01-31 山东力拓智能科技有限公司 Intelligent building operation and maintenance management system
CN116664100A (en) * 2023-05-09 2023-08-29 江苏盛达智慧科技信息有限公司 BIM+AI-based intelligent operation and maintenance management system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108984899A (en) * 2018-07-12 2018-12-11 陕西中达公路技术服务有限公司 A kind of real-time progress supervision method of BIM project
CN110909893A (en) * 2019-11-18 2020-03-24 南京美慧软件有限公司 Intelligent operation and maintenance management system for expressway
CN111045410A (en) * 2019-12-31 2020-04-21 界首市迅立达电梯有限公司 Production equipment management planning system based on big data

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120323382A1 (en) * 2011-06-15 2012-12-20 Expanergy, Llc Systems and methods to assess and optimize energy usage for a facility
CN111183108A (en) * 2017-07-18 2020-05-19 刘春鸣 System and method for managing and monitoring lifting systems and building facilities

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108984899A (en) * 2018-07-12 2018-12-11 陕西中达公路技术服务有限公司 A kind of real-time progress supervision method of BIM project
CN110909893A (en) * 2019-11-18 2020-03-24 南京美慧软件有限公司 Intelligent operation and maintenance management system for expressway
CN111045410A (en) * 2019-12-31 2020-04-21 界首市迅立达电梯有限公司 Production equipment management planning system based on big data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《BIM技术与互联网的集成应用》;舒兰;《农村电气化》;20170112;全文 *

Also Published As

Publication number Publication date
CN111476385A (en) 2020-07-31

Similar Documents

Publication Publication Date Title
CN111476385B (en) Building facility maintenance supervisory systems based on BIM
KR102084784B1 (en) Method for managing the operation of Photovoltaic Power Generation based on machine learning
CN110391783A (en) Photovoltaic power station fault monitoring method and device based on edge calculations
CN102902245B (en) Intelligent monitoring system of photovoltaic power station
CN103812217A (en) Method and system for intelligent centralized monitoring and management of photovoltaic power station
CN101447669B (en) Method for monitoring safety and stability of electric network based on stable rule information model
KR102084783B1 (en) System for managing the operation of Photovoltaic Power Generation based on machine learning
CN102737287B (en) Regional power grid on-line power supply risk assessment system
CN109151048A (en) A kind of photovoltaic plant intelligent monitor system based on Internet of Things
CN104868845A (en) Device and method for monitoring data of embedded solar photovoltaic module data
CN206330611U (en) It is a kind of can remote real time monitoring steel tower safety intelligent monitor system
CN110503211A (en) Failure prediction method based on machine learning
CN111596643A (en) Visual dynamic energy consumption diagnosis, analysis and pre-control system based on big data
CN110986791A (en) Online measurement system and measurement method for AB value of electrified railway contact net compensation device
CN112448477A (en) Intelligent monitoring power distribution control system based on Internet of things
CN114928173A (en) Intelligent power distribution system based on power grid business middling station and electric power data safety interaction
CN103529759B (en) A kind of scene supply intelligent observing and controlling server
CN114707761A (en) Electric power intelligent scheduling management system
CN106597346A (en) Electronic current transformer laser energy supply self-diagnosis method and system thereof
CN109980305A (en) Communication power supply intelligent maintenance device
CN117474250A (en) New energy multifunctional integrated intelligent application system
CN103281371A (en) System and method for controlling pumping unit in long distance based on 4G mobile network
CN110445763A (en) A kind of light current intelligent monitor system with safety
CN212158839U (en) Power distribution equipment operation monitoring system based on NB-IOT
CN214539809U (en) Transmission line shaft tower ground resistance monitoring devices based on accurate measurement technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Wenling

Inventor after: Ou Bifang

Inventor before: Ou Bifang

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220117

Address after: 518000 2602, building B, LANWAN Peninsula community, Furong Road, Futian District, Shenzhen, Guangdong Province

Applicant after: Liu Wenling

Address before: 510000 room 2406, No. 13, courtyard, 680 Huangpu East Road, Huangpu District, Guangzhou, Guangdong

Applicant before: Ou Bifang

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220201